ABAP Stack vs ABAP + Java Stack

Hi All,
We currently have two SAP systems (one for FI and one for HR) both running on ECC 5.0 using a separate ITS box to provide CATS (via FI system) and ESS (via HR system)
We are about to upgrade to ECC 6.0 and replace the existing ITS with the Enterprise Portal.
The EP box will have both the Java and ABAP stacks applied.  Now to the crux of the issue...
Do we need to
1. Install both the ABAP and Java Stacks on both the upgraded SAP systems
2. Just install ABAP stacks on both upgraded SAP systems
3. Install ABAP on FI and ABAP + Java on HR
4. Install ABAP + Java on FI and ABAP on HR
I have looked through a number of threads but haven't found a definitive answer to my question...
Your help will be rewarded...with points that is!!
Thanks,

Hi All,
We currently have two SAP systems (one for FI and one for HR) both running on ECC 5.0 using a separate ITS box to provide CATS (via FI system) and ESS (via HR system)
We are about to upgrade to ECC 6.0 and replace the existing ITS with the Enterprise Portal.
The EP box will have both the Java and ABAP stacks applied.  Now to the crux of the issue...
Do we need to
1. Install both the ABAP and Java Stacks on both the upgraded SAP systems
2. Just install ABAP stacks on both upgraded SAP systems
3. Install ABAP on FI and ABAP + Java on HR
4. Install ABAP + Java on FI and ABAP on HR
I have looked through a number of threads but haven't found a definitive answer to my question...
Your help will be rewarded...with points that is!!
Thanks,

Similar Messages

  • NW MI 7.1 has only ABAP stack. what about JAVA stack ?

    Hi,
    Recently i installed NW MI 7.1 EHP1 system. It has only ABAP stack. But for MI configuration i hope we require JAVA stack too.
    Hence can we use some other standalone JAVA system for the MI front end configuration ? If so please tell me what are the usage types are required for that Standalone JAVA.
    Thanks & Regards,
    Bala

    Hi,
    EPC or standard AS Java usage types would be required for MI configuration.
    Suggest you to go through the Master guide at https://service.sap.com/~sapidb/011000358700000391152007E.pdf
    Also more info at http://service.sap.com/instguides ->SAP Netweaver -> Netweaver Mobile 7.1
    Regards,
    Srikishan

  • How to add Abab stack to exiting Java stack

    Hi All,
    I am having a netweaver Java Stack installed on my system. I would like to install XI - in order to install Xi ,I guess the system should be ABAP + Java. But since I am having java based engine, I would like to add ABAP stack to it. So, my question how to add an ABAP stack to already existing JAVA/J2ee engine.
    So what this process is known as-- Is it upgrading or New Installation. Because I need the guide and CD's for it.
    Can any one tell me which Guide(Install/upgrade/Master) wud help me.
    Thanks
    S

    Hello
    If you are adding XI 7.1 check this page: http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000702775&_SCENARIO=01100035870000000202&
    If you are adding XI 7.0 check this one: http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000659894&_SCENARIO=01100035870000000202&
    You should read the master guides and install the new usage type on top of your current installation but check the SAP notes about it first.
    If what you want is to install XI 3.0, that is if you have an existing v6.40 java stack, I think the operation is not recommended/supported by SAP, you should install a separate instance.
    Hope it helps.
    -Sam.

  • WAS 620 ABAP+JAVA stack

    Hi all,
    we currently running on SAP Entreprise 470x110 with SAP Basis 620 on HPUX with Oracle 9i.
    And currenly we have only ABAP stack and we would like to install the Java stack on our currently landscape.
    Can you advice me on this matter and how we should start.I would like to know what are the prerequite and also the system landscape.
    Please kindly advise.
    Thank you.
    Kah Fei

    when you use web browser,Internet comm.manager(ICM) will route your request either to ABAP stack or JAVA stack.
    The Java stack is build following J2EE standards.with in the J2EE you have EJB container and Web container.So its a structure based on J2EE standards.
    Actually i did'nt understand what you mean by "i would like to use java to support frontend internet instead of j2ee."

  • ABAP+JAVA STACK STARTING ISSUE a  Work Around

    Dear Users,
    I recently got an issue in duel stack where in Java stack was not coming up. According to the  Trace file i was about to follow the SAP Note: 940893. But everything was fine for me. Then i tried a work around. I started Java first and then after sometime ABAP. It worked for me. Might be useful for others as a work around. If useful make know. If i am wrong again let me know.

