I want to give the authorization for extending the the existing materials to a particular plant. I dont want that this person should change any thing while extending the same.
How can i do that
Atul

if you extend something, then you do not get the screens that are already maintained, hence one can just enter new values when doing MM01.
If the same user has MM02 change rights, then he can go into this material and can change anything for what he has authority.
If you dont want that a user who is extending e.g. accounting views shall have the possibility to change the basic data view, then you must not give him autorization for this view . for this you have authorization object M_MATE_STA

Similar Messages

  • LSMW for extending materials to new set of plants

    Hello All,
    Our requirement is to extend some hundreds of materials to a set of few plants. Can this be done in LSMW? Or should BDC be used??
    Please elaborate on this.
    Regards
    Mahesh

    Hi Girish,
    How can I extend materials to a new plant and Sales Org.  through LSMW?
    I use the Standard Batch Object 0020, program RMDATIND for creating new Materials the first time (this qworks fine), but there is no option 'Extend to existing material'  or there is no field called Reference Material...
    Maybe it is because we use internal numbering of the new Materials that makes it unpossible to extend materials to existing material-numbers?
    Thank you, regards, Walter.

  • SCAT t-code catt for extending materials - import file?

    want to extend materials to a new plant but not with the MASS transaction.
    apparently SCAT can do this more efficiently.  i'm not sure how the import file should be formatted.  i.e. want to make thousands of finished goods that will have ~ 7 default screens from MM01.
    please send detailed documents to me if you can
    [email protected]
    thanks

    Hi,
    I have send u a soft copy of how to use SCAT..
    Reward Points,
    Thanks,
    KSR.

  • Extend material master in other plants

    Hi there,
    I have 5 plants, one of them (e.g. Plant P001) is the main distributor for supplying all the materials for the rest. I´m using valuation at plant level.
    When I create a new material, I do it initially in the main plant and I have to extend it to the rest of the plants.
    My doubt is, there is a way to extend the material to other plants automatically including the sales views?
    I would like to minimize the possibilities of errors for manual entry, for example, enter the average cost of the material, which have to be the same for all plants.
    Thanks in advance,
    Mairo.

    Hi
    Please find below web links for information and procedure for Legacy system migration workbench
    link:[http://www.sap-img.com/sap-data-migration.htm]
    link:[http://www.sap-basis-abap.com/sapgeneral/step-by-step-legacy-system-migration-workbench-lsmw.htm]
    link:[http://www.sapdb.info/wp-content/uploads/2008/08/lsmw.pdf]
    Hope this help
    Regards
    Vikrant

  • Restrict change authorization for MM17 (Material master mass maintenance)

    Hi,
    Apologies if I have posted this in the wrong forum. I want to know if it is possible to use the mass maintenance transaction MM17 (indus. material) to display data only istead of change/create. Is there some setting at the basis object level which can enable this? There are currently a lot of custom abap reports and queries in our system for viewing material master data, these can all be replaced by MM17. Basically we want to use MM17 as a reporting tool to display data only. Is a solution possible? Help is appreciated, thanks.
    Regards

    Have you tried the MM Information System node in the SAP Easy Access menu? There are a bunch of standard reports with navigation options there, for the user who has the correct authorization to display only.
    Alternately, you may want to take a look into transaction MASS and use the B_MASSMAIN object, depending on your requirements - but test it well.
    Cheers,
    Julius

  • Help on LSMW for extending materials to storage location

    Hi Friends,
    Please guide me with steps in LSMW to extend material master data to different storage location with same plant using tcode MMSC.
    Thanks in advance
    Smitha

    You should not do LSMW on MMSC, this does not make much sense.
    Use standard given mateial master import procedures, like BAPI, which is the easiest procedure to create just one view.
    By the way, you can do it easily with MM17, except you have to maintain individual values líke bin description.

  • Fast entry for extending customer master to other sales area??

