Follow-Up material items in MRP4 View

Hi All,
In MRP4 view, in discontinued part, if we set follow-up material, MRP will trigger requests for the follow –up material if the stock of existing material is zero.
Now there is a requirement, so that even though follow-up material is updated, system should be trigger any requirement for the existing one, though the stock is zero, ie, the follow up material is only for an information .
Is it possible ? can we do it with  changing the effectively of date in eff.out (set it as future unlimited)
Thanks for the help.
Regards,
  Vijesh

Pls help.

Similar Messages

  • What will happen if don't set follow-up material in material mas view MRP4

    Client get the information that some materials will not manifacture until one date. After this date, client want this material can't create BOM or PO anymore.
    I gave solution for set delete flag for this material so that when create BOM or PO error happens.
    But client want to use discontinue material in material master view MRP4, so that he can enter the last date when this material is out of use.
    Will discontinue material in material master view MRP4 can meet this requirement? enter discontinuation indicator and date then after this date will not create BOM or PO.

    As per my understanding discontinuation is related only to MRP (how system handles requirements).
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/b1/c044d1439a11d189410000e829fbbd/frameset.htm
    If you want to disallow the creation of BOM / PrdOrd / etc, you have to apply to the suggested material status control or to your own solution (marking the material for deletion), etc.
    n my opinion discontinuation makes sense if the real situation is also discontinuation (you have a real follow-up material). In this case you can use it to manage the requirements properly.
    Edited by: Csaba Szommer on Sep 2, 2010 1:37 PM

  • Alternative item with follow-up material

    Hi,
    I have a finished product X for that component A-1 pc and B-1 pc is required.
    Now A cannot be used in next year thatu2019s why my client wants 1) to issue 2 pcs of A instead of A-1pc and B-1 pc until the stock of A is available. 2) If the stock for A is not available then only it goes for B.
    1) I have used alternative item grp with priority: 1, strategy : 2, usage probability 200% for A and priority: 2, strategy : 1, usage probability 0%  for B
    System issues 2 pc of A only
    2) Also maintained follow up material as B so if there is any shortage for A then system is looking for B.
    Problem is with the above setting the follow up material and alternative item is not working together.  System issues only 1 pc of A if I maintained B as follow up material. If I maintain only alternate item then it issues 2 pc of A but at the same time it will not check B if any shortage occur.
    Pls help.

    Hi,
    [Kindly check this link |http://help.sap.com/saphelp_47x200/helpdata/en/a0/1016bd4c8311d189520000e829fbbd/frameset.htm] which has information of the below.
    Alternative item group
    You can only define discontinuation data for a stock item or variable-size item that is not assigned to an alternative item group.
    Once you have maintained discontinuation data for an item, you can no longer assign the item to an alternative item group.
    reg
    dsk

  • MRP4 view exclude storage location & material provided by vendor/customer..

    Hi
    Could anyone please tell me in MRP4 view for a material,where is the option so that i can exclude or include the storage location stock from MRP?
    and also in which T code i should indicate the material is provided by vendor/material provided by customer?In CS01wher's this option?
    Please help me
    Thanks & regards
    Raj

    Hi Karthik,
    MRP area is nothing to do with storage locations settings in MRP4 view. If you want to activate MRP area and use the MRP run at MRP area level then you have to customized MRP area either at storage location level or sub-contractor level (in MRP master data settings )... then you need to assign this MRP1 view of the material and with valid MRP type.  Now when you run the MRP then planning will be carried out at this MRP area for this part.
    With storage location indicators in MRP4 view (must enter with putting the stoarge location values from MM02/MM03) you can exclude the stock of this storage location (indicator 1) in the palnning run or you can plan seperately with indicator2 with using re-order level. Here no need of MRP area.
    If helps rewards points.
    Regards
    TAJUDDIN

  • MRP4 view in Material Master

    Hi,
    Anyone know how to make the error message '20002953 is already a follow-up material in plant 1000' from error message to just warning? I try to search in SPRO and seem cant to find it a way.
    Hope that any expert out there can give me a solution.
    Thanks.

    hi,
    You can't make the message as warning, untill the material if done wid its full procurement cycle in the plant XXXX(given in your msg.)...
    So, firstly compeated the cycle and then only try to change....
    Regards
    Priyanka.P

  • Full BOM component qty when follow-up material is effected.

