Hi,
I'm trying to find out whether it is possible to connect activity types with a group or range of cost elements, which should be allocated using activity allocation.
I don't want to allocate all costs gathered on Cost Center, but only a range of cost elements. Can I achieve that using direct activity allocation and if it's possible, how can I do it?
Best wishes,
Karol

Hi Karol,
It is possible to link the cost elements to the activity using the splitting structure in the SPRO of cost center accounting.
First the costs are debited to other cost centers using the plan activity type. At the end of the period when you calculate the actual price of the activity then based on the cost element range assigned to the activity in the splitting structure the actual cost of the cost elements are debited through the activity.
I hope it is clear now.
Regards,
Suraj

Similar Messages

  • In KP26 activity types allocation cost element displaying old cost element

    Hi,
    I changed cost element in activity types. But in KP26, activity types picking old cost element only.
    Ex: I changed 9430000002 for Labour activity with old one 9430000001 but in KP26, while planning for Labour activity it is picking 9430000001. so its becoming problem while running CK11N.
    Please suggest.
    Thanks
    Neeraja

    Dear Neeraja,
    While changing the secondary cost element for activity type, hop you got the following warning message.
    So you must check whether the existing data is there or not for that activity type.
    One more important thing.
    The cost element field is a time based filed.
    You can change this field for each fiscal year. For example, you can change the field content for a new fiscal year.
    Regards,
    Pavan Kumar Arvapally

  • Condition Type with cost element category 1

    Dear Sap expert,
    I have costing based copa and I am running make to stock scenario.
    SD team added new condition type in their pricing.
    This condition type is mapped to FI GL account which is a cost account (cost element category 1) while the other condition type in SD pricing is cost element category 11 or 12.
    I mapping this cost account to a cost center in OKB9.
    But when SD run billing, there is an error message :
    "Prof.segment for prim.cost elements not advisable for costing-based CO-PA" .
    I don't mapped this new condition type to copa value field.
    But Why does this error come?
    Please help me.
    Regards

    Hi Anu
    This is standard behaviour... Once you have COPA active, the Prof Segment gets derived when you create Sales Order...
    So, any posting that happens from Billing, gets assigned to this Prof Segment...
    The design is such that you cant post to COPA using Catg 1 cost element....
    So, if you are posting to this GL account from SD Billing, you need to have it as Catg 11 or 12.... If you dont want to post it to COPA, then do not post to this GL from SD billing.. Post it from FI side...
    Br, Ajay M

  • Activity Type and Cost Element Assignment wrong

    The cost element appearing in Transaction code KP26
    ( Activity type planning), should come through the master data of the activity type.
    What I am observing in my system, that for the combination of the Cost center and Actvity type , in KP26 the same cost element is not appearing as per the master data of Activity type. And also the cost element filed is gray. It is happening for 2008 financial year only.
    How to correct this problem?
    Is there ant note to be applied.?
    Kamlesh

    This is normally a result of changing the CE while the Activity Type was active and in use (planned against and/or activity confirmed for some production orders).
    One solution is to curtail the activity to the end of the period you are in and create a new one from the following period. Just beware that you may need to change the routings, splitting rules, etc. as well.
    Cheers.

  • Physical significance of activity type on cost center

    Hi,
         I want to know what is the phsical significance of definiing activity type on cost center.In my situation the activity type is defined on the cost center assigned to the maint. work center.Due to this actual cost is geetting reflected on my order due to the activity rate but physically no such cost is being incurred by the maintenance people.As when any material is consumed on a PM order then the MAP of material  is shown as actual cost in PM order.This is ok.Then how this activity type defining is valid on the cost center when no such work is being carried out.Pls. reply.

    As mentioned in earlier posts, we will assign Cost center & Activity types in Labor work center. In KP26, for this Cost center, Activity type & period (say Jan to Dec 2011), cost (Fixed & Variable) will be maintained.
    Reason to maintain the KP26:
    In Business, sometimes contract labors will be paid on hourly basis. If those people do the Maintenance job, as we are paying them, we need to calculate the labor cost.
    For Permanent employee, company used to pay salary (fixed & variable component on monthly basis). That will be converted into hourly basis & the same will be maintained.
    So that, for expense company doing (paying salary), there should be some offset (getting the work). If you have integration with HR & PM, you can capture the actual hours entered in IW41 in HR time sheet.
    Even though there is no such cost explicitly, these cost should be calculated to arrive at the actual work done on equipment.

  • Usage of Activity types under Cost Centre.

    Hi
    I would like to know the usage of activity types under cost centre.
    How to do direct and indirect activity type allocation.  Please explain indetail from scratch to finish with necessary t.codes at the earliest.
    Appreciate your cooperation at the earliest.
    regards.

