Availability check determination

Hi ,
Can anyone inform  me how the Avail.Check field is determined while creating sales order. i.e., On which factors contents of this field depends on.
Thanks in  advance
Kiran.

hi,
Types of Availability Check in Sales and Distribution
Processing
There are three types of availability check:
_ Check on the basis of the ATP quantities
_ Check against product allocation
_ Check against planning
The following SD-specific control features need to be maintained in Customizing:
_ Checking group
The checking group controls whether the system is to create individual or collective
requirements in sales and shipping processing. In addition, a material block for the
availability check with transfer of requirements can be set here. The checking group can
also be used to deactivate the availability check. This option was created especially for
the assembly order so that when the bill of material is exploded in the assembly order,
the individual components, if necessary, can be classified as non-critical parts as far as
procurement is concerned.
The checking group specifies in combination with the checking rule the scope of the
availability check. It is proposed in the material master record on the basis of the material
type and the plant, and copied into the sales and distribution documents.
_ Checking Rule
You use the checking rule to control the scope of the availability check for each
transaction in sales and distribution. You also specify whether the check should be
carried out including or excluding replenishment lead time. The individual checking rules
define by transaction, which stock and inward and outward movement of goods should
be taken into account for the availability check.
_ Schedule line category
You can control with the schedule line category whether an availability check and
transfer of requirements should be carried out in the sales documents. The possible
settings for this at schedule line level are dependent on the settings in the requirements
class which is determined from the requirements type of the material.
_ Delivery item category
The delivery item category can be used to control whether an availability check takes
place in deliveries.
Requirements type
The various requirements are identified by their requirements type. The requirements
type refers to the requirements class and its control features.
_ Requirements Class
The requirements class contains all control features for planning such as relevance for
planning, requirements planning strategy and requirements consumption strategy. In
addition, it is specified at a global level whether an availability check is to take place for
the material in the sales and distribution documents on the basis of the ATP quantity
(ATP = available to promise) and whether requirements are to be passed on. A finer
degree of control can be obtained for sales documents using the schedule line category.
Replenishment lead time is only included in the check performed on the basis of the
ATP quantity.
Prerequisites
An availability check can only be carried out if the following prerequisites have been fulfilled:
_ The control elements described above for the availability check must be maintained in
Customizing for Sales and the relevant assignments made to the sales transactions
_ The availability check must be switched on at requirements class level and - for the
availability check in the sales documents - at schedule line category level
A requirements type must exist by which the requirements class can be found
_ A plant must be defined. It can either be proposed from the customer or material master
record or can be entered manually in the document.
_ A checking group must be defined in the material master record on the Sales/plant data
screen in the Availability check field
Configuring entries of the Availability Check
IMGSDBasic fncsAvailability check and TORAvailability checkAvailability check with ATP logic or against planningDefine checking groups
You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
CHAN

Similar Messages

  • Availability check determination XC ----- YC

    While creating SO through va01  for Sales organization = 2100,Distribution channel = 01,division = 01. If you enter sold to party( 583382 ) , ship to party( 583382 ) material( ma896n/a )  order qty = 1 and press enter then give credit card type as VISE and credit card no as 4111111111111111 and Exp.Date as 08.2008 then  press enter . we are getting Avail.check field as XC. Ideally it should come as YC.
    On the other hand if you all the parameters at single time and press enter we are gettting Avail.check field as YC.
    So can anybody  tell me root cause of determining this avail.check.
    Thanks & Regards,
    KIran.

    While creating SO through va01  for Sales organization = 2100,Distribution channel = 01,division = 01. If you enter sold to party( 583382 ) , ship to party( 583382 ) material( ma896n/a )  order qty = 1 and press enter then give credit card type as VISE and credit card no as 4111111111111111 and Exp.Date as 08.2008 then  press enter . we are getting Avail.check field as XC. Ideally it should come as YC.
    On the other hand if you all the parameters at single time and press enter we are gettting Avail.check field as YC.
    So can anybody  tell me root cause of determining this avail.check.
    Thanks & Regards,
    KIran.

