Alt BOM Creation problem
Hi
Expert,
When i am creating alternative BOM in system it will also change the material present in alternative of 1 .
Why this is happening?
A & B alt 1 and 2
When i am creating or change in alt 2 this effect also occur in BOM alt 1
Please Guide
Thanks & Regards
Pert
Dear Kumar
For Alt BOM 1
ITEM ICT Component Component Des QTY UN ............ ITEM ID
0010 L A 2.9 KG 00000001
0020 L B 0.125- KG ............00000002
For alt BOM 2 of same material (Practically)it should be like this
ITEM ICT Component Component Des QTY UN ............ ITEM ID
0010 L C 2.9 KG 00000003
0020 L D 0.125- KG ............00000004
But it showing for alt 1 and alt 2 are same
ITEM ICT Component Component Des QTY UN ............ ITEM ID
0010 L C 2.9 KG 00000001
0020 L D 0.125- KG ............ 00000002
Are you getting my point?
Thanks & regards
Pert
Similar Messages
-
Alternative BOM creation problem in CS01
Hi.
I have created a BOM with CS01 with list of components. Now i want to create an alternative BOM for the same FG.
When I am trying to create alternative BOM using CS01, I added the components, system is showing me in the header as Alternative BOM 2. But when i try to save this BOM system is giving me the error as "Alternative BOM cannot be created for this material".
Can you please help me how to create alternative BOM for this FG.
Regards,
PadmavathiDear Padma,
If my understanding is correct,if the check box for multiple BOM inactive is set in OS27 means,you will not be allowed to even
enter into the BOM item maintenance screen.
It seems the system is allowing you to enter the second alternative BOM,but at the time of save the system is blocking from
doing so.check what's the message and check whether by means of exit this check has been incorporated in the system.
Check and revert back.
Regards
Mangalraj.S -
Alt BOM Selection at the time of order creation
Hi Friends,
For one of our FERT We Have 4 Alt BOMS and Fore Production Lines
My requirement here is while creating The Production Order In co01 I Need to select The Required Alt BOM. How to configure this spro
However the System Is asking for The Production Lines(as Pop UP Massage)
Suggestu2026u2026
HariHi,
For that you need to maintain the production Version in material master MRP4 view in that maintain all your BOM and routing.
Then MRP4 view of material master there is option selection method here you need to select 3-Selection only by production version.
After that in OPL8 for your order type and plant maintain
Production version-1 Manual selection of production version
Please try and come back.
Regards,
R.Brahmankar -
Bdc for tocde CS01(BOM CREATION)
Hi,
I want to make a bdc for the tcode CS01(BOM Creation),but the thing when i perform the Recording then there is a point that the BOM having the sub - items which might be 3 or 2 or maybe 10 . how can i manage that during the recording.
plzz provide me guidelines for solving this problem.Hi,
This code for BOM creation/Change,
using BAPI as well as BDC check this.
LOOP AT it_bom_create INTO wa_bom_create.
* Begin of CCT51465 - B09794 - 11/28/2007
* PERFORM f_bdc_dynpro USING 'SAPLCSDI' '0100'.
* PERFORM f_bdc_field USING 'BDC_OKCODE'
* '/00'.
* PERFORM f_bdc_field USING 'RC29N-MATNR'
* wa_bom_create-matnr.
* PERFORM f_bdc_field USING 'RC29N-WERKS'
* wa_mbew-bwkey.
* PERFORM f_bdc_field USING 'RC29N-STLAN'
* '2'.
* PERFORM f_bdc_field USING 'RC29N-STLAL'
* '01'.
* PERFORM f_bdc_dynpro USING 'SAPLCSDI' '0110'.
* PERFORM f_bdc_field USING 'BDC_OKCODE'
* '/00'.
* CONDENSE wa_bom_create-bmeng.
* PERFORM f_bdc_field USING 'RC29K-BMENG'
* wa_bom_create-bmeng.
* PERFORM f_bdc_dynpro USING 'SAPLCSDI' '0111'.
* PERFORM f_bdc_field USING 'BDC_OKCODE'
* '/00'.
* CONDENSE wa_bom_create-menge.
* PERFORM f_bdc_dynpro USING 'SAPLCSDI' '0140'.
* PERFORM f_bdc_field USING 'BDC_CURSOR'
* 'RC29P-IDNRK(01)'.
* PERFORM f_bdc_field USING 'BDC_OKCODE'
* '/00'.
* PERFORM f_bdc_field USING 'RC29P-IDNRK(01)'
* wa_bom_create-idnrk.
* CONDENSE wa_bom_create-menge.
