Adding cost center on OKB9 with cost element company code with valuation ar

hi ,
can anybody help me out with the Adding cost center on OKB9 with cost element company code with valuation area configuration.
i have to do this configuration but do not know the detailed steps for that one.
Good points will be awarded.

Hi Prem
Select the 1 in column acct assignment details column then in the left side in detail per business area/valuation area enter your valuation area.
Thanks
Ashok

Similar Messages

  • Transfer with in same Company code with a fixed mark up

    HI  gurus,
    here is the situation ,we purchase some unlabelled packing materials form vendor in the distribution center , then pack them up into many smaller packages with our own label , after that ,the DC transfer packed material to store for sales .
    the requirement is that ,we want to manage both the stock of raw material and goods for sales in different article number ,and when doing the tranfer posting from DC to store ,the cost of package material can be included in the transfer cost of sales goods,additionally with a fixed mark up. BTW , the DC and store belong to same company code .
    any suggestion?
    thanks in advance !
    Edited by: deyi chen on Jul 1, 2010 9:21 AM

    Dear Friend,
    your scenario look like STO within company code
    you can achieve your requirement by
    Mark up or by paking scenario if you use packing scenario you can use that item category is relevent for pricing and you can add packing charges into your main product pricing
    your SAP termilogy shows you are working on  SAP IS Retail

  • Block default cost center in OKB9

    Dear Experts,
    - If I would like to block one cost center which setting in OKB9 as defaul cost center, then change it to other cost center, what is the affect?
    - If cost element in OKB9 is having no cost center as default , then how the transaction from FI flow to Controlling?
    Kindly advice.
    Thank you.

    Hi Puri,
    When you give any Cost Center as default object in OKB9 for any Cost Element, that means, whenever there is a posting in FI in that GL, the system will prompt the default Cost Center in that line item. User will still have facility to change that cost center and can enter new cost center.
    If you want to replace a new Cost Center with a old Cost Center in OKB9, you can do that at any point of time. No implications.
    If you do no mention any Cost Center as default object in OKB9 for GL, nothing will happen but the User has to select the Cost Center manually at the time of FI postings.
    Srikanth Munnaluri

  • Account/Cost Center Determination (OKB9) for same plant & 2 cost centers.

    Hi,
    I faced a weird situation My situation is i have the same plant but 2 different profit center's & 2 different cost center's . My OKB9 cost element is configured through "Plant/Valuation Area (1)".
    Previously when ever we used this "Plant/valuation Area" determination we used to give plant and corresponding cost center and left other fields like Business Area, Order and profit center blank. see below thing for clear idea
    Plant A - Cost Center A
    Plant B - Cost Center B
    Now with this weird situation, i am not sure whether we can configure OKB9  as below
    Plant A - Cost Center A - Profit Center A
    Plant A - Cost Center B - Profit Center B
    If we can do as above, will their be any implications.
    could anyone help me out of this situation.
    Thanks
    Shriya

    HI
    No complications for this u can assign the CCtrs to Profit Centres.
    Regards
    Shammi

  • Table for Material-Cost center-Settlement Rule_REM product cost collecter

    I want to generate a report to see for particular material which cost center and which settlement rule is available.
    If we go in Product cost collecter (PCC) there we have an option to see settlement rule under header tab, I want to fetch that data for material as selection parameter, can anyone suggest how to get the data as,
    Material        Cost Center        Settlement Rule
    Thank you.
    Regards,
    Deven

    Hi,
    pleasefind tables related with cost.
                          TKA01               Controlling areas
                         TKA02               Controlling area assignment
                         KEKO               Product-costing header
         KEPH               Cost components for cost of goods manuf.
         KALO               Costing objects
         KANZ               Sales order items - costing objects
         Cost center master data
                        CSKS               Cost Center Master Data
                        CSKT               Cost center texts
                        CRCO               Assignment of Work Center to Cost Center
                        COSP               CO Object: Cost Totals for External Postings
                        COEP               CO Object: Line Items (by Period)
    .     COBK               CO Object: Document header
         COST               CO Object: Price Totals
    Regards
    SANIL

  • Can 2 cost center group share same cost center?

    Dear Experts,
    Can 2 cost center group share the same cost center? 
    Basically I'm looking at MATRIX structure where one cost center, say an Equipment shared by 2 different cost center groups (say one in "Location-A" cost center group, and the other one is in "Process-A" cost center group).  This is to enable the management to be able to see the costs incurred in either by "Location" cost center group or "Process" cost center group.
    The "Location-A" cost center group may tied to Cost center 101, Cost Center 102 and Cost Center 103.  The "Process-A" cost center group may only tied to Cost Center 101, and other cost center 201 (which is also tied to other "Location-B" cost center group).
    Please advise.
    regards,
    Abraham

    Hi Abraham,
    its not possible to assign a cost center to several cost center groups in the standard hierarchy. Otherwise, the standard hierarchy would be inconsistent.
    As stated in the online documentation under http://help.sap.com/erp2005_ehp_05/helpdata/EN/25/908fc66d8411d194f000a0c93031df/frameset.htm
    'You can assign each cost center to only one group in the standard hierarchy, but to as many alternative groups as you require.!
    Regards,
    Greta