  • Strategy group / Availability check

    Hi Gurus,
    When availability check is assign during material creation in MRP3 view, by defaul SAP assign the same one in Sales: General/Plant view. I understand that this is the same field on plant level (MARC-MTVFP)
    In my mind, the first one (in MRP3) will be used to determine MTO, MTS and so one.
    The second one (in Sales) will be used during sales order creation for availability check.
    Is there a relation between both?
    Moreover which is the link between availability check and the strategy group?
    I'm quick lost to know which I need to use on sales side, on production side because for a same availability check you can have more than one checking rules (one for SD order, one for PP...). Each one can be different.
    A best practise could not be to have similar criteria for all checking rules of the availability check?
    Thanks.
    Stéphane

    Hi,
    Availability check in the MRP3 View of the Material master is nothing but checking Group.
    ( 01- Daily requirements ,02- Individual requirements and so on )
    You allocate the checking group to the material in the material master under the availabilty check field in the MRP data screen.
    If you have not maintained a checking group for a material, the material will not be checked for availability.
    Checking Rule : In this step, you can define checking rule for applications:
        o   Sales and distribution
        o   MRP
        o   Production order processing
    Scope of Check : Checking group and Checking rule together specify the scope of the check.
    which inward goods movements and which outward goods movements are to be included in the availability check
    which stocks are to be included in the availability check
    whether the check should take into account the replenishment lead time.
    whether the availability should always be checked at plant level.
    Strategy Group:
    The planning strategy represents a procedure for planning a material and is technically controlled via the requirements types. With the help of the planning strategy, the material is automatically assigned the correct requirements type in demand management and in sales order management.
    o   The planning strategy represents a planning procedure for planning a  material.
    It is defined by one of the following:
        -   a requirements type from demand management
        -   a requirements type from sales order management
        -   a combination of both that makes sense
    o   Strategy group
        You use the strategy group to group together all the valid planning strategies. Thus, more than one planning strategy can be allowed for  a material.
    In this section, you also see various control indicators for each planning strategy on the overview screen, for example:
    o   consumption indicator (determines whether the requirements type in planned independent requirements and the requirements type in sales order management are consumed or whether sales orders increase the  master plan, and so on).
    o   availability check (determines whether the check is to be carried out according to ATP logic or as a check with planned independent requirements).
    Hope it is useful to you.
    Thanks
    Srinivas

  • Availability check and Batch Determination

    Dear Experts
    Would you provide me help documents with screen shots on Availability check and Batch Determination to customize one of our projects
    Thanks in Advance
    Regards
    Ravi

    Hi ravi
    Check the Availability check and batch configurations .
    Availability check and TOR
    [https://www.sdn.sap.com/irj/sdn/wiki?path=/pages/viewpage.action&pageid=29323]
    Batch configuration
    [https://wiki.sdn.sap.com/wiki/display/ERPLO/Batch+Determination]
    [https://wiki.sdn.sap.com/wiki/display/ERPLO/batchdeterminationin+sd]
    NOTE : Kindly search the configuration part before posting
    Regards
    Srinath

  • Availability Check Re determination

    Hi Gurus,
                  Can some one help me in resolving following challenge?
    1. When i am creating Sales order, Suppose complete quantity is not available on one day, So system creates multiple schedule lines based on customer requested delivery date.
    Schd.Line No    Material availa date  Confirmed Qty
              1                   11/17/2008             6
              2                   11/20/2008             4
    1. When i try creating delivery on 11/17/2008 it does not take S.Line with QTY-4 into delivery, Is it True?
    2. Suppose if some STO's created bfre 11/17 and i have got Goods receipts(QTY-50) , When i try creating delivery system will not allow me to create delivery for S.Line 2 because Material availability date in SO has not been changed.
    3. But if i go to SO on 11/17 and if i Re determine availability check system confirms all in single Schedule line and allow me to create delivery on that day itself.
    4. How can user knows that he has to re do the availability check for a SO?
    Thank you
    Kris

