Overtime assignment to a different cost center

Hello,
Scenario:
Overtime with different cost center
DWS: 0800 - 1700
Actual IN: 0800
Actual OUT: 2300
Approved OT: 1800 - 2400
Cost center: 10100 (This cost center is different from the cost center in IT0001) should be charged for the overtime only.
Given the scenario above, I could not use infotype 2002 (create an attendance type as overtime) since if i input 1800-2400 the system will valuate the whole six hours (6) as overtime (note: the system should only valuate 5 hours- 1800-2300; approved overtime with comparison to actual in/out).
If I will use infotype 2005, it will have the same behavior as it 2002. 1800-2400 will be paid.
If I will use infotype 2007 via the GOT function, it will valuate the overtime as 1800-2300 (approved overtime with comparison to actual in/out) correctly BUT i could not charged the corresponding cost center. I already checked the spro and it 2007's cost center could not be activated.
Do you have any ideas in mind? Any comments are appreciated.
Thanks.

Hello,
Thank you for your answers.
I am considering using IT2007 since it automatically distinguish which work should be valuated as overtime with regards to comparing the filed overtime (via input in IT2007) with regards to the time entries(clock in/out) of the employee.
Example:
if daily workschedule is 0800- 1700
actual in/out   0800 - 2300
entry in IT2007 is   1700 - 2400
The overtime that the system will recognize is 1700-2300.
Unlike in using IT2005, if i input 1700-2400, it will valuate 1700-2400 without considering the actual in/out of the employee.
I can manually change the IT2005 but the overtime of the employees which are assigned to another cost center are 1000+records in a day.  If I manually edit the entries in IT2005, it will be very tedious. Same goes if it is via 2010.
Do you guys have other ideas in mind?
Btw, I am using positive time eval.
Thanks in advance.
Edited by: Maya Fajardo on Feb 10, 2011 12:02 PM

Similar Messages

  • VA01 Sales order (line items) and different Cost center assignment

    Hello gurus,
    im searching for solutions how to assign different cost center to sales order line items, but only thing that i found is the substitution (Using Substitution (GGB1) to change Cost Center assigned in (OKB9))
    Trying to do this i was unable to create something that could work, since there was no Logistic.
    Could somebody explain me the Line item in SO assignment to Different cost centers?
    I know alot about OKB9, VKOA and other transactions, but still cant find anything suitable to solve this issue
    Best regards
    Laurynas

    What i mean is that, on the end of every month we are gathering information for Statistical Key Figures (from Controlling) entering as CO document and then distributing the costs using KSV5 TC on Internal Orders according those entered statistical key figures.
    i.e. we got INCOME 1000000 from 10 internal order, which we distribute on even percentage parts like 10 cost center, each getting 10% of the income.
    I tried to create the SO, but the Profit center field, after i entered a number, was changed automatically into another.
    And the posting didnt reach Controlling and the assigned Cost center. I think it is a lack of configuration.
    Regards
    Laurynas

  • CATS Time Entry - Charging time to a different cost center

    We are looking at using CATS for time entry for our salaried non-exempt employees.  Some of these employees charge their overtime to a different cost center.  For example, normally their overtime is charged to their own cost center but periodically they help another group and need to charge the overtime to the other group's cost center.  In the CATS profile where you select the fields you want to be available for input, display, etc., I see cost center as an option.  However, when I select it as a field for input, it does not appear on the timesheet.  I see there are other cost center fields (receiver cost center, sender cost center) but I thought these had more to do with work orders (not sure of that, though) and work orders are not used for this group of people.  Currently, the time is being charged to an alternate cost center when the time administrator enters the overtime via PA30 and then selects the 'Cost assignment' button to record the appropriate cost center. I would appreciate any information/guidance you can provide.  Thank you.

    Hi Kathleen,
    We are trying to do the same thing so I understand exactly what you are asking.  We made the sender cost center field an input field via the IMG - Cross-Applications Components> Time Sheet> Time Recording> Choose fields> - select data entry section and look for sender cost centre - field name CATSD-SKOSTL - ensure "input" is selected.
    Eventhough we have been able to enter an alternative cost center with an attendance (i.e., different from the employee's cost center saved on IT0001), it is not being transferrred to HR (does not appear on attendance infotype) therefore payroll does not pick-up the cost center with the attendance hours and it is not posted to FI.  Payroll continues to use the employee's home cost center.
    Have you been able to get any further with this issue?
    You can contact me directly if you like - 1-613-599-8600 - ext 243.
    Catherine Maunder
    Calian
    340 Legget Drive, Suite 101
    Ottawa, ON, K2K 1Y6

  • Activity Costing from same resource to different cost center

    Hi everyone,
    We  need to use a manufacturing resource where it has to cost for activities for product "X" to one cost center and for activities for product "Y" to another cost center. One resource can be assigned to only one cost center
    is it possible to do in SAP or any work around ?. Any suggestion highly appreciated
    thanks !!
    Ganeshan Kalembeth

    Hi,
    u are right we can not assign .one resource to two cost centre ....i think its not possible at all..we need to create different resource for that ...product..that only i can suggest
    regards

