Hi gurus!
Have you been able to implement an input-ready query with a hierarchy for several characteristics in row area?
I have two characteristics, 0SEM_POSIT and 0ACCOUNT and the requirement is that plan figures should be posted to 0SEM_POSIT but history data should be read from different 0ACCOUNT values for different companies even if they use the same template to plan their values. I have added 0SEM_POSIT as an external hierarchy characteristic to 0ACCOUNT info-object and created a hierarchy for 0ACCOUNT in which hierarchy nodes are defined as 0SEM_POSIT values.
However, if I use an aggregation level in my query, which has characteristic 0SEM_POSIT, hierarchy nodes are not input-ready (unless I use disaggregation, which is not possible if I want to post to 0SEM_POSIT).
Am I missing something or is it simply impossible to configure such a multidimensional query with a hierarchy? I didn't find any solution for this in SAP documentation.
Greatful for your answers, points guaranteed for helpful messages!
Sari

Thank you Gregor for you reply!
I tested 0ACCOUNT hierarchy with different kind of aggregation levels and 0SEM_POSIT as external hierarchy nodes and noticed that it was not possible to make nodes postable in a way that the values would have posted to 0SEM_POSIT. Finally i found also sap documentation telling me the same, so I decided to change my course with this:)
I have used disaggregation in many layouts, but it didn't fit here, because of several reasons. The main reason is, that several 'companies' (they all have their own comp_code in sap) use this layout. They all have different characteristic relationships between 0ACCOUNT and 0SEM_POSIT even if they use same 0ACCOUNT values. If I had used 0ACCOUNT hierarchy in my layout (different hierarchy for different 0COMP_CODE), I could have defined different accounts for each company to a hierarchy node in their own 0ACCOUNT hierarchy. The users should not have been able to see 0ACCOUNT-level though, which would have meant that the analysis item could not have been activated for navigation (only hierachy nodes would have been visible and 0ACCOUNT level would have been hided). Even if there would have been disaggregation, the users would not have known about it. The problem is, that disaggregation takes time and I think the users would not have been pleased to wait for refresh especially when they would not have known a disaggregation takes place.
Another problem would have been, that there is only one way to define the disaggregation in a query column. My requirement is that user is able to choose between two different ways to disaggregate planned values to lower organisation level (according to last year budget or actual data). That means that I have to have two planning functions in my layout for the user to choose for.
I desided to create characteristic relationship based on user exit. I will use 0SEM_POSIT as row characteristic in higher organisational levels to plan for. To derive the right 0SEM_POSIT to each 0ACCOUNT value in profit center level, characteristic relationship source characteristics are profit_ctr (which I can use for determining what the company is) and 0ACCOUNT and target characteristic is 0SEM_POSIT. I created a DSO to load different 0SEM_POSIT values for each account for different companies. I read the values from dso table when deriving 0SEM_POSIT.
Points assigned to your kind answer, Gregor!
Sari

Similar Messages

  • Hierarchy with several characteristics

    Hi,
    I want to create a display layout with cost center and cost element hierarchies in the lead column. But the issue here is BW hierarchy structure is getting disturbed because i have two characteristics in the lead column. System is generating hierarchy combinations on its own.
    For each cost center node in the hierarchy, i want whole cost element hierarchy to be displayed. It is just like BW report when we have CC and CE in rows restricted by hierarchy variables. 
    Is this possible in BPS?
    Bindu

    Hi,
    Let me explain my question with example.
    Say costcenter has the following structure.
    cost center
       Node1
         CC1
         CC2
        Node2
         CC4
         CC5
    and cost element as
      Node1
         CE1
         CE2
      Node2
         CE3
    Now i want my layout to display the data in the follwing manner.
    cost center          cost element      amount
    costcenter           costelement           300
    node1                 costelement          100
                               Node1                    30 
                                  CE1                    10
                                  CE2                    20
                               Node2                    70
                                  CE3                    70
        CC1                costelement          100
                               Node1                    30 
                                  CE1                    10
                                  CE2                    20
                               Node2                    70
                                  CE3                    70
        CC2                 costelement            0
                               Node1                     0 
                                  CE1                     0
                                  CE2                     0
                               Node2                     0
                                  CE3                     0
    Node2                 costelement          200
                               Node1                    60 
                                  CE1                    20
                                  CE2                    40
                               Node2                   140
                                  CE3                   140
         CC3                costelement         200
                               Node1                    60 
                                  CE1                    20
                                  CE2                    40
                               Node2                   140
                                  CE3                   140
    Means for each node of the cost center, whole hierarchy of cost element should be displayed.
    Is this possible in BPS?
    Thanks,
    Bindu
    Edited by: Bindu on Jul 3, 2008 2:30 PM