    Hi,
    Yes, It is true it is not possible to track that from which schedule line the delivery item has got the material . Regarding the second point if u run  backorder Tcode u will know how many orders are there where u need to rescheduling and avail. check
    Thanks,
    pramod

  • Ability to include Batch determination within Availability Check

    Hi All,
    My client has a requirement where the availability check must be driven based on the batches selected from the batch determination. This works fine when the line item is initially entered. However if the item gets backordered, there is no way to carry out batch determination again.
    Has someone encountered this or a similar scenario. For clarity, here are the steps :
    1. Sales order creation
    - Enter line item
    - Batch determination executed
    - Availability Check carried out based on batch found
    - Schedule line gets created with quantity determined.
    2. Backorder processing
    - Order is accessed
    - Schedule line is accessed
    - Availability Check carried out ( no batch determination executed ).
    - Schedule line gets updated with the quantity determined.
    If anyone has ideas or has worked on getting the batch determination triggered within the availability check or backorder processing, it would be great if you can share your experience here.

    My requirement is as follows:
    At the time of sales order creation system should check the availability check against the batch which is derived by the automatic batch determination.
    Can you please tell me how to configure this senario (availability check on batch level)
    Regards
    J.Srivastava

  • Availability Check not working for Item Cat TANN or YG05 in Btch Split

    Currently working on implementing Automatic Batch Determination (BD) project and one fine piece is holding up the implementation (make or break for project).
    In our QA System:
      - In inventory we have a quantity of 2 for a material: 1 in one batch and 1 in another batch.
      - Create an order with 2 line items with the same material number for a quantity of 1 each.  Line item category is TANN
      - When you generate the delivery the batch determination causes the items to split (even though you have a quantity of 1 in the line item).
      - When you go into the delivery and open up the 1st line item and look at the 900001 line, BD chooses the 1st batch for a quantity of 1.  Line item category is YG05.
      - When you open up the 2nd line item and look at the 900002 line, BD chooses the 1st batch again, NOT the 2nd batch which it should.
    If I change the line item category on the Sales Order to TAN and generate the delivery, BD correctly assigns the 1st batch to the 900001 line item and the 2nd batch to the 900002 line item.  Which is correct.
    Now for the strange part.  The TANN item category and BD works find in our DEV Sandbox, but NOT in our QAS system.
    I have spent two days now trying to find out where Availability Check is assigned specifically to Item  Categories and any differences between our DEV Sandbox and our QA systems to no avail.
    Our customers need the ability to be able to put the same material number on multiple lines of a sales order due to special pricing per customer within an order.
    Can anyone direct me to some configuration or transaction that controls Availability Checking by Item Category.  I have checked the 0VLP transaction and they are identical between our DEV and QA system for the TANN and YG05 categories.
    Any help will be greatly appreciated.

    In VOV6 the 'CP' Schedule Line Cat. has the Availability flag check.  There were a few areas where I found an "Availability" flag and made sure there were all set.
    But, I did finally find out what the error was:
    Logistics Exec -> Shipping -> Basic Shipping Functions -> Avail Check and Transfer of Requirements -> Transfer of Requirements -> Determination Of Requirement Types Using  Transactions
    There are entries by Item Category.  For
    I/C = TANN
    MRP type = PD
    the Requirement Type was missing (if you look at the entry for TAN/PD you see an 11 in the RqTy column).
    So I entered a 11 (Delivery Requirement) into the field and now the Availability Check works and I am getting the correct Batches and quantities during Batch Determination.
    There is no entry for the YG05 batch split, so I guess the system just uses the Item Category of the main line item.
    Thanks for the responses.  Sorry to bother you I should have figured this out earlier.
    Scott.

