Automation for actual input of utility rate in Production Cost centers

Dear All,
Currently we have a process where we are downloading actual rates through KSII for each location and rates calculated are inputed through KBK6 for all individual production cost centers by activities ,so my requirement is whether there is any procedure where downloading and uploading can be eliminated and actual rates calculated by system directly loads on to the production cost centers.
Kindly provide any suggestions
Thanks and Regards
vijay

Hi,
If u run KSII, system will give a message "Do you want to post the results of price calculation?" if u click on YES , it will automatically update  in your KBK6.  Pl. Check once.
Regards,
Rajeswari

Similar Messages

  • Alternative hierarchy for cost centers

    Hi all,
    Due to reporting needs I have to work on two cost centers hierarchy at the same time. So I decide to use the alternative hierarchy which is a copy of the standard one. I've seen on help.sap.com that it was possible to copy the standard hierarchy, and to modify this new alternative hierarchy.
    My problem is that the system doesn't let me modify the alternative hierarchy, I can't delete, replace or add any cost center.
    Thanks in advance for your return.
    Pascal

    Hi Mary,
    thanks for this reply. I have already created the alternative hierarchy by KSH1, to replicate the standard hierarchy (let's call it CENTRAL), so my new hierarchy (let's call it ALTERNATIVE) is all the same in comparison to the previous one. After the copy the two contains the same cost centers groups, and inside the nodes the same cost centers. For the year 2008, I need to move cost centers in the ALTERNATIVE from one node to another one, so I could compare node by node the 2008-CO postings with 2007-CO postings.
    The central point is that my cost centers perimeter is altered every year and I need to compare two cost centers hierarchies at the same time.
    Hope this reply is more precise.
    Regards Pascal

  • Incorrect exchange rate for Actual cost documents

    Dear all experts,
      I have an actual cost documents which was created on 02.10.2006,it should be taking the value date for currency exchange as 01.09.2006,but it is taking 01.
    04.2006 hence it resulting in picking wrong exchange rate.Any solution to solve it and what is the cause of this issue? Thank You

    hie, the currency is set in the table TCURR. the time rederence ? sorry,I am very new to this.the user just told me to that the currency for actual cost taken wrongly,all i managed to check is tat the value date for currency translation for tat particular actual cost document is 01.04.2006,tat's y it took the wrong exchange rate. And i guess the exchange rate is already updated in BW.

  • I'm trying to record in Adobe Audition and it keeps saying my the sample rates for my input and output devices do not match.  How do I correct this?

    I'm trying to record in Audition and it keeps saying my sample rates for the input and output devices don't match.  How do I fix this?

    I finally have communication between the ISA One and Audition. I moved the optic cable to another SPDIF on the computer and from the SPDIF to ADAT on the ISA One and it finally agreed that the communication was at the same clock speed. The audio was not intelligible so I moved the optic cable back to the original configuration and I can record voice that is clean.          

  • MCSI report for actual/normal sales and scrap scales

    Hi all,
         How do i can configure sales value and net value of the Scrap sales should be Zero in MCSI report(SIS)? because its not a actual/normal sales so it should not appear in the MCSI report or it should show Zero values and For Actual/normal sales MCSI report should show exact values as per the transation captured by the system.
    Please explain me in terms of Tables and fields and Configuration settings need to be changed in Pricing Procedure.
    Thanks and Regards
    Swamy HP

    I resolved it. Thanks for your valuable inputs.

  • How to get actuals at budget exchange rate

    Hi All,
    I am working on a multi currency planning application.
    I want to do variance reproting wherein I have to calculate variance between actual * actual exchage rate and actual * budget exchange rate.
    What can be the best way to do this?

    To get actuals at budget exchange rate the normal practice is to have another scenario called something like actual_bud_rate where you have the budget exchange rates loaded.
    The variance can then be accomplished in many ways whether that be via SmartView, Financial Reports, or creating another scenario and using one of the variance functions @VAR, @VARPER.
    The key to any of the methods for variance is that new scenario and loading the budget rates to that scenario.
    Regards,
    John A. Booth
    http://www.metavero.com

  • Mini DisplayPort for HDMI input?