  • Integrated planning configuration guide

    Hi,
    I would appreciate if anybody could send me a configuration guide witha general scenario for integrated planning.I tried the best practice side ,but the sales planning/cost center planning(planning scenarios ) are for bps
    regards
    savi

    As per my understanding functional config. remain the same ,however the technical configuration for IP is different from BPS.
    <b>Check below for Modelling Scenarios -</b>
    http://help.sap.com/saphelp_nw2004s/helpdata/en/43/1d2440301a06f4e10000000a422035/frameset.htm
    <b>Sales Planning & Sales Analysis</b>
    http://help.sap.com/bp_biv335/BI_EN/html/BW/SalesPlan.htm
    Hope it Helps
    Chetan
    @CP..

  • Integrated planning-config guide for a scenario

    hi,
    Aappreciate if sombody could help me out witha  configuration guide for integrated planning for scenarios of cost/profit planning etc...i tried best practice side but the docs were more of BPS
    email id:[email protected]
    regards
    savi

    This could be useful.
    http://help.sap.com/bp_biv335/BI_EN/html/BW/SalesPlan.htm

  • Issue with Input Ready Query in Integrated Planning.

    Hello Everyone,
                                I've been working on Integrated Planning for some time now. My company recently started using a new server for this work. I find that I am unable to make the queries "input ready". Though I edited the properties of the key figure to "accept user entered values" and chose the option to "start query in change mode", when I execute the query, I find that it the values for the Key Figure cannot be changed. I tried to search in the OSS for any note(s) regarding this issue, but was unable to come up with a solution. Is the problem related to the server or is there some other configuration that I should take care of? Additionally, I would also like to know if there is any method to debug such a problem. I would appreciate it if someone could help me out in this regard.
    Thanks,
    Jake.

    Hi,
    Please verify the following.
    1. Check if the underlying realtime cube is in "Planning Mode:Loading not allowed" state in rsa1
    2. If you have created an aggregation level, Check if the most detailed information is available at that Aggregation Level(i.e, include characteristics so that the record can be uniquely identified at that aggregation level).Best would be to include all characteristics and create a query first and ensure it works.Then remove unwanted charecteristics one by one, so that you can fix the issue.Best thing to start with is to create the aggregation level on top the real time cube itself.
    3. Check for any characteristic restrictions been defined for the real-time cubes.If so, try removing them temporarily and execute the query
    4.Also check if any data slices has been created on the real time cube. If so, try removing it temporarily and then execute the query.
    5. Set the property for Planning "Start query in Change Mode"- this is for th Query
    6. Set the 'Key Figure' Planning Property to "Can be changed Manually or via Planning Functions" for the appropriate KeyFigures- this is for the key figures
    7. Try removing the currency/unit from row/column. Try restricting them in filters rather than in row/columns.
    8. Check if there are any locks occurring due to filter., i.e if you are using a filter and even if 1 record of this selection locks with another user's selection you lose the input readiness.
    Mostly this should fix the issue. Assign points if this info helps you.
    Thanks,
    Balaji.

  • Configuration Requirement for Integrated Planning in BI 7.0 with JAVA Addin

    Hi,
    We have BI 7.0 with Java Add-in installation newly migrated to Unicode.
    BW consultants (I am BASIS Consultant) want to use "Integrated Planning".  I already checked IMG link of it & JCO destinations mentioned there are not in J2EE engine.   Even I am not able to create b'cos current setup is not on SLD.
    I would really appreciate your help on below queries :
    1) Can I configure Integrated Planning without using SLD ?
    2) Do I need to install BI JAVA to running Integrated Planning ?
    3) Do I need to install EP & EP Core ?
    I already checked most of SDN thread but sorry couldn't able to get answer to above questions.   I have checked SAP Notes : 901022, 919850, 917950.
    Your early reply would be highly appreciated.
    Thanks & Regards,
    Narsing.