    Hi,
    as far as usage of activity types under cost center is concerned it is addressed by ist reply to your query by another SAP Guru.
    with respect to Direct activity allocation,
    When we know the source cost center and target cost center then we allocate the activities from source cost center to Target cost center (T.Code KB21N)
    The cost is picked from the planned price given at KP26.
    Withe respect to Indirect activity allocation:
    We do not know the Traget Cost center in this case.
    First we need to enter the activity consumption in the sender cost center (source cost center).
    Then we need to allocate then indirectly to the target cost centers on some allocation basis using distribution cycles
    I am sure this will clear your query.
    Please assign points suitably
    Best Regards
    surya

  • Cost Center Report with Cost Element wise Subtotal

    Hi All,
    We have a requirement where customer wants a Cost Center report with Cost Element wise Subtotal and selection options required are Company Code, Cost Center, Cost Element.
    KSB1 solves the requirement, but when executed for 2 or more company codes it is taking 3 to 4 hours.
    The other alternative report we tried is S_ALR_87013611- Actual/Plan but this report gives debit and credit values in seperate columns.
    Please let me know if we can copy the report S_ALR_87013611 and change it using report writer to have the output by Cost Element wise total.
    Also please let me how we can increse the speed of KSB1 report.
    Thanks
    Satish

    for KSB1 Report the following is my suggestion
    1. Please go to the selection criteria for the cost elements and de select the secondary cost elements in the the exclude range and try running the report this is generate the report faster.
    2. also check the date range please give the date range for 3 t months and if you want to run for multiple company codes. if you want to execute it for longer periods say 9 months or 6 months generate the report in 2 to 3 installments and download them to your excel and consilidate them in excel for your analysis
    Best Regards,

  • Adding cost center on OKB9 with cost element company code with valuation ar

    hi ,
    can anybody help me out with the Adding cost center on OKB9 with cost element company code with valuation area configuration.
    i have to do this configuration but do not know the detailed steps for that one.
    Good points will be awarded.

    Hi Prem
    Select the 1 in column acct assignment details column then in the left side in detail per business area/valuation area enter your valuation area.
    Thanks
    Ashok

  • Activity Types to Cost Center

    hi,
    how to assign activity types to cost centers ??
    G

    I got a message like this when i try to include the activity rates to work centers, what settings do i want to maintain ?
    Activity type 10-140 not set up for cost center 1000 MPT080
    Message no. CR061
    Diagnosis
    You are attempting to assign activity type 10-140 to the work center. However, this activity type has not yet been set up in controlling area 1000 for cost center MPT080.
    Procedure
    Assign an activity type set up for cost center MPT080 to the work center or
    assign the desired activity type to cost center MPT080 within cost center accounting.
    Thanks

  • Where you are going to activate  activity type in cost centre

    Hi gurus
    whenever i am trying to assign activity type in cost centre, it is not allowing to save that particular type of  cost centre.
    also it is giving error as activity price planning is not done for this cost centre
    can you please suggest how to resolve this issue
    thanks
    shaik

    Hi Shaik,
    Can you please let me know the error message number that you are receiving?
    Thanks in advance.
    Best Regards,
    Vanessa Barth.

  • How to assign activity type to cost center

    hi Gurus,
    Sir i have got error during the T.Code: CRC1.  in which i have to assign Activity type to cost center. which is as follow: ( I have also made tickmark in cotrolling area for Activity type)
    ( Error :No activity type assigned to cost center #1301,Controlling area ABCD on 01.02.2008)
    Pls provide me the solution where the activity type should be assign to cost center.
    Than'x & Regards,
    Dhananjay

    Hi,
    Planning at KP26 for Activities itself is integration between Activity and Cost center.
    Once you do this, your problems is solved.
    Assigned points suitably
    Best Regards
    surya

  • Multiple Activity Types with one Production Cost Centers

    Dear Experts,
    I have One Cost Center 2 Activity typesu2026I can plan in kp06 in single shot thatu2026
    1Ctr-1ActvtyRs.100 and 1Ctr-2Actvty----Rs.200u2026.(Same Cost Elements)
    Here my confusion is while doing actual posting we can post cost element to Cost Center i.e.Rs.300 to 1Ctr.
    Here how I can map that 100 belongs to 1Activity and Rs.200 belongs to 2Activity because there is only cost center.
    I know that solution is simple we can maintain separate cost center for both activity types i.e 1 to 1 mapping of cost center to Activityu2026So Actual posting weu2019ll be fineu2026.
    Then what is use of Kp26 to maintain 1 cost center to multiple activity types?
    Kindlyu2026..Clear my problemu2026
    Regards,
    Balaji Bhonsle.

