Allow sale order to Make order

Hi Everybody,
I have created one sale order and tried to create one production order with reference to this sale order. It is giving error as the "Sale order is not allowed to make order".
How can i make a sale order to allow Make to order?
Thanks in advance
Regards
siva

Hi,
Check if the material used in the order it make to stock or order.. let me know if you still get the problem
Regards
Santosh Hegde

Similar Messages

  • Re : Sales order stock (make-to-order)

    Hi
        In make-order scenario after production order confirmation the sales order stock for raw material is not cleared. How to clear this stock.
    Thanks.
    Antony

    Dear,
    Reservation create against prod order. So this raw material to be issued to prod order. After doing GI by MB1A 261 mvt, reservation will remove from system
    Check in Order.
    Go to Material screen and check whether Final Issue Indicator is set or not.
    If it is not set that means still Goods issue is still not over.So Complete the goods issue or Tick that Final Issue indicator or make the order TECO then check the stock in MMBE.
    Regards,
    R.Brahmankar

  • How to link the Sales Order to Planned Order in Make-to-Stock scenario

    Dear All,
    My scenario is Make-to-Stock. Now client wants to know exactly what are the process orders created for Sales order. Please let me know where I will get the link between Sales orders and Process orders in Make-to-Stock scenario.
    Regards
    Naveen

    You will require to work on the requirement type settings for MTS Scenario. The transaction code is OVZH. The requirement type for MTS is KSL.There are various rules for determining the requirement category.
    The requirement type can be determined based on the strategy group in the material master / You can also use the item category and MRP type to determine the requirement.
    Regards,
    Ashok Chauhan

  • STOCK RESERVATION AGAINST SALES ORDER IN MAKE TO STOCK SCEANRIO

    Presently in our system stock is get blocked or reserved against Sales order in MAKE TO STOCK sceanrio.
    Now we required to remove the stock resrvation against sales order,where we have to make the changes in SPRO?
    Please specify.
    regards,
    NITIN

    Hi Nitin
    Try with MB1B movement type 411 E
    This will pull back from the sales order reserved stocks back to unrestricted
    I dont understand your comments of how the MAKE to STOCK process is getting reserved for sales orders automatically
    somebody has to make atleast a sales order to reserve ?is it so?
    Or somebody is saving a sales order and saving delivery too without PGI?
    In OVZ9 for your combination (checking rule A and checking group pf your material as maintained in MMR) you can remove the tick from the check box of  include sales requirements
    Regards
    Raja

  • Really Urgent: Problem in making link b/w sales order and production order

    Hi,
    I am trying to make link b/w the sales order delivery(VL03) by taking its Batch Number(LIPS- Delivery table) and linking with AFPO(Production order Table) field (batch no) so that i can see the fruther operations done o dat production order made against sales order,but it is not coming .
    I want to have help which allows me to make link b/w delivery (vf03) and the productiona order.
    plzz help me out it is really urgent.
    Edited by: ric .s on Apr 11, 2008 7:43 AM
    Edited by: ric .s on Apr 11, 2008 7:59 AM
    Edited by: ric .s on Apr 11, 2008 9:23 AM

    You have delivery no(VBELN) & itam no (Posnr)from lips table.
    Now
    1. go to VBFA table end get the corresponding sales oredr no and order item no.
    In VBFA table pass the delivery no in VBELN and delivery item in POSNN and 'J' in VBTYP_N and 'C' in VBTYP_V.
    Now VBELV & POSNV will return the sales order no and sales order item.
    2. Got to VBAP table and get the corresponding AUFNR to the order no and item no.
    3. Now with that AUFNR you will get a connection with AFPO(Production order Table.

  • 261E movement type to be allowed during GI of Process Order

    Dear Collegues,
    We are trying for a scenario, Where From Sales Order to Process Order directly to be made.
    Now the default movement type for GI of the order is coming 261 E . But system is not allowing with this movement & also this movement is not coming in dropdown. How it is to be mapped , please co-operate.
    Best Regards
    Aniruddha Biswas

    Hi Aniruddha,
    Please check with the stock of the  components to be issued to order, it should be enough stock in the sale order stock.(customer stock - MD)04)
    Other wise system will not allow to issue from the general stock , make the stock for ur component and try.
    If ur component is Raw material, to avoid this, set coll/ind = 2   for component at MRP view.
    Then create new order and make goods issue.
    Regarsd
    pradeep