* PERFORM f_bdc_field USING 'RC29P-MENGE(01)'
* wa_bom_create-menge.
* PERFORM f_bdc_field USING 'RC29P-POSTP(01)'
* 'L'.
* PERFORM f_bdc_dynpro USING 'SAPLCSDI' '0130'.
* PERFORM f_bdc_field USING 'BDC_OKCODE'
* '/00'.
* PERFORM f_bdc_dynpro USING 'SAPLCSDI' '0131'.
* PERFORM f_bdc_field USING 'BDC_OKCODE'
* '/00'.
* PERFORM f_bdc_dynpro USING 'SAPLCSDI' '0140'.
* PERFORM f_bdc_field USING 'BDC_OKCODE'
* '=FCBU'.
* PERFORM f_bdc_transaction USING 'CS01'.
it_stko1-base_quan = wa_bom_create-bmeng.
CALL FUNCTION 'CSAP_MAT_BOM_CREATE'
EXPORTING
material = wa_bom_create-matnr
plant = wa_marc-werks
bom_usage = '2'
valid_from = v_valid " CCT52206 - B09794 - 12/10/2007
* CHANGE_NO =
* REVISION_LEVEL =
i_stko = it_stko1
* FL_NO_CHANGE_DOC = ' '
fl_commit_and_wait = 'X'
* FL_CAD = ' '
fl_default_values = ' '
IMPORTING
fl_warning = flg_warning
* BOM_NO =
TABLES
t_stpo = it_stpo1
* T_DEP_DATA =
* T_DEP_DESCR =
* T_DEP_ORDER =
* T_DEP_SOURCE =
* T_DEP_DOC =
* T_LTX_LINE =
* T_STPU =
EXCEPTIONS
error = 1
OTHERS = 2.
IF sy-subrc <> 0.
* Begin of CCT59311 - B09794 - 07/01/2008
IF p_show = 'X'.
PERFORM f_check_lock.
ENDIF.
* End of CCT59311 - B09794 - 07/01/2008
CALL FUNCTION 'FORMAT_MESSAGE'
EXPORTING
id = sy-msgid
lang = sy-langu
no = sy-msgno
v1 = sy-msgv1
v2 = sy-msgv2
v3 = sy-msgv3
v4 = sy-msgv4
IMPORTING
msg = v_mstring
EXCEPTIONS
not_found = 1
OTHERS = 2.
IF sy-subrc = 0.
CONDENSE v_mstring.
wa_errormsg-matnr = wa_bom_create-matnr.
wa_errormsg-werks = wa_marc-werks.
wa_errormsg-mtart = v_mat_typ.
wa_errormsg-msgtyp = sy-msgty.
IF sy-msgid = '29' AND sy-msgno = '037'.
v_mstring = text-027. " Costing BOM already exist (For Material -
CONCATENATE v_mstring wa_marc-matnr ')' INTO v_mstring.
wa_errormsg-msgtxt = v_mstring.
ELSE.
wa_errormsg-msgtxt = v_mstring.
ENDIF.
APPEND wa_errormsg TO it_errormsg1.
CLEAR wa_errormsg.
ENDIF.
ELSE.
wa_successmsg-matnr = wa_marc-matnr.
wa_successmsg-werks = wa_marc-werks.
wa_successmsg-mtart = v_mat_typ.
wa_successmsg-msgtyp = 'S'.
v_mstring = text-017. " Costing BOM created successfully (For Material -
CONCATENATE v_mstring wa_marc-matnr ')' INTO v_mstring.
wa_successmsg-msgtxt = v_mstring.
APPEND wa_successmsg TO it_successmsg.
CLEAR wa_successmsg.
ENDIF.
Code Formatted by: Alvaro Tejada Galindo on Dec 23, 2008 10:21 AM -
How to select the Alt BOM in the Sub-Contract PO
Dear All,
please tell me how to select the alternative BOM in the sub -contracting purchase order.
for the above said requirement i have cretaed production versions and the BOMselction method also i have selcted in the material master data as "2" means BOM by produ ction version.
so how can i select the alt BOm in theSub-contracting PO.
Thanx in advanvce
regards
SrinivasHi,
SAP help says you have to write the production version in the subcontracting info record:
http://help.sap.com/saphelp_46c/helpdata/en/b2/fa1ed4d51d11d1a69e0000e83235d4/frameset.htm
http://help.sap.com/saphelp_46c/helpdata/en/35/b0e96787a62488e10000009b38f9b7/frameset.htm
(I've checked a subcon-info record but sorrowfully I havent found a field for this...if you can find please let me know)
BR
Csaba -
What is use of Item Category N(non-stock item) in BOM creation
Dear Experts,
What is use of Item Category N(non-stock item) in BOM creation ?
regards
rajakarthikHi,
This item category is used for components which are not kept in stock if they are used in a bill of material (BOM). Non-stock items can be entered in the BOM with or without a master record. To enter a non-stock item without a master record, you must simply enter a descriptive text.