    Dear Experts,
             How to ensure discontinuation / follow-up is implemented on FULL BOM's
             component qty, and not partial.
              Example : A requires 3B, and B is follow-up with C upon discontinuation.
                             Planned order of A should only contain 3B or 3C, not mixture eg. 1B
                             and 2C etc.
              How can the control be implemented ?

    Dear Pradeep, Rajesha & all,
          Assume BOM of "A" indicates component B qty 10 is follow-up with component C qty 10.
          Material B (say, balance 1 qty) is received into Store Y (MRP Relevant). Thus to exclude material B from MRP, we have to manually transfer stock to store X (Not MRP Relevant).
          This would mean, we have to perform manual tracking such that this store transfer is done, to force SAP to direct to material C, so that we either accept 10B or 10C in planned order and nothing else.
         Not forgetting, I could have another follow-up in another bom such that 1B = 1C. Thus, the material 1B I transfered to store X (Not MRP relevant) can actually be use in this case.
    <b>    Thus, from BOM explosion, is there a way to control discontontinuation to follow-up, based on full component qty specified in BOM ?</b>
    <u><b>My Setting as follows :</b></u>
    <b>(1)</b> Material Master of "B" : MRP4 specify (a) Discontinuation Indicator "1", (b) effective-out date, (c) Follow-up material "C"
    <b>(2)</b> In Bom of "A" (parent of "B") :
    - Item "B", indicate discontinuation group "A1"
    - Create item "C" and indicate follow-up group "A1" and qty to be follow-up upon B discontinuation.
    Thank you for your guidance !

  • Cost-Roll take follow-up material upon discontinuation effective-out date ?

    Dear Expert,
    If we use discontinuation/follow-up material, during Cost-Roll (CK11N), SAP will take default cost from discontinued material even if follow-up material is effective. 
    <b>How to make SAP take cost of follow-up material after/on effective-out date ?</b>
    <b>Example :</b>
    Parent "A" contains component "B" qty 3, to be follow-up with component "C" upon discontinuation of "B" on effective-out dated 1st Nov'07, and like-wise to take std cost of "B' before 1st Nov'07 cost-roll.
    Thus, when I roll cost in December, I hope SAP would calculate for std cost of A to include std cost of "C" (for cost-roll after 1st Nov'07).
    <b>Setting :</b>
    <u>Material Master of "B" MRP4 view :</u>
    - Discontinuation Indicator = 1
    - Effective-out date = 1st Nov'07
    - Follow-up Material = "C"
    <u>BOM of Parent "A" :</u>
    - Component "B" indicate discontinuation group "A1"
    - Add component "C" and indicate follow-up group "A1".
    <b>Thanks for your guidance !</b>

    Hello,
    We are having the same issue: is a BOM for costing the only way to handle this ? Controlling dept. here fear they wouldn't be maintained as accurately as the production ones (and they are right). We were also thinking to set the phased out materials (B in your example) as cost irrelevant when you add to new material in the BOM...and start costing the father (A in your example) directly with the new component. I would appreciate a lot to hear other examples of dealing with this issue if anybody has.
    Thanks a lot,
    Olivier

  • Production Order with follow-up material unble to save due to error CKBK009

    Dear Expert,
    When we apply discontintion/follow-up material setting, production order is not able to save. <b>Error message "CKBK009 - No price could be determine for material....."</b>.
    <b><u>SAP Help indicates :</u></b>
    "No price could be determined for material .......... Message no. CKBK009
    <b>Diagnosis :</b>
    The system could not determine a price for valuation view 0, because no valuation 
    strategy succeeded from valuation variant 006.
    <b>System Response :</b>
    Since the input quantity is zero for this material item, the costing result is not   
    affected by this error at the pricing stage.
    The standard system defines this message as an error message. However, you
    can use user-defined error management to specify that the message is a warning
    or an information message, or that it is not issed at all.
    <b>However, in Controlling's User-Defined Error Management, CKBK009 is already  warning only.
    What other setting is needed ?</b>
    Thanks for helping !

