Automatic production order creation and confirmation
Dear all,
I am in a situation where i have to configure the SAP system in the following ways:
1. From the planned orders automatically production order should be created today for the next day production and the end user will re-declare the quantity if there are any changes in the production order.
2. If there are no re declarations to be done SAP should automatically release production order and save it.
3. After the goods are produced the confirmation of the order should happen automatically from the measuring points.
4. In the order confirmation, the storage location for goods issue should be automatically captured from the goods issue slip.
5.After the confirmation of the order the goods receipt should happen automatically.
Please suggest me whether these are possible in SAP or not. If yes please tell me the procedure.
HI,
I hope this will give you the clear picture
actually my scenario is:
Finished good= x
work centers involved = WC1, WC2.
HERE BOTH THE WORK CENTERS ARE IDENTICAL, INPUTS ARE SAME AND OUTPUT IS THE FINISHED GOOD "X" FOR BOTH THE WORK CENTERS.
I HAVE A ROUTING FOR THE FINISHED GOOD "X" WITH TWO GROUP COUNTERS AS (1)WC1 AND (2) WC2
When i create plan in md61 for 1 month and when i do mrp run in md02 it will create the planned orders and we can see the stock requirements in md04 and when we double click on the planned order we can convert them into production orders.
But my users requirement is, he want to run the mrp in md01 and after that automatically each day the production order should be created.
example with the above work centers and materials:-
i have done the mrp run for "x" for November and December months
i want to produce "x" of 200 kg on 30.11.2011.
so SAP should generate production order for WC1 AS 100KG AND WC2 AS 100KG on 29.11.2011 at 5 pm automatically and the user will release the order.
similar example:-
i have done the mrp run for "x" for November and December months
i want to produce "x" of 400 kg on 03.12.2011.
so SAP should generate production order FOR WC1 AS 200KG AND WC2 AS 200KG on 02.12.2011 at 5 pm automatically and the user will release the order.
Please suggest me how to do the configure settings for my users requirement.
Thanks,
Aravind.C
Similar Messages
-
Run time error while running BDC for production order creation and confirmation:
Dear Gurus,
We have a situation, where the users are trying to do the entries creation of order or confirmation (through manual and BDC). But, if there is any kind of a deficit quantities in consumption or GR quantity, then it is going to run time error and Dumps are coming in program SAPLCORB
and the transaction code is coming for CO11N.
How to avoid this error to run the production system in smoothing way...Any flash lights on this will be great full
Regards,
Madhu.GHi Madhu,
Expert Caetano has rightly point out. Refer Note 1840705 - RAISE_EXCEPTION short dump if running CO11N in background
Cause
The short dump is triggered because SAP transaction CO11N contains new GUI elements that cannot always be dealt with in a background process,
such as the confirmation texts.
Resolution
SAP recommends that the standard production order BAPIs, such as BAPI_PRODORDCONF_CREATE_TT, should be used to post a confirmation in background.
If this is not feasible, the following workaround may be uses:
Define a confirmation profile in transaction OPK0;
In the detail areas, remove the area "Confirmation text";
Set this profile as standard, so that it is chosen automatically by the system when a batch-job
is started;
Assign this confirmation profile to the batch user with transaction SU3 using parameter CORUPROF.
Also see Note 429432 - CO11N: Batch input in background dumps if long text is maintained
Refer to note 1154692 - Endless loop during confirmation in background if you doing Auto GR during confirmations
Thanks & Regards,
Ramagiri -
IDoc Configuration for Production Order Creation and Change
Hi All,
Please Help me out for IDoc Configuration for Production Order Creation and Change
I have found the IDoc for Production Order
Messgae Type : LOIPRO and IDoc type : LOIPRO01
Actually my requirment is to send the (LOIPRO01 )IDoc from SAP R/3 to XI system ,when ever the Production Order Created and Changed,
I have done following Configurations:
1. RFC Destination created for XI system
2. PORT was created for XI
3. Partner profile created WE20 and LOIPRO01 IDoc is added in OutBound Perameter.
I need to know how to do the followning.
1. How do i configure the outbound Production order idocs when Production Order is created or changed.
2. in NACE (Output control) which is the Application for Production Order.
3. How can I set IDoc as output Type for Production Order Creation.
Thanks in advance
Dhanabal THi Michal,
I know that it is the old thread but still want to get clarified from you out of curiosity.