  • Production Order and Internal Order for each item of the sales order

    Hi
       I am developing Make To Order Report where I have to display the MTO Line Items and non MTO Line Items. For non MTO Line Items I have to display Internal order with Planned and Actual Costs and also Production Order with Planned and Actual Costs. Could anybody tell how to get the Internal order no and production order with Planned and Actual costs for each line item for a sales order.
    Thanks
    Naga

    Hi,
    You can get the Production orders, Planned orders, Internal orders generated for Sales order item from AFPO table (use fields KDAUF-Sales order number & KDPOS-Sales order item). Then to identify the order type use order category (AUTYP) from table AUFK.
    Once you have the Production/internal order, you can ge the cost from COSS and COSP table. Use the object number from AUFK to get the cost entries from COSS & COSP.
    You can use the following sample code as reference.
    Hope this is helps.. (Don't forget to mark it... )
    Form GET_COSTS                                                       *
    Get the material cost, labour hours and the labour cost for the      *
    sales order material.                                                *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_COSTS.
      DATA V_OBJNR LIKE AUFK-OBJNR.
    DATA v_menge LIKE vbap-kwmeng.
      SELECT SINGLE OBJNR
        INTO V_OBJNR
        FROM AUFK
       WHERE AUFNR EQ AFPO-AUFNR.
      SELECT * FROM COSS
       WHERE OBJNR EQ V_OBJNR
         AND WRTTP IN ('01', '04'). " p_wrttp. "Labour Cost ( Plan, Actual)
        PERFORM GET_VALUES_FROM_COSS.
      ENDSELECT.
      SELECT * FROM COSP
       WHERE OBJNR EQ V_OBJNR
         AND WRTTP IN ('01', '04')         " p_wrttp
         AND KSTAR NE '0000510033'. " EQ p_kstar2.      "Material Cost
        PERFORM GET_VALUE_FROM_COSP.
      ENDSELECT.
    Get the unit cost of the production order by dividing the production
    cost by the order quantity. The result will be multiplied by the
    GL posting qunatity (Delivery quantity) to get the production cost
    for the quantity being deluivered.
      IF NOT AFPO-PSMNG IS INITIAL.
        OUT_REC-LABOUR_HOURS_ACT = OUT_REC-LABOUR_HOURS_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_HOURS_ACT =
                          OUT_REC-ADDNL_LABOUR_HOURS_ACT / AFPO-PSMNG.
        OUT_REC-LABOUR_HOURS_PLN = OUT_REC-LABOUR_HOURS_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_HOURS_PLN =
                         OUT_REC-ADDNL_LABOUR_HOURS_PLN / AFPO-PSMNG.
        OUT_REC-LABOUR_COST_ACT = OUT_REC-LABOUR_COST_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_COST_ACT =
                         OUT_REC-ADDNL_LABOUR_COST_ACT / AFPO-PSMNG.
        OUT_REC-LABOUR_COST_PLN = OUT_REC-LABOUR_COST_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_COST_PLN =
                         OUT_REC-ADDNL_LABOUR_COST_PLN / AFPO-PSMNG.
        OUT_REC-MATERIAL_COST_ACT = OUT_REC-MATERIAL_COST_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_MATERIAL_COST_ACT =
                         OUT_REC-ADDNL_MATERIAL_COST_ACT / AFPO-PSMNG.
        OUT_REC-MATERIAL_COST_PLN = OUT_REC-MATERIAL_COST_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_MATERIAL_COST_PLN =
                         OUT_REC-ADDNL_MATERIAL_COST_PLN / AFPO-PSMNG.
      ENDIF.
    Multiply the calculated Unit Production costs with the GL quantity to
    get the actual production cost of the quantity delivered.
    Calculation for Labour Hours
      OUT_REC-LABOUR_HOURS_ACT = OUT_REC-LABOUR_HOURS_ACT *
                                 OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_HOURS_ACT = OUT_REC-ADDNL_LABOUR_HOURS_ACT *
                                 OUT_REC-QUANTITY.
      OUT_REC-LABOUR_HOURS_PLN = OUT_REC-LABOUR_HOURS_PLN *
                                 OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_HOURS_PLN = OUT_REC-ADDNL_LABOUR_HOURS_PLN *
                                 OUT_REC-QUANTITY.
    Calculation for Material Cost
      OUT_REC-MATERIAL_COST_ACT = OUT_REC-MATERIAL_COST_ACT *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_MATERIAL_COST_ACT =
          OUT_REC-ADDNL_MATERIAL_COST_ACT * OUT_REC-QUANTITY.
      OUT_REC-MATERIAL_COST_PLN = OUT_REC-MATERIAL_COST_PLN *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_MATERIAL_COST_PLN =
          OUT_REC-ADDNL_MATERIAL_COST_PLN * OUT_REC-QUANTITY.
    Calculation for Labour cost
      OUT_REC-LABOUR_COST_ACT   = OUT_REC-LABOUR_COST_ACT *
                                   OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_COST_ACT = OUT_REC-ADDNL_LABOUR_COST_ACT *
                                  OUT_REC-QUANTITY.
      OUT_REC-LABOUR_COST_PLN   = OUT_REC-LABOUR_COST_PLN *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_COST_PLN = OUT_REC-ADDNL_LABOUR_COST_PLN *
