Hi,
i am used in MTO Process.capture  for activity without goods mvt in po.
my issue is, Iron for one activity in material against . but contract people used.
am not used for service po, that reason is not related to sale order qty.
sub contract not for used,reason is material input and output are same material used.
so, any idea for this scenario.
Related for sale order qty are same not exceeded.
plz, advise me.
Regards,
JJ

Hello Srikanth,
You can use the costing sheets as proposed by Umapathi or you can use formula planning templates with business processes for allocating cost according to your requirements. If the problem is that there is no confirmation process in PP then you can use template and activity type which can allocate cost according to your formula say No. of units manufactured.
I would request you to revert back with your scenario so that we can advise accordingly.
Kind Regards // Shaubhik

Similar Messages

  • Settlement of internal activity cost to primary cost element.

    Hi Gurus,
    My client has a  urgent requirement to settle the internal activity cost captured through Warranty order to a primary cost element (FI), also need an offsetting entry to another primary cost element against the first one.
    Note: The value should flow to COPA also.
    Please suggest the way through which it can be achieved.
    Best Regards,
    Ramakanta

    When you do settlement of the order, you can post to FI all the balance of the order.
    Just configure int he peroid end closing tab of the order the settlement cost element (P&L) and the g/l account (BS- offsetting)
    For sure you can do this on a internal order, i don't know about warranty order (but shall be the same). Otherwise you can first settle to an internal order and then to the desired GL account.
    Regards,
    Paolo

  • In house mfgd. raw materials for a production order- Cost capturing

    Hello Experts,
    The scenario is as below:
    Client wants to manufacture in house some of the raw materials for a production order of sub assembly. These raw materials are made from scrap, with some manhours spent on it. After making them in house, these are handed over to stores for kit preparation.
    The planner wants to create a stock of these materials (without making individual prod. orders since there are many of these). One option is, planner can do the cost centre issue reversal (202 movement). But the raw material cost is also getting captured in it from the material master.
    From costing point of view, the cost of raw material should not be included since it is made from scrap. Only the cost of man hours spent is to be accounted for.
    Please help as to how to map this scenario. For capturing cost of man hours spent, we can include a routing for it in the production order of the sub assembly. But how to eliminate or exclude the material cost. All inputs from your side are appreciated. Thanks in advance
    Regards,
    Chetan.

    Hi Chetan,
    Your scenario has some major issue.
    1. You cannot produce RAW material in SAP.
    2. The cost of material produced inhouse will be different than that of original RAW material.
    3. There will be some cost effect in the final finished product if you consider this inhouse produced material for product costing of finished goods.
    We have similar scenario with my client and here is what I have implemented.
    1. Create a new HALB type part number for the inhouse manufactured RAW material. This will ensure that you assign Routing and BOM to same and can capture the COST for the same.
    2. Creating new material will enure that the product costing for inhouse produced RAW material is done.
    3. You can create single Production order for the same as you only have to capture cost. This depends on your Business scenario.
    4. Once you have inhouse produced raw material, you can create alternate BOM for the FINISHED Material with this new Part number in BOM.
    5. Create Production Version for the two BOM and ask Planner to select the Version 2 if he requires new part number in Production Order. I assume that this case would genrally appear in very small numbers.
    6. Now coming to product costing for final assembly. Since we are going to reuse scrap material to create the new part number, only activity cost and component cost will be used to determine cost. This cost will be less than that of RAW material cost.
    So we always suggest our customer to consider OLD part number to determine the PRODUCT COST of final material. BUT business will have to take a call on this.
    Do let me know if u need any thing else.

  • Sub Contract (operations) Cost Capturing in Product cost

    Hi Guys,
    I have a problem in  cost capturing for sub contract opertaions.
    Scenario is : I am working on product Costing. I want to caputure the cost of various product for various opeations, this I achived through activty type. But my problem is some of operations (for making the product) has been given to outsourcing through open PO and the payment to contractor is paying by unit rate(price rates are different for different operations).
    Could anybody explain me the process or settings required to capture the cost of the product which my client is paying to outsource contractor.
    Regards
    Srinivas

    Hi,
    1. Please define that particular activity as external operation in routing
    2. Flag it as subcontracting
    3. Assign a Material Info record to this operation.  Because the cost is picked up from Material info record in this scenario.
    Just talk to your PP folks.  They will definitely will guide you in Routing settings in this regard
    Please award points suitably
    Best Regards
    Surya