Unlike other IDOC, i actiavated change pointers for LOIPRO
1.message and idoc type is linked
2.function module , message type , idoc type is linked
function module used is CLOI_MASTERIDOC_CREATE_LOIPRO
3.BD64, distribution model is created and distributed
4. port and partner profile is in place.
5. IDOC is not getting generated after creating the process order.
do we need to activate the change documents for the message type in BD52,
if yes can you please provide the object types for the same.
or i am missing something else. please guide me in this regards.
Thanks in advance for your time.
S.Janagar -
APO: RRP3 automate Production order creation from planned order ?
Hi everyone ,
I have got a business requirement in APO where in Open sale orders uploaded in R/3, needs to be converted to Planned order and subsequently to Production order in APO-PPDS tcode RRP3 at all stages. They want to automate this process rather than doing it
manually.
Can anyone tell how is this possible . Any BAPI or function module available to do this . Please help.
Regards,
SyedHi,
1.You need to run the heuristics Planning of standard lots SAP_PP_002 in /SAPAPO/CDPSB0 by specifying the time profile
and strategy profile, planning version and propagation range, product and location.
2. Convert PPDS Planned Orders created to process orders thru /SAPAPO/RRP7 by specifying the product location start date of the order for production order creation.
Out put of step 1- For sales order requirement, PPDS Planned orders gets created.
Out put of step 2- PPDS Planned orders are converted to production orders.
Thanks,
nandha -
Automatic production order creation for remaining sales order quantity
Hi All,
My requirement is to create automatic production order for a particular material when the available quantity ( Stock in MD04) is less than the sales order / Delivery quantity.Automatic production order should only be created for deficit quantity.
For example if i have stock of material A 100. I have recieved a sales order for 120 pieces. Now automatic production order should be created for 20 pieces only.
Any inputs/ suggestions, please let me know.
Thanks in advance !!
regards
Pawan.Hi Pawan
In Material Master MM01 / MM02, you need to maintain 20 in MRP3 --> Planning --> Strategy Group.
If you maintain this, items can be produced only against sale order you are creating.
Dont forget to reward if this helps you.
Regards
G. Lakshmipathi -
Automatic Service Order creation and OBD line item creation - Repair Order
Hi ALL,
I tried to run the Repair process based on the help document of SAP:
Configs Followed:
1) In Material master MRP3 view, strategy group is assigned as 84 (service orders). By default this str.grp is linked with Requirement type SERA and Requirement class 203.
2 ) Requirement class is assigned with appropriate Service order type.
SPRO>Sales and Distribution>Basic Functions>Availability Check and Transfer of Requirements>Transfer of Requirements-->Define Requirements Classes (OVZG)
Actual Assignment:
Reqt. Class Service Order Type
039 SM01
203 SM01
3) Task list is assigned to your Service material - Service product - OISD
Actual Assignment:
Service Pdt Work Centre Plant B Area Gen TL Group Counter Task List Type
R-1001 PC-SERV 1200 8000 62 1 A
4) Check the Requirement class setting indicator for configuration (cnfg)
Actual Assignment:
= mandatory
5) SPRO>Sales and Distribution>Basic Functions>Availability Check and Transfer of Requirements>Transfer of Requirements-->Define Requirements Classes --> Determination Of Requirement Types Using Transaction
Actual Assignment:
Item Category Reqt class Reqt. Type
IRRS 039 SE
IRRE 203 SERP
IRRP 203 SERP
IRAL 040 KE
6) Sales and Distribution>Sales>Sales Document Item-->Assign Item Categories for determining the item category based on usage
Actual Assignment:
Sal. Doc. Type Item Cat. Group Item Usage H. L . Item Cat Item Category
RAS NORM IRRS
RAS NORM R101 IRRS IRRE
RAS NORM R102 IRRS IRRP
RAS NORM R103 IRRS IRAL
Errors Faced:
1. Service Order is not getting created automatically.
Error in SAP - IDES :"A service order has not been found for action 'Repairs'"
2. Also im not getting the automatic creation of the 4th line item(Item Category - IRAL) in the repair order, which in turn stops me from creating the Outbound delivery.
Please HELP !
RegardsHi PeteA,
Sorry, here it is...
Let me explain the process that has been followed:
1) Initially to start with Service Notification was created with IW51 T-code.
