Advantages and Dsadvantages of Remote Client Copy over Client Transport...

Can anybody explain the Advantages and Dsadvantages of Remote Client Copy over Client Transport...
Thanks in Advance

Advantages of Remote client copy over client transport
1. Client-specific data as well as cross-client customizing can be copied to the target client, this is not the same in client transport.
2. The prerequisites for performing a remote client copy are that an RFC connection has to exist whereas client transport do not need RFC connection
3. The copy can be performed in parallel with several processes.
4. Remote client copy automatically performs a consistency check on the tables being copied,for client transport performance check need to be done.
5. A remote client copy is easy to use and does not require file system space on
operating system level whereas Client transport require lot of space as files are created at OS level.
Disadv
1. A remote client copy does not create a file at the operating system level,
so there is no hard copy of the client to be copied. Therefore, the same,
identical client copy cannot be duplicated at a later time.Client transport creates import and export files at Os levels
2. To be able to copy all data during the client copy, the structures of all copied
tables in both systems must be identical.
3. An automatic repository consistency check is performed in Remote client copy and if inconsistencies are detected, the client copy is terminated and an error message is displayed.
4. You cannot copy the remote client data and use it whereas in client transport you can copy the files in a cd (like import files, export files)
Also see notes
47502
557132
Rakesh

Similar Messages

  • Client copy using Client Export... Failed .. Need ur advice

    Hi guiys how ru all doin...
    I hope some one can help me oout in this issue.iam working on sap
    4.6c, windows 2003 server, oracle9.2.0.
    we need to take client copy from production client 300 to dev
    server using client export method so I have performed client
    copy using client export.these are the list of steps which i
    performed but still am facing an error.
    Checklists /prerequisites before doing client export :
    Source client i.e. Client 300 should be locked for all users
    except Administrator.
    Ensure that NO Users are logged in both NCCSAPPRD and NCCSAPDEV
    Server.
    Inform Downtime to Users.
    At least 2 background work process should be there.
    Take Offline Backup of both Production server & Development
    server.
    Following Jobs rescheduled for next day for Client Export
    Process:
    1)Collector_for_performance_monitor
    2)Customer_evaluati on_information
    3)Error reporting
    4)Eu_out
    5)Vendor_evaluation_information
    6)Leave_en titlement
    Remove scheduled job from DB:
    1)Check opt
    2)Analyze tab
    Lock all users except administrator
    Change database mode from Archive to Non-Archive mode
    Logon in NCCSAPPRD in Client 300 the one which is to be Exported
    1.Enter Transaction SCC8
    2.Select the copy profile and target system NCCSAPDEV Server and
    other fields as necessary.
    3.Click on "Execute in Background" button.
    4.Click on the "Schedule job" button.
    5.Verify that all information is correct and click on YES
    button.
    6.Click on continue at the "Info Client Export" window.
    7.Specify the start time and click on SAVE.
    8.Specify an output device at the "Background print parameters"
    window and click on SAVE.
    9.Click on OK at the information window.
    Monitor the Client copy using transaction SCC3.
    when am going to transaction scc3 in that ->All transport
    requests ->Exports -> in that my source client 300 is there when
    am double clicking it its showing me list of how many times
    client export has been performed in that my date is also there
    when iam double clicking it and going to details tab this is wat
    the error which its giving....
    Log file:
    nccsapprd\sapmnt\trans\log\NCPET00968.NCP
    Preparation for export
    Transport request___: NCPKT00968
    System______________: NCP
    tp path : tp
    Version and Release: 305..15 46D
    Execution of the export pre-processing methods for request
    NCPKT00968
    Start:Sorting and compressing the object list
    End:Sorting and compressing the object list
    Start:Check for existence of inactive objects
    End:Check for existence of inactive objects
    End:Check for existence of inactive objects
    End:Creating project information
    Start:Writing nametab information for key entries
    End:Writing nametab information for key entries
    Start:Version creation of the objects of the request NCPKT00968
    End:Version creation of the objects of the request NCPKT00968
    Start:Adjusting the object directory for the objects of the
    request NCPKT00968
    End:Adapting the object directory for the objects of the request
    NCPKT00968
    Preparation for export
    End date and time : 200708104758
    Ended with return code: ===> 0 <===
    Mainexport
    Transport request___: NCPKT00968
    System______________: NCP
    tp path : tp
    Version and Release: 305..15 46D
    SQL error 1652 accessing GLFUNCA: ORA-01652: unable to extend
    temp segment by 128 in
    SQL error 1652 accessing PPOIX: ORA-01652: unable to extend temp
    segment by 128 in
    Incorrect export. Request is not imported.
    Main export
    End date and time : 20070810152923
    Ended with return code: ===> 12 <===
    This is the error which am getting in the transport log.
    I tried to perform 4 times client copy. the first 2 times i got
    the same error and the next 2 times it ended with return code
    ===> 4 <===.
    Plzz anyone help me out in this issue as i need to perform it
    again and this time i hope with ur help it should be
    successful.
    Waiting for ur replies
    Best regards

