Alternative item with follow-up material

Hi,
I have a finished product X for that component A-1 pc and B-1 pc is required.
Now A cannot be used in next year thatu2019s why my client wants 1) to issue 2 pcs of A instead of A-1pc and B-1 pc until the stock of A is available. 2) If the stock for A is not available then only it goes for B.
1) I have used alternative item grp with priority: 1, strategy : 2, usage probability 200% for A and priority: 2, strategy : 1, usage probability 0%  for B
System issues 2 pc of A only
2) Also maintained follow up material as B so if there is any shortage for A then system is looking for B.
Problem is with the above setting the follow up material and alternative item is not working together.  System issues only 1 pc of A if I maintained B as follow up material. If I maintain only alternate item then it issues 2 pc of A but at the same time it will not check B if any shortage occur.
Pls help.

Hi,
[Kindly check this link |http://help.sap.com/saphelp_47x200/helpdata/en/a0/1016bd4c8311d189520000e829fbbd/frameset.htm] which has information of the below.
Alternative item group
You can only define discontinuation data for a stock item or variable-size item that is not assigned to an alternative item group.
Once you have maintained discontinuation data for an item, you can no longer assign the item to an alternative item group.
reg
dsk

Similar Messages

  • Rounding PR00 in header level (+1 item with the same material)

    I have currently a problem, my customer prints the invoice by sumarizing the materials (line items with the same material and pr00), but by doing this the unit price by the quantity is not correct because the rouding at line item is not the same when we put all together.
    e.g.
    line 1 - qty = 7,5 and pr00 = 0,15 ->total of 1,125 -> stays in line item with 1,13
    line 2 - qty = 7,5 and pr00 = 0,15 ->total of 1,125 -> stays in line item with 1,13
    in the layout we have a total of 2,26, but in real we must have 2,25 if we see this like a header group.
    Can we have a rounding solution for the PR00? like we have for discounts using a rouding routine?
    thanks in advance,
    joao

    in the layout we have a total of 2,26, but in real we must have 2,25
    Since the issue is only in output of billing document, you have to take the help of ABAPer and modify the smart form.
    thanks
    G. Lakshmipathi

  • Production Order with follow-up material unble to save due to error CKBK009

    Dear Expert,
    When we apply discontintion/follow-up material setting, production order is not able to save. <b>Error message "CKBK009 - No price could be determine for material....."</b>.
    <b><u>SAP Help indicates :</u></b>
    "No price could be determined for material .......... Message no. CKBK009
    <b>Diagnosis :</b>
    The system could not determine a price for valuation view 0, because no valuation 
    strategy succeeded from valuation variant 006.
    <b>System Response :</b>
    Since the input quantity is zero for this material item, the costing result is not   
    affected by this error at the pricing stage.
    The standard system defines this message as an error message. However, you
    can use user-defined error management to specify that the message is a warning
    or an information message, or that it is not issed at all.
    <b>However, in Controlling's User-Defined Error Management, CKBK009 is already  warning only.
    What other setting is needed ?</b>
    Thanks for helping !

    Dear all,
            Manage to solve the problem via Note 1008643, per following.
           <b> THANK YOU for all your guidance & Have a nice day !</b>
    <u><b>NOTE 1008643 :</b></u>Symptom
    In a production order error message CKBK-009 is raised during cost calculation.
    This message cannot be modified into a warning or information message.
    Other terms
    CKBK009, CO01, CO02, CO03
    Reason and Prerequisites
    System design
    Solution
    Please make a new entry in TA OPR8 with the following characteristics:
    ErrorManagID    ApplicationArea   MsgNo  MinMsgType    MaxMsgType
    PPCO            CKBK              009
    Then run TA OPR4_PPCO to modify the message type for CKBK009.