    Hello!
    I'd like to connect my hd camcorder via HMDI adaptor to my 13" MacBook Pro (previous version). But I'm not sure if it's actually possible to use the Mini DisplayPort for HDMI input - could anyone tell me?
    Thanks!
    amlug

    I suspected it. Unfortunatly my camcorder doesn't have Firewire but I'll try with USB. (My idea was to use the MacBook for preview during the shots.)
    Thank you!

  • What is the -k option for of the Ping utility in OS X?

      Hi,
    May I know what is the -k option for of the Ping utility in OS X? It doesn't seem to be a ICMP protocol standards-relates.
    Below is the description of this option copied from Yosemite.
    -k trafficlass
                 Specifies the traffic class to use for sending ICMP packets.  The
                 supported traffic classes are BK_SYS, BK, BE, RD, OAM, AV, RV,
                 VI, VO and CTL.  By default ping uses the control traffic class
                 (CTL).
    Thank you!

    These are low-level bits defined in the kernel's IPv6 support code.
    Here is the first reference I could find that actually says what some of them are: https://github.com/darwin-on-arm/xnu/blob/master/bsd/sys/kpi_mbuf.h
    Search for "MBUF_TC_BE"

  • Activity prices in KP26 used for actual and plan in version 0

    We plan activity prices via KP26 in version 0. We then plan activity consumption via KP06, and run the plan reconciliation via KPSI.
    During the year, we need to update the activity prices used in actual activity allocation. This price also comes from version 0.
    When we change the activity price, the planned amounts change also. We are looking for a way to maintain a separate price for actual activity allocation.

    Ajay,
    Your answer definitely sent me down the right path...thank you!
    For other's benefit, these are the steps I took to make this work:
    1) set the "Purely Iter. Price" indicator in plan version 0
    2) import planning layout 1-N01 from client 000 (OBKF)
    3) add planning area "Cctr: Manual actual prices" to planning layout SAPALL (KP34)
    4) add planning layout 1-N01 to planner profile SAPALL (KP34)
    5) create and run custom program from note 551309 to add cost element field to the input screen in KBK6 (SE38)
    6) transport planning layout for planning area "Cctr: Manual actual prices" (OKEX)
    Now we can plan a price in KP26, and maintain a different price in KBK6 which is used in the actual activity allocation.
    Thanks again,
    Linda

  • Business area as a req..field for vat input tax g/l

    in fs00 . we  set the additional account assignment for field like suppress req. entry,opt. entry..i want to know for which general ledger it will be required...?
    actually in our system for (vat input tax ) gl  business area it is not mandatory field ...or when i check the line items for this general ledger business area wise ...it displaying for all  business area...
    so tell me if i set it as req. field,then will it be right or not?
    Thanks & Regards
    Rekha Sharma

    Hi,
    To my understanding taxes are always posted without a business area. System makes transfer postings from tax account to business areas for the income and expense account. A balance sheet adjustment is carried out according to business area if 'Business Area Balance sheets' has been activated in company code global parameters(OBY6).
    When you post a document the system determines this document and notes for the adjustment. Documents noted during posting are calculated for the adjustment. The system calculates the adjustment according to the account assignments. Execute F.5D(programSAPF180A) reads the marked documents, calculates the necessary adjustment postings, and updates these in its own database tables. After that execute F.5E(program SAP F180) reads the adjustment posting tables and on this basis posts the accounting documents required.
    For example you posted on customer invoice:
    Customer A/c  Dr 1150(Accts Receivables)
    Revenue A/c1 Cr         600 (BA-1)
    Revenue A/c2 Cr         400 (BA-2)
    Tax A/c Cr                   150
    During the Balance Sheet Adjustment the system divides this tax entry by business area wise
    Tax A/c 90(BA-1)
    Tax A/c 60(BA-2)
    You cannot run balance sheet adjustment without activating the 'Business Area Balance Sheets' at company code global parameters.
    Hope it will clear your query.
    Regards,
    Krishna Kishore

