Cost Center Integrated Planning with GP12N

We are using the New GL in 6.0.  I have made all of the Integrated Planning settings in the versions for both the GL Planning and the Cost Center Planning.  If I load the Cost Center Planning through KP06, the transfer works fine.  However, it was my understanding that you could load Cost Center Planning through GP12N, and see it in Cost Center reporting.  This does not seem to work.  Am I missing some particular setting?  We are loading into FAGLFLEXT.
Thank you for any suggestions.

Hi,
- this is not going to happen; cost centre planning is flowing from CO to FI and not viceversa. the same apply if you run a cost centre allocation in accouting: it is not posting to CO.
- you can use FI planning for accounts not managed as cost element and cost centre planning for the others.
- as an alternative you can design cost centre reporting in accouting with transaction FGI0.
Paolo

Similar Messages

  • Adding cost center on OKB9 with cost element company code with valuation ar

    hi ,
    can anybody help me out with the Adding cost center on OKB9 with cost element company code with valuation area configuration.
    i have to do this configuration but do not know the detailed steps for that one.
    Good points will be awarded.

    Hi Prem
    Select the 1 in column acct assignment details column then in the left side in detail per business area/valuation area enter your valuation area.
    Thanks
    Ashok

  • Cost center Group associated with a Cost center

    Hi Experts ,
    I have a requirement , where I need to find the cost center group of given cost center.
    Is there any FM to do the same?
    I have Cost center in the Input and should get Cost Center group associated with it.
    Thanks !!

    BAPI_COSTCENTER_GETDETAIL

  • Cost Center Activity Planning

    Can some one explain the process of cost center activity planning?

    Hello
    Please check this link on activity planning:
    http://help.sap.com/erp2005_ehp_02/helpdata/en/08/51490c43b511d182b30000e829fbfe/frameset.htm
    Reg
    assign points if useful

  • Cost center integration with HR - logical system for CRT inconsistent

    Hi there,
    we are distributing Cost centers from our SAP ERP system to another SAP HR system via ALE [COSMAS01 basic type].
    The cost center created in target system contains information about source system logical system name - table CSKS, field LOGSYSTEM.
    This is causing problems in Travel Managment in SAP HR system, where we get the error: Logical system for CTR inconsistent.
    Cost centers created/changed in HR system does not contain any value in CSKS-LOGSYSTEM field and work fine.
    Any ideas how to solve this issue?
    For now to fix the issue, user needs to do a phony change in SAP HR system to get rid of original LOGSYSTEM value.
    I am thinking about removing field E1CSKSM-LOGSYSTEM from COSMAS IDoc but I gues there must be simpler soloution.
    Thanks for your advices,
    Igor

    Igor :
    I think this has something to do with matching logical system with controlling area in TKA01. Another option for cc's logical system to have no values when outbound ALE is to config V_TKA01_ALE (so it will be transported to the system that has cc ALE to other systems) to have field 'ALE Distribution Method' blank (No distribution to other system).
    This way, when SAP is creating outbound idoc for COSMAS, field CSKS-logicalsystem will not be populated (logic is in SAP 'MASTERIDOC_CREATE_COSMAS' , around line 86).
    Rgds.

  • S_ALR_87013611 - Cost center: Actual/Plan/Variance selection report - outpu

    Hello all,
    when running the report,it can be seen in SAP screen by cost groups and by cost elements.
    The problem is that when user tries to save report in local file, then it is not able to see cost center distribution. User can only see cost elements amounts.
    is there a way we can save on a local file cost groups as well?
    Thanks in advance for letting me know
    regards
    Hana

    Hi,
    Look for data source 0CO_OM_CCA_1 ( Cost Centers: Costs and Allocations ) ..it will give you the plan / actual /commitment amounts & qty.
    Link is http://help.sap.com/saphelp_nw04/helpdata/en/8d/1f383fe58d5900e10000000a114084/frameset.htm
    Hope that helps.
    Regards
    Mr Kapadia

  • KP06 Cost Center Budget Planning System error when locking the data records

    Hi,
    While updating Cost Center Planning system(KP06) its giving the below error:
    System error when locking the data records.
    Message no. KI502
    Diagnosis
    The lock to protect the data records being processed could not be set. The
    probable reason for this is that the SAP locking table is full and no more
    entries can be added.
    Procedure
    Inform your system administrator immediately
    No planning data has been changed
    Message no. K8038
    Diagnosis
    You used Post. While preparing the data for posting, the SAP System
    determined that no changes were made in the available databank values.
    System Response
    A posting activity price is not necessary
    Please help me how can we rectify the above error..
    Thanks
    VS Rao

    Hi,
    check the locking entries (t-code SM12).
    http://help.sap.com/saphelp_erp2004/helpdata/en/37/a2e3ae344411d3acb00000e83539c3/frameset.htm
    Best regards, Christian

  • Change cost assignment (cost center) in confirmation with badi?

