Hi everyone,
We  need to use a manufacturing resource where it has to cost for activities for product "X" to one cost center and for activities for product "Y" to another cost center. One resource can be assigned to only one cost center
is it possible to do in SAP or any work around ?. Any suggestion highly appreciated
thanks !!
Ganeshan Kalembeth

Hi,
u are right we can not assign .one resource to two cost centre ....i think its not possible at all..we need to create different resource for that ...product..that only i can suggest
regards

Similar Messages

  • Active cost center field in delivery item line

    Thanks for this Forums.
    I want to active cost center field in delivery item line.
    how can I do it?

    Hi,
    In Del Doc.--> Financial Processing --> Account Assignment
    This are Automatic entries, posted while delivery done.
    As, you may find entries in Field: Profit Center (as Income posting from Internal order)
    Similarly, Field: Cost Center may get hit by some entry if there is any subsequent Purchase Order, linked to your Sales Order. so, when you Accept services from your vendor, a delivery gets genrated to your Customer with posting expense in to the Cost Center.
    However, I would suggest you to post the same query in to Forum: SAP Financials or wait for some other Senior Member's comment.
    Best Regards,
    Amit.

  • Active cost center field in FA master data (subnumbers)

    hello,
    I would like to ask you, what is the path in SPRO if I want to active cost center field for maintanancne in subnumbers?
    Thanks
    Hana

    Go to SPRO-Asset accounting->Master data->Screen layout->Define screen layout for asset master data. There inside the screen layout tab go to Logical Field groups and inside Time dependent data you will cost center field mantenance.
    This screen layout would be assigned to your relevant asset class in SPRO transaction OAOA.
    Thanks and regards
    Kedar

  • Active Cost Center field in PA30

    HI !
    Can you guide me how to create employee master data in PA30.
    I required following feilds:
    1. Personnel no : Whether I can use the external number as personnel number.
    2.Cost Center : Active the cost center code .
    Anagha

    Welcome to SDN.
    Check this link -
    http://help.sap.com/saphelp_47x200/helpdata/en/48/35c7004abf11d18a0f0000e816ae6e/frameset.htm
    Regards,
    Amit
    Reward all helpful replies.

  • Manage MetaData from same photos in different formats like it was one

    For example - I import photos in RAW and than export in into JPEG. Id like to manage them later like one photo. Now When I want to see also the JPEG I need to import it once again - so I have the same photo twice in different format. When I change metadata I want automatically to change it in both formats. Something like stack into one photo, but with this future - when I change metadata - it will change in both.

    Hi Xiaojing,
    Thank you for your answer. It is useful.
    The problem is: My application is not going to play music or video, it just needs to browse over the disk and create a list of available music files including info like song name, album, artist. All this info is kept in meta-data. Some users can have a lot of music of their computers. That's why I don't want to load the whole file and wait for onMetaData event - it can take a long time. I just want to read the meta-data from the file, but not to load the all file as I need for listening the music of playing the movie.
    I already applied extracting meta-data for MP3 files exactly the way you mentioned, it works fine. I only have to wait for Event.ID3 – I implemented Timer to wait until all my files are processed. Probably, if user has a lot of music on his computer, it will take a lot of time.
    I can try to read AAC the way you advice.
    I am really looking for implementation of your advice for reading the music file as a ByteArray and extracting meta-data. In this case we don't need to load all the file, but just to read part of it.
    Do you have some code implementation?
    Thank you again for your response,
    Elena

  • Routing JMS message from same queue to different channels.

    From a given adapter module, is there a way of calling different communication channels?
    The scenario: The sender of the data is JMS. One single queue contains desperate text format. Based on the content of the first 4 characters , PI has to parse it differently in its own corresponding MT. The target IDoc structure remains the same. I have multiple messageTransformBeans set up, one for each MT assuming that the data would arrive in different JMS queues. However since the data is now all heaped on to a single queue, the challenge of routing the data now lies in SAP PI.
    HowTo - Send Test Messages to the Adapter Engine (to an Integrated Configuration) - This solution does send message directly to the IE (using 7,1), but not to the adapter engine where the messageTransformBeans exist.
    Any solid pointers in the direction will be really helpful.
    Regards,
    Keerti

    Hi,
    you can go for end to end testing.
    if jms not available use file adapter in the sender side and fetch the text file and test it.
    Regards,
    Muni

  • Display only active cost center in match code

    Hello everyone.
    I know this question was already posted but it hasne been answer, any suggestions?
    Thanks!

    By the face of the heading I am unable to understand your requirement.
    However I am answering this with an assumption that while you do an F4 search help for searching the cost centers and at this juncture you don't want all the inactive cost centers to be supprssed.
    If my assumption of your requirement is correct there is no standard functionality available. However you can customize your search help with an ABAPer who can code the display of values as per your requirement.

  • Full request deletion from same datasource in different R/3 systems.

    Hi,
    I have a cube in which data is full loaded . I have a two R/3 Systems e.g. A and B.  there is a standard datasource which is loading data as a full load. this same datasource is pulling data from these two R/3 Source system i.e. A and B. Now My problem is I want to remove earlier data from the same datasource from cube before new data arrives in the cube.
    There are settings to be done at infopackage level, I want to know what setting shall I do so that only source system relevant data get deleted from the cube before new data with full load arrive in the cube.

