Availability check purpose

I want to know the purpose of availability check in material master.(daily requirements,individual requirements etc) .
how does it effect in planning.
which values to be selected in availability check.
Edited by: Csaba Szommer on Jan 6, 2012 8:26 AM

Hi,
u could search threads available on this topics,
Pl. refer following excerts from SAP help.
Availability Check 
Use
During sales order processing, the availability check enables you to tell the customer if the product can be delivered on time. You can control how the availability check is carried out by setting the Availability check field in the material master.
Integration
There are two availability check methods:
u2022     Check against planned independent requirements
o     Used with, for example, strategy 50, 60, 52, 63, 74. (All other strategies use ATP check.)
o     Only planned independent requirements are taken into account
o     No MRP elements (for example, stock) are taken into account
o     No requirement to customize the checking rule
o     The field Availability check is only used to determine the requirements passing (daily or individual requirements)
u2022     Available-to-Promise (ATP) check
o     Check is performed against stock and all other MRP elements (for example, stock, production orders, sales orders, requirements, schedule lines)
o     Option to check against a replenishement lead time (RLT).
o     Very accurate
o     Always performed when production orders are processed.
Activities
Transferring Requirements from Sales Orders
The following applies to both checking methods:
In the standard system, checking group 01 is set up so that daily requirements are passed on to production. This means that there is only one line visible in the stock/requirements list (as shown above) that contains the cumulated quantity for one day, rather than the individual sales orders. The sales order number does not display on the Order line in the stock requirements list.
If you want to see individual requirements, you can create a new checking group in Customizing for Sales and Distribution (choose Basic Functions  Availability Check and Transfer of Requirements  Availability Check  Availability Check with ATP logic or against planning  Define checking group) and a new checking rule that combines the new groups with A.
Set up the ATP Checking Rule for Sales Order Processing
The following applies only to the ATP checking method:
u2022     You can define how the system checks availability of components in production orders in Customizing for Sales and Distribution. Choose Basic Functions  Availability Check and Transfer of Requirements  Availability Check  Availability Check with ATP logic or against planning  Carry out control for availability check.
AV (= Checking group for availability check)     Description     ChR (= Checking rule for availability check)     RLT
01     Daily requirements     A     'Blank' (= check with replenishment lead time)
02     Individual requirements     A      'X' (= check without replenishment lead time)
u2022     The checking rule in the sales order is A in make-to-stock strategies and AE for make-to-order strategies. The checking rules for 01/AE and 02/AE are the same in the standard system.
u2022     You can define your own checking rule for production orders in Customizing. In the standard system,the checking rule for production orders is PP.
Set up the ATP Checking Rule for Production Order Processing
The following applies only to the ATP checking method:
u2022     Maintain the Availability check field on the MRP screen of the material master. In the IMG for Production, choose Production Orders  Operations  Availability check  Define checking group.
u2022     Maintain the checking rule. In the IMG for Production, choose Production Orders  Operations  Availability check  Define checking rule. The checking rule is assigned to the order type and transaction (create/release). In Customizing, choose Production Orders  Operations  Availability check  Define checking control.
u2022     Define the scope of the check. In the IMG for Production, choose Production Orders  Operations  Availability check  Define scope of check.
u2022     Maintain the checking control. In the IMG, choose Production  Production Orders  Operations  Availability check  Define checking control to define a plant and production order type combination and when check availability can be performed, during order creation or during order release.
Regards
Devendra

Similar Messages

  • Dynamic Availability Check for Goods Issue,Transfer Posting

    Dear All,
    Can anyone explain the Dynamic Availability Check??
    I mean the relevance on setting this indicator for a mov.type?
    In OMCM & OMCP I have defined a Checking Rule & also assigned the same to a Mov.type as well the transaction code?
    whether the Dynamic Availability Check concept is same in case of sales ie Say I have a Stock of 100 qtys for a material in a plant & in the availability Scope of Check I have ticked the include safety stock.
    In my material master I have a safety stock of 500 qtys.
    So when I do a transfer posting for this material with Qty as 200, System should allow me do proceed as in my availability check I have enabled the safety stock option.
    But this is not happening & I am getting an error message as deficit of stock 100 nos. Also what is use of setting the dynamic availability check indicator for my mov.type as A - Warning message , B - Error Message etc..
    Kindly suggest valuable inputs.
    Thanks & Regards,