    Dear experts,
    for a certain request, we want to implement logic that will clear out the cost center when creating or saving the confirmation.
    We have tried the DOC_CHANGE BADI but this does not seem to do the trick. following code:
    LOOP AT acct_data into ls_acct_data.
        IF ls_acct_data-acc_cat EQ 'OR'.
          CLEAR ls_acct_data-cost_ctr.
        ENDIF.
        MODIFY acct_data from ls_acct_data.
    ENDLOOP.
    ET_ACC[] = acct_data
    Is my code wrong, or should i use another badi?
    Regards,
    Tom

    Hi,
    I have tried the following but does not seem to change anything:
    Loop at IT_ACC into ls_acct_data.
      If ls_acct_data-acc_cat EQ 'OR'.
        CLEAR ls_acct_data-cost_ctr.
      Endif.
      MODIFY it_acc from ls_acct_data transporting acc_cat.
      Endloop.
    Also with the following method, it is not changing the account assignment. I am in doubt that this badi could actually change the account assignment on confirmation?
    Loop at IT_ACC into ls_acct_data.
        If ls_acct_data-acc_cat EQ 'OR'.
          CLEAR ls_acct_data-cost_ctr.
          Append ls_acct_data TO lt_acc.
        Endif.
      Endloop.
      ET_ACC[] = lt_acc.
    Edited by: Tom Seminckx on Jan 20, 2009 1:18 PM

  • Cost center creation prefix with 0000000(zeros)

    Hi All
    Is there any way to creat cost center prefix with 0000(Zeros).I have created cost center called 0000012345 and when i saved this data 0000 were discapperd.Is there any way to create cost center with prefix Zeros(0000000)

    Hi Praneeth
    Thanks for your reply, i agree with you, but once i have done with above step which is explained from your screen, and i pressed enter,by defeault 0000 got disappered.Please see below screens
    Screen 1:
    Scree 2

  • PA Integrated Planning with Excel.

    Good day guys
    I'm busy setting up PA planning with Excel. I've built the planning layout and linked it to a planner profile.
    Im now at the maintaining the file description screen. I would like to save the file description but cannot find how to do it as I do not have the 'save as' to clivk on and give it a file name to use when uploading.
    I'm also getting this message:'A later upload is not possible with this layout
    Message no. K9363'
    Can someone show me where I'm going wrong and help resolve this issue?
    Regards
    Meneti

    Hi Guys
    I've resolved the issue. I went to Excel options and changed the Save function to allow 'Save As'
    Regards
    MS

  • Profit center integrated planning using excel

    Hello,
    We are on ECC6 and new GL is not turned on.
    am trying to upload plan for profit centers using excel upload functionality for 12 months. I created a planning layout using 7KEA and assigned the layout to the planner profile KP34PC.
    When trying to save the file extension, i get the message:
    Message No K9363
    A later upload is not possible with this layout
    the layout cannot be used for an upload. This can be caused by one of the following
    1. the layout does not contain data field that is ready for input.
    2. the layout has a lead column that only contains text for the characteristic value and not the characteristic value itself.
    3. the layout contains formulas
    4. The layout has complex lead columns and contains empty lines.
    We need to upload budget in the next couple days. Any suggestions if this achievable is appreciated.
    Thanks.

    Hi,
    - this is not going to happen; cost centre planning is flowing from CO to FI and not viceversa. the same apply if you run a cost centre allocation in accouting: it is not posting to CO.
    - you can use FI planning for accounts not managed as cost element and cost centre planning for the others.
    - as an alternative you can design cost centre reporting in accouting with transaction FGI0.
    Paolo

  • Force user to change cost center master data with validity date

    Dear All!
    we do have customer fields in table for cost centers (CSKS) and would like to force the user to do changes for these customer fields in combination with the change of the validity from/to date. I did not find any possibility to add this functionality with the customizing transaction OKEG or any other transaction. We now would need some good ideas from you as SAP experts!
    Regards,

    Hi,
    You can use COOMKS02 enhancement.
    Regards,
    Eli

  • Activate Integrated Planning for Cost Line Items posting

    Hi all,
    Based on this SAP Help link, there are two ways to create plan line items:
    1) By adding the business transaction "Plan line items" to the user status of the WBS Element.
    2) By activating Planning Integration a.k.a. Integrated Planning for version and WBS Element/Project Profile.
    Option 1 works fine for me.
    However, option 2 does not seem to be working when I activate it, contradicting the state from the link:
    If planning integration is active in the fiscal-year-dependent parameters of the relevant planning versions, the system writes cost element planning line items for plan-integrated WBS elements, regardless of user status.
    So far what I have customized is:
    -In transaction OKEV, select the version, click on "Settings for Each Fiscal Year" and double click for the year. Then I mark both "Integrated Planning" and "Integrated planning with cost center/bus. processes" checkboxes.
    -Activate "Integrated Planning" at Project Profile level: go to transaction OPSA, select Project Profile, go to tab "Controlling" and mark "Integrated Planning".
    Nevertheless, when I post plan costs from transaction CJR2 using the customizing above (based on second option), I see no cost lines when running CJI4.
    I wonder if there is something missing in customizing that allows me to see posted cost line items in CJI4. I would appreciate very much your help.
    Many thanks and best regards,
    Pablo

