Dear Experts,
I have done KL01 and KP26 transactions. That is I ahve defined the activity and assignes a cost conter to it.
Still, when I am trying to enter the activity type in costing tab while creating the work center, the system throws an error as "No activity types are assigned to the cost center XXXXX, controlling area XXXXX....."
The Msg No. is CR 091.
Please guide me to find out where I am missing something?
Thanks & Regards,
Rohit.

HI,
Create a Cost center using T code - KS01.
Create an activity type using T code - KL01.
Assign the Rates for an activity type & cost center combination using T code KP26.
In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
After performing this in work center assign activity type & cost center
should be assigned. Then while creating routing/task list this work center can assigned for performing
as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
Overhead cost is the indirect cost which's spent during production.
So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
Hope You will get some idea
Thanks and regards
E.Rambabu

Similar Messages

  • Activity Type Changes in Work Center

    Hi Experts,
    We now want to change the activity type in a work center, and hope all the routings that have the work center being changed automatically. Currently, the existing routings can not be changed automatically. Is there a way to have all the routings changed as well? 
    Best Regards,
    Helen

    Hi,
    In Costing tab next to the activity you should find a check box for Reference Indicator. If this is ticked, then the changes done in work center will be automatically read into routings.
    If it is not, then you will have to manually change in routings. For individual, you can use CA02, for mass work with CEWB, working area as SAP_OPERATION
    Regards,
    Vivek

  • How to set activity type for a cost center

    i was practicing the split valuation topic and for the that i was making a routing for a product so that i can have that product for inhouse production.
    while using ca01(to create routing), i am facing a problem with the activity type.
    when i am setting up the operation i am getting an error " activity type # is not set up for cost center 10004220 in year 2007"
    can you please tell me how should i come out of it.
    thankyou very much

    hi Nandha, i am sorry but i could not do it. i am new in this. let me make my problem more clear to you.
    i was creating a routing using ca01
    after puttig all the details i switched to operations tab and in operation tab i put workcenter as (1111 - lathe, may be i am wrong as i told you i am just practicing).
    i did not put anything on that screen and then when i pressed enter it took me to another screen with name Operation check.
    here is the layout of the problem on that screen
                          std val      unit     activity type     efficiency
    set up                            min        1422
    machine                         min        1421
    labor                              min        1420
    and then curser being on the std value i am getting this error "activity type 1422 is not set up for cost center 1000 4220 in the year 2007.when i am ignoring it it is switching to next std val coloumn and the same error.
    thankyou for your time

  • Overhead for each Work center

    Hi all,
    Presently we are calaculating the overhead for the total operations in the service order.Now the requirement is client want to have overhead for each workcenter user in the service order.
    Lets say,there are 3 workcenters were used in the service order with 3 operations.Now instead of single overhead,they want three overhead in the order.I know this is not the right place to post this and I just thought some one could experianced this scenario in their projects.If so pl share with me.
    Regards
    Sureshbabu Arunachalam

    hi
    you can do this provided you have customized the costing sheet as per the requirement .Create separate Activity type for each work center with different cost element .
    while creating the costing sheet create separate base row for the respective cost element and then fix the overhead percentage
    Also kindly consult your CO person on this
    regards
    thyagarajan

  • Different activity type for different capacity category in a work center

    Hello,
    Multiple capacity categories can be created in a work center like
    Engineer
    Sr. Engineer
    Architect
    Rates for all of them will be different (obviously) , however we can only have 1 activity type as default in a work center . We intend to 'HR assignment' corresponding to each capacity category . how can we have multiple activity type for different capacities (Engineer , architect etc).
    With regards,
    Mrinal

    Hi Paulo,
    thanks for your quick reply.
    Requirement is to assign all persons (Engineer, architect ) to 1 work center and to 1 activity , but to default different activity type (corresponding to capacity category) in worklist of time sheet .
    With regards,
    Mrinal

  • Employee Responsible for a work center

    Good Morning,
    We use Project Systems in order to do project management within SAP.  We use the work center to define the team structure.  I know that there is a place to maintain the person responsible for a work center in the config, but the entry here is a text field.  We are trying to link the owner of a workcenter back to the reporting structure that can be pulled from HRP1001, and a text field makes it more difficult to track this back to the HR side.  We currently enter the name of a manager in this field, and if there is no other place to define the person responsible using a pernr, we'll have to start using this field to enter personnel number.  This will allow ABAP to pull the pernr and trace it to a position number on HRP1001.  I'd like to keep the manager name in this field if at all possible though.  Any help will be much appreciated.  Thanks in advance.

    HI,
    Create a Cost center using T code - KS01.
    Create an activity type using T code - KL01.
    Assign the Rates for an activity type & cost center combination using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
    After performing this in work center assign activity type & cost center
    should be assigned. Then while creating routing/task list this work center can assigned for performing
    as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
    Overhead cost is the indirect cost which's spent during production.
    So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
    Hope You will get some idea
    Thanks and regards
    E.Rambabu

  • How to get a list of production orders for a work center?

