Availability check and Credit check

Hi
I have set up credit management. I have a query in my case for a MTS scenario the credit check is before I do the availability check
but in the case of a MTO scenario credit check is after availability check.
Am I missing any setups???? I am not able to understand this behaviour, should it not be considering the value as soon as the order is created and not wait for the availability check.
Thank you for your time
Regards
Madan Shetty

Sorry about the late reponse I was away for a few days.
Thanks Srinu and Eduardo was taking timeout and responding.
Totally agree Srinu and that was exactly my point as well and hence the post on SDN
Srinu my issue with a MTO material is when I enter the order and save it there is no reponse from the system as currently stock is not avaiable, for some reason it doesnt do a credit check .
But for the same customer with a MTS material as soon as enter the customer num and the material
it gives a pop up stating
STATIC credit check: credit limit exceeded(data cannot be saved).
PLease do let me know if you require further details in the meanwhile I am gonna try and verify as well from my end.
My FD32 setup incase I have made any errors please do specify
Regards
Madan

Similar Messages

  • Relationship about ATP check and credit check

    Dear all,
              At present,  we have credit control in sales  order. The rule is : once the sales order's amount over 1 dollar, the order will be blocked for credit check. This order has to release credit block manually in VKM4.
              Here has a problem, when a sales order has credit released with the status "D",  if i check ATP for one item in this order, the credit status will return to "B", it is not match our requirement.
              How can the credit status not change when ATP check happen in the sales order?
             Thanks in advance!

    Hi Irene,
    You can copy this requirement with new code like :
    IF yvbuk-cmgst = 'D'.
          MOVE CHARX TO BYPASS-SECURITY.
          MOVE CHARX TO BYPASS-STATIC_LIMIT.
          MOVE CHARX TO BYPASS-DYNAMIC_LIMIT.
          MOVE CHARX TO BYPASS-DOCUMENTVALUE.
          MOVE CHARX TO BYPASS-CRITICAL_FIELDS.
          MOVE CHARX TO BYPASS-REVIEWDATE.
          MOVE CHARX TO BYPASS-OPEN_ITEMS.
          MOVE CHARX TO BYPASS-OLDEST_OP.
          MOVE CHARX TO BYPASS-DUNNING_LEVEL.
          MOVE CHARX TO BYPASS-USER1.
          MOVE CHARX TO BYPASS-USER2.
          MOVE CHARX TO BYPASS-USER3.
          MOVE CHARX TO status_reset-STATIC_LIMIT.
          MOVE CHARX TO status_reset-DYNAMIC_LIMIT.
          MOVE CHARX TO status_reset-DOCUMENTVALUE.
          MOVE CHARX TO status_reset-CRITICAL_FIELDS.
          MOVE CHARX TO status_reset-REVIEWDATE.
          MOVE CHARX TO status_reset-OPEN_ITEMS.
          MOVE CHARX TO status_reset-OLDEST_OP.
          MOVE CHARX TO status_reset-DUNNING_LEVEL.
          MOVE CHARX TO status_reset-USER1.
          MOVE CHARX TO status_reset-USER2.
          MOVE CHARX TO status_reset-USER3.
        EXIT.
    ENDIF.
    If you are a problem with yvbuk-cmgst, you can use user exit MV45AFZZ to save the credit status (cmgst) into an other field.
    This new field is checked in the new requirement.
    This requirement deactivates the credit check if the credit status is released. In this case, no credit check is possible in SO.
    Regards,
    Lionel

  • Static check and credit limit

    Hi,
    If I tick static check in OVA8, may i know besides open order and open delivery which adjacent to static check, credit limit in FD33 also considered as static check?
    In FD33, the credit exposure (receivable/liabilities/sales value) to determine credit limit, I would like to know if it is also considered static check if limit over.
    Thanks

    Yes. If you check Static Credit Check in OVA8, system will check the Credit Limit Defined in FD32 (displayed in FD33).
    Static Check considers the Credit Exposure displayed in FD33 & the available Credit Limit.
    The only thing not available in Static Check is the Horizon factor. (With Horizon in Dynamic Check, you can decide uption how many months in future you want to consider open Orders).
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • I am suddenly having a problem printing 4x6 photos.  The print as though starting in the middle of an 8x10 sheet.  I've checked and double-checked the print settings.  Anyone else have this problem?

