Age based calculations for Germany

Hi,
In germany,we got a unique requirement.Based on the age of the employee,a one-off payment of a particular amount has to be automatically processed in the payroll.
Is there any way to meet this requirement.
Regards
Mitra

i think it not possible to get deafalut base on age.
i hv a solution for that but i belive that is not proper; please
you need create EE group based on ages and create LGMST based on that.
If EE crossed some age he need you to transfer to that group by an action
you have to create an action for that in customizing procedures
Best Regards

Similar Messages

  • Sample size calculation for Source Inspection

    Dear Gurus,
    I have an issue regaring sample size calculation for Source Inspection.
    I created a PO for 500 nos.
    The sampling procedure assigned in the Quality Plan is %age based (10%).
    When Inspection lot is created, system is caluating the Sample size as 500 and not 50.
    Moreover, when I go to Result Recording, the Inspection qty for the MIC is shown as 1. If the system is calculating sample size as 500, then the inspection qty for the MIC should also be 500. Moreover, the sample size should be 50 only.
    Please provide your inputs on this.
    Regards,
    Nitin

    Thanks Sujit!
    Your are correct. It works in the same way as u told.
    Assigned you the points for the answer.
    Closing the thread.
    Regards,
    Nitin

  • Automatic calculation for batch characteristic

    Conversion factor is a batch characteristic which is to be calculated based on the other batch characteristics values entered by the user at the time of confirmation.
    I have maintained the objectdependency in the batch class (023). The dependency type maintained is "Procedure".  The batch class is assigned to material master. The formula is as follows
    $self.conversionfactor=((($self.actthickness-0.067)*$self.density)
    ($self.paintgsm$self.metalgsm))*$self.width/1000
    The formula is appearing in 2 lines in the dependency editor. There is no syntax error. As well as the dependency status is also "released".
    But at the time of confirmation, if the values of the other characteristics are entered, no calculation for the characteristic conversion factor is done by the system.
    Can anybody please guide on this???
    Regards,
    Manish

    thanks a lot

  • AR aging basing on Invoice date

    Currently client gets AR aging based on Due Date. For audit purpose they need AR Aging based on Invoice Date. During SAP implementation they were instructed to use document date as invoice date and generate a dump from FBL5N and do the aging. However this does not work for balancing items as the document date changes to the date on which the partial clearing of that item was done. This is not acceptable to auditors.
    Please help.
    Any useful answer will be rewarded with points.

    Hi
    Please try to use the field Baseline date for this purpose as this field will not be disturbed even when we do partial clearing of invoices.
    Reward points if found useful.
    Regards,
    K Lakshmanan

  • Calculation for subcontracting item of type N (non stock) as it for type L(Stock)

    Hi Gurus,
    I have a Requirement for calculating the cost for Subcontracting  Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
    This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
    please suggest the user exit or Badi where i can change.
    Please refer the below logic-
    BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
    Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
    In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
    Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
    From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
    If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
    For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
    From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
    If ‘V’ the price will be picked from the field “VERPR”
    If ‘S’ the price will be picked from the field “STPRS”
    Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
    The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
    Br,
    Surya

    Hi Surya,
    Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
    requirement:
    VALUATION_CK                            BAdI for Valuation in Product Costing
    CK_KALAMATCON2_CI                       BAdI for CI Fields for Table KALAMATCON2
    COSTINGRUN_CK                           Edit Costing Run
    COST_APPORTION_CK                       Maint Apportionment Structure Joint Production: Dist Rules
    CO_PROD_COSTING_CK                      Cost Management for Joint Products (Costing, Target Costs)
    DATA_EXTENSION_CK                       For Data Enrichment in Product Costing
    DYNPRO_EXTENSION_CK                     BAdI for Interface Enhancement in Costing
    ORDER_COSTING_CK                        Enables Header Data Changes in Preliminary Order Costing
    QUANTITY_STRUCT_CK                      Enables Quantity/Structure Changes in Costing
    SUR_STOCK_TRANSF_CK                     Overhead on Materials with Stock Transfer Between Plants
    Thanks
    Sri