  • Execute BAPI for different input values and dispaly data in a table

    Hi all,
    I have a specific problem about executing BAPI multiple times for different input values and didplay result in a table.
    I am using the code similar to the following logic.
    Bapi_Mydata_Input in = new Bapi_Mydata_Input();
    wdContext.nodeBapi_Mydata_Input().bind(in);
    String in = wdContext.currentperdataElement.getnumber();
    in.setDestination_From(10)
    wdThis.wdGetMydataComponentController().executeBapi_Mydata_Input();
    in.setDestination_From(20)
    wdThis.wdGetMydataComponentController().executeBapi_Mydata_Input();
    in.setDestination_From(30)
    wdThis.wdGetMydataComponentController().executeBapi_Mydata_Input();
    And I want to display the data in a single table. I want the result in a table for Bapi execution based on input parameters passed 10,20 30.
    But I am getting the table data only for the input parameter 30.I mean its actually display the data in table only for the last input parameter.
    So May I ask you all if you know the solution for this problem.PLease advise me with some tips .or sample code is very much appreciated.I promise to award points to the right answer/nice advises.
    Regards
    Maruti
    Thank you in advance.

    Maruti,
    It seems that WDCopyService replaces content of node, rather then adds to content.
    Try this:
    Bapi_Persdata_Getdetailedlist_Input frelan_in = new Bapi_Persdata_Getdetailedlist_Input();
    wdContext.nodeBapi_Persdata_Getdetailedlist_Input().bind(frelan_in);
    final Collection personalData = new ArrayList();
    String fr1 = wdContext.currentE_Lfa1Element().getZzpernr1();
    frelan_in.setEmployeenumber(fr1);
    wdThis.wdGetFreLanReEngCompController().executeBapi_Persdata_Getdetailedlist_Input();
    WDCopyService.copyElements(wdContext.nodePersonaldata(), wdContext.nodeNewPersonaldata());
    for (int i = 0, c = wdContext.nodePersonaldata().size(); i < c; i++)
      personalData.add( wdContext.nodePersonaldata().getElementAt(i).model() );
    String fr2=wdContext.currentE_Lfa1Element().getZzpernr2();
    frelan_in.setEmployeenumber(fr2);
    wdThis.wdGetFreLanReEngCompController().executeBapi_Persdata_Getdetailedlist_Input();
    WDCopyService.copyElements(wdContext.nodePersonaldata(), wdContext.nodeNewPersonaldata());
    for (int i = 0, c = wdContext.nodePersonaldata().size(); i < c; i++)
      personalData.add( wdContext.nodePersonaldata().getElementAt(i).model() );
    wdContext.nodeNewPersonalData().bind( personalData );
    Valery Silaev
    EPAM Systems
    http://www.NetWeaverTeam.com

  • Html INPUT for numeric input

    Hi all,
    I need a INPUT html control for numeric input, that is:
    - No alphabetic characters,
    - At the lost focus, align the number to the right and formating the number.
    How can i do this or find a component with this functionality?. I tried with a jsp tag but stay out of FORM structure.
    Thanks in advance!!
    Salvador Huertas.

    So...  Do I understand correctly that there is no real interest in fixing this BlackBerry PlayBook OS/browser bug?  I don't know about other developers or users, but it actually manages to render one of my apps to near-uselessness, and it seems like it shouldn't be that hard to correct (especially given that it wasn't always doing that) if someone actually wanted to...
    Developers and users, if this bug bugs you, look up the ticket tracking this bug at https://www.blackberry.com/jira/browse/TABLET-623  and "vote" it up.

  • Microsoft Utility Rate Service - not available in your market

    We are planning to use Microsoft utility Rate Service for one of our clients but the link says
    “Not available in your market.” 

