Overhead costs on raw materials

Our requirement is to have some percentage overhead on raw materials.  So I created a costing sheet and applied a percentage to them and did a std cost estimate. Now when GR is received it valuates against the std cost (which includes OH) and posts the difference to PPV. Client wants it to valuate against the orginal price of material (without OH)
Ex;  ROH  Mat A $1.00 in planned price 1
       Costing sheet : 10% OH
Standard cost of this ROH A is $1.10
Purchase order will be at $1 so GR will post  Dr. Inv $1.10  Cr. Gr/Ir $1.00 PPV $ 0.10
But clients want that PO price $1 to be valuated against $1 (true ROH cost) and post $0.10 to absorption account
Dr. inv $1.10, Cr Gr/IR $1  Cr abs $0.10  
if P.O is $1.10 then Dr. Inv $1.10 Cr. Gr/IR $1.10 Dr.PPV $0.10 Cr ABS $0.10
I am not sure if it is even possible if not waht options do I have to have and overhead for Raw materials with out updating standard cost estimate with $1.10.
Thanks

Hi
Yes, it is possible
What you want is to Debit the inventory with 1.1 i.e. inclusive of Overhead.. But, Credit the GR/IR with 1 $ and post the 0.10 to absorption account instead of PPV... So, that PPV reflects true PPV
You need to create an accrual key for the same..
1. Create an accrual condition type and accrual account key in MM pricing procedure. In this way, there is a credit entry to the GL account represented by accrual account key. Hence the PPV represents the true value.
2. For the accrual condition type, you can create a condition record such that its value is same as your overhead. You can use the user exit to automatically populate its value from KEKO and KEPH table.
Refer this post where it was discussed a few days back
Product Costing-Overhead inclusion in Inventory standard cost without PPV
Regards
Ajay M

Similar Messages

  • How to capture raw materials,activity & overhead cost without order

    hi
    my client wants to capture cost of effluent  plant.
    i do not want to create a seprate  production order.
    in etp plant
    waste water enters . it goes to some processing and come out as purified water.
    some raw materials are used like alum,DAP,........
    Some activities are done so there is processing cost,power cost,labor cost...
    how can i capture all raw materials cost,processing cost,labor cost,power cost
    is it possible without creating production order

    Hi,
    Without creating a production order you can't able to get the actual costs for material cost and the activity cost. By maintaining BOM, Routing you can get the Standard cost.
    regards,
    V. Suresh

  • Allocation of overhead cost to finished goods through vendors and raw mat.

    We are trying to allocate a cost base in our purchasing department of around 200 mio dkk to our finished products. These products we manufacture ourselves. The cost represents salaries and external services
    The outcome of an ABC study has been to allocate these costs, first on vendor level based on the total spent on each vendor and subsequently to the raw materials from each vendor based on value. The cost of purchasing should then be included in cost estimate of the raw material and hence in the cost of the finished goods through the bill of materials.
    Our challenge now is to implement this algorithm into our product costing system in SAP.
    The easy solution from the point of view of the SAP department is to have cost controllers doing the math of calculating the cost per material number in Excel and then allocate this rate through a costing sheet or a template.
    But this solution on the other hand leaves the users with an extra manual task which again leaves room for error and it reduces transparency.
    So has anyone tried implementing such a calculation scheme in product costing?

    Hi
    As far as I know, SAP does not support this... What you can do is
    1. Calculate this price outside the system and include this overhead in the Plan Price of raw material (Costing 2 View).. So, this gets included in raw mat price itself
    or
    2. if you want to see it as an overhead, you need to arrive at an overhead% which you may calculate as Amount of these Expenses / Total raw material cost and apply this % across
    Study the historic data of past 3-4 years to see if the % remains more or less stable
    br, Ajay M

  • Cost Estimates - system collects planed price for some raw materials only

    Hello
    I have a question regarding price determination for raw materials when creating cost estimates. My costing variant uses material future price (Accounting 1 view) in raw materials as a primary source for price collecting of raw materials and I want it to be that way. But the problem is that when creating a cost estimate only some materials are recognized as raw (key symbol) while others are recognized for costing (calculator symbol), although all of them have a future price entered into material master data on the same date. For those that are recognized for costing the system uses the average moving price.
    I have tried setting all the data for raw materials the same way, the costing views (do not cost, no qty structure), the accounting views are the same and I still cant find the reason why system uses one type of valuation for some and other for others.
    Help?