    Hi Manjesh,
    Then i tried a work around. I started Java first and then after sometime ABAP. It worked for me.
    It looks like Server has insufficient memory to hold ABAP+ JAVA stack.
    You can think of the following
    1) Reduce the no of WPs in ABAP stack
    2) Reduce the JAVA memory settings to half using configtool
    3) Restart both ABAP and JAVA
    4) Check the results.
    Hope this helps.
    Regards,
    Deepak Kori

  • Errror in RFC connection between SCM ABAP stack and JAVA Stack

    Hi All
    we have installed SCM Abap stack and SCM java stack on same system within single database.when i create rfc connection AI_RUNTIME_JCOSERVER from SCM Java stack to SCM Abap Stack its working fine,but when i am configuring same from SCM Abap to SCM Java using SM59 its giving error.
    Error Details     Error when opening an RFC connection
    Error Details     ERROR: failed to open file G:\usr\sap\SCD\DVEBMGS00\data\sideinfo.DAT
    Error Details     LOCATION: SAP-Gateway on host OPS20SCD1.Octal.pet / sapgw00
    Error Details     CALL: fopen
    Error Details     COMPONENT: SAP-GW-LIB (ReadSideInfo)
    Error Details     COUNTER: 1854
    Error Details     ERROR NUMBER: 2
    Error Details     ERROR TEXT: ENOENT: No such file or directory OR: The system cannot find the fi*
    Error Details     MODULE: gwxxside.c
    Error Details     LINE: 274
    Error Details     RETURN CODE: 451
    Error Details     SUBRC: 0
    Error Details     RELEASE: 701
    Is it compulsory to create RFC connection between abap and java installed on the same system.
    plese suggest.
    Regards

    to configure acceptance of the ABAP (integrated ITS / WebGUI) saplogonticket on the java stack, just log into the java stack (http://FQDN:50xxx/nwa) and select configuration  THe last item in the list is Trusted System... click.
    on the ensuing page, click on the add trusted system button --> by querying trusted sytem.
    Enter the required data on the page:
    system type: ABAP
    host name: FQDN
    System Nr: your instance number
    client (of the productive client)
    and a username and pw with superuser priveliges in the system (SAP_ALL/SAP_NEW, etc).
    the click next
    On the final screen, click finish.
    You have now SSO setup between the ABAP and Java stacks. To configure SSO to accept java saplogontickets on ABAP see:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/2b0310d6-0801-0010-3185-b2371a280372
    This should resolve your question.

  • ABAP and JAVA stack together?

    Hello Friends,
    I wanted to install the ABAP stack SP12 with JAVA stack SP09. I am downloading the last file of the stacks. Is it possible to install them together on one OS(I have W2K Enterprise Edition)?
    Can you guys please help me out here ?
    Best Regards,
    Fatih Koekce.

    Hi
    Basically ABAP and Java patches would be inpendent of each other except the Kernel.
    You can apply them together as Java patches are to be applied through JSPM and ABAP patches through SPAM, but it is usual practice to apply ABAP patches first and go ahead with Java stack. Because Applying them together would use considerable amount of system resources.
    Hope this is helpful.
    Regards
    Rahul

  • Install  ERP ECC 6.0 with EHP4 and JAVA stack (usage type)

    Hi all,
    I need to install ECC with EHP4 and also JAVA stack.
    I know that I have to install 2 stacks with different SID and oracle homes, firts I have to install ABAP stack and then the JAVA stack, but wich usage type should I choose for JAVA STACK?
    What I would like to have in my new installation would be the same usage type for JAVA stack like ERP 6.0 SR3 ABAP+JAVA stacks.
    What should I choose?
    Regards
    Thanks

    Hello,
    SAP ECC 6.0 allows ABAP and JAVA but EHP4 this feature is not.
    One thing I can suggest if you install ABAP stack first, it will initiates (even different SIDu2019s) the JAVA stack also.
    So JAVA stack having a protection with ABAP, because you know JAVA stack is a very sensitive and time consuming one when you want to start are stop.
    So you can do this sequence
    Suresh

  • How-to remove java-stack

    Hi,
    is it possible to remove a java-stack from a central instance? For example a CRM installation, having both abap and java stack?
    The java-stack is not used.
    Toine.

    Hello Toine,
    Yes, it is possible to remove the java stack. You can find the information how to do it in the WAS installation guide of your release, under a section "Deletion of an SAP System Installation (J2EE)"
    Kind regards,
    Marcelo

  • Activate abap proxy withou java stack on ECC side

    Hi gurus,
    Can we activate abap proxy on ECC side if the ECC don't hava java stack? As you know , we need to create two jco RFC provider in Visual Administrator, but without installing java stack, we can't do that.  Any ideas? Thanks in advance.

