Help me configure Change request management !!!

Dear friends,
I am Going to Configure Change request Management, so just to ensure that the configuration is not erronous, i would need Expert advise..
Just want to know Clear few things before i proceed..
I am also refering SPRO and related notes
Scenario :
I have two SYSTEMS SAP ECC 6.0 with System id R03 and Soluiton manager with SYSTEM id SOL,
R03 has 3 clients, 300 600 700..
In R03 300 is the development client, 600 is quality client, 700 is the production client.
SOL has 2 clients, 100, 200
With 200 as the production client.
Q.1) <b>Do i have to configure CHARM in both the client (100 and 200 of SOLMAN).</b>
Q.2) Initially I had tried to set CHARM in client 100 of solman, but later on realized that it has to be set up in client 200.
When i logon to client 200 and  Execute IMG activity Spro-> sap soltion manger->basic settings-> sap solution manager system->activate integration with change request management.
Then by default it take the previous client ( client 100) as the change request management client.
( as we know there are three steps in the above activity ), the other activity are executed properly, only prblem being that the default client is always set to 100, which should not be the case).
I do get the prompt saying ( "The change request clent is set to clent 100, do u want to change to client 200, on clicking yes, still it is always set the same client 100 as charm client ")
<b>Plz let me know what do i do to set the change request client to 200??</b>
Q.3) Regarding TMS, we have local domain controller in solman and local domain in R3.
We are planing to establish domain links between the two systems( ie both the domain controllers) ??
Is this the right strategy ??
<b>Any other method that u can recommend  ??</b>
Q.4)One of the IMG activity says, Generate Destinations to client 000 of all the domain controllers..
Whenever i do this these, destinations are created with errors, i am not able to create trusted RFC destinations without errors.
When i logon to satellite domain controler and excecute sm59 there are 2 destinations created Trusted and BACK.
These destinations works well,
but when i logon to Solman, got to sm59 , when i test the TMW and TRUSTED rfc destinations  i test these destinations using Remote Logon i get error,
" no authorization to logon as trusted system"
I went thru one note which recomended Kernel upgrades to solve the problem,
I r3 my kernel relaese is 700 with patch level 56, the note recomends to apply patch 80, did u have these problems??
<b>what is your kernel patch levels in sateliite and solman systems.</b>
Q.5) TO be able to raise tickets from R3 to solman we create RFC destinations.
We also create RFC destinations to client 000 of all the sateliite system,
<b>dont u think these RFC destinations might interfere with each other??</b>
Q.6) Is there anyone who has successfully configured CHARM. Can you plz share the  configuration documents with me..
Please note :
<b>All the contributors would be handesomely rewarded with points .</b>

Hi,
Check this
Note 128447 - Trusted/Trusting Systems
For your Q4.
Q3.)
Establishing Domain link - That's the right way. Go ahead.
These are the steps.
<b>1.Define Transport Routes for System Landscape</b>
assign exactly one development system to a production system, and that these two systems are connected by exactly one unique transport track. If a development system and a production system are connected by more than one transport track, this may lead to inconsistencies within the transport distribution. This type of transport configuration cannot be supported by Change Request Management, and may cause inconsistencies within the tools involved.
<b>2. Activate Extended Transport Control</b>
The CTC parameter should be '1'
<b>3.Configure Transport Strategy</b>
Deactivate the QA Approval.
<b>4. Activate Trusted Services.</b>
5.Activate Domain Links.
You have to activate domain link between systems.
6. Generate RFC Destinations to Client 000
Hope this helps.
feel free to revert back.
--Ragu

Similar Messages

  • Solution Manager 3.2 SP 8- Change Request Management Configuration Problem

    Hi friends,
    We are in process of implementing SOLMAN 3.2 SP8 in our landscape.I am facing  problem in configuring change request management.
    When the developer is working on an urgent correction document we are facing a problem.The steps we are following are here under provided.
    Step 1 :
    Selected Action "In development" - > it created the transport request in the dev system.
    Step 2:
    Action "Log into System" -> made correction attached to the transport request manually and released the task.
    Step 3:
    Action "Release transport requests" -> The transport request in the development was released.
    Step 4:
    Went for action "Pass to correction" -> I am facing exceptions which conveys
    Status was reset by system
    A condition is not satisfied because of an exceptional situation
    Not all transport requests yet released
    And we would be thankful if you provide the authorization required for the different roles in the change request management.I have followed the help file of SOLMAN 3.2 and create the users as under
    User - Role
    SOCM_RQSTR - ZSAP_SOCM_REQUESTER
    (Derrived from SAP_SOCM_REQUESTER)
    SOCM_DVLPR - ZSAP_SOCM_DEVELOPER
    (Derrived from SAP_SOCM_DEVELOPER)
    SOCM_CHNGNGR - ZSAP_SOCM_CHANGE_MANAGER
    (Derrived from SAP_SOCM_CHANGE_MANAGER)
    SOCM_CHNGNGR - ZSAP_SOCM_IT_OPERATOR
    (Derrived from SAP_SOCM_IT_OPERATOR)
    Even then I am facing problems while developer creating transport requests and while logging into development system.
    I tried adding S_RFC,S_RFCACL auth objects to their roles but did not help.
    Pl. suggest.
    Thanks & Regards
    Mrutyunjay
    Message was edited by: Mrutyunjay Rao Dora

