Availability check for Make to stock and Make to Order

Dear All,
Client is selling   Make to stock and make to Order material.
How and what settings need to do for Avaialbility check.or we can use standard one.
I hope in case of Make to Order availability check may not happen.
Please correct me.
Thanks in advance.
Regards,
Shrikant

hi,
yes for make to order we dont have AvChk.  for make to stock items u need to follow the
below configuration.
Availability check
1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
7. There are three types of availability checks u2013
Check on basis of ATP quantities.
Check against product allocation.
Check against planning.
Configuring Availability check through Checking Groups u2013
1. The checking group + checking rule determine how the availability check is to be performed.
2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
6. Advantages of individual processing over summarized processing u2013
Backorder processing is possible.
You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
The system automatically uses individual requirements in case of special stock items.
7. Required data for the Availability check to be carried out u2013
The Availability check must be switched on at the requirement class level.
The Availability check must be set at the schedule line level.
A requirements type must exist by which the requirements class can be found.
A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
8. Configuring Availability check and defining Checking Groups u2013
Checking groups are introduced into the sales order based on the setting in the material master record.
SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
If an entry exists, this default value is over written by MMR.
11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
regards
anand

Similar Messages

  • Availability check for configurable material while creation of sale order

    Hi Experts,
    Does anyone know how stock can be viewed for configurable materials.
    Does ATP work at the time of Sales order to check for material avaialablity based on the variant in the sales order ?
    Regards
    Chandru

    Dear Sir,
    Sorry for the delayed reply. I was in long leave.
    My scenario is same like Material variant.
    This is my requirement. Whether this is possible or not.
    To check stock of machine nearest to configured specs or lead time.It should indicate the percentage of material  in production stock & lead time for manufacturing the same. & also we should be able to link production order number in sale order manually.
    Please guide me to sort out this issue.
    Regards
    Chandru

  • Make to stock and make to order

    Hello,
    Is it possible , if we have a sales order (make to order sales order) when running MRP, to ready unrestricted stock. It means, there is a sales order for material A for customer B, in MMBE transaction there is not special stock for customer B, but there is unrestricted stock for material A. So, when running mrp, instead ECC/SAP creates a MTO purchase requisition for customer A, it reads unrestricted stock?
    thanks.
    Renato Rêllo Penna

    i think there is a slight confusion in ur question. material A, customer A??. can u elaborate abit more

  • Is there a place to see the "Marker Text" for the entire index and make changes?

    I know how to make individual changes in "marker text" for the Index.
    Is there a place to see the "Marker Text" for the entire index and make changes there?
    I am indexing a book that uses quotes from scripture.
    As an example, I want to change listings from
    Colossians 3:10-11
    to
    Colossians 3 verses 10-11
    I would appreciate any help.
    If this is not the correct venue for this question, please disregard.

    You didn't mention which version of FM that you're using. In FM9, this can now be done in the Marker Pod.
    There are third-party utilities that also let you see all marker content.
    In the freebie category is MarkerWorker from Cudspan at: http://www.cudspan.net/plugins/
    In the paid plug-in category are:
    IXgen: http://www.fsatools.com/ixmid.html
    MarkerTools : http://www.leximation.com/tools/info/markertools.php
    emDex: http://www.emdex.ca/
    Indexing add-ons:
    IndexTools (helpful for formatting and other Index layout tricks): http://www.siliconprairiesoftware.com/Products.html
    In the DIY category, you can create a List of Markers for the Index (with hypertext enabled), open the Marker window (Special > Marker...) and then use ctrl+alt click on the entry to make a hypertext link to the location and see it in the marker window for editing. [Note: you can also do the same thing from the Index itself]

  • Error during availability check for order

    Hi PM experts,
    How can I make below warning message (W) to an error message (E)?
    Message no: CO820 (Error during availability check for order)
    Regards,
    Nizam
    PM Consultant

