A Variable for Replacing From Date -- To Date

Hi Friends,
I am trying to create  a variable that can replace From Date -- To Date ,
For Example In the Variable if the user enters 3 , It should Take Systems date ( today) and should show the resukts for the next three days ,
Like this for 4 days or 5 days ..... whatever is the input , The variable should take todays date and should give the result accordingly ,
Hope this is clear , Any sample code on this or any standard extractor or any Document describing this type of scenario would be great help ,
Thanks in advance,
sathy

Hi Sathy,
You can try the following.
Create a formula variable (YOUR_USER_ENTRY_VAR in this example) for number of days offset (user entry).
In customer exit we will calculate the TO_DATE based on system current date and entered offset.
Execute TX CMOD.
Choose either existing project or create a new one.
Press a button Components (or use Component radio-button).
Double click on a row with EXIT_SAPLRRSO_001.
Double click on INCLUDE ZXRSRU01.
In the body of this include place your code.
CASE I_VNAM.
WHEN ' YOUR_CUSTOMER_EXIT_VAR '.
IF I_STEP = 2.“ After selecting of input variable
LOOP AT I_T_VAR_RANGE INTO LOC_VAR_RANGE
WHERE VNAM = 'YOUR_USER_ENTRY_VAR'.
CLEAR L_S_RANGE.
L_S_RANGE-LOW = SY-DATUM + LOC_VAR_RANGE-LOW.
L_S_RANGE-SIGN = 'I'.
L_S_RANGE-OPT = 'EQ'.
APPEND L_S_RANGE TO E_T_RANGE.
EXIT.
ENDLOOP.
ENDIF.
ENDCASE.
Activate the project.
Go back using green arrow each time activating the project.
There is also some info with examples in the system:
tcode SMOD, enhancement = RSR00001, select 'Documentation' radiobutton - Display. Make sure you do it in English.
Best regards,
Eugene

Similar Messages

  • Formula variable with replacement path on system date

    Hi Experts,
    I got a requirement to calculate "Days without payment" in report level.
    Days without payment = System Date - Payment Date.
    (Payment date field is available in CUBE, but system date field is not available in the CUBE)
    As we know, the difference b/w 2 dates is not possible directly.It can be possible by creating 2 formula variables with replacement paths on the dates and by writing aformula on these 2 formula variables.
    But the thing is I dont have system date readily available, and I tried by using SAP Exit. But we cant create formula variable replacement path on another variable (SAP EXIT).
    Do we have any SAP variable  for formula with replacement path readily avaliable to get system date (or) any other suggession.
    Please suggest me.
    Thanks,
    Sai Chand.S

    Hi Arminder,
    Thanks for your valuable answer.
    I tried doing the same previously.As u said we can get system date by creating customer exit variable.
    But the thing is to find difference b/w 2 dates, we cant do it directly, we need to create 2 formula variables with replacement path.
    1) Var1 = Formula variable with replacement path on system date(custoer exit variable).
    2) Var2 = Formula variable with replacement path on paymanet date.
    Number of days = var1 - var2.
    But as in 1st point, we cant create formula variable with replacement path on another variable, as system date is already a variable of type customer exit.
    We can create replacement paths only on characteristics.
    Please suggest me .
    Thanks,
    Sai Chand.S

  • Formula variables with replacement from key

    Hi Sdns,
    Well We are doing Upgradation from BW3.5 to BI 7.0.. After Upgrade we got stuck up'd at reports.. We are facing an error for a report which is formula variables with replacement from key is not working. The final result is giving us unexpected results i.e, Itz showing the values as X.
    We got some reference from Service.sap. We found a note which is 1005772. Howeer this Note is applicable for suport package level 12. But we are already in higher suppor package level 15.. So this note is not applicable.
    Can anyone guide us if u people have faced this kind of issue.
    Regards,
    Aluri