    Hi Balaji,
    Thanks for information.   One thing to update with JAVA/JAVA addin portal core components gets installed.   So I didn't installed EP.  
    Now Integrated Planner is working fine.
    Thanks for your help.
    Best Regards,
    Narsing.

  • Errors with Integrated Planning authorizations

    Dear experts,
    We are working with Integration Planning, and when we try to create or
    modify whatever object (by the modeler or the wizard) we receive an error message like this:
    "You have no authorization for Multiprovider XXXX"
    Not only Multiprovider, but InfoCube....whatever object.
    The curious thing is that we have with the user we are working a SAP ALL.
    With the T-CODE bps0 we can do everything, but with T-CODE rsplan is
    impossible.
    We’ve checked in the T-CODE su53 and everything is OK.
    We’ve checked in the T-CODE rsecadmin and nothing there.
    We’ve checked as well in the T-CODE st01, followed the actions with the
    trace and all the return codes are 0.
    Does anyone know what happens?
    Thanks in advance
    Cecilia

    Hello Cecilia,
    if you keep a carott in front of a donkey he will run faster... this is the same what I mean if I talked from experts: Men like to be the hero and instead of carott you need to need to laud him as an expert, he will reply faster
    Lets come back to authorization: I am not sure whether RSECADMIN is a newer version of RSSM. Reason: In RSSM you can activate authorization check for a cube or MP but in RSECADMIN you administrate authorization for an user.
    I am not sure, but I think that your problem is related to this issue. If not, there are very strange problems with the web authroization, its true: What we have done is to copy an exisiting BW user and assign him the same authorization like in web. Reason: To create a new user in the web does not work in all cases. We had very much problems with SP7, since we have SP10 we dont have those problems.
    regards
    Eckhard

  • Cost Center Integrated Planning with GP12N

    We are using the New GL in 6.0.  I have made all of the Integrated Planning settings in the versions for both the GL Planning and the Cost Center Planning.  If I load the Cost Center Planning through KP06, the transfer works fine.  However, it was my understanding that you could load Cost Center Planning through GP12N, and see it in Cost Center reporting.  This does not seem to work.  Am I missing some particular setting?  We are loading into FAGLFLEXT.
    Thank you for any suggestions.

    Hi,
    - this is not going to happen; cost centre planning is flowing from CO to FI and not viceversa. the same apply if you run a cost centre allocation in accouting: it is not posting to CO.
    - you can use FI planning for accounts not managed as cost element and cost centre planning for the others.
    - as an alternative you can design cost centre reporting in accouting with transaction FGI0.
    Paolo

  • Easy cost planning with integrated planning

    Hi All,
    I am testing easy cost planning and I see that to use easy cost planning, I have to unmark the flag for "Integrated PLanning", this leeds to no creation of line items in planification. Does anyone know if there is a way to use easy cost planning with integrated planning?
    Thanks a lot in advance.

    it may be with reference to the Versions.

  • Power Sim  - Does it work with Integrated Planning (IP)

    PowerSim currently promotes itself as being able to perform superior simulations on SEM-BPS. With BI7.0, we have the option of using Integrated Planning (IP) or BW-BPS. Following are my questions:
         1.  Does PowerSim work with IP?
         2.  Does PowerSim work with BW-BPS in addition to SEM-BPS?  Assuming  yes, what are the differences / challenges (if any) using BW-BPS in a BI7.0 as opposed to going against SEM-BPS?
         3.  Does BI7 have any "out of the box" advanced simulation capabilities that are "close" to what PowerSim provides.
         4.  Given SAP's recent strategic investments of Outlook Soft / Pilot / Acorn, the assumption is that these will integrate into the BI platform over the next year +.  Does anybody know if any of these tools provide similar simulation capabilities to PowerSim and/or what SAP's timing is to integrate / ramp-up?
    Thanks

