Automatic Reservation at the time of process order creation
Hi Experts,
As you are aware, when we create a process order and save, system automatically generates the reservation and the reservation will be for movement type 261. My requirement is like this. When system creates reservation, system should consider for which order type the process order is created and create a reservation for other movement type also.
For eg. Iam having order type ZRRW. When system creates reservation at the time of order creation, system should check the order type and reservation should be created for a movement type Z11 instead of 261 in the normal case.
Is there any user exit for the same. Please let me know.
Else how can I post the goods issue with a movement type other than 261. MIGO is not accepting other movement types.
Anticipating your reply
Regards
Prathib
Hi Ayethebing,
Thanks for the reply. we created the new movement types inorder to use the SAP standard reports and get the different types of goods movements based on the different processes.
We can do the goods issue using the custom movement type through MB1A. But I was trying to use in MIGO and this is where system wont allow this.
In MIGO, system will do the goods issue based on reservation only. The reservation is created at the time of order creation and it uses movement type 261 irrespective of the order type.
I was trying to find out whether any option is there to use custom movement type to create reservation so that system would propose this movement type in MIGO for goods issue against process order.
This is an interesting case but unfortunately dont have any option of user exit or Badi. Only one user exit related to reservation is to change the str loc and back flush indicator.
@Sabine: Thanks for your reply. But the BADI that you provided wont serve the purpose.
Thanks
Prathib
Similar Messages
-
At the time of Process order creation Batch determination
Dear All,
When i am creating process order at the time system not allowing me to execute batch determaination after release only it is allowing me to do.
My requirement is At the time of order creation i want assign batches ( Execute Batch Detrmination)for the material.
how to do this one, kindly hel me
Regards,
s.sakthivelHi sakthivel
Go to OPKP (Production scheduling profile) txn code and select in Batch management tab Automatic Batch creation at order creation (1) and check this profile is assigned to material in work scheduling view
Regards -
Batch number coming automatically at the time of Process order release
Hi All,
I want the system generated batch number for header material to come automatically at the time of process order release.
At present ,the batch number is entered manualy dering process order creation.
Can anyone pls guide abt the settings required for the sameDear,
Define the production scheduling profile CORY then
Auto Batch Creation = 2 On release.
Then assign this to your FG or SFG materials in work scheduling view in material msater MM02. Then create new order and check.
Now for automatic generation i have to set internal number asignment for batches.
Batch will create for movement type say 101 SPROLogistics - GeneralBatch mangment--Creation of New Batches --Define Batch Creation for Goods Movements. so it will have same logic in MM for 101 GR against PO will be internal number range but no effect in SD.
Regards,
R.Brahmankar
Edited by: R Brahmankar on Mar 12, 2010 12:40 PM -
Selection Of BOM & Routing at the time of production order creation
Hi guys,
Please clarify how i can go about for the following mentioned scenario
I have one Master BOM(Finished Product Level) & alternative BOMs for that,similarly i have one Master Routing & alternate routings for the same finished product
At the time of production order creation is it possible for me to choose one of the BOMs & One of the routings of that particular finished product without creating a production version?
Awaiting for a quick response
VijaiHi vijai prasad shanmugam ,
In the material master MRP-4 view under the BOM selection you can maintain on what fatcors you want the BOM to be selected Viz. Selection by order quant.,Selection by explosion date.Selection by production version etc.
As far as the master recipe is concerned ........ I guess that if there are more than one valid master recipe maintained then SAP will prompt to select the one manually.........
But it the standard practice to maintain the production version ....... for the similar situation to the one that you have mentioned.
Please Let me know if I can help you in any way regarding this........
Please reward the points......... in you find the ans helpful.....
Thanks
Kaushik -
Hi experts,
I need one clarification, i am raise one process order in COR1 - Qty 1000 kg, reservation completed against the process order bill of material main storage location ( 0001 & 0002 ) To Production storage location ( 0004 ) through MB21 with mvnt.type 311, store person also moved the bill of material main storage location ( 0001 & 0002 ) To Production storage location ( 0004 ) through MB1B.