    Hi,
    Replacemet path processing type can be used with Charceteristics variables, text variables and formula variables.
    For example u have created two restricted Key figues for two
    years sales comparison and u have used characteristics variables on 0CALYEAR.
    The years for which we want to compare sales volume will be selected during the Execution.
    If 2000 and 2001 be selected,
    these can be assigned as text for restricted Key figures in the record.
    Please go thorough the following links.
    An application of Replacement path variable can be found here.
    http://www.sd-solutions.com/documents/SDS_BW_Replacement%20Path%20Variables.html
    Another application to get the Document Count: For example Number of Sales Orders.
    Query formula-Counter???
    Example for Replacement Path: Characteristic Variable.
    http://help.sap.com/saphelp_nw04/helpdata/en/2c/78a03c1178ad2ce10000000a114084/content.htm
    Variable Replacement Example
    http://help.sap.com/saphelp_nw04/helpdata/en/af/809528939d5b4fbff7e16a5bdc0d85/content.htm
    Example for Replacement Path: Formula Variable.
    http://help.sap.com/saphelp_nw04/helpdata/en/ca/5f9ac61a205a459d0e7ef313d10321/content.htm
    Hope it's helpful......
    Thanks,
    Kameswari.

  • Variable for budget from starting to previous fiscal year?

    Hi experts,
    The requirement i got in my report to calculate Budget upto previous fiscal year.
    For ex: If my project starts on Nov 2004 , then i want to calculate for the year Nov 2004 to Mar 2008.
    I tried for variable Cumulate to last fiscal yeard

    Hi,
    Here I'm giving the code to get Months based on System date, so you change this code to as per your requirement.And if any use input variable is there then you need to use ....
    LOOP AT i_t_var_range INTO loc_var_range WHERE vnam = 'ZVARAIBLE'.
    ENDLOOP.
    Note: So by using this variables you need to restrict your Keyfigures with offset values.
    * First Month Of Current Fiscal year comment*
        WHEN 'FMYEAR'.
          CALL FUNCTION 'DATE_TO_PERIOD_CONVERT'
                 EXPORTING
                   i_date               = sy-datum
    *         I_MONMIT             = 00
                   i_periv              = 'V3'
                IMPORTING
                  e_buper              =  zbuper
                  e_gjahr              =  zbdatj.
          CLEAR: l_s_range.
          l_s_range-low+4(2) = '04'.
          l_s_range-low+0(4) = zbdatj.
          l_s_range-sign = 'I'.
          l_s_range-opt = 'EQ'.
          APPEND l_s_range TO e_t_range.
    * Last Month of Current Fiscal year*
        WHEN 'LMYEAR'.
          CALL FUNCTION 'DATE_TO_PERIOD_CONVERT'
                 EXPORTING
                   i_date               = sy-datum
    *         I_MONMIT             = 00
                   i_periv              = 'V3'
                IMPORTING
                  e_buper              =  zbuper
                  e_gjahr              =  zbdatj.
          CLEAR: l_s_range.
          l_s_range-low+4(2) = '03'.
          l_s_range-low+0(4) = zbdatj + 1.
          l_s_range-sign = 'I'.
          l_s_range-opt = 'EQ'.
          APPEND l_s_range TO e_t_range.
    Thanks
    Reddy

