BDC for production order confirmation (co11n)
Dear All,
Is it better to create a table control BDC for Production Order confirmation (CO11n)?
Or there is any other efficient way?
Pls guide me.
Thank you
Vijay
Hi,
There are different BAPIs available:
BAPI_PRODORDCONF_CREATE_ACT Enter activity confirmation
BAPI_PRODORDCONF_CREATE_HDR Enter Order Confirmations
BAPI_PRODORDCONF_CREATE_TE Enter Time Event Confirmation
BAPI_PRODORDCONF_CREATE_TT Enter Time Ticket Confirmation
You can use them depenidng on your requirement..
Similar Messages
-
Batch Split during GR for Production Order Confirmation
Hi All,
We need to do batch splitting during GR for Production Order Confirmation.We are using CO11N for confirming the Production Order and in the PP settings auto GR is activated once the Confirmation is done.
Currently it is generating only single batch number for the complete quantity, but our requirement is that we need that system should create separate batch for each piece.
For ex.: Production Order is for 100 pce, when we do Production Order confirmation, system is automatically doing the GR by 101 movement type and it is creating one single batch for full 100 pce. But we want the batch number should be generated for 1 pce i.e. we want to split the 100 pce into 100 batches with 1 pce each.
Please let me know what can be done for this requirement.
Regards,
AnkitDear,
In OPK0 you need to active the screen Mill: Goods Receipt (8485) for confirmation profile for the single-screen entry.
Best way is use BAdI /SAPMP/SPLIT_CO11N for the Enter Time Ticket for Production Order transaction (CO11N)
you must activate BAdI implementation /SAPMP/SPLIT_POPUP and/or /SAPMP/SPLIT_CO11N for this BAdI
I have use the same BADI it will ask you number of split according to that it will split the GR line item.
Please refer this link,
http://help.sap.com/saphelp_dimp50/helpdata/EN/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
Regards,
R.Brahmankar -
User Exit For Production Order Confirmation Using CO15 or COGI
Hi all,
I need user exit for the production order confirmation so that i can set
AFPO-ELIKZ and AUFM-ELIKZ (delivery completedu2019 status flag) to Blank......
Thankshi,
check these exits.
CONFPP01 PP order conf.: Determine customer specific default values
CONFPP02 PP order conf.: Customer specific input checks 1
CONFPP03 PP order conf.: Cust. specific check after op. selection
CONFPP04 PP order conf.: Customer specific input checks 2
CONFPP05 PP order conf.: Customer specific enhancements when saving
CONFPP06 PP Order Confirmations: Actual Data Transfer
CONFPP07 Single Screen Entry: Inclusion of User-Defined Subscreens
CONFPS01 PS confirmation: Determine customer specific default values
CONFPS02 PS confirmation: Customer specific input checks 1
CONFPS03 PS confirmation: Customer specific check after op. selection
CONFPS04 PS confirmation: Customer specific input checks 2
CONFPS05 PS confirmation: Customer specific enhancements when saving
CONF0001 Enhancements in order confirmation
CONFPI01 Process order conf.: Calculate cust.specific default values
CONFPI02 Process order confirmation: Customer spec. input checks 1
CONFPI03 Process order conf.: Cust. spec. check after op. selection
CONFPI04 Process order conf.: Customer specific input checks 2
CONFPI05 Process order conf.: Cust. spec. enhancements when saving
CONFPI06 Process order confirmation: Actual data transfer
CONFPM01 PM/SM order conf.: Determine cust. specific default values
CONFPM02 PM/SM order confirmation: Customer specific input checks 1
CONFPM03 PM/SM order conf.: Cust. spec. check after op. selection
CONFPM04 PM/SM order conf.: Customer specific input check 2
CONFPM05 PM/SM order conf.: Cust. specific enhancements when saving
use the exit which contains both structures AFPO,AUFM. -
User Exit for Production Order confirmation with CO15
Hi All,
what User Exit I should use when validating batch when we do Production Order confirmation with CO15.
Not when we create or release a Production Order.
