Hi,
I am currently getting some production orders with no labour costs coming through. We use Activity Types maintained within Routings to capture the labour cost.
I have checked that the Activity Type and Routing details are linked correctly. But when i view the cost analysis in the production order the "Total actual Costs" field is blank.
When i view the "operation" details in the production order and look at the tab "Qty/Activities" i can see the actual labour confirmed in hours but the "Activity Type"field in this tab is empty. I'm assuming that this is why there is no labour cost in the cost analysis view.
The order has been confirmed correctly and the Activity Type is valid with the correct values. The work centre is maintained in the Routing and the same work centre is used in the production order.
I would appreciate any help.
Many Thanks
Nisar

There are 3 cost variants in play that calculate labor costs- each with their own rules (ususally very similar)
there is the Variant for the cost estimate (with qty structure)
there is a production order PLAN variant
there is a production order ACTUAL variant
For the production order the variants are visible on the Control data tab.
Each of these variants has a "valuation variant" to define the method to caclulate activity
Questions: 
in the cost analysis, is the PLAN labor cost empty also?  If yes, then the activity is priced and and the Plan variant is working.
Does the material have a released cost estimate and a labor component?  if yes then the activity is priced and the std valuation variant is working.
If you get one or two yeses - someone needs to review the other valuation  variants (OPN2)
If there are no yes, someone in CO should be reviewing their masterdata, activity pricing and valuation configuration.

Similar Messages

  • Actual cost of Production Order settled to Fixed Assets

    Dear all,
    My client is doing in-house production of moulds (internal order suggestion is not accepted by the client) for which
    they have the following
    1. BOM
    2. Machine hour
    3. labour
    4. overhead etc
    5.plan value
    6. actual value
    Can i settle the actual cost of production order to Fixed Asset ?
    If yes
    what are process kindly give me if any process other then the below
    1.production order created
    2. settlement profile - FA is settlement optional
    3. allocation structure
    4. Asset created
    5 define asset in settlement rule
    Kindly give me your valuable input
    regards
    elango

    Hi,
    Although i am not CO expert , please check with your FICO consultant who are expert before make the final call.
    During settlement to a G/L account or a fixed asset, the system ignores additional account assignments that were manually specified in the distribution rule.
    Based on what i know .
    you can stipulate that settlement may be made to cost centers and orders, but not to fixed assets.
    The Settlement profile is something that you need to create a settlement rule to settle the actual costs of a sender object.
    About the Settlement rule is something that  contains the distribution rules for the sender. It will define how the way to settle the cost.
    Allocation Structure
    In the settlement structure you combine the primary and secondary cost elements into groups, in which debits are then posted to the sender objects. For each group, you specify whether (for settlement to a given receiver type) settlement is performed
    by cost element or using a settlement cost element.
    For example, you might use settlement cost elements:
      To document the purpose of an order (such as, repairs or maintenance)
      To reduce data volumes (you can combine a number of debit cost elements
    under one settlement cost element).
    TQ

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • How to see cost componentwise production order actual cost-not planned cost

    Hi,
    Can anybody tell me how to see cost componentwise production order actual cost ?
    Thanks,
    Bijay

    Hi,
    CO03->Goto-> costs-> Anlysis
    or use the std. report KKBC_ORD
    std. reoprt MCRI
    KVBI - Actual Costs
    Regards,
    R.Brahmankar

  • To see the cost of production order  after settlement to header material

    hello guys,
       In make to stock,we settle the total cost of prodution order on header material,right(if we keep as the default rule( distribution rule in order type)?
         If i want to see that cost of production order which we settled against the header material,where should i check it?should i check in material account or somewhere else?
             Thanking you guys in advance.

    Dear,
    There is a little missunderstanding in your thought.
    If the material of price control S, When you do the GR, the STD cost of material is deducted from production order cost, then when you settle the production order, the variance is settled to variance account/PD account. hence the production order cost balance is zero.
    Example- Production order cost is 60000
    After GR the production order cost balance is 60000-50000 = 10000.
    After settlement production order cost balance is zero.
    Now your question is where can i see the production order cost?
    You can see the production order cost in the production order itself.
    In the production order...cost disply option just filter the origin with test settlement and GR.
    Then total up the cost, then you can see the cost as 60000.
    please come back if you need more help.