  • BW 3.5 - Issue with formula variable with replacement path

    Dear experts,
    I'm facing an issue with formula variable with replacement path.
    Just to clarify, I know replacement paths is raising a lot of questions but I've been using this functionnality extensively in the past, both in 7.0 and 3.5, so I'm not looking for basic information about how to use it.
    I'm trying to setup a simple report that would show total values per plant of Purchase Order < 100 €
    To do so I've setup a calculated key figure as follow:
    VAR1 * ("PO value" < 100 ) * "PO value"
    VAR1 is a formula variable with replacement path on 'purchase order' and value attribute 'constant =1'.
    (The report has to show values summarized by plant but should not show the detail PO by PO, so I'm not looking at a solution based on condition)
    The report as characteristic "plant" in rows and my CKF in columns.
    Now let's take an example. I have 3 POs in Plant 1:
    PO1 -> 150€
    PO2 -> 90€
    PO3 -> 80€
    Because of the variable with replacement path, the result in my query should be:
    plant1 = 170 (even though characteristic "purchase order" is not in my rows, system should evaluate PO one by one and return values only for those two that are below 100).
    But the result coming is 320, which is wrong.
    I've done the same report on many other 3.5 systems and it worked perfectly, and I am not able to get proper support from SAP OSS who keep saying that this functionnality is not ready in 3.5 (although I've provided screenshot of this working on another 3.5 system!!! how frustrating...)
    They have also pointed to problems of Before and After aggregation but that has absolutely no impact. Once again, the scenario is working perfectly on other 3.5 systems with the same query design, so i'm sure it has nothing to do with Query Designer options.
    Would anyone have ever come to an equivalenet problem? I'm wondering whether the DB itself could not play a role in the variable with ref  characteristic 'constant =1' ...
    Any though is welcome!
    thanks

    Hi,
    The text variable is replaced when the exact date is clear for this key figure column according to the restriction.
    To achive this, please make sure that either the variable is directly restricted in the key figure selection, or that the date characteristic is in drilldown.
    Regards,
    Patricia

  • How to use the dynamical or static variable for ESSBASE cube name?

    Hi Experts,
    When I import ESSBASE Cube into physical layer, the cube name from ESSBASE is created automatically, such as H_Sales.
    I want to use the the static or dynamical variable for replacing the external name. So I try to create the static variable in RPD,such as cubeName, and use the following code
    'VALUEOF(cubeName)' into the textbox of external name.
    However, when I view the report in answer, it will generate the error message: Database VALUEOF(cubeName) does not exist.
    Is it possible to implement this functionality?
    Thanks..

    Hi,
    use <%=odiRef.getSchemaName("D")%>
    D as parameter if it is the Data Schema or W if you need the schema from Work Schema
    Your command will be like:
    select <%=odiRef.getSchemaName("D")%>.GER_LOT_EXEC_ODI('Fluxo', 1, 'C') FROM DUAL
    Works?
    Cezar Santos
    http://odiexperts.com

  • Issue with text variable by replacement path

    Hello All
    I have a date field called ZDATE1 (it is based on 0DATE). I have used this this IO in a query and have create variables on it (ZSTARTDT and ZENDDT), Start and End date. And my KFs are based on these 2 dates: Quantity - Start Date & Quantity - End Date  / Product Value - Start Date & Product Value - End Date. Those are my descriptions for my KFs.
    Now, I want the replace the descriptions "Start Date and End Date" with the actual values that I am entering like 09/01/2010 and 09/10/2010. Ex: Quantity - 9/01/2010 & Quantity - 9/10/2010.
    Therefore, I create 2 Text Variables,
         1. ZSTART, Replacement Path, Ref Char (ZDATE1), Replace by Variable ZSTARTDT, with KEY, offset - blank
         2. ZEND, Replacement Path, Ref Char (ZDATE1), Replace by Variable ZENDDT,      with KEY, offset - blank
    And I put these text variables in the descriptions. But when I run the query, I still see: Quantity - &ZSTART& and Quantity - &ZEND&.
    Note that my ZDATE1 which is based on 0DATE does not have a master data table or text table; it is purely transaction data. Does that mean, my text replacement path variables wont work.
    Any suggestions??

    Hi,
    The text variable is replaced when the exact date is clear for this key figure column according to the restriction.
    To achive this, please make sure that either the variable is directly restricted in the key figure selection, or that the date characteristic is in drilldown.
    Regards,
    Patricia

  • How to create variables for offsets?