    Hi,
    I have list of customer master, now the requirement is to extend 60-70% of the customers to a different sales area, Is there any tcode, like fast entry for extending the customer master to the new sales area??
    Thanks
    Ghanesh
    Edited by: Ghanesh Visu on Feb 24, 2010 10:55 AM

    Hi Ghanesh,
    Below are a few helpful links on how to use MASS.
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/408104b5-8ad2-2c10-8383-9b07a2727c4e
    http://www.sap-img.com/sap-sd/sales-order-mass-change.htm
    http://sap-helper.blogspot.com/2009/03/mass-maintenance-processing-tcode-mass.html
    If you are using this tool for the first time, i would not suggest directly using it on Production.  Use it few times on Test client for making yourself familiar with this tool. It is a very powerful tool and changes made from this cannot be undone.
    You can also use LSMW to run mass data.  Few links for LSMW are as below:
    LSMW
    Thanks
    Kapil Sharma

  • T.code for extend material master to  plant

    Hi
    Is there any t.code  (other than mm01) to  extend the material master to plants?
    regards
    sesidhar

    Hi
    RAj
    THANK U so much fro ur information ,,and i want extend to storagelocation...i think it is not possible in MM50 T.code
    in mm50 stor.loc option is not there
    regards
    sesidhar

  • Authorization for Investment Management program positions by Plant Code

    Hello!
    I am looking for a way to restrict data on Investment Management reports (program positions) by plant code. I found the following auth objects, but none for plant code:
    Company code (A_IMPR_BUK)
    Business area (A_IMPR_GSB)
    Controlling area (A_IMPR_KOK)
    Profit center (A_IMPR_PRC)
    Persons responsible (A_IMPR_VER)
    Any advise?
    Cheers,
    Alex

    Refer BPGE, BPJA.
    Regards

  • WM Material Master Data - extend materials inquiry

    I have a question regarding WM Material Master Data - extend materials
    what is the best practice for extending materials to Warehouse Management views 1 and 2. We have 1 new warehouse with fixed bins 001 Pallet, 002 Racking, 003 Floor, 004 Bins, 005 Chemicals, 099 Quarantine.  My question is should we extend 3000 materials to each of the designated fixed bins to the Plant/Warehouse Number/Storage Type for WM views 1 & 2?
    Thanks,

    Hi
    As suggested by Raj you can use Mass maintenance option MM17 to update the WM1 and WM2 view
    or
    You can use the LSMW option to upload from external  file (e.g. xls, CSV files)
    Regards
    Manish Kumar

  • Authorization for Delivering Plant in Sales Order

    Dear All:
    We need to set up authorization for a user based on 'delivering plant' in Sales Order registration (VA01).  It appears there is no standard available for this.
    Can you kindly help by giving hints to achieve this?
    Regards,
    K. Dwarakanath

    Hi,
    1. You can create a custom authorization object (via SU21 or equivalent); add field 'ACTVT' with permissible values '01', '02', '03'.
    2. In form USEREXIT_CHECK_VBAP of include MV45AFZB, you can call the function module AUTHORITY_CHECK, to check the authorization and throw an error.
    This user exit is triggered everytime a user makes any change to item level, i.e. applicable for change of plant too. The call for authority check can be based on whether plant is changed or not. I guess *VBAP and VBAP can be compared to check whether plant is changed. If *VBAP-WERKS is not equal to VBAP-WERKS, then call authority check FM by passing username, custom object name, FIELD1 = 'ACTVT', VALUE1 = 01 or 02. If exception returned by FM is USER_NOT_AUTHORIZED, you can throw an error message.
    Cheers,
    KC

  • How to restrict authorization for MMBE

    Hi,
    I need to restrict the authorization for t-code MMBE according to plant wise. Can anybody tell me about the procedure and authorization object used.
    Regards

    M_MATE_WRK Material Master: Plants is the object that is used to control teh display of data at plant level in tcode MMBE