  • Fixed 30 Days calculation for any month..Not working fine when Split Occurs

    Hello Everybody,
    I am stuck with an issue..which is creating problem when there is a split..in Normal Conditions it's working fine...Kindly help me out on the same.
    We have to calculate the Salary on 30 Days fixed basis and not on calender days...
    <b>eg  For January Salary will be calculated based on 30 days and not on 31 days and for Feb also on 30 days not on 28/29 days.....</b>      Every thing is working fine for normal payroll i.e without any splits..
        <b>But if there are any splits  in the month then calculation for 2nd split goes wrong ....</b>
        Eg.  person is hired on 02feb 2007 and he got re-org on 17 feb 2007 with basic as rs.10000
      As per Clients requrement it should be calculated as  :
    for period 2nd Feb 2007 - 16th Feb 2007 : 10000 * 15/30  : Working Fine in SAP
    for period 17th Feb 2007 - 28th Feb 2007 : 10000* 14/30 :  Not Working  Properly  <b>In SAP calculation is done  as 10000*12/30</b>
    <b>We want it to calculate as 10000* 14/30</b>
    Kindly let me know wat can be done :
    1 How can i write PCR..if that needs to be change
    2. If user exit then how shall i go about the same
    if some body has any 3rd option let me know...
    Regards,
    Ketal Parikh

    Hi ,
    Solved the issue by writing rule.
    Regards,
    Ketal
    Edited by: Sikindar on Jul 3, 2010 10:28 PM

  • Out of memory Error while querying SQL Script based Calculation View

    Hi All,
    I wanted to test the performance of Graphical and SQL Script based Calculation views.
    Created Graphical (CA_GRPH) and SQL Script (CA_SQL) Calculation views.
    Analytic View (AN_GRPH) for both Calculation views are the same which is Graphical based (90 Attributes and 5 Measures)
    In Analytic View data foundation I have a Fact table which has 1.5 Billion records and 9 Dimension Tables –collectively 500 million records (7 Attribute Views). 9 Referential joins with cardinality N:1 and 1 Referential join with cardinality N:N.
    I wanted to keep (CA_GRPH) and (CA_SQL) as a base Calculation views and leverage those to create various calculation views (Will be creating different Calc views for respective Business segments)
    In order to test this I have created below calc views on top of base calc views.
    Graphical Based: Created (CA_GRAPH_XYZ) by having CA_GRPH in projection with 30 Calculated Columns. – This retrieves data in 13 secs
    SQL Script Based: Created (CA_GRPH_ABC) by having CA_SQL in projection view with 30 calculated columns – This errors out after 1.50 mins.
    Could not execute 'SELECT "COLUMN_A","COLUMN _B"," COLUMN _C"," COLUMN _D", SUM("COLUMN _REVENUE") AS ...' in 1:50.480 minutes .
    SAP DBTech JDBC: [2048]: column store error:  [2048] column store error: search table error: [1000002] Error executing physical plan: exception 1000002:
    ltt/impl/memory.cpp:63
    Out of memory ; $size$=1507711; $name$=ihm; $type$=pool; $inuse_count$=170104; $allocated_size$=219215007925
    exception 1000002:
    Any suggestion / help in fixing this issue will be greatly appreciated.
    Regards,
    Av