    Hi,
    you can cantrol not to release maint orders in case if parts are missing by OIOI transaction, here under Material Availability  against Release material you maintain option 3 No release if parts are missing. This way you can achieve this. If there are other components which has stock on Maint order then delete the un-available material from maint order then it will allow you to release the order.
    Hope availability check rule is maintained on material master.
    Hope it helps.
    Regards,
    N.Nagaraju

  • After I tried to update my ipod to iOS 5, my ipod screen turned to the screen of the cherger cord pointing to the iTunes symbol. when I try to restore it, it says that the 3014 error has occured. I went to check for support on iTunes  and i did download t

    After I tried to update my iPod 4 to iOS 5, my screen turned to the USB cord pointing to the iTunes symbol. When I try to restore it, it says that the 3014 error has occured. I went to check for support on iTunes and I did download the latest version of iTunes (11.1.1). I tried to restore it again and the same error occured. I dont understand half of the instructions for the resolution of the 3014 error code so I did the instructions that I understood and nothing has changed. Please tell me how I can fix it.

    Just what do you not understand?
    Did you try:
    Try to restore from another known-good computer and network.
    Error 3014
    This error occurs when iTunes can't reach gs.apple.com in a timely fashion. Follow the steps below to contact the iOS software update server gs.apple.com.
    Unable to contact the iOS software update server gs.apple.com
    Error 1004, 1013, 1638, 3014, 3194: These errors may be the result of the connection to gs.apple.com being redirected or blocked. Follow these steps to resolve these errors:
    Install the latest version of iTunes.
    Check security software and ensure that communication to gs.apple.com is allowed. Follow these stepsfor assistance with security software.
    Check the hosts file. The restore will fail if there is an active entry to redirect gs.apple.com. Follow theadvanced iTunes Store troubleshooting steps to edit the hosts file or revert to a default hosts file. See "Blocked by configuration: (Mac OS X/Windows) > Rebuild network information."
    Try to restore from another known-good computer and network.
    If the errors persist on another computer, the device may need service.
    The "device may need service" means a hardware problem. In that case make an appointment at the Genius Bar of an Apple store.
    Apple Retail Store - Genius Bar

  • Availability check for STO?

    Hi,
    While doing Stock transfers order (PO) plant to plant with in the company code, there is no controlling on availability check, though stocks are not available in the supplying plant, while making delivery thro VL10B,  delivery is creating with '0' Qty. This system want to stop the delivery when quantities are not available in the supplying plant.
    The following steps are configured for availability check for STO
    Schedule line Like NN activated for availability, Assigned schedule lines to item category like NLN and determined rule for STO document type, plant, Delivery type and checking rule in MM.
    how to control the delivery,  when stock are not available in supplying plant? (Means, when stock are not available in the supplying plant, delivery creation should stop through VL10B)
    Is there any more configuration is required, pl guide.
    Rao
    Edited by: R Rao on Aug 22, 2008 1:42 PM
    Edited by: R Rao on Aug 29, 2008 6:03 PM

    Alexandro,
    During delivery creation, the system performs an availability check (ATP).  You can assign the Delivery notice type for a stock transfer order delivery notice at OMGN.  The ATP for DN will be the standard ATP rules for SD delivery notices (checking rule B).You can determine which elements are used for availability checking in OVZ9. 
    To meet your goals, I suggest you use:
    Check w/o replenishment lead time ticked
    Include deliveries ticked.
    Optionally, according to your company's policies
    Include safety stock ticked
    Include quality inspection stock ticked
    Everything else unticked.
    Regards,
    DB49

  • Sales Order - Availability check for components

    Hi All,
    I have 2 parts to my qns.
    1. When a sales order is created for a component, with a req date, the system checks & informs if the mtl can be provided on the req date & if not proposes a new date - May i know which checking rule is used & also what all does the system check for?
    2. A component say 'ABC' is used internally for production purpose & also sold as a spare part. A sales order for this component is created with a req dt. say 1.3.2008. The system commits the stock to the sales order. A production order is created later with a req. dt for 'ABC' say 1.2.2008. So when i carry out a collective availability check for the plant with ATP checking rule & with availability check reset indicator ticked, i believe the system should reset the commitments made to the sales order & assign the stock to the production order, but it is not happening so. Once the commitment is made to the sales order, it is not resetting, how can i change this behaviour?
    Await inputs.
    Anyone to help on this?
    Edited by: Vivek on Jan 15, 2008 10:56 AM