    Thanks all.
    Solved by using program id of XI system in the RFC of application system.
    But we still face the issue in SPROXY. It gave the error "No connection to Integration Builder ".
    Then I runned connection test, and found SPROX_CHECK_IFR_ADDRESS and SPROX_CHECK_HTTP_COMMUNICATION
    are  right, but SPROX_CHECK_IFR_RESPONSE and SPROX_CHECK_IFR_CONNECTION are giving the error "Integration Builder data not understood". Any ideas?
    Edited by: xinjiang li on Sep 10, 2010 6:40 PM

  • PI 7.0 Installation : Physical separation of ABAP/Java stack !?

    Dear forum users.
    The system administrator of my customer would like (if possible) to separate physically both abap and Java stack on 2 machines for all XI system in the landscape.
    The goal is to optimize the clustering UNIX installation (I'm not expert of this part)
    => optimal high availability. (...)
    I just want to check near you if this can pose problem regarding XI operating way.
    From my point of you, it complexifies a little configuration steps but Is there another impacts ?
    PS : A master central SLD is envisaged and a second slave one on the XI production server.
    Thanks a lot in advance for your precious help.

    Thanks a lot.
    For information
    Our central SLD is on a standalone system
    However slave SLD (to ensure autonomy and HA for production XI system) will be deployed on Java separated hardware system of Xi production system.
    On master SLD all systems are described and all machine are linked with it (SLDAPICUST) except production XI one
    On slave SLD, all data of master one are replicated and only XI system is linked with (SLDAPICUST)

  • Config guide to configuer the SLD on ABAP+Java Stack

    Friends,
      Can you please pass me the guide to configuer the SLD on the ABAP+Java stack. My email id is : [email protected]
    Thanks!
    Vivek.

    Check this link
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e07753b9-fa0c-2a10-64a8-c6754c45396e
    Regards,
    Prasanna Krishnamurthy

  • How to Start Serv0 Process in ABAP+JAVA Stack without restaring

    Hi
    We have our SAP Systems in ABAPJAVA Stacks. Some times the server0 process does not show up at the AS/400 screen screen even though all other processes showup. Is there a way we can start Serv0 Process in ABAPJAVA Stack without restaring the entire system.
    I tried the following. Loged in to the ABAP System and from transaction : SMICM
    Menu Option
    Administrator --> J2EE Instance(Local) --> Restart --> Yes
    Administrator --> J2EE Cluster (Global) --> Restart --> Yes
    but still the service did not show up.
    Any Help in this reagrd would be greatly appreciated.
    The following services are shown in the green screen at the AS/400 OS Level
       Subsystem/Job                 User        Type  CPU %  Function        Status  
         R3_20                            QSYS        SBS      .0                   DEQW   
           DISP_WORK                SMP20       BCI      .0  PGM-disp+work    SELW   
           DISPATCHER               SMP20       BCI      .0  PGM-jlaunch      THDW   
           GWRD                         SMP20       BCI      .0  PGM-gwrd         SELW   
           ICMAN                         SMP20       BCI      .0  PGM-icman        SELW   
           JCONTROL                   SMP20       BCI      .0  PGM-jcontrol     THDW   
           MSG_SERVER             SMP20       BCI      .0  PGM-msg_server   SELW   
           SAPSTART                   SMP20       BCH      .0  PGM-sapstart     EVTW   
           SDM                             SMP20       BCI      .0  PGM-jlaunch      THDW   
          WATCHDOG                  SMP20       BCI      .0  PGM-disp+work    SELW   
          WP00                            SMP20       BCI      .0  PGM-disp+work    SEMW   
          WP01                            SMP20       BCI      .0  PGM-disp+work    SEMW   
          WP02                            SMP20       BCI      .0  PGM-disp+work    SEMW   
          WP03                            SMP20       BCI      .0  PGM-disp+work    SEMW   
          WP04                            SMP20       BCI      .0  PGM-disp+work    SEMW   
          WP05                            SMP20       BCI      .0  PGM-disp+work    SEMW   
          WP06                            SMP20       BCI      .0  PGM-disp+work    SEMW   
          WP07                            SMP20       BCI      .0  PGM-disp+work    SEMW                                                                               
    Thank You
    Reg,
    Kishore
    949-232-5622 (Cell)