  • Compatability Unit - Cost Capture

    Dear Experts,
    I am able to create CU order from CU Design , However I am not able to capture Cost in the CU order.
    I have assigned a TL and assigned couple of operations with some labor hours.
    May be I have missed some thing !
    Can any one suggest @ cost capturing in CU order ?
    Regards,
    Rahul

    Hi,
    Welcome to sap.sdn.forum.
    I think you sould consult your FICO/COPA people to take care of costing so that you can maintain cost elements and activity assignment in "KP26" for hourly billing for labour hours (also use work centre for labour).
    regards
    DSR
    Edited by: D.Srinivasa Rao on Nov 9, 2011 10:54 AM

  • Cost capture

    Hi
    can any one explain how cost is captured in producing a finished product from raw material step by step please

    Dear GB,
    Product Cost = Materials Cost(Raw Materials Cost +Semi
    Finished Materials Cost)+ Activity Cost(Operation Cost)
    1.For all your ROH - Raw materials maintain price control
    indicator as V and enter the value as Planned Price 1 and
    Planned Price Date 1 under Costing 2 View -  Planned price
    tab.
    2.For all your Inhouse manufactured semi-Finished(HALB) and
    In house manufactured Finished materials(FERT) maintain
    price control indicator as S and dont enter any value directly in
    accouting view.
    3.For activity's cost(Operation Cost) comes via ---> work centre
    in which the operation is performed.
    4.A cost centre and an activity type where a rate has been
    maintained for that cost centre and activity type (T code KP26)
    will be linked to the work centre under costing tab.
    5.As per the operation time,the cost is getting calculated.
    6.Overhead cost is the indirect cost which's spend during
    production.
    7.So when the cost rollup is taken using T code CK40N (or
    else using CK11N estimating & CK24 for marking and release)
    all this cost gets added and the materials standard cost is
    calculated and same is marked in Costing 2 view under Current
    Planned price column.
    8.Standard cost estimate is done for FERT materials so that
    automatically the system does for Semi-Finished products also.
    I hope this will be sufficient for you.
    Regards
    Mangalraj.S

  • Batch wise actual material consumption and activity cost

    hi
    my client is steel industry, client requirement is heat wise actual material and machine cost. Heat is a batch number, how i can check batch wise actual material consumption and machine cost.
    regards
    imdad

    Hi Imdad
    Whats the batch definition in your case?? have you designed One batch per Prod order or One batch per GR?
    If its one batch per Prod order - you can directly see the prod order.. however, chances are less for this as Steel company might be using PCC i.e. repetitive mfg
    If its one batch per GR - Then you will have to track using the Confirmation no because each Confirmation will trigger the Goods Issue and Activity Confirmations...
    Using Table AFRU - You can track the individual Confirmation no and also the Activity Qty confirmed....COSS / COSSD will have the Activity Cost
    If any goods mvt are posted during the Confirmation, you would see a Mat Doc No populated in the field "Mat Doc"
    Br, Ajay M

  • Material Cost Estimate with Qty Structure - Activity Cost

    Hi All
    While executing the Cost Roll up (CK11n) Im facing a peculiar problem . I have defined an activity for which the rates are also maintained in KP26 against the Basic UOM(eg for 1000 activity 10Rs is the variable price mentioned)  . When Im taking the min lot size say 1 for the costing run the quantity appearing against this activity is appearing in the lower UOM (taking actual gms but the value for this activity is appearing in rupees only calculating from activity price x this figure). This is making the whole activity cost on very higher side .whereas If I execute with the same factors but with big lotsize say 1000 the value for the activity is coming absolutely ok .
    Pls confirm me how to put a check on the value of activity or uom of activity to evaluate the standard costing with minimum lower size also
    Best Regards
    Manoj

    Im closing this thread

  • Active Cost Centers

    Req : List of active cost centers in a month.
    I tried doing this : ECC -  Table CSKS - Contents
    <b>CostCenter|ValidTo|ValidFrom</b>
    AKST1|09/01/1999|07/31/2009
    AKST2|08/31/2007|09/31/2007
    AKST3|06/31/2007|09/31/2008
    AKST4|12/31/2007|07/31/2010
    Valid To & Valid From seemed not to be of any use in this context ( for filtering ).
    When I do filter for valid cost centers in the month of 07/2007 by inputing -  Valid From - 07/01/2007 | Valid To 07/31/2007, it doesn't do the look up if the inputed dates lie btn Valid From's & Valid To's Existing in the table. What it actually does is it just luks for 07/01/2007 if existing in all the Valid From dates available in the table &  same for  Valid To's....n so results no data for this instance.
    Is there any workaround to get the list of active cost centers in a given period on ECC or BI side?