    For e.g. there is Available Stock = 1000 qty and safety stock in material master = 500 qty then system will allow you to use 1000 qty only not 1500 qty
    This is only used for availability check purpose whether system it should be considered or not?
    And following indicators means;
    A  W mess. only issued in the case of non-availability
    B  E mess. only issued in the case of non-availability
    E  Message in any case: W mess. for non-avail., otherw. S mess.
    F  Message in any case: E mess. for non-avail., otherw. S mess.
    S  Availability check only with simulation
    The above indicators indicate whether the system is to check for existing material requirements.
    Award appropriately once the thread is answered.

  • Availability check run requirement in the Sales order Save user Exit.

    Hi Gurus,
    As per the requirment we are using a user exit SAVE SALE ORDER PREPARE for BOM purpose to reconfirm the confirmation qty.
    Now we need to add one more logic in the same user exit, which will run the availabilty check run for each of the line items of the BOM and consider latest confirmation qty from it. So my concern is it possible that we can call the availabilty check run event with in the user exit SAVE SALE ORDER PREPARE or this not advisable?
    Please let me know..
      Regards,
      Babs

    HI Venkat,
    Thanks for your reply.Yes you are right availability check runs automatically at sub item level.
    But please note the customer requirment iteself is is little different from std BOM configuration.
    Currently the availabilty check is activated both at header and sub item level. They are maintaining the stock for header and sub item level.Also the these sub items are some time being sold as invidual materials. hence there exist a mismatch in the stock value between header and sub items.
    when a sales order is created both header and sub items will have confirmation with different value between each and the same mismatched values are being passed in to delivery. But the deliveries can not be processed for PGI because of the mismatched confirmation qty between header and item level.
    I guess now you the rrequirment.
    So we are using the SAVE SALE ORDER exit which will re check the confirmed qty between header and item and takes lowest confirmed qty and change the confirmed quantities from all the line items to lowest one, so that confirmation qty among all the line items are same. This is the first logic we are planning.
    Further there is one more additional process BOP need to be run for this header and sub items, which will change the confirmed qty based on the latest stock for individual line item. even in this case also the user exit SAVE Sale order is being called but we need to run the availability check run additionally because of which our requirment will be taken care.
    Regards,
    Babs

  • Availability Check at Multiple Plants for the Sales Order line Item.

    Hi Friends,
    We are having two plants, Plant A and Plant B. Plant A is used to issue the orders to the vendors and stock them, while Plant B is used to manufacture the Product and Stock.
    When we create the sales order, we want to check the Current Stock Plus Incomming Purchase order stock for plant A and also check current stock plus Production orders in plant B.
    for ex if the current stock is 100 in Plant A and No physical stock in Plant B but there are some production orders for 400 Qty which will be ready in 1 week.
    If i create a sales order for 500 qty which is scheduled for delivery 10 days later.  then we want to commit to the customer ( Looking at both the plants stock situation )  the system should check the stock availability for both the plants and automatically create two different line items , Line item 1 for plant A and line item 2 for plant b.
    I know there is a user exit for Multiple plant selection USEREXIT_PLANT_SELECTION  in program RV03VFZZ. The Description of the USer exit says ( This user exit may be used to provide a list of plants for which availability is to be checked)  But we have never used this one. Will this user exit do exactly what i want ??
    Did any of you, have used the above User exit in your implementations ? If so please let me know whats the purpose of this user exit
    Your reply is much appreciated.
    Thanks & Regards
    Srinivas