  • Alternative Item with %0 still planned with qty 0 by the MRP

    Can somebody explain me why the MRP manage also the Alternative Item MAterial with % 0.
    Why the MRP do it?
    There is any setting that I can do in SPRO to fix it, or better to let the MRP recognize the item in alternative and check the usage probability if it 0 what I expect is that I do not find into my planned order the material with % 0 but only the one with % 100.
    Thanks

    There's a good reason that it is in the planned order, and later in the production order with quantity 0.
    100% is for planning, meaning that in MRP this is the material that will be procured.
    But now, in the ProdOrd, when you perform an availability check and there isn't enough of it, the system will look for available stock in the alternative item, and commit it if so. This is the whole point.
    For that, and for the information that this material has alternatives, the system is showing the alternative materials with quantity 0 in the order. (if I remember right they all have the same line item number)
    Regards,
    Mario

  • Assigment of alternative items in Routing

    Hello All,
    In a BOM, Material A and B are alternative items with same item no. (grp-01,prior -1, strategy-1, usage prob A=100, B=0).
    In routing, material A is assigned to operation 0010 and B assigned to operation 0020.
    But when prod order is created, A and B both shows that they are assigend to same operation (either 0010 or 0020 whichever is assigned last).
    Please say me why it is not assigned correctly.
    regards,
    ranjit

    Hai ranjit kumar,
    If you use alternative item in BOM, then system will read material component that belong to the same alternative group and strategy as one component. The principle of alternative item is there are few material code that can replace one item component BOM especially for good issue/reservation. In your case, why you assign alternative item B into operation 0020?? It should be in operation 0010. If you want to allocate material A to operation 0010 and allocate material B to operation 0020, then you must not set material B as alternative material A. Remember that alternative item will be substitute for the other when good issue is done. So, the system only propose one operation which component will be allocated.

  • Concept of alternative items

    dear gurus,
        can any body explain the concept of alternative items.ie if 1 material is not there we can use other material.whether it is correct?what are all the other uses in using alternative items.please explain the configuration also
                                                                   - gide

    Hello Mr.Gide,
    I'm not willing to give you definitions & explanations for Alt.Item,
    Group,
    Priority,
    Strategy,
    Usage Probability.
    Kindly check in SAP Help.
    Let me put some practical inputs.
    Eg:
    If there's a material Alt2 which can be used instead of a material called Alt1,now we will first form an Alternative item group using this 2 material.It can be more than 2 materials also.
    Now in our case after u enter Alt1 as the line item for a HALB or FERT,select that entire row and click on Item details or Press F7.In Item data screen,in the bottom under general data u can find the field for Alternative item group.
    Click that and enter the values as follows
    A-Alt Item Group
    2- Priority
    2- Strategy
    70% - Usage probability ,now come back.
    Now enter Alt2 as the line item and after that as i said select that row & press F7.
    Click on Alt.Item group button and enter the values.
    A,
    1,
    2,
    30%.Now save.
    Now let's assume this BOM is used for a HALB.Let's assume 10 quantity is mentioned in the BOM for each of this line item.
    Now if there's PIR for say 100 quantity
    After running MRP for the HALB  the requirements will be seen as Alt1 700 required & Alt2 300 required.
    <b>Here for the planning Only Usage Probability comes into picture.</b>
    When you are doing the production booking for making 100 quantities,the system shows 1000 quantity of Alt1 and no Alt2 will be seen in good's movement's screen.
    Now the priority comes into picture,as we have given priority  as 1 to Alt1 the systems proposes 1000 quantity of Alt1.
    So while planning Only usage probability is considered and requirements fallas as per that.
    While doing Production booking priority comes into picture.
    So Here as we have maintained priority 1 and strategy as 2 for Alt1,the systems  proposes 1000 quantity of Alt1.
    If your strategy is then the planning & production will be as per the usage probability.
    <u><i>Second case:</i></u>
    If for Alt1 A              &  for Alt2- A
                  2                              1
                  2                              1
                  70%                         30%
    Planning will be 700 & 300 of Alt1 & Alt2.
    But for production booking 1000 & 300 of Alt1 , Alt2 will be proposed by the system.Because For Alt1 though the priority is 2,but its strategy is 2.
    For Alt2 priority1 but strategy is 1(Manual maintenance).
    <b>
    So many combinations can be made using this.Dont get confused.</b>
    <b>If satisfied,plz reward points to all the answers which helped u and close the thread.</b>
    Thanks & Regards
    Mangal
    Message was edited by:
            Mangal