    I am suddenly having a problem printing 4x6 photos.  The print as though starting in the middle of an 8x10 sheet.  I've checked and double-checked the print settings.  Anyone else have this problem?

        jsavage9621,
    It pains me to hear about your experience with the Home Phone Connect.  This device usually works seamlessly and is a great alternative to a landline phone.  It sounds like we've done our fair share of work on your account here.  I'm going to go ahead and send you a Private Message so that we can access your account and review any open tickets for you.  I look forward to speaking with you.
    TrevorC_VZW
    Follow us on Twitter @VZWSupport

  • KDL60W630b - software update check and region check - failing everytime and tv going into initial setup mode

    KDL60W630b - software update check and region check - failing everytime and tv going into initial setup mode I got this today today and when i tried to complete initial set-up. it never completed. TV is going in cycles with initial set-up everytime it connects to my internet and says connected successfully. after it tries to update software and tv restartssame initial set-up screen again i tried keypad button on remote and it took me to tv. i was able to see tv that way but whenever i start tv, it goes back into initial set-up again. any solution for this?

    Hi GC_Sugarland, 
    Thank you for considering Sony Community! 
    I'm sorry to hear that this happens to your TV after the update. Pleas reset your the TV to the original setting. click on this link to guide you on how to reset it.
    I hope this helps. Please keep me posted. 
    Regards,
    Jen
    If my post answers your question, please mark it as "Accept as Solution"

  • Availability check and credit release

    hello, friends.
    here is the situation:
    1.  MRP type PD
    2.  availability check 01
    now i create a sales order for 100 units for a material.  due to the inventory situation, the schedule line proposes 40 units by Feb 14 and 60 units by Feb 28.  i save the order and this is blocked for credit limit (of course, confirmed quantity will be '0').
    now i release the order through VKM1.  when we go back to the sales order, the schedule line is 100 units by Feb 28.    of course, we can also redo availability check and the schedule lines will propose the earlier 2 dates.
    now, i believe that the 1 schedule line proposal after release  has something to do with time period (or horizon) and credit control.  but where do we customize settings so that the original schedule line proposals (40 units by Feb 14 and 60 by Feb 28) is  automatically copied and/or retained?
    many thanks for your valued inputs.

    Jonathan,
    Also check Av.check and TOR under IMG -SD-BAsic Functions-Av.check and TOR- Define procedure by schedule line category.
    Av. check and TOR should be checked there also check whether there is a manual schedule line block in the sales order. becasue  if this is the case, then its very effective and works immediately
    If the availability check is switched on at requirements class level, it can be switched off at schedule line level. However, you cannot switch on the availability check at schedule line level, if it is switched off at requirements class level. You can make this setting at schedule line level. But the system ignores it and the setting for the requirements class applies. Also, at schedule line level when the availability check is switched on, the transfer of requirements can be switched off. For example, this makes sense for inquiries or sales information.
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    The control elements described above for the availability check must be maintained in customizing for Sales and the relevant assignments made to the sales transactions The availability check must be switched on at requirements class level and - for the availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found. A plant must be defined. It can either be proposed from the customer or material master record or can be entered manually in the document.
    A checking group must be defined in the material master record on the Sales/plant data screen in the Availability check field
    Please check all these above settings to see if there are in order. Also check if there is any delivery block on that date, if one single delivery is enabled and also there is any product allocation active. I am very much interested to know your status. Wud appreciate your status.
    regards
    Jude

  • Confirmed quantity in sales order and credit check

    Due to the fact that we are using automatic credit check , for the sales orders that are not blocked due to credit control the confirmed quantity is made to 0 until some person responsible unblocks the sales order.
    My issue is how to prevent the confirmed quantity from becaming 0 even if credit block exists

    Dear Friend
    If the automatic credit management is active the confirmed quantities of sales order becomes 0 because in t code OVB8 the requirement no used will be 101 and system routine will be 1 that is system reservation
    Here you need to change the 101 to something else or you have to write a new routine thro ABAPer so that even if the document goes for credit block the confirmed quantities doesnot change or become 0
    I dont have the practical experience of changing this to something else and having worked on that
    But you may try that
    The area to explore or get your requirement is this only
    Regards
    Raja

  • Credit check and Credit hold not working for 2 specific clients

    Hello dear Oracle Support,
    I would like to ask for your help in the following subject:
    The Credit deppartment assign a Credit Hold and a Credit Check for 2 specific customers, but for some reason, these check boxes are not getting respected by the system, since the sales department are not getting any message or warning when creating an order. I tryed to look at these 2 check boxes at a table but I am affraid that I cant find the field, I am using the RA_CUSTOMERS table, but perhaps it is not the correct one, so I was wondering if you could give me any advice.
    Thanks