    Hello,
    you need to check:
    Datasources Are the same
    Source Systems Are the same
    Selections are same or more comprehensive
    When you start the infopackage manually, it will ask you to confirm deletion of data packages.
    BR
    Ondrej

  • Users from same OD have different group memberships on each client

    Hello -
    I am getting the dreaded "This user can not login because an error occurred" when a network user tries to log in.
    Oddly - on some clients he can log in, but not others.
    I have checked the open directory settings in directory utility on each client machine and they are identical.
    But typing id <username> on each of the clients gives me different results :
    Server
    id: bensmith: no such user
    *Client machine that works (iMac)*
    Office-iMac:~ apndavies$ id bensmith
    uid=1040(bensmith) gid=20(staff) groups=20(staff),1027(family),103(com.apple.sharepoint.group.2),404(com.apple.s harepoint.group.7),402(com.apple.sharepoint.group.6),216(com.apple.access_loginw indow),107(com.apple.sharepoint.group.5),1033(mobileaccounts),62(netaccounts),12 (everyone),401(com.apple.sharepoint.group.3),403(com.apple.sharepoint.group.4),1 01(com.apple.sharepoint.group.1)
    *Client machine that won't allow network users to login*
    Study-Mac-Mini:~ apndavies$ id bensmith
    uid=1040(bensmith) gid=20(staff) groups=20(staff),1027(family),1033(mobileaccounts),62(netaccounts),12(everyone) ,101(com.apple.sharepoint.group.1),216(com.apple.access_loginwindow)
    Have I got a problem with Open Directory? Surely the results of the id command should be identical?
    Many thanks,
    Andrew

    Hi Tim -
    Yes it is. Sorry - was getting a bit desperate this morning.
    Problem now solved - for those with the same / similar issues there were two problems.
    Initially - the client machine that would not connect had it's DNS server set to my router - not my server (which is running DNS for the local LAN)
    Once I fixed that (don't have a clue why or how this setting got changed - could have been wrongly assigned my my router (Airport Express) - not sure), I noticed that Kerberos was no longer running on the server. I could connect to it via screen sharing, but I couldn't connect to an AFP share. I checked a few things, then happened to notice that my Snow Leopard server was no longer "bound" to open directory (itself) in System Preferences>Accounts>Login options.
    Fixing both of these issues resolved the problem.
    Thanks again to Tim for his help and advice.
    Regards,
    Andrew

  • Quality info records: how to handle same supplier with different sourcing

    hi all
    I have material which comes from same supplier but different sourcings: as in I have one vendor supplying it but it can come from different sites; as some sites might be approved and others not, how can I differentiate that?
    thanks
    Alisa

    You need to use the MPN profile functionality that is a standard part of SAP.
    In Config under the purchasing define the MPN profile.  There are several options you can turn on/off including info records.
    You assign the MPN profile to your material. It now is considered by SAP to be an internal material number. 
    You then create a HERS material type for each separate manufacturer material number you have.  You only need the purchasing view for these materials.  You can also create purchasing text views, classification and some others if you wish.
    In the SAP approved vendors list (AVL), you then assign each manufacturer vendor(s) with the HERS material created.
    You create a Q-info record for each manufacturer/HERS material combination.
    Now, when you specify the internal material number in a PO, the system will tell you to order the MPN material.  When you do the drop down for the material now, it will show you the approved manufacturers allowed in the AVL for the ordering plant.
    When the 01 inspection lot is created you will have a vendor number as well as a manufacturer's number in the inspection lot.  The DMR can be done by the manufacturer or the vendor depending on how you set up the inspection plan. Q-info record will be used accordingly.
    Take a look at it and research it.  It's not hard to set up.
    FF

  • Cost Center Information amd Work Center Infor.,

    HI All,
    Please let me know what are all the T.Code used to get Active Cost center used and also let me know the table name used also.
    Regards,
    Nagaraj S

    Hi,
    Use T.code: OKB9 and link/ relate the Cost center with G/L Account & save.
    Regards,
    Biju K

  • Resource - cost center - activity type

    Hello,
    I can see the link Resource - Cost center  (in the resource master data)
    I can see the link Activity type - cost element
    I can see where the activity type's planned cost is done, for such or such cost center
    I cannot see the relationship Resource - Activity type
    isn't there any direct link or is it only an indirect link, through the cost center
    Thanks for your help
    KR - Loï