  • The follow up material results in recurssiveness

    HI,
    I have two BOMs one is plant specific production bom
    & the other is group BOM which is engineering/design bom
         Production Bom(plant specific)     
    parent     MO     
    child 1     m1     
    child 2     m2     
         Enginering/desing bom(indepent of plant)     
    parent     MO     
    child 1     m1     
    child 2     m2     
         m3     
    So in material master  of m3  iam trying to discontinue with  discontinuation indicator 1 with follow up material MO
    The sytem is issuing the "the specified followup material results in recurssiveness"
    why the system is throwing this message though m3 is not present in the production bom (which is plant specific)

    Praveen,
    Are you trying to say that if you maintain the material BOM for M0 with M3 as component and a follow up material as M0 again..?
    It will definitely a recursive bom.
    Or is it that you are maintaining a material M3 with follow up material as M0, where the M0 bom has components as m1 and m2 and you are getting this error in this case?
    Please explain clearly..
    Sumeet

  • Follow-Up material items in MRP4 View

    Hi All,
    In MRP4 view, in discontinued part, if we set follow-up material, MRP will trigger requests for the follow –up material if the stock of existing material is zero.
    Now there is a requirement, so that even though follow-up material is updated, system should be trigger any requirement for the existing one, though the stock is zero, ie, the follow up material is only for an information .
    Is it possible ? can we do it with  changing the effectively of date in eff.out (set it as future unlimited)
    Thanks for the help.
    Regards,
      Vijesh

    Pls help.

  • Follow up material with different base unit of measure

    Hi all,
    I have the BOM with material Mat1 as a component. The base unit of measure of Mat1 is KG.
    Is it possible to replace Mat1 with Mat 2 material in MRP once the Mat1 warehouse stock is depleted.
    The base unit of measure of Mat 2 is KGK.
    The required quantity of MAT1 should be recalculated from KG to KGK accordanly unit ratio.
    Please, expain, where does it maintain?
    Thanks,
    Peter

    Hello Peter,
    You can use follow-up setting (set Mat2 as follow-up of Mat1 in MRP 4 view of material master if this follow-up scenario is valid for all BOM) with discontinuation indicator '1', w/o effective-out date. In this case Mat1's stock will run out (no PldOrd, PR, etc) will be created, and from the date, when Mat1's stock runs out, MRP will calculate with Mat2.
    As I told you, according to my best knowledge, you cannot realize this with different base unit of measures. (you have to change the buom of one of the related material masters or create a new material master if you cannot cope with buom-change).
    Follow-up group scenario can also be used but I guess different buoms will be a problem in that case as well.
    Maybe there are better solution but I'm not aware of it...
    BR
    Csaba

  • GL Line Items with Material characteristics

    Hello Sap Gurus,
    Is there a datasource for FI that will extract the GL Line Items with Material characteristics?
    We have activated the 0FI_GL_4 and 0FI_GL_6 datasource but there is no Material characteristics field.
    We are using BW 3.5 and R3 4.6.
    Thank you.

    Yes.... General Ledger Accounting FI-GL datasource is based on tables BKPF and BSEG and it dosent provides details at material level.
    Regards

  • BOM Report with Alternative Items

    Hello Experts,
    I am trying to write a query of BOM Report with the first Alternative Item (from OALI)
    Your help please..
    Thank You
    Meitalmo

    Then what is this report using for? Check this to start:
    SELECT T0.Father, CASE WHEN T1.OrigItem IS NULL THEN T0.Code ELSE T1.AltItem END as 'Item No.', Case WHEN T1.OrigItem IS NULL THEN T2.ItemName ELSE T3.ItemName END 'Item Description'
    FROM dbo.ITT1 T0
    LEFT JOIN dbo.OALI T1 ON T1.OrigItem = T0.Code
    LEFT JOIN dbo.OITM T2 ON T2.ItemCode = T0.Code
    LEFT JOIN dbo.OITM T3 ON T3.ItemCode = T1.AltItem
    WHERE T0.Father = '[%0\]'

  • View alternative items on item master screen with CRM license

    Hi,
    Does anyone got this issue? We couldn't view the alternative items on item master screen with CRM Service or CRM Sales license on B1 2007A version. We was able to do that in 2005 version with CRM license?
    Thanks,
    David

    In this case, it must be a new fix to the hole before.  CRM license might have been restricted to more degree.  However, check some marketing documents to see if they can select alternative items.  That is main purpose for the sales person.