    Hi Gokul,
    Many thanks for the link to that threat, Rachel Tang's reply on that discussion is very complete and included the answer to my question.
    She comments that three points must be checked to activate Integration Planning:
    1) Mark "Integrated Planning" at CO Version/Year level (SPRO > Controlling > General Controlling > Organization > Maintain versions).
    2) Mark "Integrated Planning with costs centers/bus. processes" at CO Version/Year level (same transaction).
    3) Ensure WBS Element has Integration Planning marked (PRPS-PLINT = X). [It looks like this is done automatically by marking Project Integration at Project Profile level BEFORE project is created]
    In my case, I had first and second steps correct. However, even though I had marked Integration Planning at Project Profile level, it seems that already created Project Definitions are not updated with new Integrated Planning value after it is changed at Project Profile level.
    Maybe it is possible to modify WBS Element's Integration Planning flag manually (though SAP OSS Note 301917 states that this is impossible), otherwise I could never achieve Integration Planning for already created projects.
    In my case it would be more suitable to use the alternative of adding Business Transaction "Write plan line items" to User Status.
    Many thanks to Sanjeev and Gokul for your help.
    Best regards,
    Pablo

  • How to create File description in cost center planning (T Code -KE13)

    Hi,
    Experts,
    I am creating Cost center planning in KP06 and would like to create my own layout(File Description) using excel. e.g. 01_1P1_IDES1572_001IDES-1572 as this is the standard SAP file description. How to create my own this way as per my excel layout.
    Regards,
    Jagruti Collaco

    <b>Three steps:
    Identify or Create planning layout.
    Identify or Create planning profile.
    Create file description.</b>
    Next upload the data.
    Detailed Steps
    Identify or Create planning layout.
    Identify an existing standard layout or else
    Create planning layout through KP65 (you can also copy a standard and modify it)
    Identify or Create planning profile.
    Go to SPRO>Controlling>Cost Center Accounting >Planning>Manual Planning>Define user defined Planning Profiles.
    Create a new Profile. You will see nodes or folders on the left indicating General Controlling>Layouts for controlling> and Default parameters.
    <b>Choose the layout for controlling and enter the layout you chose in earlier step.
    Enable Integrated excel checkbox and overview (everything you can)
    Next, select the layout and double click on default parameters.</b>
    Enter a test data with cost center, elements, period, version, year. and save all. You may want to save the file as a model in your desktop with a different name say CCAPlan.csv. (You will notice, as you come out a new file description field that was blank earlier is now populated with a name like 01_1P1_(layout name)XXXXXX_Profile Name (XXXXX)
    Come out of the screens.
    Go to KP06, extras. excel upload via extras. or KE13

  • Datasource for plan value in cost center accounting

    Hi
    I would like to create query for plan value that maintain in source system via tcode KP06
    (Controlling > Cost center accounting > Planning > Cost and activity inputs). Can experts please share with me which datasource to turn on in order to send the data to BI for reporting?
    Thanks
    Kang Ring

    Hi,
    Try 0CO_OM_CCA_1.

Maybe you are looking for

  • Printing issues in CS4

    We recently upgraded to CS4 from CS2 (Mac 10.5.7), and we've noticed a weird printing quirk that has never occured before. On two different Macs in our art dept, we have the occasional problem with files that were sent to one printer ending up on ano

  • Album Page versus Photo Page

    I setup my site with several photo pages under album pages. Then created another photo page and hyperlinked the photo for each album on that to album page to shows the different albums for each subject. Problem is, the main album page I was trying to

  • Back ground application

    When we are playing an application game, we exit it to the main menu by pressing the home button. Will the game still be running in the background and if so, how can i see the list of applications running in the background.

  • Accessing Instance variables from within javascript

    Is it possible to access Instance variables of a JSP using javascript? If so, an example would be very much appreciated. LaMont

  • No dhcp offers when booting from network

    I have 2 managed switches, a SLM2048 and a SRW2048. Neither of these switches work with thin clients booting from the network. My configuration: A Ubuntu LTSP server: More information about this here -> https://help.ubuntu.com/community/ThinClientHow