    Please check the Price Strategy sequence in the Valuation variant assinged to the Costing Variant in Tcode OKKN. The first priority in your case must be Moving avg price. So, please change it to the planned price which you want. The system will then consider this planned price for the raw material valuation.
    hope this info helps you.
    regards,
    VS.

  • Raw materials on MAP with split valuation used in standard cost estimate

    We have a few raw materials which are purchased from different vendors and of different brands. We have opened split valuations for these raw materials. These raw materials are later used in manufacture of different finished goods. We use MAP for raw materials and Std. for finished goods. What configuration and processing steps will be required to run standards cost estimate and what will be standard price for a finished good considering the following example:
    Material X is finished good
    Raw Material A with split valuation @ USD 5 (brand aplha)   &   USD  10 (brand beta)
    Raw Material B without split valuation @ USD 1
    It is expected that we used brand aplha 60% of the time and brand beta 40% of the time and production batch size is usually 100 Kg.
    Please reply
    Edited by: Chris SAP on Sep 29, 2011 7:56 AM

    hi chris
    Hope you have configured the material A for split valuation. while calculating standard cost estimate for the material C. through ck11n, the system will pick up the header price from material master.
    But here you are saying that you have chances of using the material A, 60% of brand alpha and 40% brand beta
    Instead of using split valuation use mixed costing concept. create the material A with separate Ids and create two boms one with alpha and the other with beta.
    create procurement alternative in CK91N and mixed ratio with Ck94 and release the mixed cost estimate
    please go through this thread also
    Re: Difference between Split Valuation and Mixed Costing
    Krishna

  • In house mfgd. raw materials for a production order- Cost capturing

    Hello Experts,
    The scenario is as below:
    Client wants to manufacture in house some of the raw materials for a production order of sub assembly. These raw materials are made from scrap, with some manhours spent on it. After making them in house, these are handed over to stores for kit preparation.
    The planner wants to create a stock of these materials (without making individual prod. orders since there are many of these). One option is, planner can do the cost centre issue reversal (202 movement). But the raw material cost is also getting captured in it from the material master.
    From costing point of view, the cost of raw material should not be included since it is made from scrap. Only the cost of man hours spent is to be accounted for.
    Please help as to how to map this scenario. For capturing cost of man hours spent, we can include a routing for it in the production order of the sub assembly. But how to eliminate or exclude the material cost. All inputs from your side are appreciated. Thanks in advance
    Regards,
    Chetan.

    Hi Chetan,
    Your scenario has some major issue.
    1. You cannot produce RAW material in SAP.
    2. The cost of material produced inhouse will be different than that of original RAW material.
    3. There will be some cost effect in the final finished product if you consider this inhouse produced material for product costing of finished goods.
    We have similar scenario with my client and here is what I have implemented.
    1. Create a new HALB type part number for the inhouse manufactured RAW material. This will ensure that you assign Routing and BOM to same and can capture the COST for the same.
    2. Creating new material will enure that the product costing for inhouse produced RAW material is done.
    3. You can create single Production order for the same as you only have to capture cost. This depends on your Business scenario.
    4. Once you have inhouse produced raw material, you can create alternate BOM for the FINISHED Material with this new Part number in BOM.
    5. Create Production Version for the two BOM and ask Planner to select the Version 2 if he requires new part number in Production Order. I assume that this case would genrally appear in very small numbers.
    6. Now coming to product costing for final assembly. Since we are going to reuse scrap material to create the new part number, only activity cost and component cost will be used to determine cost. This cost will be less than that of RAW material cost.
    So we always suggest our customer to consider OLD part number to determine the PRODUCT COST of final material. BUT business will have to take a call on this.
    Do let me know if u need any thing else.