Issue is at the time of confirmation i am enter the OK qty or packed qty in yield column - 950 kg , remaining 50 kg is enter in loss column.> Go to confirmation bill of material qty calculated at only for related in yield qty. Remaining loss qty related bill of material not consumed it is available in production storage location ( 0004 ),then one by one raw material and packing material qty moved to scrap location through MB1A - 541 Mvnt type.
If any other way for easy reservation and goods issue against the process order main storage location to production storage location.
I need at the time of confirmation enter yield qty related BOM qty consumed in 261 consumption, remaining loss qty related BOM qty taken scrap mvt.type 541 in automatically if it is possible for any customization at the time of loss qty enter related bill of material qty also posted in scrap ?
Kindly help me for the issue !
Thanks & Regards,
N.UmapathyHi
In Standard practice the scrap generated during the production process should be maintaid as negative qty and with differnent material codes which acts as BY Product.
In your case when you maintain the scrap percentage for BOM components , it will copied to the production order with adtditional qty and it will be consumed when you do confirmation and Goods moevement and at the same time the Scrap material is generated/received with movement type 531( not 541) as by product received out of production.
You can maintain the same BOM component as By product in BOM system will generate the stock to a different SLoc but the cost will be wrong.
Regards,
Anupam Sharma -
No Matching Record Found 'CRD1' at the time of Purchase Order Creation
Hi !
I have transferred business partners record through DTW 2005.0.17 in SAP B1. Now when I go to make purchase order, at the time of selecting business partner, It gives error msg. No matching record found 'CRD1'. I have checked the table CRD1, there the data exists. And when i modify business partner's address through business partner form, the problem is solved. I am not able to trace which value i am missing at the time of data transfer.
can anyone help?
Anupam Negi
[email protected]thanks jimmy,
I tried as per your suggestion, i deleted the following tables OCRD,ACR1,ACRB,ACR3,CRD1,ACRD,ACR2,CRD2,CRD5,CRD3,CRD7, then again imported the BP records. Its still giving the same error. I have imported the Business Partner Main template & Business partner Address template. Is it neccassary to import all other templates i.e. BPNankAccount,BPPaymentDate,BPPaymentMethod,ContactEmployees -
Co-Product Lot creation at the time of Process order release.
Hello All,
I want to map a scenario such that:
Whenever a order for material is RELEASED it should generate a LOT for say MAIN product ,CO-PRODUCT & BY-PRODUCT(in shrt also for its BOM).
Thanks.Use Userexit QAAT0001 to create m inspection lot for co-product.
For more help on this user exit refer to link
http://wiki.sdn.sap.com/wiki/display/PLM/QAAT0001Do'sand+Don'ts
Inspection lot so created is manual IL, hence it cannot be used to control stock postings.
And system will automatically create 05 type inspection lot when 531 movement is posted for co-product. Thus you will have two inspection lots for the same co-product.
You may want to review your business requirements and verify you actually need this functionality
Please note -
Inspection lot created for Finished product is different. Initially when order is released
It has no quantity association, but as and when Stock postings are done,
SAP will add these quantities to the IL and control the stock postings.
With manual inspection lot you can not have this functionality without extensive programming.
Hope this helps. -
At the time of Purchase order creation Material specification how to trace
Dear all,
I have an one issue,
when ever i am creating Purchase order for any material to vendor, the particular material quality specification or Ins plan automatically to flow to purchase order.
how to address this issue, wheather it is possible or not
Regards,
s.sakthivelHi,
For your requirement only for viewing the data I suggest you to go for below options
1) In mtrl master itself there is one option Inspection text, here u can maintain the main values so thst during PO
you can refer these values (To find this click on aditional data tab in mtrl master and inspection long text)
2) Prepare one report by fetching all the inspection values from below tables so that u can aslo refer this report
PLKO Inspection plan Header
MAPL Material Assignement
PLPO Operation Details
PLMK Inspection plan characteristics
PLMW MAPL-Dependent Charac. Specifications (Inspection Plan)
Regards
Shiva -
IDOC generation at time to transfer order creation.