  • HR authorization for Display the documents  in SAP DMS

    HI experts,
    We want to control display authorization depending on the entry made in object link tab in DMS( DOcument Management System). We developed screen for HR master object link. When user executes cv03n and enters document No. system should check hr master number entered in object link. If the user has authorization for that hr master number in PA (personnel administration), then he should be allowed to display the document. Otherwise it should restrict him to display the DIR.
    Now my query is how to achieve it. Can anybody provide me some solutions
    I have one solution, whenever user enter document number in cv03n screen, system will first check hr master number entered in object link and it will check the Personnel Area, Employee group and employee subgroup aginst this hr master number. Say for ex: PA:1000, EG:1 and ESG:01 for HR number xyz.
    Now system should check in roles assigned agaist user id for these PA, EG and ESG values. If user has got authorization for PA:1000, EG:1 and ESG:01 in HR roles,then he should allowed to display the document.
    Now my query is how feasible this approach? is this tough task for abaper? or is there any easier approach than this.
    regards
    sham

    Hi,
    Try to use the User Exit: CNEX0002.
    Check with your ABAP er for the enhancement.
    Hope it helps..
    Thanks!!!

  • Authorizations for users to change their own data

    Hi
    All the employees are given the userids to logon to sap when these employees log on to sap with the particular userids they should be able to change /Display only the details pertaining to them not others
    We have not implemented ESS but this is in pipeline but only after 3 -4 months But Authorizations are required for users now only
    How to design role which should apply to all user requirements and they should get their Personnel no by default
    Kind Regards
    Vinod

    Hi,
       For your requirement goto transaction SU21 and select the object P_PERNR and click DOCUMENTATION. Refer the Documentation for the steps to be followed.
    (i.e)  For a user to be able to maitain his or her own data. You should assign the user an authorization for the HR: Master data - Personnel number check object (P_PERNR), with the following specificatons:                   
    1. Authorization level:  *               
    2. Interpretation of assignment
       User - personnel no:  I  
    3. Infotype           :  0002
    4. Subtype            :  *
    A related link http://www.sapfans.com/forums/viewtopic.php?p=502235&sid=cd1bde22eb24059e4d5a2eae086b7c96

  • Extending customer master

    There are 2 distribution channels
    50 is for Equipment
    60 for Spares
    10 division...Like ASpares, Bspares,Cspares, AEquipment, BEquipment, CEquipments.
    I need to extend the customer master to so that i can maintain the payment terms
    Sales Org.      1000   DOM DISTRIBUTION
    Distr. Channel  50       EQUIPMENT - DISTBN
    Division        05      ASpares Sales
    But for me system should not allow this if it is equipment distribution channel then it should allow me to extend the customr only for Equipment division....
    If it is for Spares Distr channel then it should allow me for extending customer master with Spares division...

    Hi Pranav_23 
    Assign the common distribution channel & common divisions
    IMG-Sales & Distribution-Master Data-Define Distribution channels& common divisions & save it
    Let me know if your problem is solved
    Regards
    Pradeep

Maybe you are looking for

  • Add ability to use raw data in the Histogram and clipping indicators

    I have posted this as an ACR and Lightroom Feature Request at the Photoshop Family site. http://feedback.photoshop.com/photoshop_family/topics/raw_data_histogram_display_lightroom _and_adobe_camera_raw?rfm=1 It was suggested I also post it here to fo

  • Payement terms Baseline date

    Hi All, I had a billing document created on 01.04.09 and I am releasing the same to accounts on 05.04.09. Now my billing date will be 01.04.09 and payment terms C010 will start the calculation of the given 10 days from 01.04.09. But I need the start

  • How to group rows based on a formula value

    Hi experts, I have a query that returns a a char row (country) and a couple of columns, "Duration of Process in days" and "Counter of nº process done", each a calculated formula KF . What I would like is to group the results based on formula KF1 resu

  • System Failure

    When I started up my G5 imac yesterday, it instructed me to do a restart - nothing else on the screen.  My only option was to use the power button to shut it down.  When I attempted to start up again, I received a dozen lines of "info" which I unders

  • In inspection lot..task list does not fetch

    Hi QM Guru.. when i do UD for fish material. with QA32....in QA32 showing inspection lot no..but when i select line item of inspection lot and click on inspection lot..one window open..when i go inspection specification for task list..when i  click o