Activated TYPE-POOL keeps appearing in ABAP activate

I'm using v4.6c
I've created a TYPE-POOL called ZFLI. While in SE11 I activated it and all is fine.
I then use it in an ABAP program and all of the types are correct and available.
However, when I activate the ABAP program, the type pool name continues to appear in the pop-up activate list.
If I don't select the type-pool in the popup (just select the ABAP program), everything works fine and I can use the types defined in the type pool.
If I do select the type-pool name in the pop-up, I get an error.
Not only that, the type appears in the pop-up for every program I write from then on.
This seems very strange. Does anyone have an idea why, and how I can get rid of, this strange behaviour?
Thanks
Ed Baker

Hi Raj,
I'm sorry for the delay in getting back to you.
The type pool was, indeed, activated. I could actually use it in an ABAP program.
It just keeps appearing in the activate popup of all ABAP programs.
This morning I deleted the ABAPs that used the two type pools I created. I then used SE11 to delete the type pools themselves. They still appear in the popup for activation.
Here's a simple demo. I created this tiny program.
REPORT zejb_tp1 .
END-OF-SELECTION.
  WRITE:/ 'all done'.
This tiny program was created after I'd deleted the type pools. Here's what I get for the activate popup in SE38
     TYPE     zfli     BAKERE
     TYPE     zmatn     BAKERE
     REPS     ZEJB_TP1     BAKERE
If I activate the ZEJB_TP1 program, all is well.
If I select one of the TYPE entries, I get this message.
Type group ZFLI
REPORT/PROGRAM statement missing, or program type is I (INCLUDE)
I just can't seem to understand where this is coming from.

Similar Messages

  • Activation Needed message keeps appearing on Acrobat only in CS5 Suite

    I installed and activated Adobe CS5 on my Mac Pro a few months ago. All the components work great except Acrobat. Whenever I launch it, I get a system password authorization dialog, then the following message:
    Suite Product Activation Needed
    Adobe Acrobat was installed as part of a suite. To enable Adobe Acrobat, please start another component of this suite (such as Adobe Photoshop).
    Acrobat then quits.
    I've tried launching it with Photoshop, Dreamweaver and InDesign open. Same message each time. What gives? How can I run Acrobat?

    Hi,
    I have the same problem - CS5 on intel Mac Snow Leopard. 
    I tried uninstalling Acrobat 9 (using Adobe's uninstaller). Then I reinstalled Acrobat 9 from the installer for the CS5 Suite. Acrobat ran, and I used its update menu item to 9.2.
    Now it fails in exactly the same way as listed above. Again.

  • Assignment of default activity type to individual person

    Hi All,
    I have following scenario.
    One maintenance order is created with one operation. Three persons are assigned to the same operation. All these three persons are having different per hour rate and so having different activity types.
    I have mentioned all these 3 activity types in assigned workcenter.
    But while executing in maintenance order I can assign only one activity type in operation tab and so the same is appearing during time confirmation as default.
    I need respective activity types to be appeared by default for each of persons. How can be achived this?
    Sundar

    Hi,
    As 3 different activity types are having 3 different per hour rate, it would better to define sub operations based on the activity type & assign the activity types separately for each sub operations.
    Regards,
    Maheswaran.

  • Change of Allocation Cost element in Activity type during Fiscal year

    Hi,
    An activity type was planned on a cost center in KP26 with a wrong cost element. Then actual activity allocations were posted with this acitivity type. Now I have reversed all actual allocations on this cost center with this activity type and keep trying to delete the plan line item in KP26 to be able to change the cost element.
    Unfortunatelly the deletion is not succesful. I get the Message no. K8098:
    "Costs already posted under cost element 12345. No deletion possible
    Procedure
    First reverse the posted record under cost element 12345."
    I have reversed the allocations. The Balance on the cost center is 0. However the reversal seems not to be sufficient.
    Do you have any idea what needs to be done to be able to delete the plan line item in KP26?
    With best regards,
    Robert

    Robert,
    Follow this note it may be helpful. I guess you need to delete the records from table before doing anything else.
    SAP Note-175522
    Hrusikesh

  • Where you are going to activate  activity type in cost centre

    Hi gurus
    whenever i am trying to assign activity type in cost centre, it is not allowing to save that particular type of  cost centre.
    also it is giving error as activity price planning is not done for this cost centre
    can you please suggest how to resolve this issue
    thanks
    shaik

    Hi Shaik,
    Can you please let me know the error message number that you are receiving?
    Thanks in advance.
    Best Regards,
    Vanessa Barth.