                                  OUT_REC-QUANTITY.
    Get the planned material cost from the total of the planned cost of
    the component materials in the production order confirmations.
      SELECT BWART MENGE MATNR SHKZG FROM AUFM
        INTO (AUFM-BWART, AUFM-MENGE, AUFM-MATNR, AUFM-SHKZG)
       WHERE AUFNR EQ AFPO-AUFNR.
        CHECK AUFM-BWART NE '101'.
        READ TABLE I_MBEW WITH KEY MATNR = AUFM-MATNR
                                   BWKEY = AFPO-DWERK.
        IF SY-SUBRC NE 0.
          SELECT MATNR BWKEY ZPLPR LPLPR PEINH
            FROM MBEW
            INTO I_MBEW
           WHERE MATNR EQ AUFM-MATNR
             AND BWKEY EQ AFPO-DWERK.
            APPEND I_MBEW.
          ENDSELECT.
        ENDIF.
        IF SY-SUBRC EQ 0.
          IF I_MBEW-ZPLPR NE 0.
            IF AUFM-SHKZG EQ 'H'.
              OUT_REC-PLANNED_MATERIAL_COST =
              OUT_REC-PLANNED_MATERIAL_COST +
                           ( I_MBEW-ZPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ELSE.
              OUT_REC-PLANNED_MATERIAL_COST =
              OUT_REC-PLANNED_MATERIAL_COST -
                           ( I_MBEW-ZPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ENDIF.
          ELSEIF I_MBEW-LPLPR NE 0.
            IF AUFM-SHKZG EQ 'H'.
              OUT_REC-CURRENT_MATERIAL_COST =
              OUT_REC-CURRENT_MATERIAL_COST +
                           ( I_MBEW-LPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ELSE.
              OUT_REC-CURRENT_MATERIAL_COST =
              OUT_REC-CURRENT_MATERIAL_COST -
                           ( I_MBEW-LPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ENDIF.
          ENDIF.
        ENDIF.
      ENDSELECT.
    Get the Future material cost per Unit by deviding the calculated
    Future material cost above with the goods reciept quantity to, then
    multiply the unit cost with the GL quantity to get the Future material
    Cost for the Quantity delivered. (Quantity in the entery from GLPCA
    Table).
      IF NOT AFPO-WEMNG IS INITIAL.
        OUT_REC-PLANNED_MATERIAL_COST =
           OUT_REC-PLANNED_MATERIAL_COST / AFPO-WEMNG * OUT_REC-QUANTITY.
        OUT_REC-CURRENT_MATERIAL_COST =
           OUT_REC-CURRENT_MATERIAL_COST / AFPO-WEMNG * OUT_REC-QUANTITY.
      ENDIF.
    ENDFORM.                               " GET_COSTS
    Form GET_VALUE_FROM_COSP                                             *
    Get the Material cost from COSP table.                               *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_VALUE_FROM_COSP.
      FIELD-SYMBOLS: <FS> TYPE ANY.
      DATA: V_COMPONENT TYPE I.
    Cummulate the posting values of all the 16 period buckets as to get
    total production order cost. This is to handle the aprtial posting of
    prodction order values in diffrent periods.
      V_COMPONENT = 15.
      DO 16 TIMES.
        ADD 1 TO V_COMPONENT.
        ASSIGN COMPONENT V_COMPONENT OF STRUCTURE COSP TO <FS>.
        IF COSP-WRTTP EQ '04' AND COSP-KSTAR EQ P_KSTAR2.
          ADD <FS> TO OUT_REC-MATERIAL_COST_ACT.
        ELSEIF COSP-WRTTP EQ '04'.
          ADD <FS> TO OUT_REC-ADDNL_MATERIAL_COST_ACT.
        ELSEIF COSP-WRTTP EQ '01' AND COSP-KSTAR EQ P_KSTAR2.
          ADD <FS> TO OUT_REC-MATERIAL_COST_PLN.
        ELSEIF COSP-WRTTP EQ '01'.
          ADD <FS> TO OUT_REC-ADDNL_MATERIAL_COST_PLN.
        ENDIF.
      ENDDO.
    ENDFORM.                               " GET_VALUE_FROM_COSP
    Form GET_VALUES_FROM_COSS                                            *
    Get the Labour cost and Labour hours from the COSS table.            *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_VALUES_FROM_COSS.
      FIELD-SYMBOLS: <FS1> TYPE ANY,
                     <FS2> TYPE ANY.
      DATA: V_COMPONENT1 TYPE I,
            V_COMPONENT2 TYPE I.
    Cummulate the posting values of all the 16 period buckets as to get
    total production order cost. This is to handle the aprtial posting of
    prodction order values in diffrent periods.
      V_COMPONENT1 = 15.
      V_COMPONENT2 = 111.
      DO 16 TIMES.
        ADD 1 TO: V_COMPONENT1, V_COMPONENT2.
        ASSIGN COMPONENT V_COMPONENT1 OF STRUCTURE COSS TO <FS1>.
        ASSIGN COMPONENT V_COMPONENT2 OF STRUCTURE COSS TO <FS2>.
        IF COSS-WRTTP EQ '04' AND COSS-KSTAR EQ P_KSTAR1.
          ADD <FS1> TO OUT_REC-LABOUR_COST_ACT.
          ADD <FS2> TO OUT_REC-LABOUR_HOURS_ACT.
        ELSEIF COSS-WRTTP EQ '04'.
          ADD <FS1> TO OUT_REC-ADDNL_LABOUR_COST_ACT.
          ADD <FS2> TO OUT_REC-ADDNL_LABOUR_HOURS_ACT.
        ELSEIF COSS-WRTTP EQ '01' AND COSS-KSTAR EQ P_KSTAR1.
          ADD <FS1> TO OUT_REC-LABOUR_COST_PLN.
          ADD <FS2> TO OUT_REC-LABOUR_HOURS_PLN.
        ELSEIF COSS-WRTTP EQ '01'.
          ADD <FS1> TO OUT_REC-ADDNL_LABOUR_COST_PLN.
          ADD <FS2> TO OUT_REC-ADDNL_LABOUR_HOURS_PLN.
        ENDIF.
      ENDDO.
    ENDFORM.                               " GET_VALUES_FROM_COSS