    The problem you have is, that your TEMP tablespace is too small on the target system, you need to increase it.
    Check Note 3155 - Termination due to tablespace overflow
    Markus

  • Client Copy Using Client Export/Import

    Hi Everyone,
    This is regarding Client Copy Using Client Export/Import Method. We have two system Production and Development system. Iam planning to do a client copy from from PRD to DEV. I know most of the steps to perform Client Copy.I have some doubhts So if some one can please help me out i would really appreciate it.
    !) I want to know which user should be used to perfrom Client Export ?
    2) I want to know know which user to be used to perform Client delete?
    3) Is there any particular USER who is recommended to perform Client Copy or any USER can do it?
    4) After the Client Delete Procedure thorugh SCC5 ..to get back the client space we do Reorganization ? can anyone plzz tell me what are the tables that i need to reorganize or if anyone can provide me the steps for Reorganization i would be really thankful.
    Waiting For your Replies
    Best Regards

    Hi Mohammed,
    1)I want to know which user should be used to perfrom Client Export ?
    You can use your personal defined on the system UserID.
    2) I want to know know which user to be used to perform Client delete?
    Same as above, just make sure you have an account on the client and you log on to the right client
    3) Is there any particular USER who is recommended to perform Client Copy or any USER can do it?
    I am not aware that you should use a particular user. I have been doing copies/deletions with my UserID, as system administrator.
    4) After the Client Delete Procedure thorugh SCC5 ..to get back the client space we do Reorganization ? can anyone plzz tell me what are the tables that i need to reorganize or if anyone can provide me the steps for Reorganization i would be really thankful.
    Reorganization ( I personally) use SAPDBA tool. However -if you use ORACLE, there are other alternatives as well. What is your DB  vendor? I will append more info in a bit.
    Rgds,
    Loukas

  • Client copy between clients having different OS(Linux and Windows)

    Dear All,
    I would like to do client copy between a client in development system having Linux OS and a client in sandbox system
    having Window OS.
    Is it possible?
    Regards,
    Vinod

    You can get more info at ::*
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/69/c24c0f4ba111d189750000e8322d00/frameset.htm*
    & also check note 552711 which clearly say at point no 5 .*
    5. Can I create client copies in a heterogeneous system landscape?*
                  Remote copies or client transports can also be carried out between different database and operating systems.*
    Please close thread if you feel your question has been answered.*
    Thanks..
    Mohit
    Do NOT post in bold.... 2nd warning.
    Read the "Rules of Engagement"
    Edited by: Juan Reyes on Aug 27, 2009 12:07 PM

  • CLIENT COPY- HOW TO Transport client dependent objects

    Hi
    We are planning to do Client copy and after reading forums it seems that some objects doesnot get copied over like
    Transfer rule
    DataSource
    Transfer Structure
    InfoPackage
    Process chain
    Process chain variants (PSA processes)
    now my understanding is i have to transport this object from System A to B
    Release the transport and do the system copy.
    Question 1-- what steps i need to make sure while creating a transport.
    Q2 Should i click on the object in Transport connection and select (Transport all below, add/remove additional object)
    (BECAUSE if i dont do that the boxes TRANSPORT is visible and no check box is in there )
    q3 - What should be grouping ? (in dataflow before/afterwards, save for system copy etc. ?? )
    q4 What should be Collection Mode - Collect automatically or start manual collection
    q5 what should be selected in PACKAGE
    q6 i can find Process chains and not PROCESS VARIANTS
    q7 i can find Transfer rules but i cannot find TRANSFER STRUCTURE
    i just want to make sure how to do these for all objects???
    as i have to release the transport before system closes out

