Material Availability Check for material launched in the future

This is the requirement;
We are launching a product in the future. Lets use August 19th as our launch date This means that on August 19th our material can be goods issued. It cannot be shipped before then. There is no loading time etc. so our GI date usually = our material availability date
Our production & procurement activities are executed allowing us to build our stocks so we have on hand stock of the material. We are receiving customer orders. Availability check is run and it is being confirmed for dates before the GI date (As we have stock in the system). For example, a sales order is created with a requested delivery date = 19th August; Would be acceptable if there was no transit time. But what if there is a route determined with a transit time for 2 days. This brings us to a material availability date of 17th August (And therefore a GI date of 17th August) which is before our product launch date. This needs to be avoided; the earliest material availability date must be 19th August as this will then be the earliest GI date.
Therefore, the requirement is that availability is not confirmed for a date before our launch date. But is confirmed for the launch date.
For example, how do Apple launch their products (like iPads)in future dates but entertain customer orders well before the date & then confirm the future dates to end customers? At the time when they receive the orders from end customers, I am sure that they would be holding stock of sufficient iPads for future deliveries.

There may be more than one way you can fulfill the requirement. First is use of user exit. In enhancement ATP00001 (User exits in the availabity check), you can try using EXIT_SAPLATPC_002 (processing results of actual check). Here you can add logic that if the system date is less than Aug 19th 2011, then propse confirm date (material available date) as 19th of August 2011.
The second option would be use of Replishment time (RLT) in the material master MRP3 view. You can maintain certains days to match August 19th (of course you need to reduct one day when the days go-by). At the same time in t.code OVZ9, you need to uncheck the box check without RLT for the combination of availability check rule and availabity check group. After August 19th, you can check the box again after removing the RLT time in material master. My preference is to go with first option.
Regards,

Similar Messages

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Availability Check for Material..

    Hi Experts,
    I got one critical issues in availabilty Check while creating the Sales Order. System is not checking availabilty of particular material in a plant, but for all others material it is checking.
    I have check the Material master of that material. and check the SPRO setting for availability check..
    Thanks and regards,
    Babarkhan

    Dear babarkhan ,
    Check wether checking group has been maintained for that material in material master -Availability check.
    Thanks&Regards
    Raghu.k

  • Material Availability check for Networks and Projects

    Hi,
    How do I get the material availability for a Network or Project. I am currently using fm IBAPI_ALM_ORDER_ATP_CHECK but the result are not satisfying.
    Do let me know if there's another way for it.

    The BAPI that I am using .. internally it uses the FM that you have suggested. The issue is that I want to check ATP for a bulk of materials and using this BAPI slows down the execution.

  • Material Availability Date for Material

    HI,
    Can anyone tell me in which transparent table can I find the Materil Availibility date.
    One can see the same in Sales Order >double click on material>Schedule Lines Tab -> Deliver. Date
    Regards,
    Shoeb

    check this
    http://sap.ittoolbox.com/groups/technical-functional/sap-log-sd/material-availability-date-825988

  • Material Availability Check Upon Confirmation

    Hello Everyone,
    I had a question regarding Material Availability check.
    Here My raw material and Semifinished Goods are Backflushed during confirmation. My client wants to check material availability check upon confirmation of production order. System should not allow Confirmation if no stock is available. Is there any way how I can do this?
    I know we can perform material availability check upon release and prevent the same, but user does not accept this since change in production order is possible even after release.
    Any suggestion would be greatly appreciated.
    Sincerely,
    Aji Kurian Mani

    Hi,
          you can configure this in the confirmation parametres --OPK4.In General individual entry tab Error handling/logs tabmake a tick for the Goods movements --Termination for the Incorrect Goods Movts.
    Termination of Confirmation if Incorrect Goods Movements Controls if the confirmation is terminated in the event of incorrect goods movements
    If these incorrect goods movements are determined by inventory management, then the option of correcting these errors is offered in the error handling
    If the correction is not successful, the confirmation is terminated
    Thanks,
    Rajanikanth

  • Hi regarding material availability check

    hi
    can any body let me know how to perform material availability check for a sales order to promise delivery date to customer.
    regards
    jaya prasanna kumar.d

    Hello
    Please check if setting for Res/Purc.req. is set as 'from release' or 'immediately'. I assume you system is set as 'from release' .
    Via note 790219 the material availability check was corrected and has replaced note 168373. From prospect of standard it does not make sense to execute a detailed material availabilty check when the material is still not mrp relevant. The detailed material check makes only sense when the component is relevant for MRP. As still mentioned above this MRP relevance can be handeled via order type customizing. When the order type set the MRP relevance to 'immediately' instead of 'from release'.
    For influencing the MRP relevance you can change the default values of the order type or set it manually. Via the follwing customizing path you can set the MRP relevance to 'immediately' for the order type and plant:
    Plant Maintenance
    -> Maintenance and Service Processing
       -> Maintenance and Service Orders
         -> Functions and Settings for Order Types
           -> Define Change Docs, Collective Purc. Req. Indicator, Operation No. Interval.
    Regards,
    Jane