    Hi Richard,
    1) Unlike in previous versions of SEM-BPS. there's no special support for PowerSim in BI-IP. Please check with PowerSim vendor what kind of standard SAP interfaces they support (to read from/write data to BI).
    2) Yes, when it comes to PowerSime BW-BPS is no different to SEM-BPS. You cna use BW-BPS just like SEM-BPS (some limitations are the financial planning functions). For more information please see the BI FAQ at http://service.sap.com/bifaq.
    3) No.
    4) No. PowerSim provides specialized capabilities which are not included in that form in the products listed by you. Please check with PowerSim what capabilities they provide in connection with SAP NetWeaver BI 7.0
    Regards,
    Marc
    SAP NetWeaver RIG

  • Problem with Integrated Planning / NW2004s Sneak Preview

    Has anyone successfully started the planning modeler of the integrated planning in NW2004s?
    I installed the ABAP Edition of NW2004s Sneak Preview (NSP) and after that the Slim Java Edition (J2E). When starting the planning modeler I get the error message "Cannot find J2EE Engine" although the J2E-System is running according to the management console.
    I suggest that you need to modify some of the parameters of the ICM. Has anyone some infos how to do that?
    Thanks for your replies
    Thorsten

    Hi Thor,
    as raja mentioned you need NW04s Java engine to integrate with NW04s ABAP sneak preview.Right now it is not available for download in SDN and service market place. it is still under ramp up and only available to SAP internal.
    Thanks
    Sarath.

  • Problems with BI Integrated Planning

    Hello, everybody,
    We installed BI 7.0 and want to use BI Integrated Planning, but then i connect to Modeler Wizard i get error <b>No JCO Connection</b>. Our BASIS Team can't find an issue.
    Maybe there is some kind of configuration in BI side, not just in BASIS?
    Could you give us some advice?
    Thanks in advance.
    Best Regards,
    Arunas Stonys

    Joanne,
    Are you still having issues with BI-IP?  I have been troubleshooting with the basis folks in getting BI-IP up on a new system over the last few day to a week and have now gone through the process myself whereas before I had been given a system already set up.  I have enclosed some troubleshooting feedback with my counterpart in getting the system up.
    What type of issue are you having? 
    Can the basis folks start the planning modeler or planning wizard in RSPLAN even if you can't?
    1. The note mentioned above 919850 and the help documentation in SPRO under
    SAP NETWEAVER->Business Intelligence->BI Integrated Planning
    are very helpful.  They have to set the following Jco Destinations in Web Dynpro Content Administrator:
    BI_MODELDATA
    BI_METADATA
    WD_ALV_MODELDATA_DEST
    WD_ALV_METADATA_DEST
    And the problem was the connection to the message server. It was not possible to connect without having a Logon group assigned. This had to be done in WI4 ABAP as well as in the SLD for this system. After that assignment connection was no problem.
    2. make sure you have the portal ips in your host file.
    3. have they have created an account for you in client 001 of the NW04S?
    4. Have they created a portal id for you and  assign the portal role com.sap.ip.bi.business_planning_showcase to you?
    5. have they configured the setting for starting the planning modeler (also under SPRO)..
    Hope this helps.  If you have more specific questions, feel free to e-mail me directly.
    Mary

  • Status and Tracking system (STS) with BI Integrated Planning ?

    Hi, is posible get some images or demo for show my clients ?
    i am reading Salp Help
    http://help.sap.com/saphelp_nw04s/helpdata/en/b6/92bc7479fb11d5b3df0050dadfb23f/frameset.htm
    and say :
    You can use the BW-BPS Status and Tracking system (STS) with BI Integrated Planning. This is useful if you are already using BW-BPS with the Status and Tracking system but want to use additional functions from BI Integrated Planning.
    What is additional functions from BI Integrated Planning ?
    Is posible write free text in some areas for planning and option for look from high levels ?
    Is posible Insert in the proces STS to <b>"Area Manager"</b> only for look status the Planning (open, in process or finishing) ?
    General manager --> Lock when is finishing.
    <b>Area manager</b>--> only look status the Planning ?
    Submanager of area --> Responsable, Aproval, etc.
    planning1
    planning2
    planning3
    planning4
    planning5
    Submanager of area : Planning TOO.
    Thank you ... This is important info and get some images the last version in STS working in web mode, for my client buy the product.