  • Error while issue material against production order

    Hi,
      In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant,  now for this new plant I have created new profit center with KE51  and after that I have create done cost ceneter in that this new profit center is assign   now while goods movment with MB1A with movmen type 201, 202  it works OK system is not giving any error  but while issue the material against production order in MB1A with movement type 261 system is giving error message
    No postings can be made to profit center DUMMYBAOPC in company code MT50
    Message no. KM183
    Diagnosis
    Profit center DUMMYBAOPC cannot receive postings in company code MT50.
    this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated  for new we have new profit center  then it is  linking to that  what can be the solution.
    regards,
    zafar

    Hi,
      After asigning new profit center in the Production order problem solve.
    regards,
    zafar

  • Material cost in production order plan cost

    Dear all,
    -we are in sales order cost object with non-valuated stock...
    -we have created two production orders from MRP run. First one is for semi finished material and second one is for finished material.
    Issue-1
    Both production orders not showing material cost in production order plan cost...
    Issue-2
    When i consumed raw material against semi-finished material production order (261-E), system not gnerated any document and material cost not updated either in production order or sales order...
    where should i do changes in configuration to get updated material cost in the production order...
    Best regards
    Kishore

    Hi
    Issue 1 : Check Whether Standard cost is present for header material of prod order, and under control tab of order costing variant for plan is present.
    Issue 2 : Use 261 instead 261E.
    Rajneesh

  • Need BAPI to get Actual, Plan, Variance by Production Order

    Hi Experts,
    I need to get variance, Plan, and actual cost (material cost) by Production Order. Does SAP has BAPI to do this?
    Best Reguard

    For costing report, you have to read the following tables: based on material Qty/value/ Machine rate and machine posting date , machine rate ( T-code kp26)  and also types of material Raw, finished and semi finished ..
    AFRU ,AFPO,AFKO,AFVV,AFVC,CAUFV FOR PRODUCTION ORDER.
    For material calculation MARA, MSEG and MKPF as well as MAKT...
    Hope this’ll help you .
    Thanks

  • Fetching open component qty against production order

    Hi
    The requirement is to fetch component 'open quantity' for a production order. [ Open quantity = requirement - withdrawn qty of the component ]
    Can we get it through /SAPAPO/OM_ORDER_GET_DATA ? I could see the requirement quantity but not the quantity required.
    Thanks in advance...
    Yogesh

    Hi PP_HKV,
    I did as you told me  about use MB1A/261 against production order and you rigth, This not up date any quantity in production order for component only I can see this movoment in option   GOTO --> Documented goods movements, but not in component overview in field Qty withdrawn, It is the same case when I use MB1A/262 transation allow me to do the movment but the quantity in production order for component is not up date only it is show in GOTO --> Documented goods movements
    I see in standard process it is not work as I expect. Is there some way for to do that any bapi o customization?
    Thanks in advance,
    Julio Werekeitzen

  • Auto goods receipt against production order

    is it possible to do auto goods receipt against production order of (material with serial number)
    if not please suggest me solution
    please also tell me possibility of enchancement
    for goods receipt against production order
    sunil

    Hi
    If you check mark the auto goods receipt in the control key used in the work center used in the routing then you can have auto goods receipts posted for the production order against a confirmation.
    Rathnakar

  • Excess Issue of Material against Production Order

    Hi
    For Goods Issue of Material against Production order , i want the system to control excess issue of material against Production order.  How can it be controlled.
    Regards
    Madhesh Kumar

    Hi Madhesh,
    there are many loop holes to issue excess stock against production order
    so better you use user exit so that when ever any material issued against production order and it is in excess then throw error
    Thanks
    Bala

  • Partial GR against Production Order

    while doing partial GR against Production Order system is not considering the overdelivery tolerance.   It is allowing for GR quantity when we do in one stroke including overdelivery tolerance.  When we want to do GR partially in two, first time the order header quantity and second time the overdelivery tolerance quantity,  system is giving message that Document does not contain any selectable items.  I have tried by removing the tick in delivery complete in CO02 transaction, but still same message is coming.
    Please suggest sol.
    Thanks
    KrishnamurthyDSS