  • WHILE CREATING PURCHASE REQUISITION,THE AVAILABILITY CHECK FOR THE MATERIAL

    dear Friends,
    our users want to  WHILE CREATING PURCHASE REQUISITION,THE AVAILABILITY CHECK FOR THE MATERIAL SHOULD BE ENABLE,
    at present we maintaing KP in Material Master.  if we activated what will happen?
    please advice.
    with regards,
    Rajesh G

    Hi,
    The availability check is generally used for goods movements(GR,GI,reservation) & not for PRs.
    Regards,
    Vijay

  • Difference in Material availability date for ECC ATP check & for APO ATP check in the same order

    Hi Gurus,
    I have a question: on what basis material availability date is calculated in forward scheduling?
    Eg:
    For a customer GR hours are maintained in unloading point calendar in customer master and Customers are not CIF'ed across to APO.
    GR hours are maintained for weekdays from 8:00 to 12:00 & 1:00 to 6:00.
    In a sales order with two line items with Requested date today & plenty of stock on hand for two products( ECC & APO) where line 10 (product 1) triggers ECC ATP check & line 20 (product 2) triggers APO ATP check at same location (loc1).
    RDD is today, material availability date for ECC ATP check (line 10) is today (working as expected) but where as the material availability date for APO ATP check (line 20)is pushed to next day by which for the same customer there are different delivery dates. And two delivery notes will be created & truck will be on road at different times for the same customer which is unacceptable.
    What am I missing here to get the material availability date as today for forward scheduling? Please guide me on this.
    Thanks,
    Nihar

    Hi Nihar
    Though the logic you mentioned makes sense. I am confused here with the data you have provided:
    UTC day
    UTC time
    CET day
    CET time
    UTC+6 day
    UTC+6 time
    RDD
    30/04
    17:24
    30/04
    7:24
    30/04
    23:24
    MAD
    30/04
    17:24
    30/04
    7:24
    30/04
    23:24
    Lod/GI
    02/05
    17:24
    02/05
    7:24
    02/05
    23:24
    Del
    12/05
    17:24
    12/05
    7:24
    12/05
    23:24
    Del
    13/05
    1:00
    13/05
    3:00
    13/05
    8:00
    Load/GI
    05/05
    1:00
    05/05
    3:00
    05/05
    8:00
    MAD
    02/05
    1:00
    02/05
    3:00
    02/05
    8:00
    In the first row, the difference in RDD in UTC and UTC+6 is 6 hours. However, in the last three rows I can see the difference between UTC time and UTC+6 time is 7 hours. Would you know the reason to this? Also, in the first four rows, CET time = 7:24 which should had been 19:24. Please correct me if I am missing something here.
    Thanks,
    Parth Soneji

  • Longer time for Material Availability check while creation of prd order.

    Hi guys,
    I am facing a weird problem while creating production orders thru CO01.
    I enter the component and plant and I am also using the forward scheduling option.
    for some reason, SAP is taking a long time for material availability check when I hit the release button.
    Sometimes its taking more than an hour. Its happening with few specific BOM's, and I have checked the master data but I could hardly find a problem in master data.
    Can someone suggest me some tips ??
    Thanks & Regards,
    Sashivardhan

    Hi,
    Please check the Availability check control maintained for Components it should be 01 or 02. Also check the issue storage location maintained or not. You can maintain issue storage location in BOM in Status/lng text tab in Production Storage Location.
    Hope this will help.
    Regards,
    Navin

  • Material availability check be switched off for during dispatching of order

    Hi All,
    Material availability u2013 can the material availability check be switched off during  dispatching of production order but kept when order is created? 
    Is there any implications on availibilty check.
    How can we do this?
    Regards,
    Vidyasagar

    Dear
    If you want to do Material Availablity Check only at the time of order creation , please choose Availability Check Business Function 1  with your order type  /plant combination .Keep No Check  in Capacity  and do not assing  the Overall Capacity Profile Here .
    Where as keep the Capacity Overall Profile for Production Order Type with Availablity Check  -2  and Mark No Check to material availablity  option in the same .
    In OPKP -make sure that you have Capacity Profile assinged and do not mark Confirm Partial Available Qty .
    How ever , in capacity requirement , material availablity is the intregrated part  and while dispathcing production order with in the available capacity of any operation in work centre , system tries to make sure the materials are available for processing just before actual operation starts .
    Check in CM21-Setting-Strategy -Dispatch Control -Check if you have option to un-check the Material Availability .
    Regards
    JH

  • Variant configuration u2013 availability check for Configurable material

    Hi Guys,
      We are doing the variant configuration scenario for one of our client. We are using planning strategy as 25 (sales order with variant configuration).
      When we configure the Configurable material at sales order level, we wanted to check the availability check of Configurable for the combination of selected characteristics.
    How we can configure it in the system.
    Regards,
    Shailendra

    Hi,
    availability check will work as per the checking group you had defined in system.
    additionaly you need to put tick in configuration profile for availability check.
    checking for material varient is optional, if your bussiness has materail varients you can activate type matching and while configuring the sales order if the values of charactersticks matches system will suggest you the the appropiate varient and you can replace your configurable material in sales order with it.
    hope it will help you.
    If you need some more information please explain what exactly your are expecting from system during availability check.
    Regards
    Ritesh
    Edited by: R S D on May 28, 2009 7:29 AM

  • Availability check for configurable material.