  • Quantity and Price Totals on Sale Order and Delivery Order

    Dear ABAP Gurus,
    I want to add totals of line items (Quantity and Price) in sale order and delivery order screens. Can you please guide me how to do this. The price can be any from pricing procedure ie exclusive or inclusive price of sales tax.
    regards,
    RSA
    Moderator message : Requirements dumping not allowed, show the work you have already done, thread locked.
    Edited by: Vinod Kumar on Jan 28, 2012 9:23 PM

    Hi,
    Try this :
    IF @transaction_type in ('A','U') AND (@OBJECT_TYPE='22')
    BEGIN
    If exists (SELECT t3.docentry FROM OWOR T0  INNER JOIN WOR1 T1 ON T0.DocEntry = T1.DocEntry left join POR1 T2 on T2.[U_JONum] = T0.[OriginNum] and  T0.[ItemCode] =  t2.U_SubConItem] INNER JOIN OPOR T3 ON T2.DocEntry = T3.DocEntry WHERE T1.[PlannedQty] <> T2.[Quantity] and  T1.[ItemCode]  = 'subcon' and  T3.DocEntry = @list_of_cols_val_tab_del )
    Begin
    SET @error = 10
    SET @error_message = 'Not allowed to add more than planned'
    End
    End
    Thanks & Regards,
    Nagarajan

  • N97 What can I delete from C: in order to make spa...