  • Sales order - Schedule line or Availability check

    Dear friends,
    I have one requirement on sales order availability check or schedule line.
    When i enter material and quantity in sales order it should not determine stock from one storage location (0003 storage location for damaged goods) through availability check or schedule line whatever.
    Can i handle this through any routine or functional config. kindly suggest.
    Regards,
    Praveen Lobo

    Dear Praveen
    Dont maintain the storage location 0003 in MMSC.  Also, in material master, you dont maintain the "Delivering Plant" so that you will have to input manually in sale order.  If Plant is not flowing automatically in sale order, your storage location will also not flow.
    thanks
    G. Lakshmipathi

  • Material Availability Check for material launched in the future

    This is the requirement;
    We are launching a product in the future. Lets use August 19th as our launch date This means that on August 19th our material can be goods issued. It cannot be shipped before then. There is no loading time etc. so our GI date usually = our material availability date
    Our production & procurement activities are executed allowing us to build our stocks so we have on hand stock of the material. We are receiving customer orders. Availability check is run and it is being confirmed for dates before the GI date (As we have stock in the system). For example, a sales order is created with a requested delivery date = 19th August; Would be acceptable if there was no transit time. But what if there is a route determined with a transit time for 2 days. This brings us to a material availability date of 17th August (And therefore a GI date of 17th August) which is before our product launch date. This needs to be avoided; the earliest material availability date must be 19th August as this will then be the earliest GI date.
    Therefore, the requirement is that availability is not confirmed for a date before our launch date. But is confirmed for the launch date.
    For example, how do Apple launch their products (like iPads)in future dates but entertain customer orders well before the date & then confirm the future dates to end customers? At the time when they receive the orders from end customers, I am sure that they would be holding stock of sufficient iPads for future deliveries.

    There may be more than one way you can fulfill the requirement. First is use of user exit. In enhancement ATP00001 (User exits in the availabity check), you can try using EXIT_SAPLATPC_002 (processing results of actual check). Here you can add logic that if the system date is less than Aug 19th 2011, then propse confirm date (material available date) as 19th of August 2011.
    The second option would be use of Replishment time (RLT) in the material master MRP3 view. You can maintain certains days to match August 19th (of course you need to reduct one day when the days go-by). At the same time in t.code OVZ9, you need to uncheck the box check without RLT for the combination of availability check rule and availabity check group. After August 19th, you can check the box again after removing the RLT time in material master. My preference is to go with first option.
    Regards,

  • Material Availability check during work order creation and Release

    Hello All,
    We are checking material availability at creation as well as release
    Say we have Material XYZ=100 in stock MMBE
    Now XYZ =100 is say at normal storage location =75
    and scrap storage location=05 and serviceable =20
    Currently when availability check is performed it checks for 95 (It excludes scrap storage location 05 )
    but we want  Availability check to be only for normal stock =75 and not for Serviceable and Scrap location
    how to do this in configuration or via exits
    Since if the material is under Scrap location it is not counting in Availability check at work order creation this logic is working fine but I do know from where this control is put that when the material is in the stock of scrap it is not counting in Availability check for work orders.Same thing I want to extend it to Serviceable stock .
    Why not it is consider it for Scrap storage location , what is config or any MM enhancement
    So that when Availability check run it will not consider Materials at SCRAP as well as SERVISABLE storage location also.
    Please have your views on this
    Regards
    pratap

    Hello
    There are two option for your requiement
    1. Changing the status of the servisable storage location stock to restricted use stock . You can include or exclude this stock status material in OPJJ. This solution is not storage location dependent. It is stock status dependent.
    2. Please refer the enhancement for the storage location determination. I am not sure about this funtionality:
    For production orders the following enhancement is available:
    PPCO0005 enhancement for storage loc. determination/backflushing
    You can use this enhancement to change the storage location and the indicator 'backflushing' in the reservation.
    The enhancement PPCO0005 contains the following enhancement components:
    Function exit
    EXIT_SAPLCOSD_001 storage location determination/backflushing
    You can find the description in modification text of the function exit.
    You can find an example of the user exit in the function group XC01 in the include LXCO1F05.
    warm regards
    Ramakrishna