  • Overhead cost in costing run

    hi,
    costing run is to get the total estimation cost of a finish goods right? for example, in order to build finish goods A, need raw mats and overhead cost.
    raw materials is according to BOM which is also defined in cost component structure.
    1 may i know what about overhead cost? i can see overhead is defined in cost component structure but it is not defined in BOM. so how to include the overhead cost to the finish goods?
    2 to calculate overhead cost, need to use what tcode?
    thanks
    rgds

    Hi
    If you want to add the overhead cost to your cost estimate, you need define the costing sheet and assign to valuation variant
    In the costing sheet you have to give base for calculating the overhead cost and overhead rate and need to assing the secondary cost element and cost center in to credit key same cost element you need to assign cost component structure also
    In the above manner the overheads to be calculated for Cost Estimate...
    Regards
    Srinu

  • Cost estimate (CK11N)is not picking the overhead cost for some of the mat

    Hi all,
    we are facing a problem. The overhead key is defined. the calculation base is defined in the cost sheet. But the overhead cost is not picking  for some of the materials
    Bad Material 5019-0581 via CK11n.
    As you can see in the itemization, only the material and the routing are listed.  No amounts from the OH of ZPTA ( .10).  It should show a line #5 with an amount of (28 quantity  x .10) = $2.80 added to the Total value.
    first three line items it is picked from material and fourth line item from the internal activity.
    the fifth item from G overhead is not picked.

    Hi,
    Check whether u have assigned the cost sheet in u r costing variant which is being used in CK11N.
    Regards
    SudhakarReddy

  • Planning at client level for raw materials

    HI all,
                 I've several plants under one company code, sometimes same raw materials are used to produce finished products in various plants. Here, we are using central purchasing department to procure the raw materials.
    For instance, in plant 1000, the user from purchase department raises a purchase requisition for ' X ' component to produce the finished product, and same ' X '  component exist in the BOM of finished Product in plant 2000, for which stock exists in plant 2000 and is  a high value component.
    The issue here is the purchase planner in the central purchasing department is not aware of the stock which exists in plant 2000, and raises a purchase order for the requisition generated from plant 1000.i.e If the purchase planner could check the stock in plant 2000, this enables him to generate STO for plant 1000 from plant 2000, which save the inventory costs.
    I would like to know, whether this issue can be mapped in APO.
    Any help, much appreciated.
    Thanks & Regards,

    Hi Rajesh,
                    You can actually just do the whole thing in SNP Heuristics. While Optimizer is capable of giving you better solution, I suggest trying Heuristics first as it is simple and inexpensive compared to Optimizer.
    Here is the suggested solution:
    You have plants 1000, 2000 and 3000 and you  have a DC "DCA" ( your procuring department)
    When there is a requirement at DCA, you want to check the stock in 1000 first than in 2000 and then fianlly in 3000.
    Set your material with procurement type E in plant and F at the DC
    Create transportation lanes between
    DCA-1000 with transportation time say 2 Hrs ( in means of transport)
    DCA-2000 with transportation time say 3 Hrs ( in means of transport)
    DCA-3000 with transportation time say 5 Hrs ( in means of transport)
    When you run SNP location heuristics, the system checks the plant with shortest transportation time and takes 1000, if not found it tries 2000 and finally 3000 to create a stock transfer.
    Please remember that transportation lanes are always one way and APO does not support the flow in opposite direction line 1000 to DC is supported but not DC to 1000. This stock transfer has to be manually created in ECC system.
    Please let me know if I got your scenario right.