    Hi Raj,
    Thanks for your time, please find edited snap hot of Analytic View (AN_GRPH) below,
    Calculation view(CA_SQL)
            /********* Begin Procedure Script ************/
    BEGIN
           var_out =
         SELECT
                "COLUMN_1"
                "COLUMN_2",
                "COLUMN_84",
                "COLUMN_85;",
                SUM("REVN") AS "REVN",
                SUM("MGN") AS "MGN",
                SUM("ORD_QTY") AS "ORD_QTY",
                SUM("SYS_QTY1") AS "SYS_QTY1",
                SUM("SYS_QTY") AS "SYS_QTY"
    FROM
          "_SYS_BIC"."XYZ/AN_GRPH"
    GROUP BY
                "COLUMN_1"
                "COLUMN_2",
                "COLUMN_84",
                "COLUMN_85";
    END
    /********* End Procedure Script ************/
    Later i have built one more Calculation view(CA_GRPH_ABC) using (CA_SQL)in projection. i have 30 calculated measures in this final calc view. this final calc view is throwing above mentioned error.
    Not sure if i can use SQL script based calc view in graphical based calc views?
    Regards,
    AV

  • CONTRIBUTION MARGIN (PLAN) CALCULATION FOR PRODUCTS (PER UNIT, LOCATION WIS

    Requirement of a Report to calculate Contribution Margin (Plan) - For Calculating Contribution Margin.
    2 Key figures need to be arrived (per unit/cv of product, locationwise) are Net Sales Realisation (NSR) and Total Variable Cost (TVC).
    a) To arrive at NSR (Plan), all the combinations of upcoming discounts and Free Goods schemes which are going to be in force for the coming month for a product, need to be adjusted in the Net Sales Value to get NSR value per unit of Product (SKU / CV), locationwise
    The NSR is the result of adjusting Discounts, Excise and Schemes to the List price of a product.
    b) TVC is the result of adding Total Material Cost(TMC) + [(LabourPower) conversion cost]Freight.
    Calculation of material cost takes into account the LCC (Landed cost chart) price of the materials, which is a future price.
    The Total variable Manufacturing Cost (TMC+Conversion cost) can be calculated using Costing Run (CK40N), using LCC price.
    In COPA Reporting the values like List price, Discounts, Excise, Free Goods Schemes and freight flows from Billing Documents (SD) because of condition types mapping in to value fields in COPA, which are components for calculating NSR (Actual), based on the Actual sales.
    We want to understand how do the Plan values (List price, Discounts, Excise, Free Goods Schemes and freight) per unit of Product, location wise, flow to the Value fields in COPA Planning,  so that the Contribution Margin (Plan) can be calculated for each product per unit , location wise.
    Contribution Margin = NSR u2013 Total Variable Cost.

    Then you hit a bug in your version of Oracle. You may want to investigate and update to a newer version. I get the following error when trying to register your schema in 10.2.0.1
    ORA-31154: invalid XML document
    ORA-19202: Error occurred in XML processing
    LSX-00246: invalid QNAME "***_voting_flag"
    This error is consistent with Spy 2008 as well (I didn't try Xerces but I've got two that agree so it's good for me).

  • What are the custimization steps to run interest calculations for customers

    Hi,
    I need a full custimization steps to configure the interest calculations for customers. i created interest indicators, g/l accounts and account determinations also. but no interest is calculating for customers and customers are having no of days to calculate the interest. So please guide me on this regard.

    Hi,
    Configuring the Interest Calculations Procedure
    This configuration allows you to charge interest on overdue customer accounts.  Interest can be calculated by using the line items or overall account balances. SAP keep tracks of the date of the last interest run and stores it in the customer master record.
    First create an Interest Indicator.
    OB46 - Interest Settlement Calculation Type
    Int Calc. Type
    P - calculate interest based on line items.
    S - calculate interest based on account balances.
    Secornd, make it avaliable to the interest run program.
    OB82 - Interest Terms
    Third, determine the interest rate that will be used by the calculation.
    OBAC - Define Reference Interest Rates
    OB83 - Enter the Reference Interest Rates Value
    Fourth, assign the interest indicator to the reference interest rate.
    OB81 - Define Time Dependent Terms
    Finally, determine the how and to which accounts the interest program will post.
    OBV1 - Prepare Interest on Arrears Calculation
    Please check out the following link also:
    http://help.sap.com/saphelp_erp2004/helpdata/en/41/37b8e7455b11d182b40000e829fbfe/frameset.htm
    Hope this helps.
    Please assign points as a way to say thanks.
    Regards,

