Hello friends,
i  am doing operation subcontractiing. My first operation is subcontracted. So, I have assigned PP02 control key to first operation (external processing and no auto goods receipt indicator)  and maintained external processing data for opration in routing. When i saved the order, for that operation PR gets generated.
Now, I converted PR into PO and assigned raw material that has to be send to vendor. By 541 mvt. type material is issued to vendor. When i do goods receipt in MIGO, system is not showing storage location field. I dont find material in stock anywhere.
But i can see quantity received in external processing tab of first operation in routing overveiw in order.
Then how can i issue the material from storage for second operation if it is not in stock?
How can i get stock of subcontracted material by MIGO?
Please help me.
Thanks in advance!

Kiran,
Since your scenario is Subcontract of operations, you will not find a material referance in your PR/PO, so there is no GR of Material happening, in this Scenario GR means delivery of the operation.
If you really want to track, then you need to create an additional material number and assign that material number with Special Procurement key "30", here in this case you can recieve the product after subcontract as this is product sub contract process. In this case Production order is not relevant.
Regards,
Prasobh

Similar Messages

  • Problem for Goods Receipt for Subcontracting Purchase Order

    Dear all,
    Presently, we are using SAP version 4.6C and we need to introduce GR for
    Subcontracting Purchase Order. We have developed a ABAP program to handle
    subcon Goods Receipt by uploading flat-files from our subcontractor. The
    scenario is as follows :
    Goods Receipt for Subcontracting Purchase Order
    1. In the ABAP program, function BAPI_GOODSMVT_CREATE will be used for goods
    movement.
    2. Data provided to the function are as follows :
    - Posting date
    - Document date
    - Material number
    - Plant
    - Storage location
    - Batch
    - Movement type (101)
    - Quantity
    - Purchase order number
    - Purchase order item
    - Movement indicator (B - Goods receipt for purchase order)
    3. The function will do data verification and automatically determine GI
    item for subcon stock:
    - Movement type (543)
    - Special stock (O - parts prov. vendor)
    - Material
    - Quantity
    - Plant
    Our problem is that :
    Only the GR item in the interface is to be transferred and the GI item is
    determined by the system. So, the quantity for subcon stock cannot be
    changed using this BAPI. Then the system will continue processing the goods
    receipt and create material document.
    Manually, by using transaction code MIGO, the user can display the subcon
    stock data and then change the quantity.
    By using transaction code MB01, after the user fills in all the GR fields,
    the system comes to line item 002 (subcon stock data) and then quantity can
    be changed.
    As per user requirement, quantity for GI item must be same with the quantity
    that has been transferred to subcon vendor in Delivery for Subcon
    (transaction code VL02N).
    We cannot achieve this requirement by using the BAPI mentioned above. Would
    appreciate any valuable help from anyone who is able to help us on this
    matter. Are there any other BAPI's that can help us to achieve the same
    result ?
    Thank you in advance and best regards.

    As far as i understood the problem I suggest u to create the
    BDC according to user actions that are performed in he manual
    operation.
    I can't say that the BAPI performs the exac solution what you want.
    I have done some BDC work using MB01 and suggest you to be careful
    and try to keep the complete in the logic as some chages in rows in BDC will
    change the complete scenario.And throw correct quantity val in correct
    material
    row.
    This methodology will help u even in mass uploads.
    Or in case of automation u can perform the call transaction BDC in
    background mode.
    so As per my understanding bdc program is the solution. pls try and let me
    know.

  • Goods receipt for subcontracting order! BAPI_GOODSMVT_CREATE

    I wanna use BAPI "BAPI_GOODSMVT_CREATE"  to create goods receipt for subcontracting order.
    But it says that this combination is not possible.  Combination of my movement type and this BAPI.
    What can i do to solve it?
    thanks in advance.