  • Can a cost center reassign to another cost center group

    Dear Expert,
    Does SAP allow a cost center reassign from one cost center group to another cost center group in this scenario the particular cost center which going to reassign to another cost center group have posting into the cost center?
    Please advise how to reassign and what is the impact?
    Please help
    Regards,
    Karen

    Hi,
    Thank you for the prompt reply.
    Would like to seek for your advise.
    The cost center that we need to reassign to other cost center group will it carry the cost from the previous cost center group to a new cost center group?
    Please advise.
    Thank you.
    Regards,
    KH

  • STOCK TRANSPORT ORDER  With in One company code

    Dear Laksmipathi,
    While RP delivery in stock transfer order  With in One company code, the sym will pick movement tyoe 641 and which ic configrued in SL .But  in STO  there is no sale order creation  that  i mean  SL  will pick only in sale order.
    Here  order type UB and plant combination  sym will pick the Delivery type NL
    NL -NORM -V sym will pick Item category  NLN  of Delivery not  of  sale order.
    NLN-NN(Schedule line)
    Generally we know the SL which is determined by  item category  and MRP  type , here  item category is coming only in RP  delivery document.
    So my question is
    Question  1.how  this  641  which  has  determined  while RP Delivery  document?
                                   if it is  determining from schedule line NN , how  it can be consider since  sale      order is not  in the picture?
    Question 2. In 641  the cost has been updating /Accounting document is getting generatiing  where as in VF01 billing doc  not relevent for Accounting  doc  .so  how we can settle or balance the  cost  of this material  while occured in 641  or  PGI?
    Question 3.What  are the business benifits while  doing  STO?
    i am new in this  and Pls  advice  how to give the  point  to  you .
    Regards
    ISHI

    Dear Thakkar,
    Pls  compare  my question and ur answer
    Question 1.how this 641 which has determined while RP Delivery document?
    if it is determining from schedule line NN , how it can be consider since sale order is not in the picture?
    What is   I am not clearu2014that  if i641 is determining from schedule line NN , how it can be consider since sale order is not in the picture?
    Ur Ans:
    A1. In case if STO the item category is assign to Delivery typeitem category groupusages+ Item category of the higher-level item Tocde (ZERO)0VLK Taking the item category and and checking the schdeline assign to the same. In schedule line you will find 641.
    Query
    OVLK  which is  delivery header  and taking the item category of Delivery through  Delivery typeitem category groupusages+ Item category of the higher-leveL.
    Can we determine the SL  with  delivery  type  and delivery  item category since sale order is not in the picture?
    How we can take the sale  order item category  for  find SL since sale order is not in the picture?
    Question 2. In 641 the cost has been updating /Accounting document is getting generating where as in VF01 billing doc not relevant for Accounting doc .so how we can settle or balance the cost of this material while occured in 641 or PGI?
    What is   I am not clear-How settle cost  of this  material ?
    Ur Ans : The accounting is happening for material value.
    Are  you  think Is  it  correct  this  answer  yourself?
    Question 3.What are the business benifits while doing STO?
    I  am cleared in third answer which you   given   and I am appreciating to  you ur  response, but  the answer should be  according to my question.
    Thanks
    Ishi

  • Remove Company Code with all the Employees in it from r/3?

    Hi i have a bit unusual requirement.
    i want to know how can i Remove a Company Code with all its assigned Employees completely from a system(r/3) ?
    can this be possible at all? if yes then please also mentions what can be the side effects of this action.

    Jack,
    You will have to follow reverse engineering....
    As Sikandar Guru Mentioned.....identify all the PERNRs for mass deletion....
    Secondly I believe, that you want to Delete the Company Code.....check with Finance Folks.......If they have no issues, you can delete the co. code with TCODE EC01... but this will not delete the Relationships to Personnel area...etc.
    There may be custom Features, Reports or programs functioning based on Co. Code.......
    So, in a way....its not feasible..neither wise to attempt deletion of Co. Code....
    S_PHO_48000106 is the TCode for Mass Deletion.
    Good Luck !!!
    Kumarpal Jain.
    Edited by: Kumarpal Jain on Oct 26, 2009 3:20 PM

  • I need to add a single field from with_item table . need to write select query with reference to company code , account doc no , fiscal year

    I need to add a single field from with_item table . need to write select query with reference to company code , account doc no , fiscal year

    Hi Arun ,
    Can you explain little bit more ??
    what is account doc no? 
    what are the transactions should be displayed in your output??
    -Rajesh N

  • Company codes with different fiscal year variants in a controlling area

    Hi all,
    When I try to assign a company code with different fiscal year variant than controlling area I get error. It is ok so far.
    However, after assigning company with same fsv to controlling area the system lets me to change company code's fsv in company code global settings and I can even save it.
    So I wonder how it would be possible ? Why do I get just a warning instead of an error and save ?
    Thanks and regards.
    M.Yusuf Dogan

    Hi Bulut,
    There are 12 normal and 3 special periods in the fsv of the company code which i'm trying to assign. However, controlling area's fsv has 12 normal and 4 special periods.  I get an error message "KT297".
    Actually, my point is that if the company code's fsv is same with co's I can assign but the system lets me change cc's fsv after assignment.
    M. Yusuf Dogan

  • How to get list of company codes with current period not opened?