What are the config steps involved for idoc generation at the time of transfer order creation?
please advise.
Edited by: avi on Dec 25, 2008 5:31 AMHello,
TO creation with respect to Picking perspective:
Lean WM --> output type WMTA can be used to create TO automatically can be created (you can go to NACE transaction and check the settings of WMTA)
From MM WM perspective i think it is PUTAWAY concept, if Purchase order -->Inbound delivery will be created with ref. to inbound delivery TO (putaway) can be created.
Link for IDoc maintenance:
IMG>LE>WM>Interfaces>external systems-->configure wm
link for Automatic TO creation:
IMG>LE>WM>Interfaces>inventory management-->Activate Automatic TO creation
Mahesh
Edited by: Mahesh on Jan 2, 2009 11:19 PM -
TCODE for Process order creation against Sales order
Hi gurus,
Pls tell me what is the TCODE for Process order creation against Sales order
Eg. CO07 is for production order from sales ordeTypically, in MTO scenario after the sales order is created you run MRP which will create planned order and then you convert that into production order using MD04.
Or if you have SD settings correctly directly from the release of Sales Order it will create planned order or production order.
please check and revert back. -
BAPI PROCESS ORDER Creation u2013 can the SCHEDULE Date/Time be specified?
I am currently using BAPI_PROCORD_CREATE to create a Process Order from an inbound IDOC. This works well, when I pass the following fields:
BAPI Parameter ORDERDATA
ORDER_NUMBER Process Order number (EXTERNAL)
MATERIAL Material to be produced
PLANT Plant
ORDER_TYPE Order Type
BASIC_START_DATE Start Date
BASIC_START_TIME Start Time
BASIC_END_DATE Basic End Date
BASIC_END_TIME Basic End Time
QUANTITY Process Order Quantity
QUANTITY_UOM Quantity Unit of Measure
However, I have a requirement to also specify the SCHEDULED Start Date (GSTRS) and End Dates (GLTRS), but the BAPI parameters do not the SCHEDULE Dates to be specified.
I have also used the functions CLOI_CHANGES_UPL_31 and CLOI_CHANGES_UPL_45 to create Process Orders successfully, but neither of these allow for the SCHEDULE dates to be passed in.
Does anyone know how I might be able to achieve such a result?
I am trying to avoid the use of CALL TRANSACTION on COR1, so would be grateful if anyone has any thoughts.
In the mean time, Iu2019ll ask the business if it would be possible to apply any rules by whereby if we specified a BASIC_START_DATE, whether it would be able to derive the correct schedule date accordingly.
PPu2019s not one of my better modules, so apologies if whatu2019s been asked above is a stupid question!
AlistairHI...
Pls chk in scheduling control for detailed scheduling in T code OPUZ. and change the scheduling type forwards to forwards in time and backwards to backwards in time.
Now when ever you would create the order system would ask the scheduling dates either start or finish in stead of Basic dates.
Instead of using BAPI you could make a simple LSMW pogram. It would talk 5 min.
This is a standard SAP functionality to select Basic dates because SAP consider all master data for scheduling like Schedule margin key.
I think It would help you.
Regards
Vivek -
Wrong GL at the time of Production order
Hello
At the time of Production order settlement....its showing error that this GL is not possible to post automatically............there wrong GL(recon ac) have been assigned....where can i check this assignment in the system.................I have already checked it in OBYC.......but there i hv not found anything.......
regardsHi Pari
Check the following accounts for the relevant Val Class
PRD-PRF (Variance acct) / GBB-AUA or AUF (COGM) /
Also check WIP Account as well as Change in WIP assigned in IMG
br, Ajay M -
Cannot do the confirmation of process order (CORK)
Hi experts,
I entered into CORK tcode I given the Value for Process Order "XXXXXXXXXXX" and performed the enter.