  • Sales order BOm with Both Header material and line item delivery

    Hi,
           We have one requirment   we have two products  Products  A  and B, when we are salling only product B we have some amount for that e.g 1000  rupees   but when we are salling product A  along with this product B is free of cost   so as in SO it is not accepting the 0 amount  thats why while making SO for product A  we reduce 1 rupee from product A   and that 1 rupee we are adding for the Free item B   but now every time we have to add both material in SO
      So is there any way  when we make the So for product A  automatically product B should come in So and price of product A is from VK11  but price of B should always be 1 and while creating delivery with VL01 both material we want to delivery and do the PGi  in the same way we required billing doucment for both the material and in case we are salling only product B price  should be from VK11.
      How to customize the system for above requirement.
    regards,
      zafar

    Hi Zafar,
    Free goods determination is not supported in SAP for structured material like BOM.
    For your requirement, you need not have to create a BOM materiall, simple free goods determination is suitable.
    You can create an Exclusive free goods condition record where material A will be the main item and material B will be the sub item (free of charge).
    So create the Condition record for Exclusive free goods in VBN1.
    When you will create the Sales order for material A, system will take the above materials "A" as Main item (Item category TAN) and "B" Sub-item (Item category TANN) respectively.
    When you will create DELIVERY , both the items will be delivered and you can do PGI.
    As and when required you can also sell material B separately.
    Regards
    Pradyumna

  • Partial substitution of alternative item material

    Dear guru.
    I have a  bom  with two alternative item (A and B) with same group.
    I need that mrp create dependent requirement only for A and nothing for B.
    After atp check if B is available and A isnu2019t available I need that the system create requirement for B for the available quantity and create requirement for A for the remained quantity.
    How can I set the alternative item data group of bom for these two component ?
    Thanks.

    Hi,
    I hope that I understood you right;
    The set up of the alternative item group in the BOM should be like this:
    Priority - 1 for A, 2 for B
    Strategy - 1 for both
    Usage Prob. - blank for both
    Alternative item group - same for both
    Now this works like this:
    MRP will always plan A.
    When ATP is checked in production order it looks first for A. If A not available or available quantity not enough, then it looks for B.
    Be aware of system behavior when using this with backflush and overproduction! There is a note on this!
    Regards,
    Mario

  • Cannot delete read mail. Keep getting the following message "926540.emlx" couldn't be copied to "Messages" because an item with the same name already exists.

    I am trying to free up room on my hard drive but keep getting the following message. “926540.emlx” couldn’t be copied to “Messages” because an item with the same name already exists. 926540.emix is the number given to the email I want to delete. This message appears (with a different .emix number) when I try to delete any mail. I have junk mail from 2014 to 2009 that I want to delete

    Back up all data. Rebuild the mailbox. Try again to delete the message.

Maybe you are looking for

  • Count based on the UDA's in ASO cube

    In product dimension I have UDA's like MDW, NEW in all level 0 members. I would like to get the count of all MDW's and put that in an account A and count of all NEW's and put it in account B. Please help this MDX query. I tried this ..but not sure ho

  • How do I solve a self-assigned IP address?

    Hello all, Here is the situation: I am currently on the road with a MacBook Pro running 10.6.8 and an iPhone 4 running iOS 5.0.1. The hotel where I am staying doesn't have WiFi, but does have ethernet cables in all the rooms. My laptop is therefore h

  • Writing FOP output to BLOB

    Hi Experts ! i am using Apache FOP to generate PDF from xml. I am able to generate PDF file from the xml by using fol code :- public void convertXML2PDF(File xmlfile, File xsltfile, File pdffile) throws IOException, TransformerException {      //Outp

  • Error 1335 Installing j2re-1_4_2_03

    Hi, I am attempting to install a downloaded copy of j2re-1_4_2_03-windows-i586-p.exe but after 'copying new files' I get "Error 1335. The cabinet file 'Data1.cab' required for the installation is corrupt and cannot be used..." I can install j2re-1_4_

  • BFD no group info for section

    Hi, I am using Solaris 8 with CC version : CC: Sun C++ 5.8 2005/10/13 When I am trying to build a library I get following messages. The library gets build fine, but I see lots of these messages, can you please help me find the reason for this and fix