  • Allocation of cost to different cost center

    Hi Techies,
    I have to allocate cost from one cost center to different cost center according to percentage (%). Company wants to show same cost on sender and then breakdown according to % on receiver cost center.
    Example: Company wants to allocate cost from CCenter A to Ccenter B1, B2, B3.... according to % like 74.1% to B1, 14.8% to B2. Now which allocation functionality (Assessment, Distribution) I should use to solve this problem. I would really appreciate if you have method or process step to perform this process.
    Thank You,
    Kenny

    Use transaction KSU2 to call the Assessment Cycle.
    Click on "First Segment" and in the segment header, under Sender Values, select Posted Amounts and key in 100% (since you wish to assess all the costs). Under Receiver Tracing Factor, select Fixed Percentages.
    Click on the "Senders/Receivers" tab. Now under "Senders", do an F4 (dropdown list) in the Cost Centres field and select your Cost Centres (or groups).
    Similarly click on the Cost Elements and dropdown to select your Cost Elements or groups.
    Now under Receivers, in the Cost Centre field, key in the Cost Centres you wish to post costs to.
    Click the next tab Sender Values
    Here, enter Share in % as 100% (default) and under version, enter 0.
    Now click on the Receiver Tracing Factor tab. You should see all the Cost Centres you entered under Receivers in the Sender/Receiver tab. Enter the %s you wish to apportion to each Cost Centre.
    Save this cycle and run this for the period in question. Before you run this, make sure you post some costs to the Sender Cost Centres. Else the system will find nothing to assess and come back with the same error.
    Hope this helps.
    Cheers.

  • Same cost booking for two different cost center

    i am facing a problem.
    the problem is that here same cost is book under two different cost center @ the ratio of 50%.
    how it is possible.

    Hi,
    What i understand from your question is that in one FI document there are 2 cost center against same cost element with 2 different line.
    If it is so then it is correct.
    User has enter same cost element twice and enter different cost center and dividing the cost equally.
    Regards,
    Shayam

  • How to assign activity type to cost center

    hi Gurus,
    Sir i have got error during the T.Code: CRC1.  in which i have to assign Activity type to cost center. which is as follow: ( I have also made tickmark in cotrolling area for Activity type)
    ( Error :No activity type assigned to cost center #1301,Controlling area ABCD on 01.02.2008)
    Pls provide me the solution where the activity type should be assign to cost center.
    Than'x & Regards,
    Dhananjay

    Hi,
    Planning at KP26 for Activities itself is integration between Activity and Cost center.
    Once you do this, your problems is solved.
    Assigned points suitably
    Best Regards
    surya

  • What is the different between account assignment P Project & K Cost center?

    Hi ,
    I need to raise a PR and PO for repairing damge of our Project's Product.
    In this stituation, I should create PR with account assigment P (Project) or K (Cost center)?
    Thanks

    Hi,
    Material are procured as stock or non-stock materials. When you procure material which can be used in production of finished product ,stock is maintained.
    Account assignment category describes how the procured material is being used (for eg: Cost Center, Sales Order, etc). It also determines how the accounting entries made when a GR document or IR document is posted.
    When you use the Account Assignment Category "K", it means the material is allocated to a cost center for consumption. The Materials is accounted to the particular cost center.
    Account Assignment Category "P" is used for materials that are required for the project related.
    Hope it helps.
    Regards,
    Bijoy Kumar

  • Manually post to a different cost center during APP

    Hi,
    When the proposal is created, we manually go and edit the proposal and enter 2% cash discount. I have done the settign in OKB9 to pick up the cost center for the Discount Received account.
    Now, is there anyway that I can enter the cost center manually after running APP (will delete the OKBP settings). If i run APP it gives me error that in proposal log that discoun received account requires CO object.
    thanks,
    JR

    NO.
    If you have set up an account assignment rule in OKB9 you wont be able to stop the payment run as it creates the accounting documents.
    If it is always a certain Cost Center you could look at a substution looking at the document type of the payment run to make it different.

  • Where to assign GL Account to cost center?

    Hello Friends,
    Actually in MIGO T.C , I  am issuing the material against the cost center.Now in MIGO T.C ,  in Account Assignment tab i give the cost center and other requied data and save.And in display mode when i check that document than by default system takes the GL Account.Now my question is where we assign the G/L Account to cost center?In FS00 T.C i checked in Edit cost element for that account, there in Default account assignment , no cost center is maintained.So from where system is picking this G/L Account?
    Thanks and Regards,
    Jitendra Dilip Chauhan

    Hi Jitendra,
    This setting is made in OBYC. This actually MM & FI integration.
    You check this in OBYC.
    1.First check your valuation class in material master.
    2.Then goto OBYC.
    3. Double click on GBB transaction key
    4.This will pop up chart of account.Maintain chart of account & enter.
    5.Here you will see that GL account for combination of Genral modification VBR & Valuation class.
    VBR: for internal goods issues (for example, for cost center)
    That means whenever you do Goods issue of material  for cost center which having same valuation class,this GL account will be automatically assigned.
    Hope this clear you.
    Regards,
    Raja.
    Edited by: Raja on May 8, 2009 9:46 AM