    Hi Kishore,
    first of all, there's probably a problem with server0. Generally it should come up automatically. And one can see JCONTROL and DISPATCHER, so there must be some problem with SERVER0. This could be a timeout for instance. One has to check dev_server0 and std_server0 files.
    However, you can of course start/stop the Java part independently from ABAP using the transaction SMICM. That's the official way. You should be able to use "soft shutdown with restart" if you just want to restart the Java stack. If you have doubts that this process went fine, trigger a "soft shutdown without restart" and wait until all java processes are gone (JCONTROL, DISPATCHER, SERVER<number>'s and SDM). Then use "Restart Yes" to trigger a new start.
    But, as I said, there's probably some issue in server0...
    Best regards,
    Christoph

  • SAP BW 7.4 on HANA ABAP & JAVA stack

    Hello,
    We have requirement for SAP BW 7.4 on HANA ABAP & JAVA stack integration.
    Please clarify the doubts.
    1. Is there any possibility to install ABAP & JAVA stack same SID?
    2. If install different with SIDs, How can we do integration? Any restriction is there to integrate?
    3. Can we use same HDB SID for both ABAP & JAVA stack?
    4.We plan to configure the JAVA stack as UME data source from ABAP stack, Is it good practice?
    Any one share the better ideas & solutions for this issue.
    Regards,
    V Srinivasan

    Hi Experts,
    Great for viewers.
    But still expecting some ideas above questions kindly answer.
    Also i got some important points.
    Java Stack for BW on HANA
    At least any one answer the purpose of BW Java Stack.
    Regards,
    V Srinivasan

  • How to create Roles in UME (ABAP+JAVA stack)

    Hi,
    I have created roles earlier on JAVA stack alone. However, this time I am working on JAVA+ABAP stack. When I am trying to create role in UME, I am getting only two tabs:
    General Information
    Assigned Groups
    I am not getting Assinged Actions tab here.How do I assing actions ?
    Can any one please help me in creating roles in ABAP+JAVA stack.
    That would be  a great help!
    Regards
    Faisal

    HI Faisal,
    When ABAP is the UME, you can only edit users / groups that are J2EE only. Any group that is defined in ABAP is read-only for the Java Server to prevent conflicts (there is no synchronization) and has to be changed in ABAP.
    Please take a look at this link, which has a great graphic describing this.
    http://help.sap.com/saphelp_nw04s/helpdata/en/7c/36dcd59865b246b993c471199ba37a/content.htm
    So, if the Java group was created in ABAP, the ABAP user has to have the ABAP role assigned to him, so that he is in the group on the Java server. make sense? The graphic in the link above really explains it well I think.
    If you a new / custom Java group (not in ABAP) then you should be able to assign users to it from the Java server.

  • System Copy from ABAP Stack to ABAP+Java Stack

    Hi,
    Is it possible to system copy (homogeneous or heterogeneous) from a system based on ABAP Stack to a system based on ABAP+Java Stack? Is it the normal system copy procedure or something aditional is required to do. Pl. advise. Thanks
    regards
    Edited by: Abdus Samad on Oct 24, 2008 8:13 AM

    It depends on what you want to copy, a system copy will always wipe out the existing target. But if you want to only copy data, you might be able to do a client copy. You can start with this SAP note: [552711 - FAQ: Client copy|https://service.sap.com/sap/bc/bsp/spn/sapnotes/index2.htm?numm=552711]
    Regards Michael

Maybe you are looking for

  • Why are excel charts copied to Illustrator CS 5.1 now coming in as pictures?

    I've been creating charts in Excel 2004 for Mac for years and copying them into Illustrator. They have always previously pasted into Illustrator as vectors illustrations. I've created hundreds of charts in Excel before and copied them to Illustrator

  • Ipod not compatible with os 10.3.9

    I purchased a new ipod nano and it is unable to run on my system. I currently have a g4 desktop running 10.3.9 with itunes 7.4. I am looking to replace my nano 1st generation since the battery life does not last very long. Right now I can't purchase

  • Wasted vertical space

    Upgrade from 3.6 to 6x vanished toolbar and wasted top line with name of current page. HELP and right-click brought back toolbar. Highlighted Tab shows current page. Allow the size/exit icons to be on same line as toolbar (or other user choice) and q

  • Status Led AP 1250 Ligthweight

    Hi: Somebody could you help me, a few day l have 3 AP Ligthweight 1250, today l was checking my infrastructure and l saw that these 3 AP can´t join to the controller, l reset the AP  to the, and its can not  join, l checked physicly the AP, and the E

  • Making a flash animation into link

    > This message is in MIME format. Since your mail reader does not understand this format, some or all of this message may not be legible. --B_3271770931_3721276 Content-type: text/plain; charset="ISO-8859-1" Content-transfer-encoding: 8bit Hi all Cou