    Hi
    I dont know about the userexit which you are referring about
    But this is not available in R3 The system makes a Availability Check only in the plant which has got determined in the item details shipping tab and stops there
    The same is available in APO
    If there are 2 plants say 1000 and 2000
    In sales order the plant determined is 1000 and there is no stock
    In R3 system stops there
    But in APO  system checks the plant 2000 and if stocks are available it creates an STO in the background automatically from 2000 to 1000 if configured accordingly
    Even if the material is maintained in 10 plants the system will make a  Availability Check at all 10 plants and act accordingly
    Regards
    Raja

  • Availability check with storage location

    Hi experts,
    I have one problem in availability check.I will explain in steps.
    There are two storage locations
    RMMU: main storage location where GR will happen from vendor.
    WPMU:WIP storage location from where material will be issued to production order.
    A is fert material.
    B is bom item (raw material) and in material master maintained WPMU production storage location.
    Now after sales order(100 nos) and after mrp run we will get the Planned order for 100 nos and Purchase requisition for 100 nos for material B.Now we will do the GR for "B" in Storage location RMMU.
    Now we will create the Production order for ''A''.After availability check in production order ,it will show the material availability.
    The problem is that we maintained the prod.storage location as "WPMU''and in that no stock is there.It is in RMMU.Still it is giving availability of material.
    Requirement is it check the stock in  prod.storage location i.e. WPMU
    Please throw some light on it.
    Thanks in advance.
    Regards
    VILAS

    Find out your checking rule maintained  in Order Control OPJK for your order type and plant combination for both
    Create(1) and Release purpose.
    Then in t.code OPJJ and for that Checking rule and Checking group combination(Maintain in material Master) go to detail screen and don't activate check box for No Storage location inspection.
    In this case system will check the available stock in Production storage location only.If it is not maintain then system will check at plant level in all storage locations.
    If production storage location is not maintained either in material master or in BOM then maintain it.
    karthick

  • MRP  Availability check

    Hi All,
    I am running MRP for a Assembly which is to be assembled by a subcontractor. MRP run should create PR for child parts of Assembly(Finished Goods). MRP type is PD and Strategy is 10 and availability check for Assembly (Finished Goods) is KP and for child parts is 02.
    The Purpose of MRP run is simply creating PR for child parts (Raw Materials) as per Plan given in Demand Management table (MD61)
    PRs are getting created sucessfully after MRP run but I have issue with Assembly parts (Finished Goods).
    MRP requirement calculation should not consider stock of Assembly and it should also not consider subcontracting Purchase order of Assembly parts (Finished Goods)
    Currently it is considering both. How I can avoid this . MRP calculation should consider only Plan given in Demand Management table.
    Thanks
    Sanjay
    Pls. refer thread posted earlier
    Re: MRP  Availability check

    Hi,
      In the scope of check OPPJ for the assembly exclude the sloc stock by
      activating the indicator  No sloc stock inspn for assembly.
      For Subcontractor stock In OPPJ activate the indicator W/O subcontracting
      ie you need to define two scope of checks.
      You use the logic of Material Provision indicators.
    Regards,
    nandha

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • Set Availability Check to Exclude Planned Order

    Hi All,
    anyone know how to set the availability check so it will not include the planned order in the calculation ?
    I find one setting in SPRO, the path is :
    Sales & distribution ==>  Basic functions ==> availability check and Transfer of Requirements ==> Availability Check  ==> Availability Check with ATP Logic or Against Planning ==> Carry Out Control for Availability Check
    select one of the record, and update filed "Incl. Planned Orders".
    I've uncheck that field, but I can't get the appropriate result. When I create a new sales order, the availability check still take the planned order I created before into account.
    The problem is, my user want to prevent creating delivery before the goods are already put in the stock. So the planned order should not be considered in the availblity check.
    Thank you in advance
    Rudy

