How to stop process chain if it yellow for long time

hello all,
I see that my process chain is running for long time and is yellow for more than last 24 hours now. I can see where the chain is stuck(not going ahead).
What do we normally do in such scenarios?
Also one more question I have is about delete PSA request process variant. Can i use the same variant in two different process chains, is yes than do I have to include the name of the PSA tables that are in both the process chains. When the variant runs in 1st chain does it delete the PSA tables from the second chain as well..(i hope i made this clear)
Thanks in advance

Once you have done with your init load manually. Then in case it was just the start of the process in ur Process Chain then first remove the chain from schedule and then go to the start process of the process chain and save the setting for immediate, uncheck the periodic box and save and then come out of the screen and then execute and activate the chain.
Note:
1. Before changing the setting in the start process make a note of the start time and also its periodic value.
2. Once the chain is completed then change the setting in the start process back to previous start time and periodic value.
3. Don’t forget to save and activate the chain.
Regards,
Rohini

Similar Messages

  • Process chain remains in yellow for long hours

    Hi friends,
    My process chain remains in yellow state for many  hours.
    when i check the the message , it shows as chain has been removed from scheduling. Is that a problem or what may be the problem?
    generally if a problem of PC remaining in yellow for long time , what are the Tcodes to be looked into.
    regards,
    Rajesh

    Hi Rajesh
    GO to <b>RSPCM</b> check the sataus still its in yellow or green.If it is in yellow then
    double clicjk on this it will takes to you in to the chain individually .Then check the
    process ..
    Or go to <b>RSPC</b> check wher exactly the chain is kicking.Then check the monitor
    status of that particular process .This monitor u can achieve By double clicking on
    the process-->it will show u a popup in that click on monitor.and then depends on t
    the issue u can work and repeat .
    Regards
    R M K
    ***Assigning points is the only way of saying thanx in SDN ****

  • How to stop process chain, if it is taking too much time than expected.

    Some times if a process chain takes to much time to finish than expected, how I can stop the process chain and execute it again.
    Thanks in Advance.
    Harman

    how I can stop the process chain ??
    If the job is running for a long time ,
    1)GOTO RSMO and SM37 and check the long running job over there.
    2)There you can see the status of the job.
    3)If the job is still running you can kill that job
    4)delete the failed request from data target.
    for more details go to this below link
    how to stop process chain if it yellow for long time
    how I can execute it again ?
    GOto Function module  RSPC_API_CHAIN_START
    and give u r process chain name there.and execute.

  • How to stop process chain job in middle

    Hi,
    I have designed process chain ,to trigger following sequence of jobs
    Step 1 Switching from Transactional cube to Basic cube and Vice versa.
    Step 2 Loading data from Transactional cube to basic cube.
    Step 3 Buffering the Scorecards.
    My question is From Step1.
    where i am using one ABAP program as process type( ABAP program functinality is it will switch Transactional cube to Basic cube if there is any yellow request in Transactional cube,If there is no yellow request in the Transactional cube,it should stop from step 1 it self,  but I wrote a code to throw error to stop the job, in that case in sm 37 I am able to see cancelled job of this process I don't want to see cancelled job in SM 37 since this prcess chain  has been sheduled for every 1 hour, is there any way to stop this job to not to proceed successive process. please give me some input from ur side
    Thanks in advance.
    Best Regards
    Shiva

    Hi Shiva,
    This is what we have done here:
    1. Change the ABAP process type from "Process ends non-specifically" to "Process ends successful or incorrect" from Settings => Maintain Process Type.
    2. Copy SE37 function "RSPC_ABAP_FINISH" to a Z-function. Add state as the input parameter and pass that to l_s_log-state and i_state (In Function Call).
    3. Now in your program if you want to execute further step call this Z-function with status "F" else with "R" and give your ABAP Variant Name as the other input.
    Let me know if you need more help.
    Regards,
    RB

  • How to schedule Process Chain with Full Update for the past closed month

    Hello,
    I have an HR-BN benefits transactional data extractor - http://help.sap.com/saphelp_nw70/helpdata/en/08/b01d3cf8aa101ce10000000a11405a/frameset.htm
    One of the selection fields for that extractor is calendar year/month 0CALMONTH and it is a full update extractor.
    SAP recommends running this extractor once a month after the month has been closed.
    If I were to include this update/extract into my process chain, would it be possible to automate the process in a way where the process chain is scheduled to execute once a month (I know how to do that), but that also only pulls values for the past/closed CALMONTH (as if it had a variable value of which would be automatically set to the last closed month when pchain is run)? As I mentioned 0CALMONTH is one of the selection criterias in the infopackage for that extractor.
    let me know how I might be able to do that.
    P.S. we are on BI 7.0/2004s
    Thank you

    For Calmonth selection in infopackage you can use the SAP-Exit OLAP Variable 0CMLMON (Last Month)
    select Type "7" ("OLAP Variable")
    and in Details of Type screen, Select OLAP Variable "0CMLMON" Which is SAP-Exit variable for Calmonth, that returns the last month from the current system-date.
    If variable 0CMLMON is not active, you need to activate it from Business content.
    Assign pts if helpful.