In that, Sold to party and material # were entered. Then from there directly i go for Create Repair Order from the Action Box.
Order type for repair order - RAS, and when i save both Service Notification and the Repair gets saved.
Now, in the repair order, two line items were getting created automatically and the requirement Types for those line items are:
Line Item I : SE
Line Item II: SERP
2) After that i take the material in with the help of t-code VRRE.
3) Then, i do the acceptance of the stock ( Technical Check) with t-code QA11.
Once i do that, i get the Third line item in the Repair Order and the requirement Type for that line item is:
Line Item III: SERP
Now my query is, Once i do the QA11 transaction i need to get a Service Order automatically but thats not happening.
Also if i create a Service Order manually, and do the repair and do the technically completion of the service order, then i need to get a third line item (IRAL) in the repair order automatically and thats also not happening.
Regards -
Production order creation , release and confirmation cycle
Hi All SAP Gurus,
I am trying to set Production order creation , release and confirmation cycle integrated to xMII.
I am sure there must be many among you who worked on this before.
So can you please share your experience.
Thanks in advance
Regards
RiteshHi Ritesh,
I'll give you what I have been using:
- Transferring orders to MII
You can trigger the orders by tcode POIT or an equivalent BAPI (BAPI CLOI_DOWNLOAD_TRIGGER_TRANS) or have the iDOC being sent automatically whenever someone creates a new production order in R/3 (using change pointers). In both cases you will receive an iDOC in XML format from SAP with the production order information on it. After receiving this file a BLS transaction will be required to read the XML file and store it in your local DB.
- Releasing orders from MII
You can release the orders from MII using the BAPI BAPI_PRODORD_RELEASE (it will update the order status in R/3 to REL). After that you might want to update the production order status in MII local DB as well. Usually I have the bapi BAPI_PRODORD_GET_DETAIL in place in order to read the production order details whenver I need.
- Doing confirmations from MII
After the PO was released, you can do confirmations against each operation using the BAPI BAPI_PRODORDCONF_CREATE_TT. You can send up to SAP good quantity, scrap quantity, labor/machine time, etc. It's a pretty intuitive BAPI.
If your system is not ready to do goods movement automatically you will need to use BAPI_GOODSMVT_CREATE.
This is basically what I use in this kind of project. If you have any questions please let me know.
Regards
Ricardo -
Stop Automatic creation and confirmation of Transafer Order for a doc type
Hello All,
There is a requirement that I need to stop Automatic creation and confirmation of Transafer Order for a particular document type.
The issue is that sometimes the cycle goes upto creation of Invoice automatically but sometimes this does not happen. More over the user wants that the transafer order needs to be confirmed manually.
Can u please provide the .steps involved for thie case.
Thanks
ChandrashekharDear Steve,
Thanks a lot for giving reply with what I need to do, but I am unable to see result.
I have down configuration like below even though system not processing Auto TO creation. Can you explain me if I have down any mistake below.
Click on Assign button,
Press on New entries
WhN = 900
Reference Movement Type = 101
Movement indicator = B
Movement type for Whse Mgmt = 101
TR create Transfer Requirement = X
Immed.TO Creation
Mail confirmation for background processing = 01.
GR date = 2 -
Automatic Creation and Confirmation of Warehouse Task in EWM 5.1
Hello,
We want an automatic creation and confirmation of the warehouse task in EWM 5.1 on the based of a delivery type and warehouse number.
The scenario goes in this way... As soon as the inbound delivery is created/replicated in EWM, the creation and confimartion of warehouse request, warehouse task and warehouse order (all the transactions) should be called automatically. And the goods receipt should be posted.
Can someone throw more light on the customizing/BADI/enhancements etc required??
Thanks and Regards..Hi koen,
I tried with the FM that you suggested...
But somehow with the process type 'stock removal' gives an error...
Is that that this FM will help to create a pick task for a particular outbound delivery--Tcode:/SCWM/TODLV_TO.
how will this FM take the outbound delivery as an input?or it will be on the corresponding sales order number and item number as input?
Being new EWM i require help on this..about how to go about creating the pick task for an outbound delivery which wil be equal to the warehouse request.
Thanks in advance,
Rashmi. -
Production Order Number and Batch Number same during order creation
Hi All,
I wanted to keep the Production Order number and Batch Number same during creation.