    I am using Nokia Messaging with my Gmail account but, due to low memory problems on C, I am obliged to delete my incoming mails almost every hour in order to make space. Problem is that I cannot delete on the phone without sync which means that the mails are also deleted on the server which is not ok if I want to keep some mails for further reference.
    So, I have to find more space on C but what can I delete without affecting the normal operation of the phone ?
    For instance, can I delete OVI store or APIBridge ?
    It is time that Nokia issues a new firmware allowing a better use of the memory !!!!
    Thanks in advance for your help.

    Hi, first you could change messagememory - copy messages from C to E and delete them from C afterwards. Open the onboard browser and delete privacy data.  About messages - you will have to set up your mailaccount again on E - delet whats on C.
    All apps as facebook, fring, nimbuzz etc can be installed at E. Install everything possible on E. - You could delete ovistore and use it through the webbrowser instead. - I think Carman does that.

  • Jump from Sales Order to Purchase Order and back again (all in change mode)

    Hi,
    Situation is this:
      - Sales Order is created with 10 items. 4 items are created with connection to Purchase Order.
      - User open Sales Order in change mode
      - User goes to item 20 that has a related Purchase Order
      - User wants to jump to related Purchase Order and make an update here
      - User wants to be able to jump back to Sales Order Item 20 from Purchase Order
    When user jumps to Purchase Order in change mode, then this Purchase Order will also block the same Sales Order, that was open. This can be handled with dequeue and enqueue.
    Problem is that when Purchase Order is saved it will make an update to the Sales Order in the background. When user jumps back to Sales Order then this Sales Order is still open with old data and these data does not reflect data that can have been updated by the Purchase Order.
    Also: When Purchase Order is making updates to the Sales Order then e.g. Message Out Table NAST is automatically updated (insert and delete records). If user then manually updates the Sales Order with old information, then System Dump appears as Sales Order tries to insert NAST records, that have already been inserted or delete NAST records that have already been deleted via the Purchase Order.
    This means that when user jumps back from Purchase Order to Sales Order Item 20 then Sales Order needs to be refreshed with new data after Purchase Order has saved the Sales Order.
    Are there any solution to do this in a standard way (from within SAPMV45A) ?  
    I prefer not to reopen Sales Order using syntax like CALL TRANSACTION.

    Hi,
    Thanks for reply.
    In third party PR gets created automatically but PO gets create manually.So changes get refelect in PR only not in PO.
    Can you give me the solution for completing this task.
    Thanks & Regards
    Jalaj garg

  • Third party sales and individual purchase order MIGO DIFFERENCE?

    Hi experts,
                     any difference between third party sales and individual purchase orders goods receipt(MIGO). What's the stock levels chages after goods receipt in both cases? How the system knows that its third party migo and individual purchase order MIGO? Can anybody clarify my question?
    regards,
    raju

    Hi
    In third party you will not be able to create automatic PO
    The schedule line category CS settings in VOV6 order type NB, MM item category 5 and account assignment category settings as X and in VOV7 for TAS create automatic PO ticked will ensure PR creation only and not PO
    As suggested by the other friend you need to run t code ME59N or ME59  for automatic PO creation but certain condition to be met
    1) In the Purchasing View of the material master data, the "Autom. PO" field must be clicked;
    2) In the Purchasing View of the Vendor Master Data, the "Automatic Purchase Order" field must be clicked;
    3) The Outline Agreement or Purchasing Info Record shall be maintained which will allow the automatic copying of unit price and other conditions into PO;
    4) The Source List shall be maintained for the nominated vendor which was shown in either the Outline Agreement or Purchasing Info Record.
    You have to run ME59N transaction  manually or schedule this as  a background job
    Regards
    Raja

  • Partiral delivery of sales items in a service order brings the order header to in process

    Hello Experts,
    I am currently working on CRM 7.0, EHP 1.
    I am creating a service order in CRM and the sales items in the order are replicated to a sales order in ECC. The header system and user status at this point is Released.
    On creating a partial delivery for the sales items, the header of the service order is set to system status In Process. This doesnt allow creation of a confirmation because the header is no more released.
    Is there a note to stop the system status change to in process ?
    Thanks &Regards,
    Itisha

    Hi Rohit,
    It is ideally required to have both higher item and subitem in delivery. However the moment there is a sub item, the delivery quantity for higher level item becomes 0 and hence this will not affect the quantity to be delivered. Hence the presence of higher level item will not impact the delivery or PGI in anyway. You can check this.
    Similarly for billing, you can check the Billing quantity field in copy control between delivery and invoice. The value has to be either G or H based on the scenario you want.
    Having said all these things, I think just adding the customer entered material either in the customer material field in sales order (I think VBAP-MATWA) or in some other Z field will relieve you of this big complexity. So unless or otherwise your customer i adamant on this, you can think of a simpler solution than the multiple levels of items.