    thanks
    but i still need to create transport and i want to know what options to choose while creating a transport request...
    so
    1 thing is clear i have to choose SAVE FOR SYSTEM COPY
    but following question i still need to do manually and need to know what to select
    Q2 Should i click on the object in Transport connection and select (Transport all below, add/remove additional object)
    (BECAUSE if i dont do that the boxes TRANSPORT is visible and no check box is in there )
    q4 What should be Collection Mode - Collect automatically or start manual collection
    q5 what should be selected in PACKAGE
    q6 i can find Process chains and not PROCESS VARIANTS while selecting process chains in transport
    q7 i can find Transfer rules but i cannot find TRANSFER STRUCTURE

  • Client Copy v/s Transport

    Hi ,
    I want to understand the difference between Client-Copy and Transport.
    After I have developed reports in Dev Box , which is the best option out of both ?
    Should one do a client copy from Dev to QA or Transport Objects ?
    What are typical Advantages and Drawbacks of both?
    Can someone share on this ?
    Thanks
    Sajid

    Hi,
    you should transport your objects from DEV to QA and PROD.
    Client copy is typically used when you want to have your DEV and QA system look like your prodcution system. You then make a client copy from PROD to DEV and QA in order to "clean up" the systems.
    Kind regards
    /martin

  • Data migration from one DEV(DE1) system to other DEV(DE2) BW system using client copy or client export import

    HI SAP Gurus,
    Please find the below details:
    SAP NetWeaver 7.3
    We have to copy all customized or developed BW objects like master data, DSO's , Infocubes , Reports etc.
    We need only the design changes but not the data within the DSO or cubes that exist .
    We have tried below procedure:
    1) Taken export of DE1 source client 400 with profile SAP_CUST
    2) Imported transports generated for above export into DE2 target client 350.
    3) Executed transaction SCC3 and performed post processing, post processing was successful  . Still we are not able to see DSO's, infocubes ,reports.
    Please lets us know what we need to do to fulfill our requirement.
    Thanks,
    Avadhesh
    + 91 8095226536

    Hi Basis,
    Please refer to below documentation on how to perform system copy in BI systems
    How to System Copy in SAP Business Intelligence System Landscapes (NW2004)
    Post processing steps for SAP BW system copy or db copy
    BI systems has mostly cross client objects. So client copy with SAP_CUST profile will not serve your purpose.
    Hope this helps.
    Regards,
    Deepak Kori

  • How do I find music and movies that didn't copy over after restoring Ipod?

    I restored my ipod and all of my movies and music didn't copy back over. (Most did.) How do I find the ones that didn't?  When I check Itunes it showed them in the cloud before and now they are not even showing up in Itunes.  What are we doing wrong?

    Hello Cindy,
    It sounds like not all your purchases transferred to your computer before your restored your iPod touch.  I found an article with some steps to download your past iTunes purchases.  I recommend following the steps in the section titled "Apps, Books, Music, Movies, or TV shows on a computer" in the following article:
    Downloading past purchases from the App Store, iBookstore, and iTunes Store
    http://support.apple.com/kb/ht2519
    Thank you for posting in the Apple Support Communities. 
    Best,
    Sheila M.

  • Difference between system copy and Remote Client copy?

    Hi,
    Can any body suggest me , What are the major difference between System copy and Remote Client Copy.
    As per my knowledge , Both are different
    1.In system copy  entire data recovered mean copy from Source to target
    2.In Remote client copy All  Client data can't me import if you choose SAP_ALL profile also
          I hope Transaction data and user data can't copied
    Anybody share this Question and Give me some idea about this
    If anybody  give brief explanation that is very gratefull.
    regards,
    Balaram

    Hi,
    System copy will replicate all database from source to target system.
    In remote copy only client in which you are performing the copy will get refresh. Also, remote client copy will be done between systems on same patch level. with SAP_ALL profile you can bring all data in target system including your transactional data.
    Thanks
    Sunny

  • Remote client copy fails.