    Hi,
    How to get list of company codes with current period not opened?
    Is there any way we can check whether the current period is opened for all company codes.
    If not how, can we generate a report which having information of period and company code. Also please tell me, which table will have info on posting periods and company codes.
    Thanks
    Vineeth Varghese

    Hi,
    The MM periods details can be viewed In Table MARV . On the selection screen you have the option of entering the company codes , current period, year current period etc. so make the required entries and you get the all details relevant to MM periods. Also it can be downloaded as a report.Thanks

  • Settlement to cost center posted for statistical WBS element

    We have the following scenario
    Statistical WBS elements with assigned Cost center posted for actual postings
    Network assigned to statistical WBSE and settlement rule on the same WBSE
    On settlement run CJ88  the network costs are transferred from network to Cost Center posted in the WBSE.
    Issue:
    While analysing the active availability control the assigned value is doubled. This happens only of the networks are settled. System considers the Actual values from network + Statistical value from WBSE to caculate the assigned values.
    Simulation details as under.
    SP-SET-02-3  (wbs element)
        COSS 2011 11 0007101000     0001240704 KOAO D INR                 100.00  INR
        NWA 500000002408 0010
            COSS 2011 04 0007101000     0001240704 KOAO O INR                 100.00- INR   S  -- does not contribute to assigned value
            COSP 2011 04 0007101000     0001240704 COIN D INR                 100.00  INR
            COSP 2011 01 0007101000     0001240704 KPPP D INR                 100.00  INR   M   -- does not contribute to assigned value
    Hence the assigned value gets doubled and eating up the budget.
    Anyone encountered similar issues pls share the possible solutions.

    Hi Mohit
    It is against SCN's rules to post the same discussion thread twice. You have already posted a similar question in the below thread. Please refrain from doing this and close one of the threads.
    Initial balance upload of revenue GL accounts with wbs
    Regards
    Sowmya

  • Cost center query tkakes a long time while executing with User's Id

    Hi Experts,
    We have a cost-center query which is taking a long time to display the output with User's id.
    I tried running the report with the same selections and was able to get the values within seconds.
    Also we have maintained aggregates on the cube.
    When user tries it for a single cost-center the performance is Ok.
    Any help on this wil be highly appreciated.
    Thanks,
    Amit

    Hi,
    while running the query find the trace in ST05 - before running the query in RSRT activate the trace with user id and after seeing the report in RSRT deactivate the trace.
    go through the logs find the which object taking long time then create the aggregates on the cube.
    while creating agggates give the fixed value.
    please find the doc " how to find the SQL traces in sap bi"
    Thanks,
    Phani.

  • Find the KOSTL(cost center) value using coing group and coding code

    Hi,
        Can we get the value cost center Kostl by using coding code and coding group. As per the requirement the coding group is specified in the table qmel-qmgrp and the coding code is qmel-qmcod.. So by using this values only can we get the KOSTL value..Please do help me in this regard.

    so the thing is for the particular coding group QMGRP we have the coding codes QMCOD assigned to it and for the transaction QM01 we cannot have the notification number (as this number is generated only after the transaction is completed)only the notification type is specified in first screen after we press enter a subscreen with Production order number is specified press enter,
    later in the first tab strip specify any material number and also plant number later the defect location and defect type, later in the subject tab strip in the coding group we get the F4 help for the coding code and group,there by picking any of the elements we also get the KOSTL value in text so i was just worried where can we get this value i have checked for the options that u have specified but this doesn't work for me...
    Thanx and reply me back(very Urgent)

Maybe you are looking for

  • Urgent!!!! regarding report output

    i have a requirement such that, i need report without top of page..but headers needed to be in the printout in all pages.......pls gv ur suggestions. thanks

  • NationalIn​struments.​Analysis.D​sp.SignalP​rocessing.​Integrate method

    Could you give me an example use of the NationalInstruments.Analysis.Dsp.SignalProcessing.​Integrate method? I want to integrate a signal but I am not sure what to use for the boundary conditions (initialCondition and finalCondition).

  • IDOC_INPUT_HRMD

    Hi, We have a requirement to transfer personnel details from one client to another. We are using the inbound FM 'IDOC_INPUT_HRMD' for this purpose. So far, we are able to update existing records. How do we proceed when we need to transfer records for

  • Need Help for customization

    Hi, I would like to know if it's possible to delete all the tabs in the interface user and redirect the user (after log in) throught the password page which will be the only page available for the user. Thank you for your help

  • Datagrid lableFunction

    Is there any way of knowing what row a labelFunction function is currently working on, so <mx:DataGridColumn headerText="Total"  dataField="TOTAL_PRICE" labelFunction="calculateTotalPrice" editable="false" minWidth="50"/>             protected functi