  • Planning strategy for Both scenario of Make to order and make to stock

    Hi
    My client having Both scenario of Make to order and make to stock ,so please explain me step by step which Planning strategy is use for following situation
    1.Forecast the production quantities for the variants and create the PIRs
    2.sales order is created for variants
    3.Planned independent requirements should consumed by incoming sales orders
    Note:If it is MTO scenario i need sales order reference number in production order
    With regards
    Laxmipathi

    Hi,
    You can Define Strategy Group under SPRO>Production>Prod.Planning>PIR>Planning strategy-->define st.Group.
    In this step, you group strategies together into a strategy group. You can determine a main strategy as well as up to seven alternative strategies.
    The main strategy is proposed in demand management or in sales order management and can be overwritten by another planning strategy defined in the strategy group.
    You can allocate the strategy groups to the materials directly in the material master record, or you can allocate the strategy groups to an MRP group and then in a second step allocate the MRP group to the material in the material master record.
    Hope it will help you.
    Regards,
    Mukesh

  • Assign batch number from sale order to production order automatic

    Dear all, I have a question for all. Please help me in this case
    My scenario is make to order
    I have a sale order, when i create sale order, i have assigned batch number at each line item.
    When i run MRP for sale order (MD50), the system generate a planned order for it and I've converted to production order.
    So when I view production order, I think that batch number what I've assigned to sale order will be assign to production order but that is not happen.
    So, can you help me solve this problem. I think that sap can assign batch number from sale order to production order automatic but i don't know how to configure that
    Thanks all

    Hi,
    To the best of my knowledge, when system is generating planned order / production order from sales order system doesnt copy batch number from sales order.
    In fact , you are following wrong practice for generating batch no.
    Follow procedure like this :
    Create sales order without any batch assigning there. Run MRP with MD50 and then convert planned order to Production Order.
    While creation / releasing of Production order, you have option to generate batch automatically by following way :
    Go to OPKP (Production Scheduling Profile) -> Take your plant & give suitable name to Production scheduling profile-> Batch Management tab -
    > Automatic Batch creation in the order maintain this field as
    1     Automatic batch creation at order creation
    or
    2     Autom. batch creation at order release
    This will generate batch number automatically at the time of creation or release of order.
    Then follow same process i.e. Goods Issue, Confirmation & GR for production order.
    So you will get sales order stock in the form of batch managed.
    Check & revert if any issue in above flow.
    Regards,
    Tejas

  • Make to order and make to stock scenarios in prodcut costing

    Dear Co Experts,
    I am new to product costing, in product costing there are two way to estimate the cost of the product by using make to stock and make to order.
    Kindly tell me the scenario of make to order and make to stock
    In make to order scenario what are the minimum configuration steps are required in controlling, PP, MM, and SD.
    In make to stock scenario what are the minimum configuration steps are required in controlling, PP, MM, and SD.
    How we will defend the costing variant in make to order scenario
    I really appreciate for your early response
    pls tell me end to end cycle for both the scenarios
    Warm Regards
    Venkataswamy

    Hi
    In Cost Planning in Product Costing,We configure Cost variant
    Costing variant is a A tool that contains all control parameters for costing, including
    parameters that control how cost estimates are executed and the material
    prices or activity prices that are used to valuate the costing items.
    In Cost Object Controlling  category a)by order b)by period c) sale order
    a) BY Order,We create Co Production Order which will be used in Make To Order Production.
    b) By Period,We create Product Cost Collector which will be used in Make To Stock or Repetitive Manufacturing
    c) By Sale Order,We create sale order with linked to Co production order,We can use Make To Order Scenario.
    Re: Repitative manufacturing
    www.sap-topjobs.com/SpecialPP/samplepc.doc -
    Regards
    Edited by: Dublin on Oct 19, 2009 10:02 AM