Availability check problem in sales order
Hi All,
We have one material which is assembled by using two components (BOM).
During avaiability check in sales order system should check components stock available in Stores.
· If there is sufficient stock of the component materials is available, the availability check should report a fixed number of days to make assembly,
· If there is insufficient stock of the component materials, the availability check should report the longest lead time for the material which is short + fixed number of days to assembly.
Please help
Vikas
Yes, We have maintained planned del. time. and other fields also,
My problem is that, To make assembly of material A we have two component material B and C.
in the sales order of material A, system should check availability of component material B and C.
please help
vikas
Similar Messages
-
Availability check Problem in sales order according MRP sterategy
hi,
We are using strategy 56 for configurable final product and strategy 65
for its variants.Requirement type is "ELV V". According this requirement type,
it is not possible to confirm availability check and then deliver the
sales order. We tried to mark availability check for requirement type ELV V in OVZG Tcode, but the
following error came up: "Check against plan material can only be carried
out w/o avail.check". Is there any setting to handle this problem to work
with strategies 56 and 65? Is it some configuration that we forgot?
Thanks,Yes, We have maintained planned del. time. and other fields also,
My problem is that, To make assembly of material A we have two component material B and C.
in the sales order of material A, system should check availability of component material B and C.
please help
vikas -
Changing Availability Checking Group in Sales Order.
Hello Gurus:
We changed the checking group in the material master. The existing sales orders still shows the earlier checking group. So how to change the checking group in existing sales order also (after it is changed in material master). Also, once the checking group in sales order is changed, how to de-commit and re-commit material as per the new checking group. Thanks.
- ChetanChetan,
As you have changed Checking Group in MMR later on all ur availability check etc will be calculated as per previous MMR settings..
Still go to OVZ9...See if your sales order has correct Check rule/Group..
Then Go to sales order Carry out availability check again...See if Avalability Overview has changes as per your new Check Rule..
Also Do Some R & D...
Like test with change in quantity of line items...save and carry out avalability check gain..See if schedule line dates in Sales order Is there any change?
See if any change is there...
If not better create new sales order...it will minimise your efforts and will be quicker way..
REWARD IF U FINDS THIS AS USEFUL...
Regds
MM -
Availability Check in CRM Sales Order
Hello,
We have a requirement of carrying out availability check even before entering the quantity in Sales order, meaning the availability of the product should be visible while the product is searched.
Is it possible to achieve the functionality? If yes then how should we achieve this? We are on CRM 6.0.
Appreciate your inputs!!!
Regards,
ChandrakantHello.
Did you manage to solve your issue ?
I know it's an old problem but if you could share the solution, it will be very appreciated.
Regards.
Helder. -
How to change Availability check (MTVFP) in sales order
Hi,
is it possible to change the Availability check on an material in an sales order?
Some material have the value KP (no check) of Availability check in table MARC.
If we use this material in sales orders somtimes we want change the Availability check
from KP to 01 (Daily requirements). Is this possible or have i first change the material
before i use it in sales order.
Thanks.
regards, dieterIts pre-define in material master, how particular will be treated in respective sales organization / Plant /
So its always in material master , you cant change availability check n sales order.
Once order is created, after that checkin group changed in material master, will be effective for future orders only. not effective in existing / old orders.
Regards,
Reazuddin MD -
Dear All.
Looking for a way to automatically control what's chosen in the sales order Availability Dialog box depending upon certain conditions.
This is the "Rule for transferring the results of the availability check", field TVTA-REVFP.
The default is blank, which lets the user select what they want. Under certain conditions though we do not want to display the dialog box, and just have the system automatically select "A" which is what's available on the requested date.
Mainly I've been trying to find what REVFP translates to in USEREXIT_AVAILABILITY_IN, and EXIT_SAPLATPC_001.
We've reviewing P_ATPCSX-RESMD, in EXIT_SAPLATPC_001. And trying to set it to "A" in debug with no luck.
Possibly this is too late or too early in process, or the wrong field.
Has anyone done anything like this before or have any ideas on how to approach?
Many Thanks!hey kharthik,
i got the same requirement. hv u got the solution for this ..if so please provide me..
Regds
Satya -
Disable Availability Check Based on Sales Order Type
Hi All SD experts,
Usually ( correct me if i'm wrong ) availability check is set via schedule lines item type. Is there any way that I can disable the availability check based solely on Sales Order Type ? Meaning no matter what item category or schedule lines assigned to materials, availability check will still be disable.
Besides setting in schedule lines type, what are others config that might trigger availability check ? MRP settings ? Movement type ?
Any valuable feedback will be great and much appreciated. A big thank you in advance.
Warmest Regards,
EdieHI EDIE
In order for the availability check to happen,the following configuration settings are required.