    Hi all,
    We are trying to implement the Change Request Management piece in Solution Manager 3.2. 
    We are facing the following issues which I think relate to the same reason:
    1)We have created a Maintenance Project in SOLAR_PROJECT_ADMIN and assigned it a logical component, which consists of our two system landscape (namely DEVàQAS). We have also created the IMG project in the DEV system and have distributed that IMG project to both the Solution manager system and the DEV system. Now we have to make the maintenance cycle and task list for that maintenance project, but as we select the project and click on “create project cycle” it shows the message "The project is not released. Hence cycle can not be created". It is showing the status of project as locked .How can we open or unlock the project to remove the error?
    2) Also after selecting the SMI project when we click on the button “CTS status switches” or “project specific Transport route” it responds with the error "Project landscape not configured; set the project status to "open" first ".
    3)When we click on “synchronize single project” it prompts for the login of connected system (Development System) and after login, it gives an error "Warning, problems during synchronization of the system Landscape".
    For Error resolution, we have checked the system landscape and it does not give us any errors. We have done that, both from the solution manager by going to the transaction SOLAR_PROJECT_ADMIN -->  >system landscape tab>selecting our logical component and doing a check by clicking the "Check system Landscape" button. It returns with "no Errors". We also did a check on the TMS configuration by logging directly on to the TMS domain controller system and checking the Transport routes. We have checked the RFC connections without any errors.
    Any help would be greatly appreciated.
    Thanks
    Abhi

  • Approval Process configuration in Change Request Management

    Hello Gurus
    We are currently configuring Change request management. We successfully activated charm, we are now working on approval process of change request management.
    I am following the following sim for the approval process configuration:
    https://websmp105.sap-ag.de/~sapidb/011000358700002931432006E.sim
    Can any one please assist us by guiding us on the following things?
    1. From BASIS point of view we have assigned roles to each user as employee e.g. developer charm (SAP_SOAM*) role to developer user\employee in solution manager, still when we are creating tickets then we cant see the options like “in development”, “in process” etc
    2. We are going forward with the default settings can any one tell us if we need to do something extra to get all those options activated like “in process”, “in development” etc
    I am in mid of these configuration settings; please assist me asap if possible.
    Thanks in advance,
    Regards,
    Sharmishtha

    Hello
    Thanks for your reply,
    I have used BP to create and process change request. Only confused with the standard process and where to look for the change documents, thats the reason i couldnt see the requests and change their status.
    I just want to know if you have customized any thing in to the standard configuration, say for e.g. if you want to add your own actions like in maintenance cycle after requests been released in development if you want to import automatically in QA which happens in case of Urgent corrections. What I need to do if I have to do such settings or change it in my standard configuration.
    How can I change this standard configuration? Anyone has done such kind of customization?
    Thanks for your help and more help on this topic will be appreciated.
    Regards
    Sharmishtha

  • Change Request Management Configuration

    We are configuring Change Request Management in Solution Manager 4.0 SR2.
    After we have created the maintenance project, assigned our Landscape components as a logical component and created the IMG project for Development system(ASD-315); we have executed a consistency check in Change Request tab of System Landscape tab of the project, and we receive the followong errors:
    1- No consolidation system found for ASD-315 (project XXXXX)
    2- No track for project XXXXXX with log. system ASD/315.
    3- Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for ASP-500.
    Additionally, when we are trying to create the maintenance cycle (goin to to the transaction /TMWFLOW/CMSCONF), the "Distribution Routes" tab doesn't appear.
    Any suggests are welcome.

    no answer

  • Change request management in solution manger release 7.1 or 7.0

    Hi All,
    Can any body please explain me how to configure change request management in solman release7.1 and if it is possible please send document to my below maild Id.
    And please let me know what are the steps needs to be done satellite systems, we have EP7.0 landscape also there .do we have to do any additional configuration for that in solman side?
    I appreciate for your prompt response
    Thanks in advance
    My Id: haritechies gamil.com
    Regards,
    Hari Prasad . L

    Hi
    Adding more to it
    Use the following link,
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    Regular correction
    https://websmp202.sap-ag.de/~sapidb/011000358700000086572008E.sim
    Later login to solman enter tcode SPRO and goto scenario specific Change Request management node and start configuring by
    going through the IMG Help and as per requirement.
    Create a maintenance project and Activate Charms
    https://websmp202.sap-ag.de/~sapidb/011000358700005479242006E.sim
    Regards
    Uday

  • Document for Change request Management in Solution Manager

    Hi,
    We are setting up Solution Manager. I know service desk configuration. But I need a document on how to configure change request management in Solution Manager.
    Also I need a steps or a document for monitoring of EP 6.0 from Solution Manager.
    Thanks a ton for help in advance.