    I need to post 2 diferent type of costs to 2 different accounts (cost elements) my question is what impact is if I mantain in one resource with cost center 1000 2 activity types, one is also linked to CC 1000 but the 2nd is linked to CC 2000
    In the costing tab at the Resource there is a field for the cost center so my question is what are de implication with this cost center and the link between the activity types and the cost centers
    you can maintain 2 cost element for two activity.
    But you can't combine two cc in one resource
    then you need to create two resource, one with cc 1000 and other with cc 2000,
    the second question is, I have to maintain these 2 different cost at the time of confirmation, Is it correct that I mantain the cost of an HOUR in KP26 so when the confirmation happens I just have to say in COR6N that 15 hours were used so based on rate given in KP26 system will calculate and allocate that cost properly, Is this how it works?
    as per the formula in OP54, assigned in resource with respect to activity.
    at the time of actual booking, system will calculate the actual cost of the activity ( as per the formula maintained in resource)
    Also I want to ask if like the activity described before I can have 2 of these attached to the same work center and same phase? I know I can have up to six per Resource but how is the confirmation done, in one step at COR6N you give the 6 parameters to each of the activities or you have to go one by one and saving in this transaction??
    In resource for each activity ( parameter) you need to assign formula and activity type, while creating process, system will copy all the parameter and formula in process order, while booking  in cor6n system will copy all the parameter.

  • Messg-AAPO189 :Account object Cost Center differs from that in asset master

    At the time of Asset Acquisition in T-Code F-90 using Internal order, the system throws the following error:
    Message-AAPO189  :Account object Cost Center differs from that in asset master
    But in Asset Master data and Internal Order Master data's Cost Centers are same. 
    And we are not facing this problem for all Assets (only for few asset class only we are facing this error).
    Please guide on this.
    Note:
    We are not using Joint Venture Accounting.
    Regards
    JS
    Edited by: JS on Aug 12, 2009 7:14 PM

    Closed

  • Same cost booking for two different cost center

    i am facing a problem.
    the problem is that here same cost is book under two different cost center @ the ratio of 50%.
    how it is possible.

    Hi,
    What i understand from your question is that in one FI document there are 2 cost center against same cost element with 2 different line.
    If it is so then it is correct.
    User has enter same cost element twice and enter different cost center and dividing the cost equally.
    Regards,
    Shayam

  • Overtime assignment to a different cost center

    Hello,
    Scenario:
    Overtime with different cost center
    DWS: 0800 - 1700
    Actual IN: 0800
    Actual OUT: 2300
    Approved OT: 1800 - 2400
    Cost center: 10100 (This cost center is different from the cost center in IT0001) should be charged for the overtime only.
    Given the scenario above, I could not use infotype 2002 (create an attendance type as overtime) since if i input 1800-2400 the system will valuate the whole six hours (6) as overtime (note: the system should only valuate 5 hours- 1800-2300; approved overtime with comparison to actual in/out).
    If I will use infotype 2005, it will have the same behavior as it 2002. 1800-2400 will be paid.
    If I will use infotype 2007 via the GOT function, it will valuate the overtime as 1800-2300 (approved overtime with comparison to actual in/out) correctly BUT i could not charged the corresponding cost center. I already checked the spro and it 2007's cost center could not be activated.
    Do you have any ideas in mind? Any comments are appreciated.
    Thanks.

    Hello,
    Thank you for your answers.
    I am considering using IT2007 since it automatically distinguish which work should be valuated as overtime with regards to comparing the filed overtime (via input in IT2007) with regards to the time entries(clock in/out) of the employee.
    Example:
    if daily workschedule is 0800- 1700
    actual in/out   0800 - 2300
    entry in IT2007 is   1700 - 2400
    The overtime that the system will recognize is 1700-2300.
    Unlike in using IT2005, if i input 1700-2400, it will valuate 1700-2400 without considering the actual in/out of the employee.
    I can manually change the IT2005 but the overtime of the employees which are assigned to another cost center are 1000+records in a day.  If I manually edit the entries in IT2005, it will be very tedious. Same goes if it is via 2010.
    Do you guys have other ideas in mind?
    Btw, I am using positive time eval.
    Thanks in advance.
    Edited by: Maya Fajardo on Feb 10, 2011 12:02 PM

Maybe you are looking for

  • NULL value in LOV not displaying in Viewer as NULL

    Discoverer Viewer: 10.1.2.54.25 CP4 I have a list of values ('A','B','C',NULL). In desktop the drop down shows A B C NULL However in viewer I get A B C When I select the area just under C, which I presume to be NULL, it allows me to move it over. How

  • Fax no longer works in Leopard

    I have used the fax on my PowerBook for years up through Tiger and it continues to work on my iMac with Tiger. But neither of two machines with Leopard will answer the phone anymore (except manually with "Answer Now"). I posted this previously, sorry

  • Is this piracy or what?

    An seller on eBay Australia is selling a backup copy of Mac OS X Leopard with his second hand iMac, but he won't be providing the original disks. The ad reads as follows: "iMac comes with Mac OS X Tiger and iLife "06. A copy of Mac OS X Leopard and i

  • Firefox RC1 XP theme problem and with maximize/restore window

    Hello. I've installed theme Alienware Darkstar, and always when I open Firefox, is starts maximized, but it looks like it was not. http://img695.imageshack.us/i/96037597.jpg/ Also, I'm having problem with the "X" when Firefox is maximized http://img6

  • A very usable portrait mode for N900!

    I just found this, some of you probably already know about it. Download ShortcutD  from the maemo repo, then go to settings and ShortcutD. In there you can use camera button or proximity sensor (i originally set caera button but found proximity senso