  • Recurring document - FBD1 with incorrect due-date calculation for AP

    Hi Gurus,
    in our ECC 6.0 system we are creating with F.14 FI-documents (SAPF120) based on recurring documents (created with FBD1) for various purposes (e.g. Recurring entries for IC-business).
    Therefore it's important that the system provides in the final processing of the recurring documents the correct net-due-date in the AP-document based on the document date and the payment term included in the AP-masterdata (LFB1-ZTERM).
    Problem:
    The processed FI-document contains the correct payment term but the calculated net-due-date with regards to the document date (BKPF-BLDAT) isn't correct. A Dummy-Update of the FI-document with FB02 on field BSEG-ZTERM provides finally the correct net due date but this a not recommended solution.
    Any ideas how to solve that issue???
    Thanks for replies.
    BR, Bernd

    Hi Vishnu,
    the defined payment term is
    fix day: 15
    additional month: 1.
    Default for baseline date is posting date
    Therefore the expectation is that net due date is calculated for posting date
    e.g. : 01.02.2012 to 15.03.2012.
    The line item after processing in FI-document shows :
    Posting Date : 01.02.2012
    Bline Date:   01.02.2012
    Days/percent: 35
    Net due date: 07.03.2012 (dd.mm.yyyy)
    That's wrong according to my understanding of the payment term definition.
    BR, Bernd

  • TAX not Calculating for Unplanned Delivery cost in MIRO

    Dear All,
    I am having an issue with Unplanned delivery cost in MIRO,
    We have to do an accounting of a invoice/PO which contains in addition to actual Value the Unplanned Delivery cost also, and for which also the TAXes also applicable with ED 10% and ECess 2%,SHcess 1% ,
    Now in MIRO if i want to enter these Packing and forwarding chanrges in Unplanned delivery cost, but the TAX rates is not calculating for the same.
    The TAX rates are calculating only for the values other than Unplanned delivery cost.
    What i want TAX also need to be calculate based on the TAX code choosen in MIRO or as flow that of PO.
    I have checked in OMR2, there we have mentioned Default Unplanned delivery cost tax code as ED NIL.
    Can any where in the setting we can say by default the TAX rates should calculate as that of PO or whatever TAX codes we have choosen in MIRO.
    How to achive this, pl help.
    Regards,
    Nagaraj S

    hi
    the screen shot i sent is also of 4.7E
    now u can check OMR2 for default tax code for unplanned delivery cost
    can u show us the screen shot of the details tab of MIRO
    also check in SPR>MM>LIV>Configure How Unplanned Delivery Costs Are Posted
    here what value u have maintained  ,we are using 2 as (2     Different G/L line)
    regards
    kunal
    Edited by: Kunal Ingale on May 19, 2010 6:18 AM

  • What is the field " Consumption based calculations " in EC 3.0

    Hi,
    In the consumptions tab page of a facility, what is the importance of the field " Consumption based calculations ". Please explain step by step procedure to make use of it instead of providing links
    Thanks in advance
    Srinivas

    Hello Srinivasa,
    Consumptions are time dependent consumption information for a facility object like coal consumption.
    Consumption based calculation is used to calculate Emissions quantities based on amount of materials consumed.
    Consumption based calculations are defined in calculation manater and are assigned in tab Consumption material.
    For simple example without any major parameters emissions if you want to calculate sulfur dioxide emissions =
    Sulfur dioxide) in defined unit =  Consumptions * EF
    If you want to enter detailed equations taking into consideration facility parameters like temperature, control efficiency then you consumption based quations includes all such parameters
    The field you are referrring here - "consumption based calculation" - is automatically populated, based on material - consumption based equation assignment in tab Consumption materials.
    Thanks
    Jayakumar