    Dear all,
            Manage to solve the problem via Note 1008643, per following.
           <b> THANK YOU for all your guidance & Have a nice day !</b>
    <u><b>NOTE 1008643 :</b></u>Symptom
    In a production order error message CKBK-009 is raised during cost calculation.
    This message cannot be modified into a warning or information message.
    Other terms
    CKBK009, CO01, CO02, CO03
    Reason and Prerequisites
    System design
    Solution
    Please make a new entry in TA OPR8 with the following characteristics:
    ErrorManagID    ApplicationArea   MsgNo  MinMsgType    MaxMsgType
    PPCO            CKBK              009
    Then run TA OPR4_PPCO to modify the message type for CKBK009.

  • Follow up material - old material's stock goes down and up

    Hello,
    I have a question related to Follow up material. Lets assume that material A is to be replaced by material B, this is specified in the MRP4 view. In the field Eff.-Out an estimate of when the last unit of material A will be received is given in.
    If material A's stock drops down to 0 then material B should kick in, but what happends if afterwards material A's stock goes up again and then both material A and B are in stock. Will SAP notice material A's stock level and use it?
    Please advice! Thanks!
    mr

    I have a question related to Follow up material. Lets assume that material A is to be replaced by material B, this is specified in the MRP4 view. In the field Eff.-Out an estimate of when the last unit of material A will be received is given in.
    If material A's stock drops down to 0 then material B should kick in, but what happends if afterwards material A's stock goes up again and then both material A and B are in stock. Will SAP notice material A's stock level and use it? \
    If you don't know the "Effective-Out Date" (MARC-AUSDT) [because your stock situation is always changing), don't define it in material master. System will try to ramp down the stock of old material first and use the new one after that.
    However, you should take measures to prevent increasing the stock from the old material. In the system you can block it for purchasing as it was told you already.
    Regards,
    Csaba

  • Import multiple info records for 1 material item in repository

    Hi Guys,
    I have got sort of a puzzle I can not solve at the moment, maybe some one can help me to solve it. The situation in our system landscape is as follows:
    Systems:
    SRM 5.0 (Classic implementation scenario)
    ECC 6.0
    SRM-MDM 2.0
    PI 2005
    Material master is maintained in R/3 and the materials are replicated to SRM. From SRM we replicate all materials to the catalog repository in SRM-MDM.
    As the material master in R/3 is vendor independent, the materials replicated to SRM also have no vendor attached. For the first initial material replication from SRM to the catalog SRM-MDM this also means that the products in the main table of the repository, u2018catalog positionsu2019, will not have a vendor or vendor number attached (i.e. no reference to a source of supply).
    To assign a source of supply in the repository to a product (record) we will use info records which are replicated from R/3 to SRM-MDM. The mapping for this in the Import Manager can only be based on the product number. As this is the only unique value available which can map a info record to a already existing (but vendor less) ptoduct item in the catalog.
    As long as every item in the repository has only one unique info record, meaning one source of supply with a specific price, there is no issue in the above scenario. Based on the product-id, the info record data will be matched with the material item in the catalog.
    The issue for me arises when multiple info records exists for the same material. The info records can heave different vendors and different prices. All possible vendors should be available in the catalog for the same material (at least this is the requirement ).
    At this point the product-id will no longer be an unique value. Importing the info records will cause problems, as only one material record is available in the repository for the specific product-id (remember that when doing a initial replication of the material master to the catalog, no vendor data is replicated).
    Does anyone had this issue before, and knows a solution? Is it for example possible during the import of the info records in the Import manager, to duplicate material records in the destination data, based on the number of info records available in the source data for the same product-id. Or is there an other solution that I am missing?
    Your help would be appreciated!
    Regards,
    Skander