    Hello SDN Community, 
    I have an requirement to display in a pop-up window a list of production orders for a work center.
    Does anyone know which screens/transactions would show this relationship?
    Or better yet, does anyone know how to demonstrate this from the tables themselves?
    Thank you,
    Dean Atteberry.

    Hello Mangalraj.S
    >>Goto COOIS-->For the field List select PPIOO000 - operations and layout -->standard layout
    >>and execute,by this you will be able to see the operations for each order and to which
    >>work center they are assigned.
    The system I am working on is ECC 6.0.
    For this system the values in the dropdown for the "List" field are "Capacities, Items, Order Headers, Sequences, Trigger Points, etc".  But nothing that says PPIOO000 - operations and layout.
    >>Or else in the in input screen of COOIS,enter the work center for which you want to see which
    >>are the production order's assigned and execute.
    For system I am working in, I do get a grid display when entering a work center.  It has columns like "Order, Material, Icon, Order Type, MRP cntrlr, etc."   But no column with Work Center.
    Any further insight into how to use this transaction to display a list of production orders for a work center would be greatly appreciated.
    Thank you,
    Dean Atteberry.

  • What are the control functions of Suitability and setup type key in work center?

    Hi all,
    Can any1 plz tell me what is suitability and setup type key in workcenter default values tab?
    what are the functions controlled by these keys?

    Hello,
    Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
    Almost in all the PP we define same Control key to the work center as well in the routing.
    For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
    No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
    Regards,
    Piyush

  • Actual hours done against a work order for a Work Center by non-maintenance

    Hi All,
    I have below question with respect to work center.
    -If there is this actual work hours done on a work order by non- maintenance personnel for a certain work center and same is not reflecting under operation tab of work order, then where & how this hours (done by non- maintenance personnel) for a work order is maintained for that work center?.
    -In which database table these hours done by non- maintenance personnel for a work order is stored by work center wise.?
    Thanks

    Have a look at the document flow button in the order header.
    The confirmation data resides in table AFRU
    PeteA

  • Message error in trx CA01 "No activity types assigned to cost center &contr

    Hi,
    I'm getting the message error CR091 "No activity types assigned to cost center &controlling area & on &" from trx CA01.
    How can I link the cost center to an activity ?
    Thanks
    Best Regards
    Moderator: Please, avoid asking basic questions

    Cost center to an activity is linked through KP26.

  • Why I cannot enter an "Activity Type" for a trip with only one destination?

    Hello experts,
    Doing a travel expense the user must specify the type of activity (u201CAu201D, u201COu201D or u201CSu201D) that the trip expense is involved, but this option itu2019s only available when the trip has more than one destination (inside the table u201CAdditional Destinationsu201D):
    [Screen Shot # 1|http://img145.imageshack.us/img145/1789/acttype.jpg]
    [Screen Shot # 2|http://img404.imageshack.us/img404/8812/ptk05.jpg]
    When I make a travel expense report, the field activity does not
    appear, only on additional destination. Why cannot I enter an activity
    type for the first destination, only for additional destination?
    I think that the system should allow to enter an activity on general
    trip data.
    Thanks on advance
    Edited by: Luiz Victor Santos on Apr 20, 2010 10:55 PM

    Hi,
    Sorry I gave you the customizing entry for transaction PR05 and not for TRIP.
    So, go there :
    Tx FITVFELD.
    --> Your Trip Provision Variant. --> Trip Schema --> Travel Manager (Travel Expenses Only) --> General Trip Data --> Trip Itinerary 
    The Field "Trip Activity Type - PTK05_N-KZTKT " should have the parameters "Field Is Visible" and "Field ready for input" checked.
    As you can see, the entry point is in "Trip itinerary" Subscreen and not in "General Trip Data Subscreen".
    This means that unfortunately the Trip Activity Type is not available in the subscreen General Trip Data.
    If I do like this in my test system, in the TRIP tx I can see that the field Activity Type appears also in the subscreen "Mileage and Per Diem Reimbursement". So If I enter my activity type here, then it populates the value in my first destination (in Trip Itinerary) even if I have only one destination.
    Hope this help ;o)
    Regards,
    Christophe

  • How to Create New Activity Type  for Assiged to work centre Costing in Acti

    Dear Sir,
    We have four activity type to assigned in workcentre Costing Activity. Details are as under
    AIRJET     2010     AIRJET
    DONIER     2010     DORNIER
    SULTEX     2010     SULTEX
    SULZER     2010     SULZER
    in addition one more loom is comming in our unit and require new activity type.
    How can i create new.
    Please guide.
    Thanks in advance
    Regards
    Ajit