    As we know, availability check is controlled by the combination of checking rule and the checking grp.
    U can see this at OVZ9 Screen. checking grp is proposed from material master Sales org 2 view or MRP2 views.
    In the OVZ9 screen itself, we are setting what are all the stocks the system has to include when doing availability check.
    The checking rule specifies the scope of the availability check for the respective transactions in sales and distribution by specifying precisely which stocks, receipt and issue elements should be taken into account during the availability check.
    Every checking rule is allocated to a checking group: together these two elements determine the final inspection requirements. In addition, the checking rule includes a specification whether or not an availability check should take into account the replenishment lead time.
    Currently, the checking rule is predefined in SD.
    while answering to the second question, i think the system carries out the availability check again at the time of delivery, provided u need to maintain the availabililty check indicator at req. class level.
    Hope i answers.
    Reward points if it is useful.

  • Different availability check for VA01 as for VA02

    Hello,
    For the availability check, during sales order creation (VA01), the system takes into account the requirements transferred to MRP. In some cases, an order cannot be confirmed, even if there is sufficient stock according to CO09.
    If I change the order (VA02) and run the availability check again, now the system can confirm the order.
    It seems that SAP performs a different type of availability check during VA01 as for VA02. Does anybody know where in SPRO I can customize the settings for this?

    Hi there,
    In VA01 system doesnot confirm the order even the stock are available because the available stocks are reserved for other orders which are logged in prior to your order.
    There is no separate availability check for VA01 & VA02.
    If at all items are confirmed in VA01, why again you have to do availability check in VA02?
    When you say that when you change the order in VA02, what changes you have made? Changes to any material data, customer master or delivery dates will again trigger availability check.
    In VA02 if you want to see the available quantity you have to click on display availability. Not Check Item availability. If you click on Check item availability, tehn system will again carry availability check.
    Regards,
    Sivanand

  • Disable\Remove "Check for Update" "Lightroom online" and "Adobe Product Improvement Program"

    Hi,
    I wanted to confirm if it is possible to remove\Disbale the options like  "Check for Update" "Lightroom online" and "Adobe Product Improvement Program"
    under help menu in adobe lightroom 5.3? I intend to deply this application and want these options to be unavailable for the User.
    Kindly suggest, Thanks.

    So far as I know, the only way to make these features non-functioning is to detach the computer from the internet.

  • Static availability check leads to negetive stock 15.00,000- KG in 0001 UT

    Gurus,
    <b>Static availability check leads to negetive stock 15.00,000- KG in 0001 UT</b>. I am getting the above error message . Any suggestions why this error message coming up.
    thanks in advance.

    Hi,
    Here is a blog regarding how to fix WMI issue might be useful to you:
    Fixing WMI issues Using Batch Script
    http://social.technet.microsoft.com/wiki/contents/articles/6887.fixing-wmi-issues-using-batch-script.aspx
    In addition, you mentioned Remote Desktop Servers are in a cluster setup, would you tell us how did you create the cluster?
    As far as I know, with RD Connection Broker, we don’t need to create a cluster but just add multiple RD session hosts into one collection, then RD connection Broker would redirect sessions automatically.
    Best Regards,
    Amy
    Please remember to mark the replies as answers if they help and un-mark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact [email protected]