    Remote client copy fails.
    The error message and info is given below. Help me to proceed.
    Client copy
    The client copy you started has terminated
    Client Copy could not start because of Repository differences
    Diagnosis
    The table definitions differ between the systems. These differences mean that a copy of the data can cause a data loss and system inconsistencies. Differences occur when further developments were not transported or were copied between different maintenance levels.
    Procedure
    Transport all the developments of table structures between the systems using the Transport Organizer and bring your system to the same development level.
    It is observed that some tables are missing in the target system. How do I copy the table structures to the target system?
    Thanks in advance

    Hello Ashraf,
    There are repository differences between you source and traget system.
    If you want to get the list of repository differences, then run a RFC check before you execute remote clinet copy.
    You have to then remove these repository differences before you start with the remote client copy.
    to remove the difference you have to:
    "Transport all the developments of table structures between the systems using the Transport Organizer and bring your system to the same development level" as mentioned above
    I would recommend you to go for Export / Import rather than Remote client copy.
    There are several advantages of export import method over remote clinet copy
    Regards,
    Ammey Kesarkar
    <i>'Award points for useful info'</i>

  • Post-install of SSM 4.0 and client-copy

    We finished the installation of Sol. Man. 4.0 on a linux/oracle platform.  At what point in the post install do we do the client copy of client 000 for data and client 001 for users to a new client? Before, during or after all the img config in 000?
    thanks in advance,
    Steven McElwee, Duke University
    PS- Sap's install docs for SolMan 4.0 leaves much to be desired ...

    Well, we had a chicken-and-egg issue here. Let me explain. By default, the SSM 4.0 SR2 install is at SP9, which gave it a somewhat simpler IMG. However, we gave in to the temptation of installing SP11 since this SPs were obtainable without Maintenance Optimizer, which gave us a more complicated IMG which includes, at some point, the client copy as mentioned above. We went through most of the IMG resulting from SP11 until we had Maintenance Optimizer working and then downloaded SP12.
    I am in the process of installing the ABAP SP12 packages now and plan tomorrow to deploy the JAVA SP12 .SCA files. The IMG looks better and less confusing at SP12 than at SP11 or SP9. I think this calls for another IMG pass.
    The $100 question - which parts of the IMG need to be done in client 000 and which to do in our client 100 (copied from client 000 after SP11 was applied). We are really confused on this point. If anyone can shed some light on this, i would very much appreciate it.
    Sincerely,
    Steven McElwee, Duke University

  • Advantages and Disadvantages of OIM11gR2 over 11gR1

    Hello experts,
    I would like to list out the advantages and disadvantages of OIM 11g R2 over R1. Can you guys please help me in completing the list??
    Advantages:
    1. Shopping cart experience / request catalog model / interactive user interface
    2. UI customisations made easy
    3. Secure access to cloud, mobile and social networks
    I am not sure of the disadvantages but heard that its a lenghty process (risky) to upgrade from R1 to R2.
    Can any of you have ideas on the changes to workflows, provisioning and reconcilation and other procesess.
    Thanks,
    Bob

    http://rajivdewan.blogspot.com/2012/08/oracle-identity-manager-11g-r2-oim-11g.html
    anyone come across any cons with R2Some known and unknown issues are there but those you'll find with each and every product and version.
    http://docs.oracle.com/cd/E27559_01/relnotes.1112/e35820/id_mgr.htm#CHDDGDCC

  • After client copy and import export, WebUI not functioning

    Hi Experts,
    We have copied the client MKH300 into the client MKH305. The client
    copy was performed using SAP_ALL authorization.
    After the client copy a client compare was performed and several
    differences were discovered. BDLS was run and a custom program was run
    to copy custom tables from MKH300 to MKH305. This program has been run
    in several other client copy cases and there is no issue with it.
    When logging into the WebUI in client MKH305 an error message is
    displayed in the application log:
    "An exception has occurred during program processing"
    (Please see attached screen shot)
    When looking into the details the following text is shown:
    Diagnosis
    An exception occurred during request processing. This was handled
    centrally. It changed the program flow and the result of the request
    probably contains errors.
    Procedure
    Contact your system administrator.
    Procedure for System Administration
    Activate checkpoint group BSP_WD_EXCEPTION_DISPLAY. To do this, use
    transaction SAAB. If the error recurs, further details are displayed.
    When the check point group was activated there was no more information.
    The links in the Homepage are not correct even though the business
    roles, config keys etc look the same between the clients.
    Much customization seems lost for the WebUI although when comparing the
    two clients' customization for the WebUI they seem identical.
    The client MKH300 works fine so the intention was that MKH305 should be
    an exact copy of that client, but that did not happen.
    Could you please help me out.
    Thanks!
    Nagaraju

    they are included in the xe server install ...you could try copying the executables but maybe that wont work if all the libraries arent present
    failing that install the regular oracle client