    >
    Julia Nikiforva wrote:
    > I wanna use BAPI "BAPI_GOODSMVT_CREATE"  to create goods receipt for subcontracting order.
    > But it says that this combination is not possible.  Combination of my movement type and this BAPI.
    >
    > What can i do to solve it?
    >
    > thanks in advance.
    Might work
    report zbapi_goodsmovement.
    parameters: p-file like rlgrap-filename default
    'c:\sapdata\TEST.txt'.
    parameters: e-file like rlgrap-filename default
    'c:\sapdata\gdsmvterror.txt'.
    parameters: xpost like sy-datum default sy-datum.
    data: begin of gmhead.
    include structure bapi2017_gm_head_01.
    data: end of gmhead.
    data: begin of gmcode.
    include structure bapi2017_gm_code.
    data: end of gmcode.
    data: begin of mthead.
    include structure bapi2017_gm_head_ret.
    data: end of mthead.
    data: begin of itab occurs 100.
    include structure bapi2017_gm_item_create.
    data: end of itab.
    data: begin of errmsg occurs 10.
    include structure bapiret2.
    data: end of errmsg.
    data: wmenge like iseg-menge,
    errflag.
    data: begin of pcitab occurs 100,
    ext_doc(10), "External Document Number
    mvt_type(3), "Movement Type
    doc_date(8), "Document Date
    post_date(8), "Posting Date
    plant(4), "Plant
    material(18), "Material Number
    qty(13), "Quantity
    recv_loc(4), "Receiving Location
    issue_loc(4), "Issuing Location
    pur_doc(10), "Purchase Document No
    po_item(3), "Purchase Document Item No
    del_no(10), "Delivery Purchase Order Number
    del_item(3), "Delivery Item
    prod_doc(10), "Production Document No
    scrap_reason(10), "Scrap Reason
    upd_sta(1), "Update Status
    end of pcitab.
    call function 'WS_UPLOAD'
    exporting
    filename = p-file
    filetype = 'DAT'
    IMPORTING
    FILELENGTH =
    tables
    data_tab = pcitab
    EXCEPTIONS
    FILE_OPEN_ERROR = 1
    FILE_READ_ERROR = 2
    NO_BATCH = 3
    GUI_REFUSE_FILETRANSFER = 4
    INVALID_TYPE = 5
    OTHERS = 6
    if sy-subrc <> 0.
    message id sy-msgid type sy-msgty number sy-msgno
    with sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    exit.
    endif.
    gmhead-pstng_date = sy-datum.
    gmhead-doc_date = sy-datum.
    gmhead-pr_uname = sy-uname.
    gmcode-gm_code = '01'. "01 - MB01 - Goods Receipts for Purchase Order
    loop at pcitab.
    itab-move_type = pcitab-mvt_type.
    itab-mvt_ind = 'B'.
    itab-plant = pcitab-plant.
    itab-material = pcitab-material.
    itab-entry_qnt = pcitab-qty.
    itab-move_stloc = pcitab-recv_loc.
    itab-stge_loc = pcitab-issue_loc.
    itab-po_number = pcitab-pur_doc.
    itab-po_item = pcitab-po_item.
    concatenate pcitab-del_no pcitab-del_item into itab-item_text.
    itab-move_reas = pcitab-scrap_reason.
    append itab.
    endloop.
    loop at itab.
    write:/ itab-material, itab-plant, itab-stge_loc,
    itab-move_type, itab-entry_qnt, itab-entry_uom,
    itab-entry_uom_iso, itab-po_number, itab-po_item,
    pcitab-ext_doc.
    endloop.
    call function 'BAPI_GOODSMVT_CREATE'
    exporting
    goodsmvt_header = gmhead
    goodsmvt_code = gmcode
    TESTRUN = ' '
    IMPORTING
    goodsmvt_headret = mthead
    MATERIALDOCUMENT =
    MATDOCUMENTYEAR =
    tables
    goodsmvt_item = itab
    GOODSMVT_SERIALNUMBER =
    return = errmsg
    clear errflag.
    loop at errmsg.
    if errmsg-type eq 'E'.
    write:/'Error in function', errmsg-message.
    errflag = 'X'.
    else.
    write:/ errmsg-message.
    endif.
    endloop.
    if errflag is initial.
    commit work and wait.
    if sy-subrc ne 0.
    write:/ 'Error in updating'.
    exit.
    else.
    write:/ mthead-mat_doc, mthead-doc_year.
    perform upd_sta.
    endif.
    endif.
    FORM UPD_STA *
    form upd_sta.
    loop at pcitab.
    pcitab-upd_sta = 'X'.
    modify pcitab.
    endloop.
    call function 'WS_DOWNLOAD'
    exporting
    filename = p-file
    filetype = 'DAT'
    IMPORTING
    FILELENGTH =
    tables
    data_tab = pcitab
    EXCEPTIONS
    FILE_OPEN_ERROR = 1
    FILE_READ_ERROR = 2
    NO_BATCH = 3
    GUI_REFUSE_FILETRANSFER = 4
    INVALID_TYPE = 5
    OTHERS = 6
    endform.