    Hi Balaji
    You have pointed out a valid concern.. There is a solution to it as well, however, very cumbersome and less practical
    In OKKP - You allow some control indicators i.e. CCA, IO, PCA, COPA, etc.. Here, you need to allow Activity Type as Addiitional Account Assignment Object.... (This is below Cost Center Accounting)
    While booking expenses from FI, you can specify the Act TYpe along with the cost center... Provided you have that much patience and it is identifiable....
    Also, you can assign act type in Asset MAster so that while posting depreciation in AFAB, the same gets assigned to Act Type
    Br, Ajay M

  • Flow of Activity Type in Cost Estimate

    Hi
    I have made all the required settings for product costing, I have also maintained values in KP26 for activity postings, but not able to get the flow in Cost estimate.
    Can any body let me know the reasons why i am not able to get the activity postings in cost estimate.
    Thanks
    Rakesh Shah

    Dear Elza,
    Thanks for the quick reply, I have checked the settings suggested by you, and both the settings are in place,
    1. I have assigned the secondary cost element in (Assignment Cost component - cost element with category 43, the same being assigned in Activity type also)
    2. My scenario is Repetitive manufacturing so i have assigned in Qty structure control - routing selection 02 (rate routing).
    Please suggest.
    Thanks
    Rakesh Shah

  • Activity Types and Cost Centres

    Our PP is not yet live now.
    While going through the system settings, it is found that many activities (approx. 15 for indirect expenses also) are planned in the Production Cost Centres.
    However, these activities are not included in the master data of the Work Centre. Only one activity type is mentioned there for machining.
    Then, what is the purpose of other activity types planned if they are not mentioned in the Work Centre ?
    Is there any other way these activity costs will appear in the Cost report ?

    Hi,
    You are almost on the right line, activity quantities will be triggered in the  cost center report based on the routing master and through  the confirmation from the production orders.
    For the creation of the  work center - Activity Planning KP26 is required. Cost center/Activity
    where we can plan the activity quantities.
    Prior to that KP06 is required to plan the  primary cost combination of (Cost Element/Cost center/Activity Type) where we can plan the cost.
    Based on the above information we can calculate the plan price - KSPI
    Based on the confirmation from the production orders activity quantities will be updated in the center report. cost will be updated with actual postings in the cost center.
    So that you can calculate the actual activity price.
    Please look into the blog for better understanding:
    Expenses Analysis and Its splitting  - Part 1
    Regards,
    Pavan Kumar Arvapally

  • Activity Type Planning, Cost Center Planning

    Hi Friends,
    I am learning SAP Controlling. I have few doubts.
    1. Activity Type planning (or) Activity Dependent Planning (Cost Center +Activity
       type) both are same.
    2. Cost Center Planning (or) Activity Independent Planning (Cost Center + Cost
        Element +Activity type) both are same.
    Thanks,
    Rams.N

    Activity Planning and Cost planning are different. The first in quantity planning, while Cost planning is Dollar Planning.
    While planning cost ($), you can mention, if such cost is activity dependent or not.
    The purpose is to derive an actitivity price. This is derived by dividing, the cost by the activity quantity. If a cost center has more than one activity, then the cost need to be associated with the activity. This is where we require to identify, if a cost is activity dependent or not. When you mark a cost as  an activity dependent, that cost is fully cosidered while deriving the associated activity price.
    The activity independent cost are split amongst activities to derive the price for each activity. This step is done before the activity prices are computed.

Maybe you are looking for

  • 0DOC_NUMBER - Sales Order No - Attributes

    Hi Guys, Here is my requirement. I need sales order related characteristics like soldto, shipto, endcustomer,purchase order date and some line item level fields  like few dates and status flags. I am planning to add all the above as the attributes of

  • I am running Safari 5.1.7 on 10.6.8 and experiencing frequent freezes and crashes, how do I solve this problem?  Hal Harris

    I am running Safari 5.1.7 on 10.6.8 and experiencing frequent freezes and crashes, how do I solve this problem? Hal Harris

  • Multi scale graph

    I have made an LV in 6.0. It has a multi scale graph. it is attached. As you see there are three types of plots on this graph. How do I show only one scale and hide the other two scales? I want to avoid editing everytime I want to use a particular pl

  • How do I change fonts in my email?

    I am using AOL mail on my iPad and would like to change the font size and text color.  I changed it on my computer, but it didn't carry over to my iPad 3.

  • K800 & iMac Bluetooth Problems

    My k800i connects and works great with my macbook, however, when I try to connect with my iMac (intel) it won't connect. I can use my computer to browse my phone, but not the other way around. I can't send or connect from the phone to the computer at