  • Availability check at sales Order level

    I am working in retail project and we have Cash sales, Rush order, Standard order scenario. All articles are created as Trading articles HAWA.
    When we create a sales order with cash sales document type, Rush order the availability check happens at sales order level itself but if I use the OR document type the availability check happens at delivery document level not at sales order level
    I want the availability check to be happening at sales order level so I have marked the availability in VOV6 for schedule category CP and CV.
    I donu2019t have the stock for the material X and we have not created any purchase order for X material but system is giving the confirmed delivery date with OR document type. So I have marked the check without RTL in OVZ9. After this system shows the confirm delivery qty is 0. 
    I think if the availability check happens without replenishment lead time then only I can get the output as per my requirement
    Can anyone guide me is it the right way to address this scenario

    Hello,
    Cash sales --> The detail configuration that has to be made for Cash sales are as follows:
    1.  Create a new order type ZBV by Copying the BV Standard Order and in the functionality of ZBV activate immediate delivery.
    2.  Create a new category ZBVN by copying item category BVN and check whether credit active unchecked or not in ZBVN.
    3.  Make all the neccessay setting for the item category determination for cash sale for which u configured.
    After the delivery document is created in the background, billing document is generated wrt Order.
    Rush order -
    >
    1.  Create a new order type ZRO by Copying the RO Standard Order and in the functionality of ZBV activate immediate delivery.
    2.  Create a new category ZTAN by copying item category TAN and check whether credit active unchecked or not in ZTAN.
    3.  Make all the neccessay setting for the item category determination for Rush order which u configured.
    Please remember here the goods has to be picked and then PGI has to be posted. Then only you can bill the Order.
    And for standard order process, please refer the below link:
    [Standard order scenario|http://help.sap.com/bp_blv1600/V5600/BBLibrary/Documentation/148_BB_ConfigGuide_EN_IN.doc]
    Regards,
    Sarthak

  • Stock confiramtion at sales order level for future date- Availability Check

    Hi all
    Here is the scenario
    This setting is available in the system:
    Stock is available
    Sales order created with Requested delivery date in future-> not confirmed
    Sales order created with Requested del date today -> confirmed
    The requirement :
    how and where to change this setting in IMG so that also orders with Requested Delivery Date in future are confirmed if stock is available.
    As this is urgent request to respond quickly.
    Regards
    Devender

    Hello Devender,
    You can achieve the mentioned scenario by configuring ATP. You can do ATP with RLT or ATP without RLT.
    In ATP with RLT, system will check and confirm the quantities from existing stock only and if quantities are insufficient then the system will consider inline POs or manufacturing time to confirm remaining quantitites.
    Else you will be getting schedule lines for only items in stock and remaining will be unconfirmed as ATP without RLT will be activated i.e., system will check and confirm the quantities from existing stock only.
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which stock and inward and outward movement of goods should
    be taken into account for the availability check.
    _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible
    settings for this at schedule line level are dependent on the settings in the requirements
    class which is determined from the requirements type of the material.
    _ Delivery item category
    The delivery item category can be used to control whether an availability check takes
    place in deliveries.
    Requirements type
    The various requirements are identified by their requirements type. The requirements
    type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy. In
    addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on. A finer
    degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in
    Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the
    availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master
    record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data
    screen in the Availability check field
    Configuring entries of the Availability Check
    IMGSDBasic fncsAvailability check and TORAvailability checkAvailability check with ATP logic or against planningDefine checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    Reward points if helpful.
    Regards,
    Priyanka

  • Controlling scope of availability check

    Hi,
    The requirement is to have different scope for availability check when Standard Sales Order and a Replacement Order (Replacing the goods for free).
    In the above scenario, the item category is different, so we can have different requirement type, hence can have different requirement class.
    Item category determination is based on Sales document type, but availability check do not have any control at sales document type level.
    Scope of availability check can be controlled with the combination of Checking group (material master) and checking rule.
    I need clarification here on how we can get different scope of check for the same material.
    Clarification on this is highly appreciated.
    Regards.