  • Assign Business Area to cost center

    HI Guru's
    i would like to assign the business area to existing cost center, which is having some posted entries.
    But system throws the below error message
    "For change Business area is not possible (transaction data already exists)"
    Pls help me
    Rgds,

    Hi,
    You cannot change buisness area for a cost as this field is for each fiscal year. For example, you can change the field content for a new fiscal year by changing the validity period. Mean splitting the validity period provided there is no transaction data. The data in this field is always time-based.
    This is to for the consistency of data in SAP.
    Please also check out the following link:
    http://help.sap.com/saphelp_47x200/helpdata/EN/08/51457143b511d182b30000e829fbfe/frameset.htm
    However, I think you can use substitution rule to subtitute business area in document level for cost center. I am not sure whether this will work.
    Hope this helps.
    Please assign points as a way to say thanks.
    Regards,

  • Error when Assign Order Reason to Cost Center& Sales Area

    Hi,
    SAP Guru,
    I Define the Order Reason.
    Now I want To Assign This Order Reason to Sales Area & Cost Center.
    When I am Doing this I got the Error SYST:Date 00/00/0000 not Expected. Message No.FGV004
    Please Advice me.
    Thanks & Regards
    Bhushan

    Hi,
    Just define the order reason and it will automatically come in the header irrespective of the Sales area. But if the system is giving you this error FGV004, then consult the abapper that the system might be seekin the date from the program bcoz normally the system pics up the OS date.
    Regards
    Gaurav

  • MSS different cost center by approved time sheet

    Hello,
    In Table CATSDB seen we the results from time entry. The fields Send cost center and receiver cost center. An employee has an standard costcenter as masterdata. When this person works a couple of hours on a cost center that differs from his standard (master data), he giving in the cost center were he works on. Every thing is ok in ESS.
    In MSS in the team viewer this person belongs to a team. Bij the approval of time sheets he displays standard (master data) and the u2018differentu2019 cost center. This situation we want to avoid. The u2018differentu2019 cost center is somebody else his responsilibility.
    I try something with Cost center responsility. Can someone help me?
    Thank you

    Dear Dilek Ersoz 
                    I have the same requirement where i have to default the Sending cost center and Actiivty type from infotype 315  in the CAT2 sending cost center and activity , but in the cats profile defaults section i have kept the Cost Center and acitivyt type checboxes being checked , still iam not getting the values of the 0315, please could you let me know how to default the values in cat2.
    regards
    sai.

  • Account assignment category Asset to Cost Center in po items

    Hey,
    We have a Question how to handle this Exception:
    We have purchase order items with the account assignment category "A - Asset" and we have created Asset master data. Later, this assignment category is changed to "K - Cost Center". But the Asset Master Data is still there.
    How to handle this in the future? Do we have to delete the purchase order items with the account assignment category "A - Asset" and have to create new items with assignment category "K - Cost Center"?
    Thanks!

    Hi
    Once you change the acct assnment category to K, then there is no need for asset master. You can take help of your FICO consultant for deleting the asset master. You changed acct assnment in PO?
    Thanks

  • Assigning work centers to cost center

    Hi, In a Z-report we found that one work center is assigned to more than one cost center. Pls advice how to ensure that particular work center is assigned to one cc only? pls advice.

    Hi,
    At any given point in time, you can assign one work center to one Cost center only..
    The situation may so arise that, the Cost center walidity may be limited and we may be forced to change the Cost center afterwards in the work center..
    Check with the Table: CRCO
    Check the Cost center validity in the T.code: KS03.
    Regards,
    Siva

Maybe you are looking for

  • ERROR: You do not have sufficient privileges to complete this installation

    When attempting to install iTunes 9.0.1, I receive this message just after the installation begins: You do not have sufficient privileges to complete this installation for all users on this machine. Log on as an administrator and then retry this inst

  • Document not posted with BAPI_ACC_GL_POSTING_POST

    Hi,    I am trying to post a FBCJ document with BAPI,     BAPI_ACC_GL_POSTING_POST  it is giving message docuemnt posted succesfully  but when i checke again in FBCJ  the document is still in save condition only it is not posted    my actual problem

  • Error - tag.getAsString : attribute 'title' not found in context ---- Help

    hi, I have included a jsp page in tiles definition xml. if i try to access an attribute defined in the tiles definition using tiles:getAsString method it is throwing the following exception Error - tag.getAsString : attribute 'title' not found in con

  • Opening an existing page in iWeb

    i'm a bit of a newbie to iWeb and having just upgraded to the new version of iLife i want to continue working on a page i've already got published to a folder, however i can't figure out how to open the existing site i've made in iWeb, its probably v

  • TimesTen Replication with Oracle

    I am generating some 100k data in TimesTen i would like to replicate those data to Oracle database. What will happen if there is sudden crash in the system of TimesTen ,how replication will takes place ,once again i reconfigure the replication to ora