    Hi,
    Check out these links
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/media/uuid/b4406827-0a01-0010-3da2-f56b36d88510
    BI and Portals 2006 [original link is broken]
    very good collection of eclasses. for making use of solution manager.
    Feel free to revert back.
    --ragu

  • Regarding Configuration of Change Request Management in solution manager4.0

    HI Techies,
    I have configured the change request in solman 4.0 but the transactions SDCR,SDMN,SDMI,SDAD,SDDV,SDTM,SLFN,SDHFare not working for activating this i have executed the BC sets as mentioned in Note :903527 ,is there any BC sets available for this ,can anyone suggest me with the solutions.
    Thanks in Advance solutions awarded for sure !
    regards,
    ESRkumar

    Hi Tripti,
    I have already done it .i dono where iam lagging can u please send me the docs regarding the Change Request Management in solution manager 4.0 with sp12 .Still iam facing the same
    thanks in advance!!
    ESRkumar
    Edited by: esr kumar on Feb 26, 2008 11:10 AM
    Edited by: esr kumar on Feb 27, 2008 5:47 AM
    Edited by: esr kumar on Feb 28, 2008 10:10 AM
    Edited by: esr kumar on Feb 29, 2008 9:28 AM
    Edited by: esr kumar on Mar 13, 2008 6:10 AM

  • Change Request Management  "There is no task list for this project"

    Hello!
    I would like to use the functionality of CharM in SOLMAN 4.0.
    When I enter the Tcode /n/tmwflow/proj I receive the waring/error "There is no task list for this project" (/TMWFLOW/TRACK_N114)
    If I create my own task list via Task list --> create
    I get the warning "You cannot change task lists in the SAP namespace"
    What are the steps to define task list for my project?
    Do I need to configure SPRO ... --> Extended Configuration --> Schedule Manager?
    The second warning I get: "NO CTS projects created yet" or
    "The Solution Manager project does not have an active CTS project yet".
    How can these warnings/errors be corrected?
    Thank you very much!
    regards

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • How big effort it is to setup Change Request Management?

    We are interested in implementing Change Request Management into our Solution manager 7.0.
    What size of an effort in mandays it actually is and what kind of professional roles are required to set it up? Some background information for your responses:
    implementation project is already there in Solman (SOLAR01/02) and is already live
    satellite system connections within SMSY are already active
    no central CTS/CTS+ is currently in use
    when having CHARM it is assumed that also CTS+ should be used
    So, I guess we are in a typical situation where implementation project has ended and live and support organisation and tools are being setup. There we need CHARM and CTS+.
    I have read lots of SDN threads and blogs, but did not get a clear picture how big effort setting up CHARM is. Please note, I not looking for config guides now, just your experiences. Even if am not interested in config guides, could you at least describe the main steps that are necessary in setting up CHARM?
    br Kim

    Hi
    Adding more to it
    Use the following link,
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    Regular correction
    https://websmp202.sap-ag.de/~sapidb/011000358700000086572008E.sim
    Later login to solman enter tcode SPRO and goto scenario specific Change Request management node and start configuring by
    going through the IMG Help and as per requirement.
    Create a maintenance project and Activate Charms
    https://websmp202.sap-ag.de/~sapidb/011000358700005479242006E.sim
    Regards
    Uday

  • Change Request Managment setup for Solution Manager 4.0

    Hi guys! Can someone help me on how to setup the Change Request Management in Solution Manager 4.0? I have already have checked the SAP Marketplace for any documentation about this topic but found none. I am configuring the two test servers (1 prod and 1 dev) in tcode SMSY. I have also configured the system role for each server. When I try executing /TMWFLOW/CMSCONF in SE38, no clients appear in the CRITICAL OBJECTS pane. Did I miss a required step in the implementation? I hope you guys can help me. Thanks in advance...
    Regards,
    Ronald Navarro

    Hello Ronald,
    Following the spro configuration will setup the Change Request Management scenario, each spro point has associated the corresponding documentation.
    Also in service.sap.com/rkt-solman>solman 4.0>CCC profile you will find valuable information about how to use this scenario.
    Hope this helps,
    Dolores