    Hi Azam Khan,
    Thanks for the post.
    The link also says
    Microsoft URS Data
    6/1/2011
    To acquire data from Microsoft URS, you will have to register with DataMarket at Windows Azure DataMarket and subscribe to Microsoft URS on the Microsoft Utility Rate Service subscription page. For more information about how to create an application by using
    data from DataMarket, including information about how to use Access Control Service, see Create a DataMarket Application on MSDN.
    We have already registered with DataMarket but unable to Subscribe to the URS in there.
    For most of the datasets, we get options on the Right Hand side of the Screen to purchase the services. Where as for URS, it says "Not available in your Market".
    What should we do to get it in our market and start utilizing the services.
    It would be great if you could help us in understanding where are we going wrong.
    Thanks and Regards,
    Akhila Hebbar

  • Actual Overhead rates on Production Orders

    There is a function that let you recalculate overhead rate for actual?
    I mean for example, when you use activity types in production orders, during confirmations planned price is posted to orders, then at the period end closing you can calulate actual price (KSII) and then revaluate production orders with this new price (CON2)
    Is there something like this for overhead rates? p.j. if your actual rate is $3.00 by produced unit. Then at the end of the month is there any transaction that compare actual expenses and actual production and determine new rate? example $3.5. In order to revaluate production orders?
    Thanks

    Hi Espinosa
    Welcome to SDN!
    I guess your question is to check if there is a mechanism to auto calculate the overhead rate in the system....
    Sorry, there is no such mechanism.. You need to manually calculate and maintain it in KZM2 or KZZ2... Then revaluate the prod orders with new rate using CO43....
    However, I find it painful and boring.. Hence, I have developed a workaround which I prefer to use always...
    You need to decide on what basis you would like to absorb your overhead... Say, Machine hrs, lab Hrs or Output.... Lets assume you choose Output (KG) to absorb the overhead
    1. You need to create an Activity Type called PRDOVH and assign it in the PP Work center... Assign the cost element of this act type to a separate cost component in OKTZ
    2. While creating the Routing, the Activity Qty = Operation Qty for this Act Type... i.e. If you are creating routing for 100 Units, specify the Act Qty for PRDOVH as 100...
    3. The Formula in the work center will be fully variable for this Act Type.. i.e. the Act Qty should change in proportion to the Qty Confirmed....
    4. The PP Guys will confirm the operation in PP... This Act Type will also get confirmed along with it
    5. Now calculate Act Price KSII as usual and run revaluation... From this point onwards, follow the normla procedure which you follow in month end
    br, Ajay M

  • FX gain/loss on input of FX rates

    Dear All
    Pl explain me regarding this issue
    "SAP should calculate FX gain/loss on input of FX rates. This should be enabled for multiple currency scenario."
    Regards,
    KSP

    Hi,
    Did not get you fully please correct me if I got it wrong.
    You are looking for Foreign Currency valuation.
    Then first you have to maintain the Valutaion method in OB59.
    Then assign GL in OBA1 for KDF.
    You have to maintain Exchange rate in OB08.
    Then when ever there is the difference in Exchange Rate system will post to this Gain or Loss Account.

Maybe you are looking for

  • Planning Information in SAP R/3 and BW

    Hi all, How to Establish clear understanding of what planning information is stored and used in SAP R/3 and which should be extracted to SAP BW for use in reporting in one particular client. Thanks in advance S VR

  • Excel 2010 "Save As" happens twice

    In Excel 2010, whenever I choose "Save As", it starts normally and performs the requested change. However, it then repeats itself as if I performed the "Save As" a second time. This does not happen in the other Office 2010 Pro Plus components. Does a

  • Acrobat 9 Pro: Install Problem "not enough disk space"

    Hi: I just bought and downloaded Acrobat Pro 9 from the Adobe site and took the following steps: 1) Uninstalled Acrobat Pro 7 & rebooted 2) expanded installation copy onto Desktop 3) Copied Install to CD 4) Installed and chose both "Typical" & "Compl

  • Can 5 axis image stabilization be engaged with non system lenses for A7II and A7rII?

    Many people use/will use their excellent non system manual focus non system macro lenses on the A7II and undoubtedly on the soon to be released A7RII. Stabilization in the X/Y planes is very very important for macro. Sony on the A7II only stablizes t

  • ERS payment didn't generate

    hello everyone, here is the issue : user changed PO line item to ERS after goods receipt was generated, so ERS payment didn't generate for this PO line item, now what can we do to make it work? one way I was thinking is to let vendor send the invoice