  • How can we process the CRM Order again for second time in debugging mode

    Hi,
    Can anybody please tell me how can we process the CRM ORDER for second time.  that I want to process in debugging mode.
    Thanks,
    bsv

    Hi bsv,
    Are you trying to reprocess a BDOC for debugging purpose?
    If the BDOC is not with a final status, you will be able to reprocess it using the reprocess button in the smw01 search result list.
    And you may put /h on the popup when you click on the 'reprocess' button.
    If it is allowed to make some changes in the CRM ORDER for testin purpose, it would be easier to perform debugging.
    A more 'careless' way is to deactivate the outbound or inbound queue in transaction smqs or smqr, then in smq1 or smq2 to locate the interested queue, and click on button 'debug LUW'.
    Hongyan

  • How to stop the TR which has run a long time

    Hi,
    I released a TR, but the system import it a long time. I think maybe have a problem with it.
    I want to stop the import job of the TR. How can I do for that?
    jk

    hi,
    Q: How to kill a long running job in SAP.
    Answer
    You can 'kill' your own long running jobs by doing the following.
    Open a new SAP session.
    In the new session, from the SAP R/3 screen, follow the menu path: Tools>>Administration
    (new screen) Monitoring >>System monitoring>>User overview
    Fastpath:  /nsm04
    Result: the "Overview of Users" screen appears. This is a list of the jobs currently running.
    Find your username in the list and click on it
    Click on the Sessions button .
    Result: the Overview of Sessions screen appears.
    Click on the End session button .
    hi, ask your BASIS people for killing the job..
    regards
    vijay

  • How to run ABAP Function Module in Background FOR LONG TIME?

    I am not that experienced with ABAP. I am on SAP BI 7.0. I WANT TO RUN A FUNCTION MODULE
    RSDRT_INFOCUBE_DATA_COPY.
    I used SE37 and then executed the module, I supplied  the parameters on the form which opped-up and then  program started running. . Program was however interrupted after 10 minutes by ABAP. How can I run  it in background without interruption?
    THANKS A LOT.

    Change parameter rdisp/max_wprun_time.
    Default value for this is 600 seconds (10minutes).Change it to a time which you think you need for copying infocube data.
    May be 5 hours.
    PS:You can not run Function Module in background directly,but you can create a Z* program and call that FM from within that program and then run the program in background.
    Hope this answers your query. Best of Luck!
    Thanks and Regards
    Anindya
    Edited by: Anindya Bose on Jun 30, 2009 1:24 PM

  • How to enable a printer which was offline for long time?

    Hi,
    One of our printers has not been used for a long time and was set to be permanently offline. Due to the need of printing, the printer was enabled. It is powered on (and can also be disabled and enabled) but is unable to print.
    Is there anything in SAP to check to see why it is failing to print?
    I have tried to check the status of this printer with other printer which is working fine. There is no difference in between their settings.
    The spool requests are waiting to be printed. I would like to check the ip addresses of the printers. Is it possible to find them through SAP. My O/S is Unix.
    Please help me to find the IP addresses of printers attached through SAP and I will try to check them first.
    Thanks
    Vijay

    Hi Vijay,
    Check SPAD -> output devices
    Check thats the printer is properly setup and it been handled by and active spool server, check that the printer ip-address is correct and the right method is in place.
    You can find the ip address of the printer by doing a ping <name of the printer> in a command prompt.
    Regards
    Juan
    Please reward with points if helpful

  • How to find process chain using background job in sm37

    How to find process chain using background job in sm37

    Better is to select the job.
    Select (Define) Step (s) or F6.
    Select the line and Menu Goto>Variant.
    The variant contains the name of the CHAIN and its VARIANT.
    Success
    We faced an old job and via job monitoring we were informed about a cancelled job every 'interval'.
    We noticed that the related chain was deleted but still the job was scheduled each interval again and was cancelled because an event was missing
    We could not find the scheduled job via SM37.
    Via view V_OP, view over tbtco abd tbtcp, we find the related entry.
    We delete these entries via function BP_JOB_DELETE....
    Edited by: Jack Otten on Jul 9, 2010 2:50 PM

  • How to schedule Process chains in Bi Admin Cockpit

    Hello friens,
    I am working on installing Bi cockpit.
    After installing the info providers, i have to schedule the process chains for Bi admin Cockpit.
    I know the transaction is RSPC.
    But I dont know how to schedule process chains for Bi admin cockpit.
    How to schedule Init and Delta
    If you can send me step by step documents.
    Or any good sap note number.
    Or any good links i will really apreciate it.
    I want to schedule process chains
    Content Master Data
    Data Load Statistics # Delta
    Data Load Statistics # Init
    Query Runtime Statistics # Delta
    Query Runtime Statistics # Init
    System Master Data
    Please advise

    Hi,
    Please check out this document:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    Hope it helps.
    Thanks
    Mona

  • How to change process chain in SAP APO, in RSCP tcode.