    Hi Bala ,
    Yes you can use the STS for BI IP also and you need to configure the Planning level and sub plan area and follow the steps to set up STS.
    STS still has BPS flavour and can be used in IP.
    Hope this helps
    Raja

  • Load issues with integrated planning

    I have a cube XYZ. Sometimes some key figures are wrong and they should be manual changed. I use a real time cube for adjustment. I loaded all data from cube XYZ to real time cube. I changed some key figures with integrated planning. Now I have to load correctional data to XYZ. If I use delta, in first request all data will be loaded to XYZ. In this case, I have double data in XYZ. 
    My question: how can I load only correction data to XYZ?

    Hi,
    After you have loaded from XYZ to the real time infocube, you make a initialization without data transfer back to XYZ. This means that the change pointer is reset.
    Then you change the records in the real time infocube. These changes will be put in a new request which equals the delta queue (because you reset the change ponter).
    Make a delta load from the real time cube to the XYZ cube => only the changes are moved.
    Hope this answer helps
    Best regards,
    Keld

  • Problems with HowTo "Creation of BI Master Data in Integrated Planning...)

    Hi,
    one of our customers need a planning application in which he can create master data for different attributes, insert some key figures for this attributes and changes already planned key figured.
    For the last two point I've already found a working solution, the first point (creating of masterdata in web template) is still a problem. After a little search, I found a howto-guide "Creation of BI Master Data in Integrated Planning (IP) through Web Layouts", in which the necessary steps are described, how to do this (please see following link: http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/607193d5-cdd5-2b10-c699-8ff04c3124f6)
    Does anyone of you know this guide and was able to build a working solution?
    I have different questions, maybe you could help me:
    - what kind of variable is he using?
    - do I need a DataProvider in Web Template?
    - how do I get the connection to the used variable in the button group?
    Thanks for your help.
    Regards
    Tim

    Hi Timo,
    you require two howtos to implement the solution.
    First, please take a look at the first document:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/10d2b273-0e12-2c10-fab3-a34bde559f92?QuickLink=index&…
    In chapter 3 you see the prerequisites (note 1101726 and notes 1384495, 1387004 and 136772). By this, you change the system behaviour, not to check if the new inserted master data is valid (it can't be valid, because the entries are new!)
    And after this please implement the solution from the how to.
    Furthermore you can take a look at this how to, which might help you too:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/607193d5-cdd5-2b10-c699-8ff04c3124f6?QuickLink=index&…
    Even if my first post is a bit old, my customer still uses this solution, at the moment we are on 7.3 sp06, so it is working in newer releases too.
    Hope this helps.
    Regards
    Tim

Maybe you are looking for

  • Need suggestion

    hi....i need suggestion on my problem.i've been given a complete atand-alone java application.my assignment is to make the system,a web-based system so that when we want to make a demo we did not need to bring an installer.just show to from the brows

  • Manual for BI Interactive Dashboards

    Hi All, I'm looking for user manual for predefined Interactive Dashboards ('Manufacturing Analysis' and 'Order Booking and Fulfillment', etc.). On Metalink I found only 115fieig.pdf (Oracle Fusion Intelligence For E-Business Suite Implementation Guid

  • Query time out

    Hi, My application is hosted on http://htmldb.oracle.com/. One of my page always gets timed out recently. I have query like the following: 1. "bugcritc" is a table stored some bugs I cared select bug_num from bugcritc -- 0.03 sec, 65 rows returned 2.

  • Selection-screen comment.....?`

    Hi All, I need explanation for the following statement        SELECTION-SCREEN COMMENT 1(15) TEXT-001. What does 1 and 15 mean in the above statement? Regards Dnyanesh

  • Need help with Updating Crystal Reports XI Release 2.

    I had to reload my Crystal Reports XI Release 2 and I am trying to get the software up to date.  I looked for Service Pack 1 Incremental on the Downloads and it is not available.  I tried downloading Service Pack 2 Incremental and it said I need Serv