    Dear ,
    To create new Activity Type  , you need to follow the below steps :
    KA01 - Create Primary Cost Element for the new activities type.
    KL01 - Create Activity Type tied to the primary cost element. 
    KP26 - Change Activity Type/Activity Price Planning - maintain the Variable price
    Assign the activity type to cost center using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal Year as 20xx.
    Click on Overview tab on top and key in costing details in this screen.
    After performing this ,while creating the work center ,this combination of activity type & cost center should be assigned.
    At work centre level , you should have
    1.Create Standrad Value Key -OP19 and Formula Key in OP49.
    2.Create Formula Parameters in OP7B or u can use existing one to assing in the Standard Value Key
    3.In CR02-Assing the Standard value key in Basic Data  and select the Formula Key in Costing tab with cost centre assingement .Save
    Try and check
    Regards
    JH

  • Re: Work flow for resource / work center in MEINT

    Hello Experts,
    We are working on SAP ME 15.0 recently installed. We are trying to send the work center from ECC to ME. In MEINT we see only the following work flow for work center / resource:
    As can  be seen, LOIWCS02 is not there. When we sent work center (category 9100) with LOIWCS02 IDoc type, it failed in MEINT. But when we sent work center from ECC (category 9100) using IDoc type 9100, it was processed successfully in MEINT but it created work center in ME.
    The other component LOIWCS02_ME_RES or LOIWCS02_ME_WC is not getting called. What is the possible reason and resolution?
    Would be thankful for any feedback on this.
    Thanks in advance
    Srinivas

    Hello Alexander,
    Thanks for the quick reply.
    As per the help document, the work center category 9100 is supposed to create a Resource in SAP ME but it ends up creating work center in ME.
    If you see the screen shot I had put in my query, I see that there are three work flows - one for LOIWCS03 and the other two for LOIWCS02_RES and LOIWCS02_RES. Would this make any difference since I would expect that the work flow for RES and WC should also be in line with LOIWCS03?
    I will be asking my tech team to raise a support incident for this. Meanwhile I would appreciate your reply on this.
    Thanks
    Srinivas

  • How to Book Activity Type to the Cost Center

    Hi Guys
    How should I put Activity type and a value to it in the cost center.
    In the Assessment Cycle I am getting the error as the reciever : Cost Center has Activity type assigned to it but there is no value in the Activity type.
    Can some one help me out on how the activity is initially linked to the Cost Center.
    and how will we put activity value in the cost center.
    Thanks in advance
    kranthi

    Hi,
    Use T.code KP26.
    Here enter the version as '0' & then enter the activity type, cost center & then click the overview icon in the top.
    A new screen will appear, here you can enter the fixed/vairable price.
    This activity type is to be assigned in the work center (T.code cr02), costing tab.
    Hope this helps, pl. reward.
    Regards,
    SDS

  • Activity independent in a work center

    In a work center, When  you define an activity-dependent quantity, the cost estimate is based in quantity. i.e.: lot size is 1000 and activity price is 10 usd.
    if you change the lot size to 500, activity price will be 5 usd.
    So, in case of activity-independent (i.e.: time of setup machine) that is independent of the quantity, how you customize this in a work center?

    Hello Cetalina,
    Set up time is not an activity independent for the machine... If you really have set up time for a machine as an acitivity then you have to assign this activity via standard value key.
    Set up also base quantity dependent (Lot size dependent). In material master "work scheduling view" you can define the set up time for suppose base quantity 1000 is 10 minutes then every time during scheduling this time will be multiplied with base quantity...You have to manintained formula also. For costing create as activity as set up time to cost center and assign this to work center in costing tab with formula.
    If you want to define the lot size independent then you can define total in house production time as lot size independent in the same view. There is no key to define setup time as independent time.
    IF helpful please rewrads your points.OR let me know any more doubts.
    Regards
    TAJUDDIN

Maybe you are looking for

  • Color Correction for Web

    This is sort of a generic post questions. I am working on a project for the web. My final output will be to Digibeta. How do others approached color correcting in this situation? Being the computer monitors generally have such different characteristi

  • Adding a class to a project in sunone studio that already has a main method

    i have a frame class and it contains a main method, I can't figure out how to add a class that makes use of the JDialog and call it from the main class. When i try to add a JDialog, it creates its own main method. If abc.class is my main method class

  • 2LIS_02_SCL : Extracting problem

    Hi, I tried to load 0PUR_C01 with 2LIS_02_SCL ( FULL method ), but in the monitoring I've got 0 record and an <b>Extraction error</b> which deals with data selection. <i>Note : I do no selection in my infopackage.</i> In R/3 my setup tables are fille

  • Query ref. Sales Revenues v Delivered Costs of these

    Hi Experts I picked up on the following SQL Query in answer to another users requirements. SELECT Distinct T0.DocNum 'Invoice#', T0.DocDate, T0.DocDueDate, T0.GrosProfit, T1.ItemCode, T1.Quantity, T1.Price, T3.DocNum 'Delivery#' FROM OINV T0 INNER JO

  • LMS 4.0.1 - missing device model

    Inventory jobs run successfully, but when running Inventory Detailed Device report, finding information missing under Chassis Model Name. Doing a MIB walk I do find Model name information is available under Standard Entitiy-MIB for the problem device