    Hi BW Experts.
    I have a tricky one that has been posted before, but I couldn't get my head around a feasible answer just yet.
    My customer wants to be able to display his ageing AR report with different buckets, depending on the month.
    For example, if it's January he wants to see buckets for 1-30 days, 31-60 days, 61-90 days and 91 to 120 days.
    If it's February, he wants to see buckets for 1-28 days, 29-58 days, 59-88 days and 89-118 days.
    If it's March, he wants to see buckets for 1-30 days, 31-58 days, 59-88 days and 89-118 days,
    and so on.
    We have create a structure in the query, filtering the key figure 0DEB_CRE_LC by 0NETDUEDATE. We have a variable for 0NETDUEDATE as a starting date and use different offsets to get the buckets. However, the offsets need to be hard coded, preventing us the flexibility of choosing the days in the buckets.
    Is it possible to create variables for the offsets, so the user can choose the days for the buckets at the report run time?
    Thanks in advance.
    Kind regards,
    Aline Passos.

    Hi Aline,
    as user is entering 0NETDUEDATE & he needs different buket for different months, which are more or less decided well in advance, I believe it cane be handled by User Exit varaibles which will draw value from the variable value you have entered & go backward.
    you will need to write the ABAP code with your logic to drive the correct user exit values.
    hope it helps
    regards
    VC

  • Replacement path variable for date not working

    We have a formula variable using replacement path (BEx 7.0) for a date field and after that we have calculated key figures to perform date difference calculations.
    This was working perfectly well until recently when the calculated key figures displayed an "X" instead of the value.
    The value seems to appear only when the date fields are drilled down in the report.SO this works like a formula instead.
    Is this just an unnatural case where something just stopped working ?
    We have checked the calculated key figures and the formula variables , they havent been changed in the recent past.
    Is there any other solution you could offer to get date differences without having the date fields in the rows ?
    Edited by: ABCD on Jul 29, 2009 2:28 PM

    How to use Replacement Path Variables to perform Date Calculations
    A Step-by-Step guide
    Have you ever wanted to perform calculations using dates defined as characteristics but have never worked out how it can be done? Replacement Path Variables are the key.
    Using Replacement Path in your Text and Formula variables, replace values held in a characteristic. The Characteristic value variables are replaced by the results of a query at run-time.
    The steps detailed below show a technique to enable a BEx query user to determine the number of days between two dates.
    Scenario:
    The group HR administrator wants a detailed line item report that lists all employee absences in a given period. The report is to show the employee number, the absence start date, together with the end date of the absence and show the number of calendar days the employee was absent.
    The good thing about using this technique is that no redesign work is needed from your technical BW team, no ABAP is involved and best of all, it quick and easy.
    Solution:
    For this example I created an ODS object called Absence that holds basic employee information along with individual absence record data.
    Follow the steps below:
    1.     Open the BEx Query Designer and create a new report on your chosen InfoProvider.
    2.     Drag the Employee, Valid from and Valid to characteristics into the Rows section of the screen.
    If needed, apply data selection restrictions to the characteristics as shown in Figure 1.
    3.     Right click on the Key Figures structure and select New Formula (Figure 1).
    Figure 1
    4.     
    5.     In the new formula window right click on Formula Variable and choose New Variable ( Figure 2 ).
    Figure 2
    6.     
    7.     The Variables Wizard will launch and will require you to specify the variable details.
    ( Click the NEXT button if the Introduction screen appears )
    8.     Enter the variable details on the General Information as shown in Figure 3 .
    Enter the Variable Name , Description and select Replacement Path in the Processing by field.
    Click the Next Button.
    Figure 3
    9.     
    10.     In the Characteristic screen (Figure 4) select the date characteristic that represents the first date to use in the calculation (From Date).
    Click the Next Button.
    Figure 4
    11.     
    12.     In the Replacement Path screen (Figure 5) select Key in the Replace Variable with field. Leave all the other options as they are (The offset values will be set automatically).
    Click the Next Button.
    Figure 5
    13.     
    14.     In the Currencies and Units screen (Figure 6) select Date as the Dimension ID.
    Click the Next button.
    Figure 6
    15.     
    16.     The Save Variable screen (Figure 7) displays a summary of the new variable.
    Click on the Finish button to save the variable.
    Figure 7
    17.     
    18.     Repeat steps 4 to 11 to create a second variable for the second date to be used in the calculation.
    In the example shown, the characteristic 0DATETO is used to create the variable ABSEND (Absence End Date).
    Define the Calculation
    We can now use our two new replacement variables to define our new calculated key figure that generates the number of absence days for each record.
    1.     You will now be back at the New Formula screen (Figure 8). Drag and drop the two new variables into the formula section of the screen and insert the subtract sign (u201C-u201C) between the two.
    2.     Give the new formula a description and click the formula syntax check button  to ensure the formula is valid.
    Figure 8
    3.     
    4.     The new calculated key figure will now show in the columns section of the BEx query designer (Figure 9).
    Figure 9
    5.     
    6.     Save the query and execute it.
    In the example shown the Number of Calendar Days Absent is calculated correctly. See the table of results below.
    Employee     Valid From     Valid To     Number of Calendar
    Days Absent
    50000001     17/04/2004      21/04/2004      4
    50000002     16/07/2004      29/09/2004      13
    50000003     07/01/2004      09/02/2004      33
    50000004     04/08/2004      05/08/2004      1
    Cheers:)
    Vivek