How I can do that during creation of order only. So during creation same number to be get assigned automatically in the background.
One thing I can maintain ; the same number range for both.
But how to activate other functionality.
Regards,
AmitHi SAP2511,
For Production order-
1.You can define a Order type and Mantain the number range same as batch number range (in OPJH transction)
For Batch
1.Activate Automatic internal batch assignment - (OMCZ)
2.Number range for batch - for object - BATCH_CLT - (OMAD)
For batch creation at time of Order creation -
You can create Automatic batch at the time of order creation or order release
1 Create Production scheduler Profile(OPKP) and assign in Work scheduling view of material master for which you want to create batch at the time of order creation or release.(Select automatic batch creation at the time of release or creation in OPKP)
Things to be taken care -
1 . What if you set deleation flag for order?
Regards
Girish
Edited by: girish khobare on Aug 20, 2010 9:31 AM -
Automatic TO Creation and Confirm for the 321 Mvt type
Hello Experts,
Like to know the customisation invovlved for automatic TO creation and confirmation for the 321 movement type in which QM is activated.
I have already activated in OMKZ as below
1.Automatic TO for 321 mvt ytpe
2.TO item to be confirmed immediately
3.Propose confirmation
Table T333 -AUTTA
T333-SQUIT &
T333-VQUIT is activated.
Please let me know any other settings to be performed
Regards
KrishnaHello Experts,
I am trying to create the Automatic TO and TO confirmation for the mvt type 321.
I made the below settings
I have activated in OMKZ as below
1.Automatic TO for 321 mvt ytpe -"A"
2.TO item to be confirmed immediately - tick mark
3.Propose confirmation - tick mark
Table T333 -AUTTA
T333-SQUIT &
T333-VQUIT is activated.
I have activated in OMKX as below
Table T321-TBFKZ Immediate TO Creation with "A"
T321-TAFKZ TR creation with "X"
After doing the settings i am not able to see the Posting change number in the Material document created for the mvt type 321.
Please let me know how to create the Posting chnage notice for the material document and how to convert the Posting change notice to automatic TO and confirmation.
Thanks & Regards
Krishna
Edited by: Hariharan krishna on May 25, 2011 8:01 AM -
Batch no assigning during production order creation
Sir,
We are manitaining the batch management for inut raw materials. During production order creation it is mandatory to assign the batch no for raw materials then only production order releasing is possible.In our case due to batch assignement to production order while order creation,we are facing the lot of problems like batch no not assign for full req qty and also if unavailabilty of stock for particular batch no it will come to COGI.hereby i need experts help for,
1.I want to determine the batch no during confirmation instead of order creation and also allow to release the production order even batch should be in blank.
Kindly help
Regards,
PSHi
For Rawmaterials why cant'n you assign Batch nos buring GR of purchase order.
Then you can do automatic batch determination during confirmation of order for mvrmt type ;261...
This is easy to handle.
Please check and come back
Regards,
srihari -
Notify of Production Order Creation service
The SDN WIKI for Integration of Manufacturing Execution Systems states that...
"Now, as of Enhancement Package 4, each time a production order is created in SAP ERP, that action automatically invokes the Notify of Production Order Creation service operation, which informs the MES system of all the details of the new production order. "
I am not able to locate any further documentation and definition of the Notify of Production Order Creation service. Please provide assistance on where to find documentation of this service.Look at these links , may get some help ....
https://www.sdn.sap.com/irj/scn/wiki?path=/display/espackages/create%252bproduction%252bplanning%252border
https://www.sdn.sap.com/irj/scn/wiki?path=/display/espackages/find%252bproduction%252border%252bby%252belements
https://www.sdn.sap.com/irj/scn/wiki?path=/display/espackages/change%252bproduction%252border
https://www.sdn.sap.com/irj/scn/wiki?path=/display/espackages/find%252bproduction%252bplanning%252border%252bfor%252bapproval%252bby%252belements%252b(SCM)
Regards
Abhishek -
Serial number in production order creation CO01 Transaction
Dear All,
we are maintaining serial numbers for each product by using serial number profile .
For some products we creating serial numbers automatically during production order creation.
For some products we are selecting predefined serial numbers from IQ03,during production order creation.