    Hi Rudy,
    Concept of availability check is to verify if the stock is available at the time of creation of sales order. If available, when it can be ready for delivery (as Packing, arranging for transportation, etc may have lead time) & if not available, when it would be available considering Packing, arranging for transportation, etc lead time.
    Availability check whether material is available on required delivery date (backward scheduling) or not. If not available on required delivery date, system will propose next available date (forward scheduling)
    1.     Define Checking Groups
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups
    You define checking groups with which you specify the type of requirements records the system is to create when processing sales orders or deliveries
    2. Define Material Block for Other Users
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Material Block for Other Users.
    3 .Define Checking Groups Default Value
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups Default Value.
    4. Carry out Control for Availability Check
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Carry Out Control for Availability Check.
    5. Define Procedure by Requirements Class
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure by Requirements Class.
    6. Define Procedure for Each Schedule Line Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure for Each Schedule Line Category.
    7. Determine Procedure for Each Delivery Item Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Determine Procedure for Each Delivery Item Category.
    8. Checking Rule for Updating Backorders
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Checking Rule for Updating Backorders.
    9. Define Default Settings
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Default Settings.
    Availability checks
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how – confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) – planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics – sales & distribution – sales – environment – availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks –
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups –
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above – checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing –
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out –
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups –
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 – summarized requirements and 02 – individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users – the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check – in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under –
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order – is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    Please Reward If Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Avail. check in subcontracting orders

    Hi guys,
    I have recently faced an issue that must be a well-known problem. Unless I am doing something wrong.
    When you place a subcontracting PO, its components are reserved in stock. The problem is that the availability check is not started automatically when the order is placed, but must be explicitly triggered by the user on the component screen.
    This creates two problems:
    - There's no warning about unavailability of components
    - The reservations are not confirmed (committed), which means that the other orders (prod. orders, sales orders) competing on the same stock don't see them and reserve the stock for themselves.
    I wonder if there's a way in standard SAP (either customising or a user exit) to force availability check of the components.
    TIA
    Raf

    Hi,
    Thanks for the input. I have found the answer - it is impossible.
    If you like, check the OSS note 323991 why.
    In short, SAP doesn't want to reserve the stock and doesn't recommend doing this manually since the following stock movement (541) doesn't consume this reservation, as this is the case in e.g. SD and PP. The functionality is simply not there.
    For our purposes however, it is enough to cancel the reservation when the the subcontracting PO is recieved and closed (thus effectively cancelling the reservation). But SAP doesn't have provision for this case. We will have to continue running the avail. check manually...
    BR
    Raf

  • MRP planning and Availability check

    Dear Friends ,
    We are updating  Availablity check in the MRP view for all materials in materials master , While running MRP system is considering ATP check as per SPRO settings defined for Availablity check group .
    Weare not conclude what is the relation for MRP run and availablity check , or  any seperate SPRO settings available for MRP on availablity.
    If we not assigned the Availablity check in MRP view what will happen if  during MRP run ?
    thanks & regards
    Suresh Babu.S

    Suresh,
    MRP does not look at what you have configured for Availability check. These two are independent from each other.
    As given in Help,
    In the planning run, the system carries out the following partial processes:
    1. The system checks the planning file entries. Here, the system checks to see whether a material has been changed in some way relevant to MRP and should therefore be included in the planning run (see Checking the Planning File Entries).
    2. The system carries out a net requirements calculation for every material. Here, the system checks to see whether the requirement quantity is covered by available warehouse stock and fixed receipts from Purchasing or production. If the requirement quantity is not covered, the system creates a procurement proposal (see Net Requirements Calculation).
    3. Then the system carries out the lot-sizing calculation. Here, the system takes the lot-sizing procedure and, if necessary, the rounding up or down values into account (see Lot-Sizing Calculation).
    The system carries out scheduling to calculate the start and finish dates of the procurement proposals (see Scheduling).
    4. The system determines the type of procurement proposals. Depending on the settings, the system creates either planned orders, purchase requisitions or schedule lines for a material (see Determining the Procurement Proposal). If you have maintained the necessary specifications for procurement quota arrangements, the system determines the source of supply which it assigns to the procurement proposal (see Quota Arrangements).
    5. The system recognizes critical situations which the planner has to processes manually in the planning results. For this purpose, the system creates exception messages and carries out a rescheduling check (see Creating Exception Messages and Rescheduling Check).
    Availability check is not a planning process, it is basically a CHECK, based on the Scope of check derived for that Particular transaction, system check the availability of a material and it can confirm or propose the possible availability date.
    In short if a material is defined with Check Group "KP", but with MRP type PD, still MRP would creates procurement proposals if the demand is more than the stock+recipets.
    Regards,
    Prasobh