  • Goods receipt for import material

    Dear all,
    The excise tab does not appear during goods receipt of imported material. But when are doing the goods receipt for domestic material the tab does appear.
    Even after posting goods receipt and while trying to capture excise details in J1IEX i.e. incase of imports CVD, CVD-Ecess, CVD-HEcess and additional duty, the system asks for the invoice number and then throws a message that PO does not contain any selectable items. We have defined as separate pricing procedure for imports.Have maintained the material and vendor details in J1ID.
    Request to kindly suggest any settings that we need to check so that the excise tab appears for imported material also.
    regards,
    mahesh.

    Hi,
    Import Process: -
    1. ME21N - Create Import PO
    2. MIRO - Customs Invoice
    3. J1IEX - Capture Bill of Entry
    4. MIGO - Goods Receipt
    5. J1IEX - Post Bill of Entry
    6. MIRO - LIV for Vendor Invoice
    7. MIRO - LIV for Clearing Agent
    Following condition types to be used in MM Pricing.
    JCDB     IN:Basic Custom Duty
    JCV1     IN : CVD
    JECV     IN : Ed Cess on CVD
    J1CV     IN : H&SECess on CVD
    JEDB     IN : Ed Cess on BCD
    JSDB     IN : H&SECess on BCD
    JADC     Addnl Duty of Custom
    Mandatorily, use a Zero % Tax Code in Import PO.
    Import Duties will not come from J1ID, in J1ID only you have to mainatin material and Vendor (Customs Office and Import both) excise details.
    Above all, check the Excise Defaults for CVD conditions in SPRO > LO > Tax on Goods Movement > India > Basic Settings > Mainatin Excise Deafults

  • Batch number issue when posting goods receipt for Subcontracting PO

    Dear expert,
    I always heard there will be issues while posting goods receipt for subcontracting PO. If the component is managered by batch.
    No batch number will be proposed during PGR in MIGO...
    I dont quite understand where is the issue??
    My understanding:
    We have batch managered components and End Product. All have batch numbers, then we PGI the stock to 'SC stock' via 541 movement type.
    Then Vendor will finish the end product and send us back the end product.
    We consumption the components use 543 O movement type? And GR the end product..
    So while goods receipt, the sytem just need pick the existing batch number for both components and finish products..
    Where are the issues???
    Thanks.

    Hoo Laa wrote:
    I have questions for people always mentioning there are issues with batch determination while post goods receipt for subcontracting orders.
    >
    > I am thinking maybe they didnt active the batch determination for 543 movement type..
    >
    > Thanks.
    Hi Hoo,
    You are right!!
    Setting of batch number determination has its importance in Mvt Type be it 541, 543....
    The issue you might have observed would be with Batch Determination in Goods Issues which folks find it bit tough to achieve n make it work for them.
    Cheers!!
    Shiva

  • Good receipt for serialized material

    Hi
    We are using Serial number functionality. When we do good receipt for serialized material, we canu2019t enter more than 6 serial no together. Generally we used to procure 50 -100 materials. We will get serial no to excel sheet by barcode scanner. But when we entered in SAP, system allows only 6 material .
    Is there anyway we can copy from excel sheet and paste it in SAP all materials together.
    Thanks
    Jeny

    Hi
    Yes there is a way of uploading more than 6 materials at a time in MIGO screen,
    You need to  first upload or create the serial numbers for the material using an LSMW for IQ01 & here donot give any plant or storage location specific details
    At the time of Goods receipt Copy the material serial numbers by clicking on find in MIGO in serial number tab, you need to enter the material & serial numbers copying from the excel sheet & click execute this will list all the serail number , you can select them all & copy into the MIGO screen.
    This is how we didi it in our system.
    Thanks & Regards
    Kishore

  • Goods receipt for subcontract does not erase requirement in MD04

    Hi,
    I have a subcontract material for example X which is built of 3 components - A,B & C.
    Initially the BOM in the Purchase Order of X did not have any component. I mistakenly posted a goods receipt and realized that the requirement were not getting deleted from MD04 of the components. There after to correct this, I reversed the goods receipt and populated the BOM with components A, B & C and again posted goods receipt for the subcontract material X.
    When I receive material X, the requirement still exists in the stock requirement list (MD04) of A, B & C.  I also went to Transaction ME2O and saw that the stock at the vendor did not get reduced.
    I have checked the Goods Receipt material document and the components A, B & C have a movement type of 543 O. In MB51 Goods movement for the components, I can see the deduction from the vendor.
    Why are the requirements not getting deleted from MD04 of A, B & C and why is not  the component stock at the vendor getting reduced?
    For all other orders, the requirements get erased in MD04 of A, B & C when I receive X
    Please help me out with this issue.
    Sincerely,
    Ketan

    thread closed

  • Goods Receipt for Subcontracting PO

    Hi,
    I got an issue like this....User has Created and posted Sub contracting PO.
    and when we tried to enter Goods Receipt for this SUbContracting PO system is giving an error like this
    <b>"No special stock O of the material (batch ) exists in storage location for 0000000333 331/18237".</b>
    Any one can tell me how to resolve this issue....
    Thanks and Regards