    Hi,
    We are implementing SAP ECC-6 & facing
    issue during availability check for
    configurable materials.
    I'd like to take an example of
    computer for better understanding.
    Will consider Computer as super BOM and
    following 2 as BOM:-
    BOM-1. a)Monitor b) Cpu c)Key
    Board d)Scroll Mouse e)With
    Mouse Pad.
    BOM_2. a)Monitor b) Cpu c)Key
    Board d)Optical Mouse e)With
    out Mouse Pad.
    But Customer wants A)Monitor B)Cpu c)
    Key Board D)Optical Mouse e) With
    Mouse Pad.
    In the above case System will not show
    %age of Configurable materials
    available & Vice-versa but rather it
    creates requirement for computer and
    it gives availability as the lead time
    maintained in the Material Master of
    the Super Bom.
    Here the busines requirement is that
    it should show %age of configurable
    materials
    available.
    Plz find the attachment for your kind
    reference.
    Kindly guide me to sort out this issue.
    Thanks & Regards,
    Chandru

    Dear Sir,
    Thanks for the guidance/ reply . Still we have some doubts in this:
    As per your instructions, I have created sales order and  did the MRP run for the same.
    I got the planned order, then I have checked the ATP in Planned order change view and got the following results.
    No. of components checked:   641
    Missing parts:   640
    Overall confirmation date could not be determined 
    But  where I can see the Percentage of Avaialble and percentage of to be produced.
    Please guide me.
    Thanking you
    Regards
    Chandru

  • Material availability check not consider the MMBE stock correctly

    Dear Experts,
    Thanks for your continuous support.
    I have one clarification ,at the time of process order raised COR1 - Click Material availability check after that massage had come in all material check available , but system wise some of the Bill of materials having not stock in MMBE ? What is the reason for the issue, with out stock material also given the status ok in ATP.
    At the time of confirmation i have put some loss qty , where is the way of display in loss qty after that confirmation.
    I need the report for one month process order confirmation list with order qty, confirm qty, delivered qty, &Loss qty ? Loss qty details only i am seeing kindly give the guidance if any t.code for display loss qty against the process order.
    Thanks,
    N.Umapathy

    Hi N.Umapathy,
    "Click Material availability check after that massage had come in all material check available , but system wise some of the Bill of materials having not stock in MMBE ? What is the reason for the issue, with out stock material also given the status ok in ATP."
    There can be an available quantity even if there is no stock in MMBE for that material.
    A simple example:
    Production order created with component X.
    Component X has a required quantity of 100.
    There is no stock in MMBE for material X.
    However, there is a planned receipt of stock (maybe in the form of a purchase document for example) of 100.
    In this case, it is possible that the availability check will confirm 100 is available even if it is not in MMBE.
    Another contributor on here, Jürgen L has written a very good blog on this here:
    Unrestricted use stock not equal to available stock
    Hope this helps.

  • Availability check for configurable material while creation of sale order

    Hi Experts,
    Does anyone know how stock can be viewed for configurable materials.
    Does ATP work at the time of Sales order to check for material avaialablity based on the variant in the sales order ?
    Regards
    Chandru

    Dear Sir,
    Sorry for the delayed reply. I was in long leave.
    My scenario is same like Material variant.
    This is my requirement. Whether this is possible or not.
    To check stock of machine nearest to configured specs or lead time.It should indicate the percentage of material  in production stock & lead time for manufacturing the same. & also we should be able to link production order number in sale order manually.
    Please guide me to sort out this issue.
    Regards
    Chandru

Maybe you are looking for

  • ITunes doesn't launch automatically when iPhone is connected

    This used to work fine...I'd attached my iPhone 3GS to my MacBook via USB, iTunes would automatically launch and begin synching my iPhone. Then (I'm not exactly sure what happened...perhaps it was an update, or a spate of time when I was travelling a

  • How to highlight a whole filename or folder in maverics?

    Just bought a new mac with Maverics and migrated.  Problem is that I have a lot of folders with one important file and lots of supporting files.  In snowleopard the whole filename could be coloured to make it really obvious which one I need to double

  • JSF Components are not being rendered - Websphere

    First, I don't mean rendered as in rendered="true'' What I mean is that a page I've created doesn't show any of the components rendered. Even while looking at the source, the HTML is not generated. Example: test.jsp <%@ taglib uri="http://java.sun.co

  • Font panel stopped working

    Opened a text document for the first time since installing the last big update, and I cant seem to change the font or size. I can select a different font in the font window, but nothing changes. When clicking on a font, it is highlighted with the ?se

  • IPhone 6 Plus Verizon shipping/delivery

    Has anybody that ordered their iPhone 6 Plus through Verizon actually gotten their phone yet? or even got a shipping confirmation email and tracking number? i pre ordered my 6 Plus 64gb Space grey on 9/17 and have a ship date of 10/31, my status on v