    If you try the steps I gave beforee, it should work:
    Try this:
    1. Make cost centre as a info provider - RSA1 - Inset chars as info provider.
    2. This makes cost centre as a reportable object.
    3. Create a variable on valid from and give single values.
    4. Same for valid to.
    5. Use both variable in the query.
    Ravi Thothadri

  • Active cost center field in delivery item line

    Thanks for this Forums.
    I want to active cost center field in delivery item line.
    how can I do it?

    Hi,
    In Del Doc.--> Financial Processing --> Account Assignment
    This are Automatic entries, posted while delivery done.
    As, you may find entries in Field: Profit Center (as Income posting from Internal order)
    Similarly, Field: Cost Center may get hit by some entry if there is any subsequent Purchase Order, linked to your Sales Order. so, when you Accept services from your vendor, a delivery gets genrated to your Customer with posting expense in to the Cost Center.
    However, I would suggest you to post the same query in to Forum: SAP Financials or wait for some other Senior Member's comment.
    Best Regards,
    Amit.

  • PO cost capture date.

    I  wanted to check if the cost captured is based on the PO creation date (before cut-off) or the input amt date ( after cut-off).

    Hi,
    Where do you need to capture?
    Are you reading it from IDoc?
    Please be more descriptive.
    Regards
    Ramesh

  • Activity Cost

    Hi All,
             I have create a production order.In this order i have maintain activity type in routing. But The problem is when I go to cost itemization in the order activity cost show in 1/2 price. WHY?
             In KP26 i have maintain fixed price. activity type i.e. machine is used for 20 Hr. In KP26 i have maintain machine price is 10 Rs. According to that my cost is 200 Rs. but system show me only 100 Rs.
                     Thanks
                      Parag

    Hi Anupam,
                 I have created cost center, activity type, and cost element  in month of octomber. thats why in kp26 at the time of assignment of cost center and activity type i have maintain according to fiscal year
                           version                  0
                          from period             7
                          to period                 12
                          cost center            1301
                           activity type           machine

  • Activity Costs Revaluation Using Actual Price

    Hi,
    Since we can revaluate the activity costs at actual price in the product costing module itself using t.code MFN1, why SAP has provided another option to revaluate acticvity consumption at actual price in the material ledger multi level price determination?
    What is the difference between the both? If i had used MFN1, do i still have to use the revaluation of activity costs provided in the material ledger?

    Hi,
    However don't you think if the production order activity cost has been revaluated at actuals in the production order then during settlement it will carry the activity actual costs which will be shown in material ledger receipts category with the same actuals value for the activity costs.
    So why should i be revaluating the activity costs again with actual activity price in material ledger once again? It sounds like a duplicate work to me under this scenario....

  • Active cost center field in FA master data (subnumbers)

    hello,
    I would like to ask you, what is the path in SPRO if I want to active cost center field for maintanancne in subnumbers?
    Thanks
    Hana

    Go to SPRO-Asset accounting->Master data->Screen layout->Define screen layout for asset master data. There inside the screen layout tab go to Logical Field groups and inside Time dependent data you will cost center field mantenance.
    This screen layout would be assigned to your relevant asset class in SPRO transaction OAOA.
    Thanks and regards
    Kedar

  • Actual Activity Cost

    Hi Friends
    For calculating the actual rate system take all the actual activity cost and divide it with actual quantity. I want to know how the system is calculating actual activity cost.
    In KSII system will calculate the actual activity rate. What is the backgroung calculation. Or how to find out the actual activity cost per period is XXXX.
    Regards
    Jos
    Edited by: Joji Jose V on Nov 15, 2010 3:58 PM

    Hi Jose
    1. Actual Activity cost means Actual cost posted with cost center and act type in FI postings / Depreciation postings
    however, this is quite rare... To use this, Act Type must be switched in OKKP in Control Indicators
    2. In absence of (1), Actual Actvity cost means Actual cost posted with cost center
    3. If there are more than one act type in a cost center, then KSS2 would split the costs between the act types based on your Splitting rule in OKES... And then these costs would be divided by Actual Act Qty to calculate the Activity price
    Regards
    Ajay M