    Krishnamurthy,
    Please let us know how you are performing GR, is it through Confirmation? or MB31 or MIGO?
    If it is in MIGO it should be possible, once you remove the Delivery Completed Indicator in the Goods Recipet Tab of the Order header.
    If your GR is through confirmation, first system checks the defination of overdelivery for confirmation of yield based on the confirmation parameters set for the plant / order type combination.(OPK4). Here you define the "Warning message for Overdelivery".
    Hope this helps...
    Regards,
    Prasobh

  • How Can We Trace Out  Delivery  Against  Production Order

    Dear All
    How  can I check the  delivered Qty(invoicing) Against  Production Order .
    For Egg :-order qty Is 50000
    Like 1 P.O-10000
           2. P.O-5000
           3. P.O-2500
    And Despatch Or invoicing of 12500 qty.
    Then Through which report i can Find out That 12500 qty Is despatch From 1& 3 PRODUCTION ORDER.
    Rgds
    Pankaj Agarwal

    Hi
    yes we can do it
    please go to CO02
    change prod order
    see in header >> goto>> goods movement document
    please tell me if any more question or reward
    Sunil

  • Collect cost against sales order / sales order item

    Dear All
    Is it possible to collect costs against sales order or sales order item. 
    The cost is no.of hours the employee booked time against sales order / sales order item.
    Regards
    Deepu Pillai

    Hi,
    Yes. The Sales Order Item can be made cost object to collect the cost. But your requirement is to charge the customer for the no of hours employee worked on that sales order. Through condition type, you can book the expenditure and invoice the customer accordingly. It is purely SD area.
    Trust this helps much!
    Cheers!

  • GR against production order accounting entry

    Looking for help regarding offset account hit at the time of GR of Finished production
    Let see the entries
    When GI Against production order for  material code x000000091   by 261
    6110010 CONSUMPTION - XXX     10,000.00 Dr.
    3430020 Stock account    10,000.00- cr.
    When GR of Finished good Concrete  by 101
    3450010 FINISHED GOODS  19,990.00 Dr.
    6000010 Production offset  19,990.00- Cr.
    just we want to know how does production offset be cleared, even it is showing in our trail Balance as Cr.
    please help how does production offset works.

    Hi,
    Please consult your FI-Co consultant.
    The setup in OBYC needs to be checked & corrected. The G/L account specified seems to be incorrect. The output from production should be credited to the Production Output account & not Production Offset account.
    The entries should be:
    Cr. Production Output A/c
    Dr. Finished Goods
    Hope it clarifies.
    Regards,
    Vivek

Maybe you are looking for

  • My sons ipod has been stolen, how can I get it back.

    I have try to sent the SMS by fine my ipod, but its didn't work. Can I get my sons iPod back by see the serial number.

  • Time Machine and Lexar SSD - how to use it?

    I have Lexar SSD - 16 Gig version, it's formated with MacOS Extended (Journaled) filesystem, so it should work, right? No, it doesn't. Time Machine displays nothing in target drive window - it's completely empty, no sign of SSD whatsoever... What sho

  • Message mapping logic help

    Hi All I have a source structure like this below. It's a big structure actually. I'm just pasting the relevant structure where I need your help. </root>      <storage>           <id>AB</id>          <Type>TY</storType>          <Temp>100</Temp>     <

  • Problems with acknowlegment of soap

    Hi, I have the scenario idoc - xi - soap I sent the idoc to webservice but  the acknowledgment have a mistake: In the rwb Message processing failed. Cause: com.sap.engine.services.ejb.exceptions.BaseTransactionRolledbackLocalException: Exception thro

  • Parameter event - to be set according to  EWA report

    Good day fellas, I have a problem on my EWA report : event 10027 trace name context forever, level 1   10028 trace name context forever, level 1   10142 trace name context forever, level 1   10183 trace name context forever, level 1   10411 trace nam