  • Function Module for RSAP001 requires Type Pool

    Hi
    I am not an ABAP Freak:
    I want to set up a Function Module for RSAP0001.
    Setting Import and / or Tables Parameters give an Activation error:
    Type pool SBIWA has not been declared
    Message no. FL031
    Diagnosis:
    You used a type from type pool & in the interface of a function module.
    Procedure:
    For the program to be syntactically correct, you must
    declare the type pool in the global data declaration of the
    function group using the 'TYPE-POOLS: &.' statement.
    Where do I  find the global data declaration of the
    function group ?
    Thank You
    Best Wishes
    Martin

    Hi Martin,
    When you click on the function group you will find many includes declared in it.
    Some of them will be Include L<fgrp>UXX and there will be one include,
    INCLUDE L<fgrp>TOP, this is the include in which you will have to make declarations, and here you will have to declare type pool.
    Simply goto transaction SE38 and the the program name as L<functionfroupname>TOP and you can directly change this include. 
    Regards,
    Durgesh.

  • Multi Resource Scheduling MRS - How to exclude certain Maint Activity Types

    is there a way to exclude orders that have a specific maintenance activity type.  We have standing work orders that in reality we should not have appear on the planning board.  Well, we really shouldn't have any standing orders but we do.
    Has anyone had this issue and been able to solve it.   thanks, Linda

    While a lot of MRS configuration includes maintenance activity type as a way to refine the circumstances in which something occurs (e.g., stretched assignments), that is not the case for defining which demands will be brought into MRS.  However, while not positive, I believe "BAdI:  Integration of Maintenance/Service Order with MRS (ERP)" can be used for this purpose.
    Mark

  • I have downloaded Adobe Photoshop digitally but when i activated adobe I keep getting this error message Adobe Premiere Elements.exe - NO DISK. There is no disk in the drive. Please insert a disk into drive/device/harddisk/dr1

    I have downloaded Adobe Photoshop digitally but when I activated adobe I keep getting this error message Adobe Premiere.exe - NO DISK - There is no disk in the drive. Please insert a disk into drive/device/harddisk/DR1

    It sounds like you downloaded the wrong application, namely Adobe Premiere Elements.
    If you meant Adobe Photoshop Elements, you're in the wrong forum.  This is not the Elements forum.
    Here's the link to the forum you want:
    https://forums.adobe.com/community/photoshop_elements/content
    If you mean Photoshop proper, since you are posting in the Photoshop forum, give version details and your system specs.
    BOILERPLATE TEXT:
    Note that this is boilerplate text.
    If you give complete and detailed information about your setup and the issue at hand,
    such as your platform (Mac or Win),
    exact versions of your OS, of Photoshop (not just "CS6", but something like CS6v.13.0.6) and of Bridge,
    your settings in Photoshop > Preference > Performance
    the type of file you were working on,
    machine specs, such as total installed RAM, scratch file HDs, total available HD space, video card specs, including total VRAM installed,
    what troubleshooting steps you have taken so far,
    what error message(s) you receive,
    if having issues opening raw files also the exact camera make and model that generated them,
    if you're having printing issues, indicate the exact make and model of your printer, paper size, image dimensions in pixels (so many pixels wide by so many pixels high). if going through a RIP, specify that too.
    etc.,
    someone may be able to help you (not necessarily this poster, who is not a Windows user).
    a screen shot of your settings or of the image could be very helpful too.
    Please read this FAQ for advice on how to ask your questions correctly for quicker and better answers:
    http://forums.adobe.com/thread/419981?tstart=0
    Thanks!