When you use this item category, the system automatically creates a purchase requisition for these components,
Special functions
The following functions are supported for non-stock items
You maintain purchasing data for non-stock items in the bill of material.
In the planning run, the system generates purchase requisitions
instead of dependent requirements for components that are procured directly. When you configure your R/3 System for MRP, you can define whether direct procurement is triggered by the planning run or by production order management.
Product costing processes take valuation data from the BOM item.
The system determines the release strategy on the basis of the price data you enter. The material group is required to produce a purchase requisition.
Pavan -
At the time of BOM creation We choose copy from.After that which material ,which plant needs to be copied how will we come to know about this?Do we need do to select all the items from the BOM of source material.After copying items of the source material can i change the item quantity there .Please giude me on that.
Dear,
First you are enetering material and plant of BOM to be created, in copy screen you enter the material and plant form which you want to copy the material BOM
example
Material A in plant 0001 is existing BOM
Copy function can be used for
Case 1 create BOM for a Material B and plant 0001. Now you want to copy from Material A plant 0001.
Here you use the copy frumction and enter material A and plant 0001.
Once you entrer you will see the items of material A/plant 0001, you can select all items or you can select some of them and click on copy, then system will take you to BOM of B in plant 0002 and items of B. here you can delete/add/change the qty, items whatever and save it...so that Material B BOM willbe created. Nothin will happen to material A BOM
Case 2 create BOM for a Material B and plant 0002. Now you want to copy from Material A plant 0001.
Here you use the copy frumction and enter material A and plant 0001.
Once you entrer you will see the items of material A/plant 0001, you can select all items or you can select some of them and click on copy, then system will take you to BOM of B in plant 0002 and items of B. here you can delete/add/change the qty, items whatever and save it...so that Material B BOM willbe created. Nothin will happen to material A BOM
I hope you got it -
Cideon / Autocad 2007 / Material BOM Creation from autocad
Hi,
we are using Cideon integration for AutoCad 2007 & SAP ERP communication. DIR's in DMS are created from AutoCad drawings via SAP menu.
We want to create Material & Material BOM from AutoCad but we cannot see any option present in SAP menu. We can just create Header Material from SAP menu in AutoCad, no BOM option. What steps should be taken to enable material & bom creation from AutoCad SAP menu.
Thanks
Edited by: Rob Burbank on Oct 22, 2010 3:56 PMModerator message - Welcome to SCN
Please read [Rules of Engagement|https://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement], How to post code in SCN, and some things NOT to do... and [Asking Good Questions in the Forums to get Good Answers|/people/rob.burbank/blog/2010/05/12/asking-good-questions-in-the-forums-to-get-good-answers] before posting again.
In particular, offering points is against forum rules
Rob -
Is there any BAPI for BOM creation? which does by RCSBI010 / Batch Input.
Hi Experts,
I need to Upload the extracted Excel-file(.txt) for BOM creation, so, pls, let me know that, Is there any BAPI for this purpose. In detail the requirement is that,
The suggested idea shuld work as like as pgm. RCSBI010
thanq
Edited by: Srinivas on Feb 14, 2008 6:18 PMHi Srinivas,
Try these Function Modules
CS_BI_BOM_CREATE_BATCH_INPUT - Create BOM Via Batch Input
CS_BI_BOM_CREATE_BATCH_INPUT1 - Create BOM Via Batch Input (Corrected Session Handling)
There are two BAPI's too, which can be used
ALE_MATERIAL_BOM_GROUP_CREATE
BAPI_MATERIAL_BOM_GROUP_CREATE - Creation of a material BOM group
Hoe this helps.
Edited by: Priyabrata Samanta on Feb 15, 2008 3:56 AM -
Error when ECO and BOM creation using IDoc
Hi experts,
now i am doing an interface about ECO/BOM creation and changing using IDoc.The idoc type is ECMMAS02 ans BOMMAT04.
since i know a little about ECO/BOM, can anyone provide some good materials for me?
and i don't know which fields are mandatory in idoc segment, so i go to tansaction BD30 to run a BOM changing. i input a change number but the idoc log shows that change number does not exist. what is the change number using? where i can implement the changes, e.g, change the quantity? should the change number be used when creation and changing? how can i get this change number?
thanks a lot in advance!Hi experts,
now i am doing an interface about ECO/BOM creation and changing using IDoc.The idoc type is ECMMAS02 ans BOMMAT04.
since i know a little about ECO/BOM, can anyone provide some good materials for me?
and i don't know which fields are mandatory in idoc segment, so i go to tansaction BD30 to run a BOM changing. i input a change number but the idoc log shows that change number does not exist. what is the change number using? where i can implement the changes, e.g, change the quantity? should the change number be used when creation and changing? how can i get this change number?
thanks a lot in advance! -
Hello,
My requirement is User must be able to create plant specific BOM creation. For this, Do we need to do any SPRO config in Material master side? or any other settings needs to be done? Kindly let me know... Thanks!!