  • Profit Centers for Raw Materials

    Hi Experts,
    I would like to know in general which profit center will be used in raw materials. For example raw material, say sugar, it can be used in finished product A and finished product B, its like a shared service, in this case which profit center needs to be assigned. Will there a P&L taken in these profit centers.
    Also for cost centers, in a production line, there are can be different product lines can be manufactured, for eg finished product A different product line and finished product B different product line manufactured in one common cost center. In this case which profit center will be used in this common manufacturing cost center.
    Apart from assignment, should we perform some month end allocation and stuff like that.
    Thanks.
    Best Regards,
    GJ.

    Hi,
    If the raw material is shared by 2 product to manufactured then use the common profit center for raw material .
    Regards,
    Sreekanth

  • Overhead costing sheet in easy cost planning

    Hello,
    I have created a overhead costing sheet (having base as material cost elements where a %age is defined to be applied on the material cost) and attached it to the valuation variant of easy cost planning in PS module.
    Now for a given project when I am checking the easy cost planning, it is showing all individual lines of resources like material etc. along with its qty, price and value but I can not see the effect of the %age specified in overhead costing sheet.
    Kindly suggest what is to be done.
    Also pl. let me know whether I can see the cost component structure of easy cost planning.
    With Thanks and Regards
    Ratna

    Hello,
    Thanks for your reply.
    But when I run CJ46 for a particular WBS element, it says "The object is not relevant for processing".
    I have created the costingsheet as per the process mentioned below.
    For overhead costing sheet, base is created with raw material cost elements range and origin group range.
    Overhead rate is defined with dependency D020 - Overhead Type/Plant as 1.5% with proper validity period.
    Credity key is defined with secondary cost element with category 41 and cost center and fixed % with default "*".
    The above costing sheet is attached to the valuation variant of easy cost planning in PS module.
    There is a cost component structure 10 which is attached to costing variant PS06.
    Still CJ46 gives message as "The object is not relevant for processing" when I run it for particular WBS element.
    Kindly suggest whether I m missing any other step.
    With Thanks and Regards.
    Ratna

  • Overhead cost

    Dear All,
    We have manufacturing set up,where in the client produces  diffrent kind of mother boards (FG materails ) in a Single Line :(i,e created as a one Production Cost center) .We have four activity types through which direct cost will be captured for each activity type for each FG material.
    Apart from the above,we have Facoty Overhead,Manfacturing Overhead,Admin Overhead & Other Overhead Cost.
    One way to bring this overhead cost to production cost ihat first allocate this overhead cost to Production cost center,then splitting of thse overhead cost among four activity types and finally arriviring at the actvity cost per hour ,which includes
    both the Direct Cost & Overhead Cost.
    But my client is not acepting this approach of aplitting and taking as part of activity cost.
    Client wants to allocate the  Overhead cost to different FG materials based on the no.of mother boards produced as overhead cost needs to be captured separately for each mother board production cost.
    Can any body throws some light on how to bring the overhead cpst as part of product cost (inventory cost),instead of splitting the overhead cost to activity types.
    Regards
    Su

    Dear Ajay,
    Dear Mr Ajay,
    I have explored the costing sheet concept and worked on this,but when I was estimating cost by CK11N,I could able to see Overhead Cost in the Cost Component View,but when I select Itemisation view,Overhead costs are not appearing.
    Please tell me what could be the reson for this .Am I missed any thing.
    One more concern I have that l when I estimate the cost by KKPAN,there is no item category for bringing the Overhead Cost.
    As you know that Category 'M' will be used for Material   ,Category 'E' will be used for Actvity Cost,similarly what item category to be used to bring the Overhead Cost.
    Please suggest.
    Regards
    Su

  • We need to manage raw materials by vendors(makers).(about Split valuation)