  • What are Parameters? How are they differenet from Variables? Why can't we use variables for passing data from one sequnece to another? What is the advantage of using Parameters instead of Variables?

    Hi All,
    I am new to TestStand. Still in the process of learning it.
    What are Parameters? How are they differenet from Variables? Why can't we use variables for passing data from one sequnece to another? What is the advantage of using Parameters instead of Variables?
    Thanks in advance,
    LaVIEWan
    Solved!
    Go to Solution.

    Hi,
    Using the Parameters is the correct method to pass data into and out of a sub sequence. You assign your data to be passed into or out of a Sequence when you are in the Edit Sequence Call dialog and in the Sequence Parameter list.
    Regards
    Ray Farmer

  • Problem in displaying dates for replacement path with text variable

    Hi all,
    I have to display dates in sequence as descriptions for 15 columns based on the the date entered by the user in Bex Report.I managed to display date as description using text variable with replacement path for single column.I could not able to increment date for other descriptions.Could you please help me to solve this issue.Its urgent.
    Ex: User enters 03/09/2007 then in the out put desciptions for the columns should be  03/09   04/09  05/09 ............ 17/09.
    Thanks in advance.
    Regards,
    Mandadi.

    Hi,
       goto the properties of your KF and click on the variable button side to that of the description field and click on new/Create option.Enter the technical name description for the text variable and select Replacement path as the Processing type and in the nxt screen select Fiscal year as the replacement variable and in nxt screen  specify as Key and provide offset values if necessary and click on finish.now select the variable by clickin on the variable button next to the description field.it comes after the description of the KF.Now run the query.
    Thanks,
    Sandeep

  • Create a formula variable using replacement path for current date

    Hi All,
    I created a formula variable using replacement path for current date.
    But when i used this variable am getting an error message saying .
    " This Variable cannot be used in this query".
    Could you please let me know the reason?
    Thanks,
    Zehra

    Hi All,
    Thanks for all your help...
    I just found a solution via the below link
    in Bex Formula variabel, Current calander day(sap exit) missing.
    Here he is trying to use the existing formula variable.
    My doubt here is, Even i could not find this varaible in BEX formula variable, But could see this in BI Content path as mentioned in the above link.  DO i have to transport this varaible , or i simply can activate it in production?
    I just could find this in BI Content but not in MetaData Repository.
    Thanks,
    Zehra

  • Hi. My phone screen broke and I had it replaced from a phone shop. The guy said that while changing the screen and phone was blocked. It is now disabled for like 23,000,000 minutes and I can't restore it cause I dont have all the data sync to my computer.