Regards,
SaravanaMake the field Plant for CS01 via transaction variant SHD0.
Then user can't continue without enter plant.
Regards
Dev -
Plant specific BOM creation SPRO settings
Hello,
My requirement is User must be able to create plant specific BOM creation. For this, Do we need to do any SPRO config in Material master side? or any other settings needs to be done? Kindly let me know... Thanks!!
Regards,
SaravanaHi Saravana,
As such there is no SPRO setting for it.
Please check the authorization object C_STUE_WRK -CS BOM Plant (Plant Assignments)
Regards,
R.Brahmankar -
Dear Gurus
Are there any other Tcodes for BOM creation other than CS01? Any Tcodes I could use for BOM creation for LSMW upload?
Need help ASAP. Points assured
Thanks in advanceHi Obie,
As all experts has suggested there are only two transaction codes for material BOM,
1. CS01 for creation of BOM
2. CS02 for editing of BOM
There are diffrenet t codes if you want to create equipment BOM like IB01 & IB11.
Hope this will resolve your querry.
Regards,
Avinash. -
Dear
Let me know that is it possible that Production Area Overhead and General Factory Overhead in BOM creation should be calculated automatically.
for Example:
we have Activity 1 in which we have Activity 2 in which QC Hours are
Lab =5Hr Lab =10Hr QC=5 Hrs
Machine=1Hr Machine=1Hr
Now our company policy is that Production area Overhead cost driver is sum of All activities Labour aand Machine Hrs
Production area OH=(51)(10+1)=17 Hrs
Now our company policy is that General Factory area Overhead cost driver is sum of All activities Labour aand Machine Hrs and QC Hrs
General Factory Overhead OH=(51)(101)5=22Hrs
So When i enter the value in all activties so is it possible that i should make or allow the Production area overhead and general Factory Overhead field automatically calcuated the Hrs instead of posting manually.
regards
AftabDear,
cannot understand your statement
"we have Activity 1 in which we have Activity 2 in which QC Hours are
Lab =5Hr Lab =10Hr QC=5 Hrs
Machine=1Hr Machine=1Hr "
pl explain the above.
Anyway any type of activity can be tackled in routing activity type difinition. and overhead by defining correct costing sheet.
pl explain your issue clearly so that i can help you. -
Hi,
Is there a BAPI or a function module available for Equipment BOM creation for transaction IB01.
ThanksHi Nidhi,
Chk the below links you might get an idea.
/people/prakash.singh4/blog/2005/05/15/explode-boms-in-enterprise-portal-using-htmlb-tree--part-1-abap
http://help.sap.com/saphelp_erp2005/helpdata/en/d1/2e4114a61711d2b423006094b9d648/frameset.htm
Reward points for the helpful answer.
Regards,
Harini
Maybe you are looking for
-
Connectivity issues - Bridge CC to Photoshop CC - Image Processor issues.
Hi guys. I'm having issues with Image Processor between Bridge CC and Photoshop CC. I can see in the forums that others are having issues that are close to mine but not the same. I can still see my image processor tab in my Tools menu. The problem is
-
Okay, so I'm trying to modify a region template and I can't get it to work. I've tried using custom CSS in my HTML Header, I've tried actually adding a line to the CSS include file on the server - I can't get anything to work. Firebug shows that as s
-
My M2727nf doesn't work properly
Hi I've got a M2727nf. It works for 3 or 4 minutes and then stops working. Why should i do? One of my friends told me to reset its bios. Does this work? How should i do so?
-
Invisible Text in Flash Player on Financial Website
Just spent an hour on the phone with one of my financial sites on which I can no longer see some important text. They tried everything, none of which worked, and concluded it must be incompatibility of the adobe flash and Snow Leopard. It started rig
-
Show 'Text' Document contents instead of using Document Links
I have a requirement from my customer that requires comments to be stored and display both on the planning layout and display instantly in query. I am aware that documents which type other than text is stored in BIN form, so my first approach is just