Now I am "Process Order Confirmation Create : Actual Data" screen. Here I selected the the radio button "Final confirmtn and cliced the check box " Clear Reservation" under the Confirmation Type.
Now I am trying to "SAVE" at this moment I am getting the below message i.e indicated in bold letters.
''Error in determining actual costs for order xxxxxxxxxx.''
I confirmed process order status.
Process order has not the status "CSER(costing error)".
COGI has not records for the process order.
Why the error happen I don't know....
Could you please help me to avoid this problem.
Thanks in advance.
Edited by: Satoru Miyagawa on Sep 17, 2010 5:08 AMHi everyone,
Thank you for your help.
I got the solution of the problem I had!!
The cause of problem is that target profit center has locked by master. (check the lock indicator)
Therefore, process order has not costing error when calculated cost in COR2,COR1.
Thank you!
Satoru -
Batch Determination at the time of Production Order Confirmation
Hi,
I am working with Batch Determination at Item Level.
I already have configured system to generate Batch Automatically at the Time of Production Order Release.
But now i want to generate Batch Automatically at the Time of Production Order Confirmation
Please help me with the necessary Configurations which would be required into achieving the same.
Thanks in advance.
HarrisHi,
I have maintained the same for my Order Type in OPJ2 but still the same is not being picked at the time of Order Confirmation and it is being put to COGI mentioning the error as No batch specified in production order
Also if i try to Manually Select the Batch through in Goods Movt. of CO15 it is giving a msg that No Strategy could be found.
I have done following settings:
1. Have maintained Condn Records in MBC1 for the component whose batch is to be determined.
2. In material master in MRP2 Batch Determination: 2
3. In OPL8: Batch determination search procedure
4. In OPJ2: BD ticked for that relevant Order Type
5. In OPKP: Automatic Batch creation kept as BLANK.
Please support
Thanks
Harris -
Reservation of component Batch for Process order
Hi PP Guys,
I did the batch determination of a particular component batch in process order, but when I try to create another process order system proposing the available qty without considering the earlier reserved batches.
I want to view only the batches which are free from any reservations during batch determination in process order.
Example: If Batch "A" having qty 1000 kg in unrestricted stock.
I have created a process order and did the batch determination for the quantity of 900 kg, when I create another process order for the same material system should propose only the available component batch qty of 100 kg only, but system still proposing the un-restricted available qty of 1000 kg.
Please advise me the solution to map the scenaio.
Thanks in advance.
regards,
PurnaHi,
Check whether Reservation is included in your checking control(T.Code OPJJ).
If not then correct it by activating check box for Include reservations.
Regards,
Dhaval
Maybe you are looking for
-
How to change font size in Finder system wide?
Hi all, I'm wanting to increase the size of the font in 'Finder' in my folders. I've increased the size of fonts in Firefox and it looks much better. I went into 'Finder', 'Show View Options' and I can change the size of fonts, but it's for every ind
-
Trouble with power to Apple TV
My new ATV consistently loses power after a few mins. Have to unplug and plug it back in. Thought it might be a defective unit, and swapped it out for another; same problem. It's not power source, b/c ATV is on surge protector with other components t
-
Dynamic link error message again?
Hi I am running Bridge CS6, somethimes with photoshop CS6. I am running mac OSX.6.8 (snow leopard). mac book pro I am getting the dynamic link error message again after not having the problem since CS6beta. It sometimes is only with mov or other movi
-
I have one ODM which contains my current group & user settings. With Podcast Producer I had to set up a second ODM on the PcP server. Is there anyway to access and use my users and groups from my first ODM on the second? For example, can I add a user
-
Hello Experts, How to find an info objects belongs to HR.Please help me. Regards, Shivu.