  • How to deactivate Change Request Management workflows task

    We are in a situation where we are switching external SAP service
    organisation and we cannot at this stage introduce any new procedures
    regarding sceduling-tasklists/TMS/etc. Our ChaRM implementation project
    must be set back in to a possision where we can maintain our normal
    system maintainance processes without using a fully implementated
    CharRM functionallity. The implementation of CharRM has to be realized
    in 2 steps:
    a) activate only ChaRM documentation system/flow as an extention of
    servicedesk, implement this in our organisation
    b) activate fully ChaRM functionality with interaction with
    SLD/TMS/tasklists/etc after we have switched service organisation
    Needs:
    1) How to deactivate ChaRM IMG setting SAP Solution Manager-
    >Configuration->Scenario-Spesific Settings->Change Management->Change
    Request Management->Standard Configuration->General Activities-
    >Activate Integration with Change Request Management and related
    settings.
    We had in an earlier stage the total service process/documentationflow
    up and running and with possibilities to interact/respond on
    servicemessages for these roles: User, Servicedesk, Change Manager,
    Change Advisory board, Developer, Tester, IT Operator equal to ChaRM
    process.
    2) Ensure availability to use ChaRM as a extention to servicedesk
    regarding administration and documentation of SAP changements.

    Hi,
    Find the guides : on help.sap.com
    Change Management:
    http://help.sap.com/saphelp_sm40/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/frameset.htm
    Service Desk:
    http://help.sap.com/saphelp_sm40/helpdata/en/45/51fbdbd4941803e10000000a1553f7/frameset.htm
    Regards,
    Siddhesh

  • Creating a New Task in SOLMAN Change request Management

    Dear all,
    We are using SOLMAN 4.0 and scm functionality.In the change request screen we have a create follow up task(+ icon on top left).What is the use of this task,can we asign a task to some particular person?for example can i assign task to tester?If the task has not completed the task,while closing the correction will it give error?
    Please give your suggestions.
    Thanks in advance,
    Avinash.

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • SOLMAN- Change Request Management

    we have a request from one of our customers a big insurance company, to use the "change request management" out of the SOLMAN for non-SAP solutions.
    is it possible ? what are the advantages and disadvantages?
    thanks
    Amnon

    Hello Amnon,
    SAP Solution Manager as the name suggests is for managing the whole gamut of SAP and Non-SAP solutions in the IT Landscape of an organisation. It provides you the tool, content and gateway to create, operate, manage and monitor your solutions over time.
    Please use the following links which may help you in a better way....
    Manually registering a non-SAP system in SMSY
    http://www.sappro.com/downloads/NonSAPsystems.pdf
    SAP Solution Manager Ready
    SAP Solution Manager Ready
    A General overall discussion on Solution Manager http://www.sap.com/platform/netweaver/components/solutionmanager/index.epx
    Hope it helps.
    Cheers,
    Satish

  • Solman Change Request Management Issue - about create task list

    Dears,
        We are now using Solman ChangeRM. I have created a maintainance project and maintained its logical component and IMG project. when I want to create a task list for this project, a message"The project is not released. Hence cycle can not be created" poped. The message no. is /TMWFLOW/CONFIG_UI017. Where can I release the project?
    Thanks
    Roger

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Change of systemlandscape in Change Request Management

    Hi,
    We have a Systemlandscape with 4 SAP Systems. Now we would like to reduce the landscape to 3 systems. We use the Change Request Management and we work with urgent corrections. Which are the problems by changing the landscape?Which is the best approach to get from 4 to 3 Systems without loosing any transports?
    Best regards, S.Blaser

    Stefan,
    Have you checked SAP note 987927? It can help.
    Regards,
    Raquel Cunha

Maybe you are looking for

  • IPod Touch iOS 4 Update Problem

    Hello, Today I received a new iPod touch 8GB 2nd Generation from Apple, after my old one's audio jack failed. When I got home I decided to try and update to iOS 4 from 3.1.3. Download went fine, started to install. Everything went fine until my iPod

  • In MIGO FI Documents post BADI or USEREXIT

    hi, In MIGO I wnat to update update Translatn date with Document date befor save, is there any USEREXIT or BADI for that please help. Regards Deepak

  • Regarding  parameters in rfc

    hi all, can any one explain me why RFC does not support the u201Cby referenceu201D mechanism , as i want to pass table parameter to rfc how they wil be passed without  u201Cby referenceu201D . thanks in advance dilip

  • Who knows the meaning of the symbols in the second column of the audio bin

    One of them looks like a clock? Thank you!

  • Add bottom bar to ViewNavigatorApplication

    I am creating a mobile application based on ViewNavigatorApllication and I would like to create something akin to a status bar at the bottom of the app that is visible across all views. any suggestions or examples of how I can go about that Thanks