    Hi all.
    We just  started a project to install SAP system.
    Our client need to valuate their raw materials by vendors(makers).
    For example : raw01(3Cm*3Cm steel hot coil) is sold by VendorA, VendorB, and VendorC.
    Raw01(from VendorA,  B, and C) are same materials but the price is largely different by vendors(makers),
      just as raw01(VendorA)'s price is 1,000/EA,
           ,     raw01(VendorB)'s price is 1,500/EA
         ,and raw01(VendorC)'s price is 2,000/EA
    So our clients , expecially finance dept and purchasing dept, want to manage them seperately.
    Finally we consider about split valuation(batch valuation with valuation type).
    But Our concern is as below:
    1. System Performance : The number of GR is 1,000 / per day.
                                            It means that the batchs(1000EA) will be created everyday.
    2. In case of raw mat, we want split valution.
       All material type use Batch : Our material types are raw mat, half finished good, finished good.
                                                     They will be managed Batch number.
                                                     But we just want to manage split valution in case of raw material.
    Now we consider all cases which can be occured.
    Please give us good advice.
    Best.
    Mahnkwi.

    hi chris
    Hope you have configured the material A for split valuation. while calculating standard cost estimate for the material C. through ck11n, the system will pick up the header price from material master.
    But here you are saying that you have chances of using the material A, 60% of brand alpha and 40% brand beta
    Instead of using split valuation use mixed costing concept. create the material A with separate Ids and create two boms one with alpha and the other with beta.
    create procurement alternative in CK91N and mixed ratio with Ck94 and release the mixed cost estimate
    please go through this thread also
    Re: Difference between Split Valuation and Mixed Costing
    Krishna

  • Getting Blend materials from Raw Materials in RMWB transaction technically.

    Hi,
    I am working on a PDM report having requirement for determining all unit and case UPC that contain a chemical represented by a CAS.
    I have a requirement for getting Blends using Raw materials.I am able to find the raw materials from pure substance but not able to get a logic for getting the Blends from this raw materials.
    Is there any Function Module to find the Blends from raw materials or any logic which I can put in my program to find this.If anybody could help me in this.
    Then I have to get the Finished Goods using the Blends.
    And Finally Finished Goods comprised of Finished Goods.
    There is no time to debug the Standard RMWB transaction.
    <removed_by_moderator> .Kindly all PDM-ABAP users please help me on this issue.
    Thanking you in advance.
    Sudip
    Edited by: Juan Reyes on Aug 14, 2009 2:49 PM

    Hi Chetan,
    Your scenario has some major issue.
    1. You cannot produce RAW material in SAP.
    2. The cost of material produced inhouse will be different than that of original RAW material.
    3. There will be some cost effect in the final finished product if you consider this inhouse produced material for product costing of finished goods.
    We have similar scenario with my client and here is what I have implemented.
    1. Create a new HALB type part number for the inhouse manufactured RAW material. This will ensure that you assign Routing and BOM to same and can capture the COST for the same.
    2. Creating new material will enure that the product costing for inhouse produced RAW material is done.
    3. You can create single Production order for the same as you only have to capture cost. This depends on your Business scenario.
    4. Once you have inhouse produced raw material, you can create alternate BOM for the FINISHED Material with this new Part number in BOM.
    5. Create Production Version for the two BOM and ask Planner to select the Version 2 if he requires new part number in Production Order. I assume that this case would genrally appear in very small numbers.
    6. Now coming to product costing for final assembly. Since we are going to reuse scrap material to create the new part number, only activity cost and component cost will be used to determine cost. This cost will be less than that of RAW material cost.
    So we always suggest our customer to consider OLD part number to determine the PRODUCT COST of final material. BUT business will have to take a call on this.
    Do let me know if u need any thing else.

  • Consume the empty barrel of raw materials

    Dear Guru's,
    In our organization we have purchase the Raw materials X along with barrels and while GRN happens it is only for Raw materials then how i could use that empty barrel in production once raw material consumed in another batch.
    I want to use that empty barrel in another batch so how i could able to use the same.
    Please give me idea to map the Scenario.
    Thanks in Advance.
    Regards,
    Vijay Pabale

    Dear Sir,
    Thanks for replying.
    This is imported raw material and in PO only we can put Raw materials name,qty and rate not other than that means no line item can added into it becoz barrel price also included in procurement cost of raw material.
    Regards,
    Vijay Pabale