    Hi Shai & Ravi,
    Thanks for your answers. The MDM version which we are using is 5.5 - currently on SP6
    @ Shai: you are right; the standard SRM-MDM 2.0 catalog repository has a qualified lookup table u2018priceu2019, in which itu2019s possible to store the info record data. The standard fields in this sub-table are: Purchase Org, Amount, Currency Lower B, PIR-ID, price based quantity and Price based quantity UoM.
    I added some extra fields (non qualified), to accompany the remaining info record data (product no. u2013 vendor id  u2013 product category)  which is exported/imported, via the standard extraction program in R/3: Tcode MECCM
    I tried the solution Ravi proposed. This scenario works fine when, for example you want to maintain multiple info records for one specific material record in the main table (all info records related to the same source of supply, i.e. vendor). But as I described, the info records we import for one product can have different vendors. 
    The source of supply (vendor) in the shopping cart of SRM is determined via the u2018supplieru2019 field in the main repository table (which is in itself a flat lookup table ). What happens now is that all related info records are added to the u2018price informationu2019 field of the specific product record in the main table. Thus info records which have different suppliers are attached to a record in the main table which will have one specific supplier in the u2018supplieru2019 field. So from my point of view this will not work.
    I am still stuck with the situation that the material master import will only import one record for every distinct product, which can have multiple info records. The info records can/will have different vendors. As the supplier field in the main table determines the source of supply in the shopping cartu2026. Iu2019am seeking for a solution which will duplicate the material records in the main table, based on the amount of imported info records for that specific material record, that have distinct vendors.
    Shai, if you have some useful info on how you accomplished this requirement on a previous version of SRM-MDM, it would be greatly appreciated if you can share it..
    Thx.
    Skander

  • Ici in mrp4 view

    My understanding is that by setting 2 in ICI of mrp4 view, it will combine the all pru2019s or planned orders of that particular material and generates single procurement proposal. My doubt is that if the date of procurement is different, then what system will do? I mean if procurement date of one sales order requirement is 20.01.10 and other is 25.01.10, then how system behaves? Will it generate two pru2019s or single pru2019s? what is the reference for system to decide so? Please advice.

    Hi,
    This will be controlled through your lot sizing procedure. If there are two sales orders which have a common component as A and you have two different delivery dates for them then when you run the MRP system will be have as follows,
    1) create 2 PR's/PO of the delivery date for both of them are different and you use EX in Lot sizing
    2) If you use daily/weekly/monthly lot sizing then system will generate the cumulative requirement based on the delivery dates.
    Regards,
    Zoheb Hasan

  • Average plant stock in MRP4 view

    Hi all
    We are using long term planning and want to change Average plant stock in MRP4 view.
    Also we are implementation MDG. Now we cannot use MM02 and we have to follow change process to change anything in material master.
    Is there is âny way to change  calculated average plant stock  shown  in MRP4 view. ? 

    Hi.
    I can use MS29 to calculate the average stock. The average stock could be used ad initial  stock on LTP scenario.
    Than you can update it by material, if requested, directly from MM02.
    Regards.

  • Why can't i add playlists to my iPhone from my mac while they are connected? I keep getting the following message "some items (meaning all of them) were not transferred because iTunes match is enabled." This is incredibly frustrating.

    I keep getting the following message "some items (meaning all of them) were not transferred because iTunes match is enabled." when I try to drag and drop a playlist, song, or album to my iPhone. This was NEVER a problem before iTunes match or the last iOS update. So what is the deal? Why can't i just add music to my phone from the mac? There is space on the phone. The only way I have found to get the music i want to the phone is to have it download from the phone. This is not something i want to have to do: go through and manually add every album and recreate a playlist on the phone when its there on the mac. And, even more irritating, since the new update, when the phone is plugged into the mac i can't actually view from the mac what music is on the phone. This is incredibly frustrating and any help would be much appreciated in managing my music libraries for each device.