But some products , we are maintaining serial numbers in excel sheet ,when ever production order created , we used to copy the required
serial numbers from excel and pasting in CO01 serial no provision fields.Here it is allowing to paste 20 serial no's at a time, but we want to
give more than 20 serial no's at a time
please find the attached screen shots and provide solution
Production order creation
Execute Transaction : CO01
After entering qty , we usually go to Header and select serial numbers
then it will populate provision to enter serial number for 30 sets
Here we are entering required serial number manually fro few products
The serial number to be used for this production order against this product like below
M1001
M1002
M1003
M1004
M1005
M1006
M1007
M1008
M1009
M1010
M1011
M1012
M1013
M1014
M1015
M1016
M1017
M1018
M1019
M1020
M1021
M1022
M1023
M1024
M1025
M1026
M1027
M1028
M1029
M1030
Then we will copy all 30 serial number and try to past in below screen
But it allowing only 20 serial number at a time not for 30
After pasting 20 serial no's , user manually selecting remaining 10serial numbers and pating in the same screen by scrolling the page
For example if production order quantity is 500 , then user put serial numbers 25 times it consuming more time
Requirement:
System should allow to paste all serial numbers at a time
Regards
SatyaHello Satya,
I checked this requirement and did not find anything relevant.Even for MIGO there is a note 1883420 - In the transaction MIGO only 6 serial numbers can be entered at the same time .So as per my view you can either
1. Create serial no's before hand which you want to paste from Excel or
2. Some custom/alternate development for CO01,discuss with your Abaper. or
3. Raise OSS messge to SAP.
Regards, -
Expected yield variance in production order creation
Dear sir
pl tellme ,where i have to capture the expected yeld variance.
for thisbelow given reasion i have to capture the expected yeld variance
Total confirmation quantity not equal to planned confirmatio.
The confirmed quantity for this operation is not equal to the planned quantity to be confirmed
The quantity confirmed until now for this operation is greater that the planned quantity to be confirmed.
pl tell me
thanks and regrds
BaswarajHi raj,
At the time of order creation system shows Delivery tolerance in goods receipt tab since you maintained at Material Master level But Expected yield variance will be Zero (System doesn't know how much you are going to confirm).
After Doing Final confirmation with clear reservations indicator and goods movements, System calculates the difference between actual order quantity and confirmed quantity at operation level in percentage. System updates the same in Production order. In your first order you got 0.2-. That means based upon operation yield confirmation, your expected yield i.e. GR quantity is 0.2% less than the order quantity. At the time of GR, system proposes the quantity you confirmed at operation level, but not the order quantity.
Where as coming to second order your conformed quantity is same as your order quantity. Hence system is not showing any expected yield variance in production order.
Check it with different order quantities.
Regards,
Venkat.V
Note: At the time of operation final confirmation in CO11n, if you select Confirmation Type Final confirmation and the Indicator Clear Open reservations, Irrespective of operation quantity UOM system proposes Expected yield variance in CO02 after conformation.
Edited by: Venkat V on Nov 13, 2008 10:48 AM
Maybe you are looking for
-
Viewing pdf files side-by-side in Preview.app
I was wondering if Preview allows two PDF files viewed side-by-side like Adobe Reader. That is, under Adobe, when you have two PDF files open, you can go to Windows->Tile->Vertically to place two PDF files side-by-side for easy viewing. I know you ca
-
dear friends i have a table having primary key and i have a file containing image (JPG) files and are named same as primary kay have please guide me how to add one image in a file and how to add complete folder in the database against the primary key
-
ThinkPad Bluetooth with Enhanced Data Rate Software Problem
I'm having a weird issue. I use a X200t tablet with Windows 7 Profession 64-bit. Apparently my current "ThinkPad Bluetooth with Enhanced Data Rate Software" is Version. 6.2.1.2900. Thinkvantage System Update wants me to download and install Version 6
-
How to use built-in iSight & external Firewire iSight simultaneously?
The solutions I've found here and elsewhere, about launching iChat first so it "controls" the internal iSight and will force the firewire iSight to work, does not work. With Quicktime and Photo Booth, I stll get the feed from the internal camera. iCh
-
An Idea of What Techniques Were Used in Editing This Music Video?
hi forum, im a music producer from japan, who has recently gotten into video editing/production. i just wanted to ask if anyone could shed some light on the techniques that were used in editing the following video: i know the song is horrible, but i