  • VPRS cond type is not appearing after creating a sales order

    Dear Friends,
    I have copied pricing procedure from Std pric procedure i.e from RVAA01.
    In Material master in Accounting 1the following things are maintained,
    Valuation Class--7920 ( Finished products)
    VC Sales Order Stock--7920 ( Finished products)
    Pricing Control-V ( Moving average Price/Periodic unit price)
    Standard Price--- Blank
    Price Unit--1
    Total stock--100
    In Pricing procedure VPrS cond type is included and settings are as follow,
    Statistics---Relevant
    Subtotal-- B ( carry over value to KOMP-WAVWR (cost))
    Requirement--4
    Item Catg is TAN and in Business data it is relevant for Determine Cost.
    Activated cost determination for item categ TAN
    But when I am creating sales order VPRS cond type is not appearing.
    Analysis is saying
    The requirement 004 is assigned to this condition in the pricing procedure. This requirement was not met and so the condition was excluded from further processing.
    Can anybody tell me where I am going wrong?
    Regards,
    Shrikant

    Hi Friends,
    Thanks for your reply as per your instruction I have maintained cond type and also in Pric procedure I removed 4 from Requirement column.
    Now I am getting following error,
    Diagnosis
    This condition has not been determined using condition records. The amount or value should be determined from another data source. For cost (condition category 'G') it is read using conditions from the material valuation segment, for a cash discount condition it is read using conditions from the terms of payment table.
    In this transaction an error occurs - the material valuation segment or the terms of payment table could not be read or a currency translation has failed.
    System Response
    The condition has been provided with the deactivated indicator 'X'.
    Procedure
    Refer to the messages in the status line of the condition overview screen.
    Regards,
    Shrikant

  • Error Activity type 502000 not set up for cost center 1000 cc111

    hi all
    While creating a work center (CR01) I need to enter a cost center and activity type for machine hours. However, while entering the activity type the following message appears:
    Message no. CR 061
    You are attempting to assign activity type XXXX to the work center. However, this activity type has not yet been set up in controlling area 1000 for cost center xxxxx.
    while creating the activity type in KL01 i have already given * in cc category so it should go for all cc
    What could cause this problem?
    Thank you in advance,
    Kind regards

    Hi,
    Check whether the activity type is maintained at the correct controlling area via KL03. If not, then create the activity type (KL01) in the corresponding controlling area.
    Regards,
    Darrel

  • MASS activity type in router

    I'm hoping someone has any ideas if CA85N can really MASS change activity types. I have been testing the transaction in our test client and have entered the material, plant, work center in the selection criteria and then in the change tab I have entered the new activity type and click the copy button.
    However, the system keeps giving me errors that there isn't an activity type for standard value for setup. But I'm not changing setup, I'm trying to change labor.
    I also get another error "consistency check is not successful when changing operation 0004. But for this one material I'm not changing operation 0004. I'm changing operation 0030.

    Hi,
    Activity Type will for a Work Center and not for the Standard Value Key. Hence when you are trying to change the activity type system will try to modify for the standard values for Setup / Operation / Labour etc. In your case I think you have not entered any activity type for the Setup, hence it is showing that error.
    I suggest you to go tcode : CR02/CR03 and check in the costing tab whether you have maintained the activity type for Setup or not.
    Hopw this will help you.
    regards
    radhak mk

  • How to add new row in KL02 trx - Activity type control data

    Hi guys.
    I am not a FI-CO consultant, but I want to add a row since KL02 transaction within a cost center, with a new fiscal year. When you access KL02 (change activity type), you set the activity type, then press Master Data and the basic screen appears. If you press the Display planning control button, you will see the "Display Activity Type Control Data" List. I wanna add a row for a specific cost center here, because the cost center I refer has not 2011 as fiscal year. I tried to use, since basic screen of KL02, use the Change planning control button, but when I set my cost center and 2011 as fiscal year, the Save button is inactive. Furthermore, I tried to press the Period screen and a message appeared "No data has been entered yet". So I dont know how to add one row for a cost center in the Planning control (Activity type control data) list of the KL02 transaction, specifically for an activity type. Do you know? Thanks in advance

    Hi,
    The list of cost centers in which the activity type is planned is given in KL02 under planning data.  In order to add a new cost center to this, you need to enter the activity type in transaction KP26 for a particular year. 
    Goto transaction KP26
    Give version - 0
    from period 1 to 12
    year - 2011
    cost center - mention the cost center
    Activity type - mention activity type
    goto overview screen F5 and add the plan price for the activity in the cost center.  This step will automatically add new row in the activity type control data.
    Hope this helps.
    Thanks,
    Ram