  • Availability Check & MRP

    Dear All,
    I need your inputs in the following scenarios:
    a) Availability Check
    b) MRP
    I know some details about customizing these from SD Point of view(IMG>SD>Basic Functions).
    I need to understand logically why and where these are used in SD Flow / SD Module.
    Kindly give your suggestions to understand these in a better way.
    I would be greatful to you if you can provide me the links or sources wherein I get the information regarding these.
    Regards,
    Raj Kumar Reddy,
    SAP-SD Consultant.

    Dear SD
    a)  Availability Check
    When you enter a sales order, you can only confirm the delivery of the goods for the required delivery date if the goods are available for all the necessary processing activities which take place before delivery:
    The shipping department must ensure that freight forwarding or another shipping company is advised early enough so that sufficient time remains for packing and loading to be carried out. An availability check can be carried out on the deadline date for availability for the goods.
    The procurement department must ensure that the production and purchasing departments are advised of inadequate stock quantities so that goods can either be produced punctually or ordered. Sales transfers the information on materials ordered as requirements to material requirements planning. Requirements are planned outward movements of stock. The transfer of requirements informs production that goods must be produced, or advises purchasing that purchase requisitions have been created for which purchase orders must be created and sent to the suppliers. An availability check can only be carried out if these requirements are transferred.
    b)  MRP
    The main function of material requirements planning is to guarantee material availability, that is, it is used to procure or produce the requirement quantities on time both for internal purposes and for sales and distribution. This process involves the monitoring of stocks and, in particular, the automatic creation of procurement proposals for purchasing and production.
    In doing so, MRP tries to strike the best balance possible between
    optimizing the service level and
    minimizing costs and capital lockup.
    The MRP component (PP-MRP) assists and relieves MRP controllers in their area of responsibility. The MRP controller is responsible for all activities related to specifying the type, quantity, and time of the requirements, in addition to calculating when and for what quantity an order proposal has to be created to cover these requirements. The MRP controller needs all the information on stocks, stock reservations, and stocks on order to calculate quantities, and also needs information on lead times and procurement times to calculate dates. The MRP controller defines a suitable MRP and lot-sizing procedure for each material to determine procurement proposals.
    Thanks
    G. Lakshmipathi

  • Availability Check Issue

    We were using on similar batch ZZZZZ for all migration purpose so that all material will be received in ZZZZZ batch & sold from Z1000 batch whose date of production is 31.12.2008 and got expired on 29.06.2009.we have restricted Z1000 batch in MSC2N transaction.
    And some of the sales orders are incomplete due to stock issue and are reflecting in MD04 and these sales orders will be processed separately by loading the stock manually.
    Now the issue is that when the end users are creating sales order system undergoes availability check and quantity is not being confirmed. But when I make the batch ZZZZZ  unrestricted system confirms the stock provided ZZZZZ  batch should no contain any free stock. The bottleneck in making ZZZZZ  batch unrestricted is, if any of the free stock is available in ZZZZZ batch system confirms that quantity which is not supposed to be.
    I have checked in availability checking rule also u201CInclude restricted stocku201D is deactivated so system is not checking restricted stock.
    Kindly suggest any solution for this issue.