    Hi,
    You cannot manually manage music with match turned on on your iOS device. If you want to manage music manually, you will need to turn off match on your iPhone.
    Jim

  • Material Item Hierarchies in SRM 7.0

    Dear Experts,
    we are on PPS 3.0, SRM 7.0, Extended Classic scenario and using the MM-SUS scenario for sending POs from SRM to SUS via ECC and PI.
    The issue we are facing is the message mapping errors in PI, when  the PO from SRM contains a material item hierarchy with  free text subline items that do not have quantity, price or delivery date defined.
    A free text item does not have any information defined, but XI expects the fields like quantity, Price, delivery date etc and hence the error.
    The process flow is an item hierachy PO is created in SRM, replicated to ECC successfully and a Idoc is sent successfully to PI. The failure occurs in PI on its way to SUS.
    Did any one face this issue with free text subline items in Item hierarchies and what is the resolution.
    Thanks in advance,
    Scott

    HI
    This speaks about the status of the Cart. This means that the Status of the Cart is AWAITING APPROVAL...I dont know which document you have gone through but procedure for adding a Custom Field in SRM 7.0 is:
    1. Create a Custom field in the Database in SRM. Preferrably add the field in an include and extend thta include to the table in SE11.
    2. Go to Portal Login of SRM and right click the part of the screen where you want to add the custom field. Click on More Field Help. The popup will give you the name of WebDynpro Applicaiton which controls that area.
    3. Login to SRM via GUI and display the webdynpro application using SE80. Enhance the Webdynpro application.
    4. Add the custom field to the Context of the WebDynpro Application View. You will be selecting the field from the database table while adding the custom field to the context
    5. Add the field at the specified place in Layout Tab of the WebDynpro View,
    6. Create a binding between the Layout Field and the Context
    7. Activate the changes.... you will see the field in Portal login of SRM....
    For more details , refer to the Webdynpro help of the application...
    Regards
    Virender Singh

  • Multi level follow up material in BOM

    Dear All,
    Our client have a requirement for multi lvel follow up material in BOM.
    for example
    BOM for Finish Good made of A.
    if material A is depleted then used material B
    if material B is depleted then used material C
    if A and B have stock used A(higher priority)
    I tried to used follow up material in MRP4 and BOM but it can not be used for multi level like this case.
    Is there any solution for this?
    Best regards,
    Fred

    Hi anyway I tested the BOM master data like this
    F/G 1 Master Box
    |--- A 10 PCS  Alt Group Z1  Priority 1 Usage 100% Strategy 2 (100% Check)
    |--- B 10 PCS  Alt Group Z1  Priority 2 Usage 100% Strategy 2 (100% Check)
    |--- C 10 PCS  Alt Group Z1  Priority 3 Usage 100% Strategy 2 (100% Check)
    Stock A is depleted
    Stock B enough
    stock C enough
    Expected result F/G only used B 10 PCS
    Actual result is
    F/G 1 Master Box
    |-- A 10 PCS
    |-- B 10 PCS
    |-- C 10 PCS
    Do ou have ides how should the percentage in BOm is maintain?
    Best regards,
    Fred

Maybe you are looking for

  • Error 1334 message when re-installing app from swtools directory... filename missing from data1.cab

    Any ideas on how to correct this?  Have exactly the same app on two computers and the second works just as it should.  WIN7 Pro x64 M81 

  • Problem with Mail Merge to PDF

    Hi there I'm having problems with the mail merge to PDF feature of Acrobat XI, in that the process fails part way through and displays the error message 'Acrobat PDFMaker was not able to mail merge the document': This process used to work, and still

  • Song won't play

    Downloaded a song, won't play, says authorize computer. Then says computer is already authorized

  • After Effects CS6 Launches to Render Cue after 11.04.2 Update Yosemite

    After Effects CS6 Launches to Render Cue on OS X Yosemite after 11.04.2 update prior to this update it wouldn't even launch. Everything is grayed out as well. I am running a fully licensed version. MBP 15 Retina OS X Yosemite 2.5 GHz Intel Core i7 NV

  • Can't watch movies online

    Hi so I just recently bought a 13" Macbook Air. So of course I wanted to go to youtube to see some reviews or tips on my Macbook but youtube videos won't play. All I see is a black screen, no pause button, it's not buffering. I saw a post saying to t