    HI SAP APO Experts
    I am from SAP ABAP background, I need to change a 'AND' operator in process chain in RSCP tranaaction in SAP APO.
    I dont have any idea how to change process chain.
    Could you please help me how to change process chain in SAP APO in RSCP tcode.
    Appreciate your help or comments.
    Sandeep..

    Hi Sandeep,
    The t-code RSCP does not exist in SAP APO.  The correct t-code is RSPC. 
    Step 1:- In RSPC t-code, select the process chain which you need to change. 
    Step 2:- Double click on it. 
    Step 3:- It will display the various programmes attached to the process chain.  Go to change mode by clicking on the change indicator (Control + F9)
    Step 4:- Select the programme area where you need to do the correction or change.  Double click on it.
    Step 5:- It will take you to the programme and its selection contents.  Make the relevant changes.  You can directly carry out the change in se38 also if there is variant kind of changes for that particular programme.
    Step 6:- Once the changes are done, save the changes and press F3 button which will take you to the home page of the process chain
    Step 7:- Save again so that the change in the programme alongwith the process chain will get saved.
    Regards
    R. Senthil Mareeswaran.

  • How to create Process chain in BI 7.0

    hi,
        I dont know how to create process chain in BI 7. If any one have document step by step process to create process chain. help me. thank u.

    check these links..
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/00a1f389-ec7c-2c10-04bc-9d81b3084171
    http://wiki.sdn.sap.com/wiki/display/BI/Processchainscreationandmonitoring
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/900be605-7b59-2b10-c6a8-c4f7b2d98bae
    http://wiki.sdn.sap.com/wiki/display/BI/FiveWaystoEnhanceBIFunctionalityUsingABAP--PartV--ABAPinProcess+Chain

  • Stopping Process Chain schedule for just one day...

    Hi,
    Our source systems and BI are getting a patch upgrade during this weekend and I need to stop all the Process Chains schedule for Friday night/ Saturday morning. Is there a simple way I can stop all the Process Chains from executing just for tomorrow instead of manually removing each PC from schedule and again putting them back on schedule on Saturday?
    Thanks,
    Sri.

    Hi
    You can reschedule them instead of de-schedule and schedule back.
    1)open your process chain in rspc1
    2) goto planning mode
    3) right click on start --> display schedule job
    4) select the job --> in menu bar --> click on first one from left --> change
    here change the dates as per your requirement and save the job.
    If you have any event based chains which are going to start after time based chains gets complete, no need to de-schedule as we are not going get trigger from time based chains.
    I don't think so we have any program to de-schedule all the chains at a time.
    Regards,
    Venkatesh

  • How to create Process chain for Aggregate for Master data

    Hello friends,
    I created Aggregates on Navigational Attributes.
    Now they are working fine, but i need to know that how shall i create the Roll up for Aggregates on Navigational Attributes.
    The point is the master data changes frequently a lot of time for e.g. for 0customer etc.....
    So if any one can send me the step by step documents so as to know how to roll up the Aggregates for Navigation attributes or for aggregates created on Master data....
    How to create process chains for the same ?????????
    Because if master data changes, then rolling up the aggregates straight forward will not help.
    So we need to write a process chain so that it deactivates the aggregate and reactivate again and fill up again..........
    If i mis interpreted something please rectify it.......
    Please advise

    Hello,
    the changerun that you have to schedule in order to activate the master data will adjust the aggregates automatically.  There is no need to deactivate them after master data loads.
    Best regards,
    Ralf

Maybe you are looking for

  • Plasma needs new capacitors

    I have a Magnavox 42" plasma with 5 capacitors swelled. I was wondering what the price range is to fix this issue. I am currently in a area where the nearest best buy is a bit of a drive to so before I jump in my car and waste all that gas going to b

  • Cahnges Alternate Document type

    Hi Friends, I have maintained an alternate document type ZMMF in OR10 Sales Order. In Sales order it is showing both options i.e. ZMMF and OR10. But when I am going to change this, system is prompting an error as below: Changes to sales document type

  • Keep Time Codes in Final Output?

    For various reasons I won't bore you with here, I want to show the time codes in my final output. I have them (audio and video) on the canvas, and it's exactly what I need, but I can't seem to permanently keep them with my video. They disappear when

  • I am having "downloading safari safe browsing data" syncing problem !

    I am having "downloading safari safe browsing data" syncing problem ! My videos and music erased off from my new generation Ipad with IOS7 and I can restore them back from my itunes? I am using Win7. How can I get rid of this problem ?

  • Mp4 floating controller too big in exported swf

    When I export to swf, the floating controller for one of the mp4 is huge, no matter if I change the pdf options settings to 1/5x; it still comes out huge. Also, the mp4 stops playing on page turn. Should I postprocess these in another adobe program s