    Hi. My phone screen broke and I had it replaced from a phone shop. The guy said that while changing the screen and phone was blocked. It is now disabled for like 23,000,000 minutes and I can't restore it cause I dont have all the data sync to my computer. Is there anything I can do or can Apple do something if  I give them the  correct password?

    As you had the iPhone opened by an unauthorised repairer ( Apple do not replace screens on iPhone 4)
    Apple will not provide any service or support
    Take it back to the "phoneShop" and tell them to fix it
    You have no other alternatives
    or try this
    http://support.apple.com/kb/HT1212

  • Formula variable for date in report

    Hi All,
    I have to display the last date value of a particular date in the report.
    For a better understanding,
    I have Customer, Equipment, Service date, Amount
    In the report, I have to display
    Customer, Equipment, Last Service date, Last Service Amount.
    I have created a formula variable (Formula variable for Service date) for Service date with Replacement path.
    Replace Variable with Infoobject, Replace with Key, Dimension dates.
    And in Key figures, I have created a formula (Last Service date) with Last value in the Aggregation using the "Formula variable for Service date".
    The Last Service date is displayed as 'X' in the report since the Service date is not in the row. I cannot have the service date in the row either (not even by hiding the display).
    Kindly tell me how to rectify this problem.
    Thanks and Regards
    Adhira Anand.

    The X is appearing because, with the drill downs you have added, you have more than 1 date value to choose from when you attempt to aggregate.
    Have you tried using APD instead of exception aggregation?
    Have you built the exception aggregation calculated key figure globally or just locally (i.e. as a structure element)? It must be built globally to work properly.

  • Formula variable for a user input DATE value

    Hi All,
    I want to create Formula variable for a user input DATE value as I need to use it in a formula to compare between user entry date & date in the DSO. Does any body has any idea about it?
    I tried to create formula variable with manual entry but then I am not getting DATE option.
    Regards,
    Sonal

    Hi ,
    You have to create a formula variable in the formula.
    The formula variable in the general tab would have the reference characteristic as your date characteristic on which you have created a user entry variable or on which you intend to create a date entry variable.
    Give the proceesing type as replacement path.
    Next in Replacement path mention you would replace the variable with value of another variable.
    Mention the variable name.(This is the actual varaible created on the selection screen),
    Also mention you would replace only from value/to value of the variable.
    Check the following help link
    [Replacement path type formula variable|http://help.sap.com/saphelp_nw70/helpdata/en/e3/e60138fede083de10000009b38f8cf/frameset.htm]
    Hope this helps,
    Best regards,
    Sunmit.

Maybe you are looking for

  • Photoshop CC crashes when exporting image to PDF file

    Hello all, I have recently started using PS, and when I attempt to save an image as a PDF, it makes it to about 97% and leaves a temp file, but crashes before it can complete. I have provided a copy of the crash log below: Faulting application name:

  • Oracle BI Spreadsheet Add-in 10g 's API has forgotten what OLAP is !

    Hello, Did you know that since the 10g, the news API to reach AW is in SQL language? Never mind, after all, since one obtains what one wishes! The problem is that this interface generates an SQL request BY Excels cell!! 100 cells = 100 sql requests!!

  • Database connection with Dreamwever MX 2004

    Hi, everybody. I'm a new in this area. So, may be, the solution of the problem that I've faced is very simple! When I'm connecting to the MySQL database it says: HTTP error code 404 File Not Found. Here are some possible reasons for the problem: 1) T

  • How to open a workbook in BEx 700

    Hi Friends, Is there a way to open a workbook in BEx, just knowing its ID and name? Workbook is not saved in a role, psooibly in favourites of a user. In 3.5 using FM RSAH_LAUNCH_EXCEL was a way to achieve this. Any ideas? Regards Joe

  • Attn. Raghu of JDev team...

    Hi, This might be out of topic,but... thisz with regard to that xml file, can I get the dtd file corresponding to the xml file generated,from the xml file its expecting ejb-jar.dtd, but in my server I have ejb-jar_1_1.dtd, trying to open on j2ee serv