    Dear MK,
    Once Subcon PO is created, we have to send the child components to vendor. This can be done either by MB1B or ME2O.
    Once these components are issued to the vendor, we can view them at MMBE stock over view as 'material provided to the vendor' OR by T-code MBLB.
    In your case, probably user has not followed the above two steps and hence the error.
    Regards
    Ravi

  • BAPI for goods receipt for subcontracting PO

    Dears,
    I Just want to confirm that whether BAPI "BAPI_GOODSMVT_CREATE " will do the goods receipt for the subcontracting PO. SInce  I will be passing only 101 mvy type in BAPi, will the system automatically call 543 mvt type and post the consumption.
    Require suggestions
    Regards
    Kamesh

    Hi,
    Yes, BAPI_GOODSMVT_CREATE will work for subcontracting GR as well.
    It all depends on the parameters you pass to the BAPI.
    Example give below:
    *Item Parameters to be passed:     
    Ordered (Subcontracting) Material:
    Parameter     Field     Description     Value
    GOODSMVT_ITEM     MATERIAL     Material Number     100-200
         PLANT     Plant     1000
         ENTRY_QNT     Quantity in Unit of Entry     0.000
         MOVE_TYPE     Movement Type     121
         PO_NUMBER     Purchase Order Number     4500000007
         PO_ITEM     Item Number of Purchasing Document     00010
         MVT_IND     Movement Indicator     O
         LINE_ID     Unique identification of document line     000001
         PARENT_ID     Identifier of immediately superior line     000000
    Note: Quantity of ordered material must be zero.
    Component Material 1:
    Parameter     Field     Description     Value
    GOODSMVT_ITEM     MATERIAL     Material Number     100-100
         PLANT     Plant     1000
         ENTRY_QNT     Quantity in Unit of Entry     2.000
         LINE_ID     Unique identification of document line     000002
         PARENT_ID     Identifier of immediately superior line     000001
    Note: LINE_ID should be incremented for each component and the PARENT_ID remains same for all the components of an ordered material. Component negative quantity can be given in case of Under Consumption.
    Component Material 2:
    Parameter     Field     Description     Value
    GOODSMVT_ITEM     MATERIAL     Material Number     100-100
         PLANT     Plant     1000
         ENTRY_QNT     Quantity in Unit of Entry     3.000
         LINE_ID     Unique identification of document line     000003
         PARENT_ID     Identifier of immediately superior line     000001

  • Goods Receipt for packaging material - Item cat. ELP

    Hi expert,
    I am facing a problem regarding receive Packaging Material Item i MIGO via inbound. Problem detail as below hope you can advise me:
    1. I create PO order 1pc of Throttle
    2. In Inbound Delivery Screen I do Packing for Throttle by using Handling Unit Function, packaging Material is Carton Box.
    3. After Pack complete, Item for packaging material is auto generated in inbound screen:
    - Item Cat. of Throttle = ELN
    - Item Cat. of Carton Box (Packaging Material) = ELP
    4. When i do MIGO via Inbound: there is only 1 item for Throttle is displayed. How to do Goods Receipt for Carton Box item? Do i Miss any setting for that?
    Thanks.

    i thnk u sould maintain material master with two units one is throttle and second is cartoon.
    u shud maintain that how many throttle is equal to 1 cartoon.
    this u can maintain directlt in PO (In condition tab, with these two field : OUN and UN). in PO as a OUN ,give throttle n UN , give cartoon in item overview as well as condition tab.
    and during delivery change the unit in cartoon. then while migo, material will show in cartoon.
    hope it will be helpful.
    Thanks
    Nisha