  • Use of activity types and cost splitting

    Hi All,
    We would like to track activities for cost centers, but don't necessarily have the need for a sending cost center/object.  I understand in a traditional manufacturing set-up, you have sending and receiving cost objects that incorporate the use of activities.  Our business is a service that we provide, not a tangible product that we produce.
    Here is the scenario.  We have activities that a cost center performs.  Cost center 1 will perform 2 types of "pick-up" activities, so this would require two activity types.  Throughout the course of the month, the activity quantities would get posted to the cost center.  So my first question is how can you post only quantities to a cost center--what is the t-code?  We're not concerned with incorporating an activity price, we just want quantities.
    Second, as primary costs get posted to the cost center in FI, we want to split the costs onto the activities.  I have researched t-code KSS2 and can't seem to split the primary costs based on the activity quantities.  It keeps refering to target costs, which I don't really want to have to worry about.
    What we're trying to do is a makeshift ABC scenario.  Since the use of true abc seems almost non-existent, there's not much info out there on it.  Does anybody have any good docs on abc in SAP?
    Thanks
    Kory Squire

    Hi,
    1. I understood your case in this way .
    Cost Center A performs 2 activities . The cost center collects cost by Fi posting through out the month.
    Now you want the activity type should nt have price , only it should have quantities.
    And now you want to allocate the cost of the cost center to other object by activity types.
    If i am right..
    then instead of activity types why not create SKF(statistical key figures) . At the month end by t.code Kb31n post the activity qts. for combination of cost center and SKFs.
    Then as per your requirement run allocation cycle.
    The kind of you are planning , in that case activity types to be converted as cost object ( it can be done in control area setting) and then you want to allocate.. seems to be little complicated..
    Hope i understood and in turn i conveyed the message properly..
    Assign points if found helpful
    Regards
    Prabhat

  • Error message hkey_local_machine\software\classes\itunes.aifc keeps appearing when updating.

    Error message hkey_local_machine\software\classes\itunes.aifc keeps appearing when updating.  Then update uninstalls.  I was trying to fix a missing driver error.

    Press WinLogoKey+R to open the Run... dialog box
    Type in Regedit and press enter/return
    Tap the plus symbol next to HKEY_LOCAL_MACHINE
    Tap the plus symbol next to SOFTWARE
    Press C on the keyboard, then again or scroll down until Classes is selected
    Tap the plus symbol or use the right-arrow key to open the branch
    Press i on the keyboard, then use the Page Down key, scroll bar or arrow keys to locate iTunes.aifc
    The registry editor should now look something like this: (Click to enlarge)
    Right-click on the iTunes.aifc key and click Permissions... to see what is going on. My current permissions for the iTunes.aifc key are shown below: Giving Administrators and/or yourself Full Control should be enough to let the installer make changes. Alternatively you could delete the key and let the iTunes installer recreate it.
    tt2

  • Error saying "Enter the sender activity type also"

    While trying to upload the HR details from NON SAP to SAP through SE38, an error reflects asking to enter the sender activity type.
    Can any body help me.

    Hi,
    Please refer to the online documentation help whose link is listed below :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c3/c6c2a40f4f11d2956400a0c930669b/content.htm
    This link mentions four different data entry scenarios that can be configured for data entry profile in CATS.
    if you want to have the activity transfered to HR, you have to activate this Controlling object for pers. cost assignment in your
    customizing:
    - Personnel Time Management
      - Time Data Recording and Administration
        - Integrating Time Management with Other R/3 Applications
          - Recording Personnel Costs
            - Enter Controlling objs permitted for pers. cost assignment
    here you can find in the documentation:
    'In this step, you specify which Cost Allocation or Funds Management  objects the personnel costs can be assigned to.
      and, in addition, for account assignment to activity type:
      COBL-LSTAR Activity type
       In cac1 'cost accounting variant' is set to 'Assignment of personnel costs to master cost center'. In this case, the cost center is not transferred to HR. Activity allocation is done directly from cats through the other (non-hr) components. Check for 'activity allocation' in the online documentation.
    the cost assignment variant 'B' (Assignment of personal costs to sender) needs a receiving accounting object.
    If there is no receiving object the cost assignment variant changes to '0'.
    regards
    Waman

Maybe you are looking for