Availability check:
a) you have to define requirement class & requirement type.
b) you have to activate at scheduline category level
c) in deleviry item.cat ,there is availability check off field,,,,, if u dont mention any values here,then system checks for availability.if u mention 'x' here,then system dont check for availability.
d) you define checking group and checking rule ,these determine how availability check is going to be performed
MRP:
MRP determines how material is planned,whether it is inhouse production or external procurement.MRP also determines the time taken for the material to become available for ready use.When ever an order is rised,the requirement is passed to MRP through transfer of requirements(TOR), here MRP determines the inhouse production time or external procurement time.
Movement Type: Movement type determines the type of material movement ,whether it is Goods Issue ,,, or ,, Goods Recipt,,,,, stock transfer between two plants etc.Movement type is determined in schedule line category level.
Award points if it is useful
Prasad.G -
Availability Checking Rule in Sales Order- Urgent....
Hi Gurus,
I m PP Consultant, I want to know How Checking rule is populated whilr creating Sales Order.
e.g - I am creating sales order for the MTS material then availability checking rule A must be come. & same for MTO I think AE should come.
please revert back soon. Hey Gurus Plz help me out its urgent ticket
thanks & regards, points will be rewarded yaar...
Anant.
Edited by: anant joshi on May 29, 2008 8:17 AM
Edited by: anant joshi on May 29, 2008 11:20 AMAvailibility checking rule populates from the availibilty maitined in your material master.
i.e 01 Daily requirements
02 Individual requirements
If you go to transaction OVZ9
you will see the assignment of checking rule against 01 & 02.
e.g 01 A SD order
01 B SD Delivery
01 AE Make to order Stock
I Think This will clear your doubt.
Reward If useful
Regards
Rasik -
Manually trigger Availability Check in the Sales Order User Exit MV45AFZZ
Hi All,
As per the normal scenario where sales orders are created and the schedule line delivery dates are determined.
Based on some business logic for few customers we need to change the delivery priority and confirmation delivery date.
We are implementing this logic in the user exit MV45AFZZ in the routine USER_EXIT_SAVE_DOCUMENT_PREPARE.
The availability check logic is already implemented by then. Now we have scenarios where the date redetermined by the custom logic is greater than the one determined by the standard availability check done by SAP.
We have changed the values of the field VBEP-EDATU as per our logic but we still have 2 lines in the schedule line data where the requested date is greater than the confirmed date.
This can be tackled if we can redo the Availability Check.
Can someone provide pointers on how can we trigger the availability check manually in the code.
Regards,
KarthikWhat was the solution?
-
Availability checking rule for sales orders
Hi experts,
To meet our useru2019s requirement I have switched off the availability check at the schedule line category level. But when I created a sales order the AVC is still happening. Upon checking I have noticed the availability checking group as u201C02u201D and checking rule as u201CBu201D in sales order. To my understanding the checking rule should be u201CAu201D for all sales orders. Could you please advise as to why it is happening so?Hi,
I have done as what suggested and I created a new sales order. Upon checking (Sales screen --} environment --} availability) the availability checking group is 02 and checking rule is B. Please note that for the other sales document types we have, the checking group is 02 and checking rule is A -
Urgent : Availability check in CRM sales order using APO system
Hi,
When we create sales order in CRM while entering vendor in the line item alongwith product and quantity, it goes for a Quantity Allocation check in APO system. Is there any standard BADI or User Exit to receive the information from APO to CRM system, so that using that we can provide the error msg in case of order quantity is more than with the allocated quantity.
Thanks in advance.
KartavyaHi,
You can use BADI CRM_AV_CHECK_APO_01 for the purpose.
You can make use of any of the 2 methods of this badi:
CHANGE_APO_RESULT_CRM_FORM
CHANGE_APO_RESULT_NATIVE_FORM
kindly reward with points if helpful
sharif. -
I have a problem regarding sales order line item with confimed quanity
Hi Experts,
I have a problem regarding sales order line item with confimed quanity with '0' with delivery block but confirming the sales order quantity once the order is released from credit check.
The situation arises as per the below scenarios.
Scenario - 1 - When the sales order has two line item - one line item with confirmed qunaity in the schedule line and for the 2nd line item there is no available stock for the Material xxxxxx.
Initially the sales order is created for the line item 2 with confirmed quantity = 0, and having the delivery block = 01 for the Material xxxxxx and the order is set with credit check. Once the order is relased from the credit check. The quanity for the item 2 where the confirmed quantity will be = 0 ( Where it is not changing the confirmed quantity)
Scenario -2- Updating the order qunaity for the line item 2 as (9Pcs) it will goes to credit check and save the order.
Maintain the stock for the line item 2 ( 5 Pcs).
Once the order is released from the credit check. Then for the line item 2 the confirm quanity will be seting to 5 Pcs with Delivery blcok 01.
This should not happen, When the credit check is released even though if it has stock based on the delivery blockl it should set the confirmed quanity to Zero.
Can you please help me how to solve this issue.
Looking forward for your reply.