    Hello Jayant,
    Check out the material status in Stock/Requirement list (MD04), it will give you better picture about the open items.
    Hope this helps.
    Regards
    Arif Mansuri
    Reward if answer is helpful.

  • Sales Order - Availability check for components

    Hi All,
    I have 2 parts to my qns.
    1. When a sales order is created for a component, with a req date, the system checks & informs if the mtl can be provided on the req date & if not proposes a new date - May i know which checking rule is used & also what all does the system check for?
    2. A component say 'ABC' is used internally for production purpose & also sold as a spare part. A sales order for this component is created with a req dt. say 1.3.2008. The system commits the stock to the sales order. A production order is created later with a req. dt for 'ABC' say 1.2.2008. So when i carry out a collective availability check for the plant with ATP checking rule & with availability check reset indicator ticked, i believe the system should reset the commitments made to the sales order & assign the stock to the production order, but it is not happening so. Once the commitment is made to the sales order, it is not resetting, how can i change this behaviour?
    Await inputs.
    Anyone to help on this?
    Edited by: Vivek on Jan 15, 2008 10:56 AM

    As we know, availability check is controlled by the combination of checking rule and the checking grp.
    U can see this at OVZ9 Screen. checking grp is proposed from material master Sales org 2 view or MRP2 views.
    In the OVZ9 screen itself, we are setting what are all the stocks the system has to include when doing availability check.
    The checking rule specifies the scope of the availability check for the respective transactions in sales and distribution by specifying precisely which stocks, receipt and issue elements should be taken into account during the availability check.
    Every checking rule is allocated to a checking group: together these two elements determine the final inspection requirements. In addition, the checking rule includes a specification whether or not an availability check should take into account the replenishment lead time.
    Currently, the checking rule is predefined in SD.
    while answering to the second question, i think the system carries out the availability check again at the time of delivery, provided u need to maintain the availabililty check indicator at req. class level.
    Hope i answers.
    Reward points if it is useful.

  • Sales order Availability check for Reservation

    hi ,
    When i create a sales order , it should check the availability also reserve the required quantity for the order
    automatically. pls let me know the step by step process
    mohan

    Hello,
    Availability check with ATP logic can only promise the amount of stock that can be delivered to the customer on a particular date, it cannot reserve the stock until the order the saved. But once you save the order the stock allocation is done automatically.
    Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date.
    For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material.
    It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    The system will not allocate or reserve any stock of items until the order is saved.
    REWARD POINTS IF HELPFUL
    Regard
    Sai

  • Availability check in PM order

    Hi,
    In a PM refurbishment order with components, when I press the 'Availibility Check' button before release of the order, I am getting the message "No check exists for planning (item: 0010, mat.:XXXXX" (Message no. C2119). I have already maintained the configuration for the plant and the order type in Maintenance and Service Orders-Functions and settings for order types-Availability check for material, PRTs and capacities-Define inspection control as 1 (Check during order creation) and component check type as 1 (check against preliminary planning) and collective conversion as 1 (User decides on creation if material is missing) for material availibility. Checking rule is PM (Checking rule for plant maintenance).
    Please tell me what I am missing and what additional configuration I need to maintain. Our business purpose is to ultimately perform an ATP check before the components are committed from the warehouse for consumption after order release. But before that I need to ensure that the availability check is working correctly and not giving error as above.
    Thanks and regards,
    Abhijit

    Hello
    You have to mantain the additional Availabilty Check 02 for 'Release' control parameters
    Plant Maintenance and Customer Service -> Maintenance and Service Processing -> Maintenance and Services Orders-> Functions and Settings for Order Types -> Availability Check for Material, PRTs and Capacities -> Define Inspection Control.
    Then
    Availabilty Check 02
    Checking Rule:Which your using earlier
    Release Material:2
    Regards,
    Rakesh