  • MB5B Report for Date Wise Stock and Value

    Hi,
    I am Taking MB5B Report for Date Wise Stock and Value.
    But I have one doubt all stocks is coming or not in these report like Unrestrected Stock,Return Stock.Blocked stock,Transist stock,Restrected Stock,qty Inspection Stock.
    I have another Doubt in these report three Stock type indicaters are there like these.
    1.Storage Location / Batch Stock
    2.valuated Stock
    3.Special Stock.
    But i have one doubt what is defferent these
    1.Storage Location / Batch Stock
    2.valuated Stock

    Hi Prasad,
    Yes MB5B report consider the Unrestricted, Quality, Blocked, Transit stock and restricted stock. Not sure about Return Stock.
    If you select the Storage location/Batch stock radio button then the system will display all the possible stock from the storage location and the corresponding batch also.
    If you select Valuated stock radio button then system will show only the valuated stock not the Non-valuated stock. Because Non-valuated material type is available in SAP system will not show those stock suppose if you select the Valuated stock radio button.
    Regards
    Karthick

  • Availability check for configurable material.

    Hi,
    We are implementing SAP ECC-6 & facing
    issue during availability check for
    configurable materials.
    I'd like to take an example of
    computer for better understanding.
    Will consider Computer as super BOM and
    following 2 as BOM:-
    BOM-1. a)Monitor b) Cpu c)Key
    Board d)Scroll Mouse e)With
    Mouse Pad.
    BOM_2. a)Monitor b) Cpu c)Key
    Board d)Optical Mouse e)With
    out Mouse Pad.
    But Customer wants A)Monitor B)Cpu c)
    Key Board D)Optical Mouse e) With
    Mouse Pad.
    In the above case System will not show
    %age of Configurable materials
    available & Vice-versa but rather it
    creates requirement for computer and
    it gives availability as the lead time
    maintained in the Material Master of
    the Super Bom.
    Here the busines requirement is that
    it should show %age of configurable
    materials
    available.
    Plz find the attachment for your kind
    reference.
    Kindly guide me to sort out this issue.
    Thanks & Regards,
    Chandru

    Dear Sir,
    Thanks for the guidance/ reply . Still we have some doubts in this:
    As per your instructions, I have created sales order and  did the MRP run for the same.
    I got the planned order, then I have checked the ATP in Planned order change view and got the following results.
    No. of components checked:   641
    Missing parts:   640
    Overall confirmation date could not be determined 
    But  where I can see the Percentage of Avaialble and percentage of to be produced.
    Please guide me.
    Thanking you
    Regards
    Chandru

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Steps in configuring availability check for STO Prs

    I want to configure Availability check for stock transport PRS.
    what are the steps.

    Hi,
    please check the transaction code OMGR.(Sprommpurchasingpurchase requisitionset up stock transport requisition.
    Regards,

Maybe you are looking for

  • Issue in publication of Crystal Report on BO CMC

    Hi, We have a Crystal Report which needs to be bursted in order to create multiple pdf files based on Account Number field used in report. For this, we have created a source report which contain all the fields required having Account Number. The repo

  • I have iCal 6.0 on Mac Air after upgrading to Mountain Lion. I would like to upgrade iMac desktop iCal version 5.0.3 to 6.0 but can't find the upgrade/update.

    I just purchased a new iMac 27" with Mountain Lion and migrated all my files/programs etc. from previous desktop. The iCal version 6.0 on my Mac Air has the dedicated calendar sidebar is a feature I would like to have on my desktop as well but I've b

  • Using QI06

    Hi,     Has anyone used QI06 successfully to create QIRs from PIRs?  I am trying to run the report an selected the "only from purchase info records" checkbox on the initial screen. The report runs but does not create any QIRs. Also if anyone has used

  • How do I get an XY-graph to auto append?

    Here is my problem. I have a Visual C program getting info from a user. That info is appended to a log file everytime the user hits "enter". Now, my labview program has to display the data in a graph, but I only want to see the 30 most recent points.

  • Not able to add a friend

    Please help me in adding a friend on Skype. I have tried a lot but not able to add. I have tried to add with phone no. N Skype id both but then also failed to add. Kindly solve the problem ASAP..