Thanks and Regards,Hi,
I agree with your point. In the sales order When the complete delivery check box is enabled where the confimed qty is set to zero, it is fine but when we save the orderr it goes to credit check. Once we release the order using VKM3 where in the sales order the confimed quantity is setting to 5, But it should set to Zero quantity. Quatity should not be get confirmed it should be Zero Quantity.
Further in SPRO - customizing in the deliveries blocking reasons - It has a tick mark in the confirmation blcok. But we dont want to remove the - Confirmation Block tick mark
Please any one can help me if you have any solution to solve this problem.
Thanks and Regards. -
Problem about sales order stock stock transfer and batch determination
Hi, experts, I get a problem about sales order stock stock transfer and batch determination.The following is the current situation of my system:
In OMCG I assigned search procedure ME0001 to both 311 and 311 E and ticked check batch. After that, I found that if iI need to tranfer unrestricted-use material from storage location 1000 to 2000 with movement type 311, I just need to input * at the field batch, then the system will display all of the available batches. But for the transferring of sales order stock with movement type 311 E, after I input * at the batch field, no batch is displayed and there is also no message from the system.
Can anybody help me? Is there anything else I need to do? Thanks very much.I think my question is not clear, actually I tried 562 E , 411 E and 413 already. all the transaction looking for the sales order but unfortunatly the sales order is deleted from SAP.
-
Availability check problem - with item category(TAN and TANN)
Hi All,
We have a problem with the availability check in the standard order. Suppose if I give the item category as TAN, the availabilty check is green for that line item. If I change the item category from TAN to TANN, then the availabilty check is red.
How Item categories influence the availability check? Is availability check also depend on customer?
Thanks & Regards,
Anil.Hi ,
please check in this path.
Customer Relationship Management>Basic Functions>Availability Check>Assign ATP Profile to Item Category
In this step you assign the ATP profile to an item category:
1. Choose the relevant item category.
2. Enter the name of the ATP profile in the ATP profile field.
If this field is empty, no availability check is carried out.
ATP profile-
1. A key that is assigned to the item category of a sales transaction item to control whether availability check takes place for this item.
2. If availability check is carried out in SAP Advanced Planner and Optimizer (SAP APO), the name of the requirements profile in SAP APO is used for the ATP profile in CRM Online to carry out the following functions in SAP APO:
-ATP check
-Transfer of requirements
-Delivery scheduling
-Transportation scheduling
Hope it will useful.
thanks
Hemant ghiya -
Hi Experts,
I would like to retain the old schedule lines after the ATP/GATP check in the sales order for certain conditions.
I don't want to change XVBEP,IVBEP,VBEP contents in the user-exit..
Is there any standard sub-routine or function module to reatain old schedule lines in the sales order so that the schedule lines will not update with the new values after the ATP check ?
Thanks
RayuduIn Include LV03VFMM, you have:
* Userexit availability
PERFORM USEREXIT_AVAILABILITY_IN USING DA_ATPPR.
There may be an option to implement some logic in here. However, I tried changing the value of MVERF_POS-EINTEIL[1]-VFPKZ to initial. This will ensure that when FM AVAILABILITY_CHECK_CONTROLLER is called that the following IF statement is untrue:
CHECK NOT P_ATPCSX[] IS INITIAL.
as P_ATPCSX[] Table[0x648].....
However, this will just mean that the 2nd confirmed schedule line (assuming we have > 1 schedule lines) will have a confirmed quantity to zero.
EXIT_SAPLATPC_001 could also be used. However, when I removed the "X" from CHKFLG, I get the same result; the 2nd schedule line will revert to zero.
They were the only tests I tried; I cannot think of any other ways around this....
Maybe you are looking for
-
Hi, if I will use Sigma SPP raw converter (3.5.x or 4.x) to work with .X3F raw files and select "monochrome" WB there and then quit SPP leaving that setting (SPP stores processing settings in .X3F files, almost like you can do w/ .DNG files) then Ado
-
PDF document not openeing on some PC's
Hello, In my BSP application a PDF document opens on a button click. However, the PDF seems to work on some machines and not on others. This is mainly in production. Can you please provide any suggestion for why it is behaving as such?
-
For the past week or so, I've had to move the power plug around to get the laptop to charge. I determined that it's not the cable, but is the internal part. Today, when I opened the lid to bring the laptop out of sleep mode, my desktop displayed for
-
After printing display window still says "printing..."
using HP7310 office jet all inone can't print while this message "printing..." is still in display window on printer. Once it goes away after about 5 minutes I can print again. How do I fix this? Shane
-
Avoid Alert window on close/Problem getting serious
A website button on click opens a Link.swf. The Link.swf on init opens a PopUp in Full size. Perfect. But now, I have under my PopUp window the useless Link.swf. I want to get rid of it. The code in my Link.swf is: getURL ("javascript:var myWin; if(!