  • Advantages and Disadvantages of JMS Queue over Fabric

    HI,
    I want to know both the advantages and disadvantages of using JMS queue over the default Fabric queue in B2B adapter.
    Is it ok if I configure all my inbound and outbound transactions across all the trading partners to communicate with their respective SOA composite via the default JMS Queues(B2B_IN_QUEUE and B2B_OUT_QUEUE)?
    Please advise.
    Thanks in advance.
    Regards,
    Monica

    Hi Monica,
    But the size of the payload which I am using is unpredictable, it can differ from 1 MB to 40MB in future.This is not a problem. B2B can handle MB's of file if server has enough resources.
    all other payloads greater than 3MB, it is getting faulted with the message:
    "SAX Exception in translator. SAX Exception raised while trying to SAX Parse InputStream . Please make sure that the xml data is valid."Please remember that when B2B will find a large payload then it will write the large payload into the "Large Payload Directory" (defined in Administration--> Configuration) and pass it's reference to the middleware. So at middleware, you will not receive the actual payload but you will receive it's reference. Using File adapter sync read option, you may read the large file from "Large Payload Directory" at SOA layer.
    If you are using PS5 (11.1.1.6) then you will see that for large payload, B2B passes the JMS header LARGE_PAYLOAD to the back-end so in your composite, you may build logic around this. If this header (LARGE_PAYLOAD) is not coming at SOA layer then payload will be available in the body and if it is populated then payload will be available in the "Large Payload Directory" and it's reference will be available in the message body.
    Regards,
    Anuj

  • Client copy question - Overwrite an existent client...?

    Hi gurus,
    I want to know if there is a problem to do a client copy over on a existent client, this is, now I have to do a client copy from 300 to 400 but the client 400 exists in the system, and I want to know if it´s possible and is any problem to do this or before this I must delete the client 400 and only after that I can do a copy from 300 to 400...?!
    Best regards,
    João Dimas - Portugal

    Hello,
    Everything depends on the size of your target client 400.
    If this client contains a lot of data I recommend that you first perform a client delete via SCC5.
    Otherwise you risk that your client copy will fail (extend problems, undo problems, ...) or will take too long (because data in 400 also needs to be deleted).
    Advantage of deleting the client first is that the actual client copy will go much faster (because nothing needs to be deleted anymore).
    Deletes during client copy or client delete often take most of the time, because this is done via non optimized SQL statements like (delete from table where mandt = '400').
    There are a lot of SAP Notes to optimize client copies and especially client deletes !
    Wim

Maybe you are looking for

  • Upload data from Excel to Sap-Crm

    Hi All, I need to upload data from EXCEL to SAP-CRM system.The problem is in crm there is no ALSM_EXCEL_INTO_INTERNAL_TABLE or corresponding function modules exist.Using GUI_UPLOAD I can upload data from excel to CRM but the main problem with this is

  • FOR THE FIFTH TIME - lost audio FF 4.0.1 Windows Ultimate

    Where do I find answers? I have reported this problem 4 times before. I have no audio with FF 4.0.1 running on Win 7 Ult. No problem with any other browser nor any other app.

  • ISE/NAC posturing - WSUS not available?

    We ran into this scenario this weekend. We have 2 VPN sites(US and EMEA) both ASA 5515X...each site has a WSUS server (US is master, EMEA is downstream). VIA GPO, we have EMEA workstations set to get updates from the EMEA WSUS server. We have the VPN

  • How to create a count up timer in flash ...

    How do you make a count up timer in flash? I have the custom counter I made in photoshop and I can get it to count up, but not with the dynamic text field I've created in flash, what do I need to do....... simpl code: var startT:Number = 1; var endT:

  • Dragging clips into the timeline...

    I recently installed a trail version of Premiere Pro using Creative Cloud. I imported my MTS files as normal; however, they wouldn't be dragged into the timeline for me to edit and every time (and method) I tried it proved impossible. I then tried im