  • Production operation external processing goods receipt for subcontract PO

    Hi PP/MM experts,
    I searched for existing forum entries but no luck or final answer.
    I have a question about the goods receipt for a subcontracting PO that is account assigned to an operation of a production order (external processing for operation).
    The following situation:
    Production order type PP02 - external processing
    There is only one operation in the production order with control key PP02 - external processing. I marked the control key PP02 in configuration for 'Automatic goods receipt'.
    I created a PO for the PR is the operation
    When I'm doing the goods receipt of the subcontrating PO a 101 posting is triggered for the finished product and components are consumed by 543 O movements. So far so good. But the inventory for the finished style is not increased. In MIGO I even see that even a batch number for the finished product is determined. Looks like that only the service is posted but not the inventory. I assumed when I mark the operation contol key for 'goods receipt' that the MIGO will also post the inventory for the finished style.
    Reason for PP order and not only subcontract order is that we want to manage capacities of external suppliers with PP capacity planning.
    Is that a bug in our system or normal behaviour? We use SAP ERP 6.5 with IS AFS.
    Thanks in advance for your answers.
    Best Regrads,
    Harry

    Hi Rizzi and all others,
    thanks for your replies.
    I'm using a production order for the following reasons:
    We want to use capacity planning for external suppliers. At least to have some overview of work they have to do in a month
    The external assembly can also be changed to internal assmebly and for that reason we will start always with the same kind of document -> production order.
    But one more thing what is really confusing. In the materials document list MB51 the 101 movement for the service is listed even if the inventory was not increased. That is really confusing for the users.
    Best Regards,
    Harry

  • Good receipt for process material.

    Hi PP Gurus,
    In process material scenario (Material type PROC) when I create a process order (cor1) for the same. In good receipt tab "Good receipt, non valuated" check box getting activated be default. As a result order is not getting credit of any co-product produced from above process order.
    My requirement is tick should be there in "Good Receipt" instead of "Good receipt, non valuated".

    I think the issue is getting diverted. Please understand I don't want to maintain price. The reply I have given as a feed back to the earlier reply. My issue is different. Pl go thro intial question. Pl do not go by chain and comment.

  • Good receipt for indirect material using MIGO

    Hi all, our company has a trouble in receiving PO for indirect material.
    We would use the MIGO transaction for these order but withouth having an inventory movements (since they are indirect material)
    I don't know how normally these PO are managed, if we're using a wrong process or we need a customization of the normal procedure.
    thanks in advance for any help

    If you want to track Inventory then you need the material code & Quantity updating to be managed for those material type in OMS2 , If you are doing purchase without any Material code & against the cost center then those items directly get consumed after GRN, So now you have to decide which process you want to follow , Normally both are Standard Process.

  • Goods Receipt for Different Material

    Hi Gurus,
    I've created PO for Material A,while MIGO when inspected found different Material,
    But Package of the material shows Material A only,how to accept this Misc Material While MIGO??
    thanks

    If you are Sure that the Material is Different to Po material then You can send it back to Vendor.
    Or Keep this material in GR Blocked Stock 103 until Situation is Resolved.
    Else Inward the material with out referring po in migo with 501 mov type.
    I would suggest you to follow the First option.
    Regards,
    Ashok

  • Last purchase order and goods receipt for material

    Hello to everyone,
    is there any standard report where I can see the last purchase order and goods receipt for a material?
    Regards

    Hi,
    Latest PO you can get from ME2M, by giving input as material and scope of list as best.
    Latest GR date can be get from MB51, by giving input as Material and movement type as 101.
    Regards,
    Prabu

Maybe you are looking for

  • Reason for CALL_FUNCTION_RFC_ERROR

    Hi Experts, I am having an error messgar in a program with a particular variant for the particular date only saying:- ABAP/4: CALL_FUNCTION_RFC_ERROR The reason for this error I found over forum says that it is coming because RFC call is getting fail

  • Using network drive with time machine.  IS IT POSSIBLE?

    There are lots of discussion on using network drives with time machine. I have not been able to make them work. Could somebody tell me if this is possible

  • Error: 0x400110020000100A

    _Hp Recovery Manager on DVD, error message above when using_ HP Pavilion dv6503eo (2007), Vista 32 bit Black screen, after BIOS password, says "No Operating System" F10, BIOS (Phoenix) Setup Utility: Primary Hard Disk Self Test - "Estimated test-time

  • Delivery Document Currency to Customer Currency

    Dear Experts,           Currently we are dealing one international Roll Out. The business / local Currency is VND (Vietnam local Currency). This plant has to dispatch the goods to parent company in USA. So the common currency planned to use is USD. S

  • Desktop display randomly getting smaller and moving to the upper left of the screen.

    Hi all. I am hoping someone can shed some light on an issue I've been expierencing. I have scoured the web and have been unable to find much, if anything, in way of solutions.  All little difficult to describe, but I will include a pic as well as a v