  • Fixed-Rate Age-Based Insurance Plan

    Hi SAP Benefits experts,
       We have a new insurance offering this year wherein employee rates are determined by the employee's age at the time of initial enrollment.  If an employee enrolls at, say age 25, his or her rates will not increase as the years roll by, even though the employee is now 65.  Our other age-based plans allow for moving rates, so that as the employee ages, his or her rates will adjust. 
       How do I configure a plan to hold the initial rate that an employee qualifies for to be constant as time advances?  I thought I would be able to use the Age Basis fields in the Cost Variant screen in IMG.  However that only allows for a day and month.  I think it would require a year as well for this to manage a fixed cost. 
    Thanks in advance.
    Yvonne

    Plz check below function
    create or replace function cacl_roi
    (p_dep_prd number, ----- deposit amount in years
    p_unit varchar2 default 'D', -------unit of time (years/days)
    p_mode varchar2 default 'X', ------Renew mode
    p_gen varchar2, ------geneder M/F
    p_work varchar2, --------working/non-working
    p_age number , --------Age
    p_anninc number ------Annual income
    return number is
    num_prd number;
    l_roi number;
    begin
    select decode(p_unit,'Y',p_dep_prd*365,p_dep_prd) into num_prd from dual;
    if p_age < 65 then
    if num_prd >= 120 and num_prd <=240 then l_roi := 6;
    elsif num_prd >= 241 and num_prd <= (2*365) then l_roi := 6.5;
    elsif num_prd >= (2*365)+1 and num_prd <= (4*365) then l_roi := 7;
    elsif num_prd >= (4*365)+1 then l_roi := 8;
    end if;
    If p_mode ='R' then l_roi := l_roi+0.5;
    end if;
    if p_gen = 'F' then l_roi := l_roi + 0.5;
    end if;
    if p_work = 'W' then l_roi := l_roi - 0.5;
    end if;
    end if;
    if p_age > 65 then l_roi := 9;
    end if;
    if p_anninc > 10 then l_roi := l_roi + 0.1;
    end if;
    return l_roi;
    end;
    /

  • TAXINJ WITH CONDITION BASED CALCULATION

    Hi MM Gurus
    We are using TAXINJ procedure for tax calculation with formula base calculation (i.e. tax rates are maintains in J1ID ). As we now that TAXINJ procedure support both condition based and formula based tax calculation. But when I want to use the condition based tax calculation with TAXINJ by maintaining the condition record in FV11, I am getting the tax calculated with formula based only. System is ignoring the condition record maintain in FV11. So please explain how to use the TAXINJ procedure with condition based calculation by maintaining the condition record.
    Reward point will be given please…..
    J K Patel
    Ahmedabad
    Gujarat

    Hi JK,
    if you r using taxinj, then system picks up the rate from J1ID only. if you want to maintain the condition records in FV11 then delete the rates in J1ID. hope this will solve your problem.
    Regards,
    patil

  • Weighted avg Unit Cost calculation for COGS

    Hi friends,
    Has any body done weighted avg unit cost calculation for inventory valuation and COGS calculation. In a way we need to mirror ECC material ledger functionality based on the APO data in side the planning tool.
    Any ideas on the above!!!
    Kind Regards,
    Krish

    Hi Jerry,
    Thanks for the tip. I actually needed to clean the spreadsheet up and put bogus values in to comply with company policy. Anyhow, here is a sample of the spreadsheet
    http://dl.dropbox.com/u/7499586/junk.png
    Just imagine about 100 products and several hundred raw materials, a dozen types of labor and about 30 types of packaging. It's a monster spreadsheet.
    The "units" under each product is the number of units per batch. You can see each product has two columns. One where you put in how much of a raw material, package type, and labor type go into each batch, the next calculates the cost for each item. Then it gets summed at the top for the total unit cost for that product.
    Let me know if you have any other questions about it. Thanks so much for your help!

Maybe you are looking for