    Hi
    1. IMG -- SD -- Basic funtions -- credit management/risk mgmt -- credit mgmt -- Define credit groups.
    Here confirm that you have
    01 - credit group sales order
    02 - credit group delivery
    03 - credit group for GI
    2.  IMG -- SD -- Basic funtions -- credit management/risk mgmt -- credit mgmt -- Assign sales document type and delivery document type
    Here you have to assign
    01 - to the sales order(Ex OR) types
    02 - to delivery document type (Ex LF) <b>Dlv credit group</b>
    03 - to delivery document type (Ex LF) <b>GI credit group</b>
    <u><b>For delivery document type we have to assign to credit group one for Delivry another for PGI</b></u>
    3. IMG -- SD -- Basic funtions -- credit management/risk mgmt -- credit mgmt -- Define automatic credit control (OVA8)
    Maintain new combination for Your credit control area/risk categry of the customer/03 (GI credt group)
    Example : 1000/001/03
    maintain static/Dynamic credit check for this combination.
    Note : give warning at order level (credit grp 01) and delivery level (credit grp 02)... and give error at PGI level (credit grp 03).....
    So that you can see difference easyly
    4. FD32 - Maintain credit limit and Risk category(001) for your customer
    5. order - delivery - PGI
    Try this
    Hope your problem will be solved
    Let me know if you have any problem
    Reward points if helpfull
    Muthupandiyan

  • Down payment and credit check

    Dear Guru,
    I want to do setting in the system for the following which I need your contributions
    1.      customer down payment, in a way that a customer sales order number must be reference during down payment if not system should give error
    2.     I want credit check to also be carried out for customer at the point of doing PGI. In other words during PGI the system should check the value of stock to be issued to customer against the customer balance if credit limit set is exceeded it should not allow further processing to done.
    Thanks in advance

    Hi,
    Doesnt it looks like standard. Let us know- where did you get struck , so that you will get the exact inputs.
    - To map the Customer down payments , are you following with SD or FI route?
    [http://help.sap.com/saphelp_45B/helpdata/en/dd/56163b545a11d1a7020000e829fd11/frameset.htm]
    -During credit check if you want the system to consider the Customer down payments , then in Tx:OBXR.
    Double click on " Down payment request" ( Spl G/L ind= F )
    select G/L account & click on "Properties"
    Now tick mark the check box " Rel for credit limit".
    2. I want credit check to also be carried out for customer at the point of doing PGI. In other words during PGI the system should check the value of stock to be issued to customer against the customer balance if credit limit set is exceeded it should not allow further processing to done.
    Credit check will not happen based Stock value, its always based on Sales price/ net value of the document. Hope you have done Credit management customization & maintained record in OVA8 for Credit Group:03- PGI
    Regards,
    Reazuddin MD

  • 'Checking' and 'Un-checking' multiple selected items

    Would like to check my entire 'Holiday' playlist without doing it one at a time.
    I forgot how and this new version of iTunes may not have this capability(?)
    Please help.

    Select the playlist by clicking on it. Now go to "edit/select all" and that will highlight the songs in blue.
    Now right click on them and select "check selection".

  • Avaliability check and ATP check for material in CO02 tcode

    Hello All,
    I have a requirement where i am building a portal for WM pick list . The requirment is like i enter a production order number on the screen and gives me the material and it's corresponding components. Now the user has the option to select these components (more than one at a time ) . Now, i have provided few buttons like ATP Check, Pick component etc.
    I need to check the availabilty for the selected order components from the list. If the ATP check is successful and all the parts are available, then user can continue with the WM pick process and the Pick Component button becomes active.
    Does anyone has any idea on how to find the availability for the individual component and if yes please provide the steps to do it.
    Thanks & Regards,
    Ravi Aswani

    Hi ,
    You can check  the availability of material (component   ) via  the following function modules
    MD_STOCK_REQUIREMENTS_LIST_API  and BAPI_MATERIAL_STOCK_REQ_LIST
    Please  check the above  two function module  for your  requirement .
    you  can use this function module  in your customized progam  to  check the material  stock.
    Hope this information helpful.
    Best regards,
    Chithaanantham

  • When opening email on Iphone 5 keeps saying password is missing for icloud account? I have checked and triple checked all account details and I can access icloud on all other devices

    New iphone 5: whenever I check my email, as it's checking the icloud account it keeps popping up "Password is Missing". I have checked al my account details and I am inputing everything right and can access icloud on other devices. I've rebooted my iphone and still no go - any suggestions?

    You have to do the following to get your new Apple/iCloud ID signed onto your device:
    1.     Go to Manage your Apple ID and change your Apple ID back to the old email address (do not verify it - this is temporary):
    Apple - My Apple ID
    2.     Go to Settings>iCloud, scroll to the bottom and Delete the iCloud account. Use your current Apple ID password when asked. Follow the prompts to delete the account
    3.     Go back into Manage your Apple ID and change your Apple ID back to your new email address (you may need to verify it again)
    4.     Go back to Settings>iCloud and sign onto iCloud with your new Apple ID. Turn on the options you want sync'd with iCloud, give it a little time to push the info down to your device.
    Cheers,
    GB

  • My nano turns itself off after one minute while connected to an auxiliary cable, not while plugged into a dock.  I have checked and double checked to see that the cable is plugged in tightly.  I restored the ipod on itunes.  Ideas?