    Checking Rule is assigned with Plant also. So if Replacement Order is created from a single Plant then you can achieve the same.
    Else if you don't want to run Availabily Check then you can remove the checkbox "Availability" from Schedule Line Category.
    Best Regards,
    Ankur

  • Availability check for configurable material.

    Hi,
    We are implementing SAP ECC-6 & facing
    issue during availability check for
    configurable materials.
    I'd like to take an example of
    computer for better understanding.
    Will consider Computer as super BOM and
    following 2 as BOM:-
    BOM-1. a)Monitor b) Cpu c)Key
    Board d)Scroll Mouse e)With
    Mouse Pad.
    BOM_2. a)Monitor b) Cpu c)Key
    Board d)Optical Mouse e)With
    out Mouse Pad.
    But Customer wants A)Monitor B)Cpu c)
    Key Board D)Optical Mouse e) With
    Mouse Pad.
    In the above case System will not show
    %age of Configurable materials
    available & Vice-versa but rather it
    creates requirement for computer and
    it gives availability as the lead time
    maintained in the Material Master of
    the Super Bom.
    Here the busines requirement is that
    it should show %age of configurable
    materials
    available.
    Plz find the attachment for your kind
    reference.
    Kindly guide me to sort out this issue.
    Thanks & Regards,
    Chandru

    Dear Sir,
    Thanks for the guidance/ reply . Still we have some doubts in this:
    As per your instructions, I have created sales order and  did the MRP run for the same.
    I got the planned order, then I have checked the ATP in Planned order change view and got the following results.
    No. of components checked:   641
    Missing parts:   640
    Overall confirmation date could not be determined 
    But  where I can see the Percentage of Avaialble and percentage of to be produced.
    Please guide me.
    Thanking you
    Regards
    Chandru

  • Availability Check at Multiple Plants for the Sales Order line Item.

    Hi Friends,
    We are having two plants, Plant A and Plant B. Plant A is used to issue the orders to the vendors and stock them, while Plant B is used to manufacture the Product and Stock.
    When we create the sales order, we want to check the Current Stock Plus Incomming Purchase order stock for plant A and also check current stock plus Production orders in plant B.
    for ex if the current stock is 100 in Plant A and No physical stock in Plant B but there are some production orders for 400 Qty which will be ready in 1 week.
    If i create a sales order for 500 qty which is scheduled for delivery 10 days later.  then we want to commit to the customer ( Looking at both the plants stock situation )  the system should check the stock availability for both the plants and automatically create two different line items , Line item 1 for plant A and line item 2 for plant b.
    I know there is a user exit for Multiple plant selection USEREXIT_PLANT_SELECTION  in program RV03VFZZ. The Description of the USer exit says ( This user exit may be used to provide a list of plants for which availability is to be checked)  But we have never used this one. Will this user exit do exactly what i want ??
    Did any of you, have used the above User exit in your implementations ? If so please let me know whats the purpose of this user exit
    Your reply is much appreciated.
    Thanks & Regards
    Srinivas

    Hi
    I dont know about the userexit which you are referring about
    But this is not available in R3 The system makes a Availability Check only in the plant which has got determined in the item details shipping tab and stops there
    The same is available in APO
    If there are 2 plants say 1000 and 2000
    In sales order the plant determined is 1000 and there is no stock
    In R3 system stops there
    But in APO  system checks the plant 2000 and if stocks are available it creates an STO in the background automatically from 2000 to 1000 if configured accordingly
    Even if the material is maintained in 10 plants the system will make a  Availability Check at all 10 plants and act accordingly
    Regards
    Raja

Maybe you are looking for