    A support tech at Best Buy couldn't figure out the problem...hopefully someone out there has an idea for me.

    Problem solved for now.  Cleanded the jack port with a q-tip and pushed the cable in harder.  Seems to be working.  Thanks to all others who posted these past suggestions.

  • How to Block a Quote on Credit check and prevent suseqquent functions

    Hi,
    The client wants to prevent the Quotations which are blocked due to credit check to be turned in to sales order.
    We are maintaining credit group 40 , assigned it to quote, and maintained records in Fd32 and ova8.
    The item categories have been checked for credit check.
    After all these, when a quote is blocked, we can see it in vkm1 for release.
    But, it allows to create the sales order with reference to the blocked quote.
    Can anyone please help me in resolving this?
    P.S. The client wants to do this at Quote level because they are using Assembly processing. Since it is not possible to prevent creating a production order even though the credit check has been set for sales order (Client uses 90% of KMAT's (Item cat-TAC)  and Assembly processing (Strategy group 82) with VC.)
    Any suggestion to achieve either one of the above will be appreciated and Rewarded.
    Thank You,
    Manoj.

    Hi
    Please try this way...this is a guess and let's see if it works.,
    Define a new Credit Group (say 04) for Quotes.
    Assign the new Credit Group for the QT document type
    In the Define Automatic Credit Control - make the necessary assignment for the combination of
    CCA - Risk Category - Credit Group
    Check the functionality by creating the Quote for an amount exceeding the credit limit and referring it for creating the sales order, which shouldn't be allowed.
    Thanks,
    Ravi

  • Recreating planned orders strategy 81, credit check.

    We've set up a flow with strategy 81, assembly orders with planned orders. We run the availability check at component level.
    Whenever the planned order gets deleted, for instance if the SD order is blocked due to credit problems we can't seem to get the planned order created again when the order is released from the credit block.
    Anyone know how this is supposed to work? I imagine it's got something to do with running the ATP check again, but when we do it we just get something like  an ATP screen with "simulated requirements" and then a chance to create a planned order to cover.
    This is not what we want, we just want to it to create the necessary planned order for the date and do the component check. Basically we want the same thing to happen again as when we create the order from scratch.
    We can get it to work if we delete the relevant line in the SD order and recreate it, but that's a pretty bad way of doing this.
    Ideally the planned order would be recreated when the SD order block is lifted, or we could run some kind of batch job that
    could do it.
    Anyone have experiences with getting orders deleted/created when doing assembly to order?
    Regards
    Simon Pedersen
    Edited by: Simon Pedersen on Nov 26, 2010 1:35 PM

    Dear ,
    You can try in two ways :
    1.Fine tune the set up in OVA8-Checks -Dynamic Credit Check -Remove Status Block  and Keep Warning Indicator-A or Blank
    2.Pls go to SPRO >SD>Basic Functions>availabilty check and requiremets>maintain requirement for transfer of requiremnt
    Remove routine 101  so that it will allow you to proceed farther .
    3.Check the Functional Module : SD_ORDER_CREDIT_RELEASE  and check OSS note : 396791
    Refer the expert comments : Automatic creation of Production order when credit limit lock got released
    Regards
    JH

Maybe you are looking for

  • IPOD not recognised by my PC - tells me it's synched to another computer!

    30gB ipod video when put into its cradle is not recognised by iTunes - it tells me that my iPOd is synched to another PC - however, it has NEVER been synched to another machine and only ever synched to my PC!! **I have around 25 gigs of music on it b

  • Projector resolution?

    I am hooking up an Epson Home Cinema digital projector to an iMac G5. When the projector is not connected, the highest I can set the screen resolution is 1440 X 900. But when I connect the projector, then I have the option of 1920 X 1080 (which is th

  • Link problem in flash 9

    Hello, I provide flash buttons etc for myspace users. myspace ads this bit of code: allownetworking="internal" to all embed tags. with Flash 9 in firefox, no links work. is this a flash issue? Can I submit the problem if it is? Or is there something

  • Adobe Dynamic Link

    Hey Everyone: Just curious about something. When using the Adobe Dynamic Link feature in Encore, I import an After Effects project for a menu (or menu transition; basically whenever I use the AD Link). As with most any project I want to make a change

  • VA02 Sales order, shipping point

    Hi, I'm trying to save a sales order but there is in the Incompletion log that Shipping point has not been select. I tried to make a selection but I receive the message: "No possible entries exist for this field" I clicked on F1 in that field and the