Will reward,
mindaugas
Edited by: Mindaugas Kazlauskas on Jan 30, 2008 5:03 PMHi
The Follwing Userexits available:
Transaction Code - CO15 Enter Production order Confirmation
Enhancement/ Business Add-in Description
Enhancement
CONFPP01
PP order conf.: Determine customer specific default values
CONFPP02
PP order conf.: Customer specific input checks 1
CONFPP03
PP order conf.: Cust. specific check after op. selection
CONFPP04
PP order conf.: Customer specific input checks 2
CONFPP05
PP order conf.: Customer specific enhancements when saving
CONFPP06
PP Order Confirmations: Actual Data Transfer
CONFPP07
Single Screen Entry: Inclusion of User-Defined Subscreens
CONFPS01
PS confirmation: Determine customer specific default values
CONFPS02
PS confirmation: Customer specific input checks 1
CONFPS03
PS confirmation: Customer specific check after op. selection
CONFPS04
PS confirmation: Customer specific input checks 2
CONFPS05
PS confirmation: Customer specific enhancements when saving
CONF0001
Enhancements in order confirmation
CONFPI01
Process order conf.: Calculate cust.specific default values
CONFPI02
Process order confirmation: Customer spec. input checks 1
CONFPI03
Process order conf.: Cust. spec. check after op. selection
CONFPI04
Process order conf.: Customer specific input checks 2
CONFPI05
Process order conf.: Cust. spec. enhancements when saving
CONFPI06
Process order confirmation: Actual data transfer
CONFPM01
PM/SM order conf.: Determine cust. specific default values
CONFPM02
PM/SM order confirmation: Customer specific input checks 1
CONFPM03
PM/SM order conf.: Cust. spec. check after op. selection
CONFPM04
PM/SM order conf.: Customer specific input check 2
CONFPM05
PM/SM order conf.: Cust. specific enhancements when saving
If it is helpful rewards points.
Regards
Pratp.M -
Run time error while running BDC for production order creation and confirmation:
Dear Gurus,
We have a situation, where the users are trying to do the entries creation of order or confirmation (through manual and BDC). But, if there is any kind of a deficit quantities in consumption or GR quantity, then it is going to run time error and Dumps are coming in program SAPLCORB
and the transaction code is coming for CO11N.
How to avoid this error to run the production system in smoothing way...Any flash lights on this will be great full
Regards,
Madhu.GHi Madhu,
Expert Caetano has rightly point out. Refer Note 1840705 - RAISE_EXCEPTION short dump if running CO11N in background
Cause
The short dump is triggered because SAP transaction CO11N contains new GUI elements that cannot always be dealt with in a background process,
such as the confirmation texts.
Resolution
SAP recommends that the standard production order BAPIs, such as BAPI_PRODORDCONF_CREATE_TT, should be used to post a confirmation in background.
If this is not feasible, the following workaround may be uses:
Define a confirmation profile in transaction OPK0;
In the detail areas, remove the area "Confirmation text";
Set this profile as standard, so that it is chosen automatically by the system when a batch-job
is started;
Assign this confirmation profile to the batch user with transaction SU3 using parameter CORUPROF.
Also see Note 429432 - CO11N: Batch input in background dumps if long text is maintained
Refer to note 1154692 - Endless loop during confirmation in background if you doing Auto GR during confirmations
Thanks & Regards,
Ramagiri -
IDOC/BAPI for production order confirmations
Does anyone know IDOC or a BAPI for confirming a production order? CO11 is the normal transaction for confirmation.
I found one BAPI: BAPI_PRODORDCONF_CREATE_HDR
Is this the right one?
-Thanks
BhavenHi Bhavan,
status can be find using function module <b>STATUS_TEXT_EDIT</b>.
Sample code:
CALL FUNCTION 'STATUS_TEXT_EDIT'
EXPORTING
client = sy-mandt
objnr = >object number of order<
only_active = 'X'
spras = 'E'
IMPORTING
line = hold_status
EXCEPTIONS
object_not_found = 1
OTHERS = 2.
*Exception in case status is not found
IF sy-subrc <> 0.
MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
ENDIF.
*Check Status of the Order
IF hold_status CS 'CNF'.
confined production orders.
ENDIF.
Best regards
Suresh Babu Karanam -
User exit for Production order confirmation during goodsmovement
Hi Guru's
Am in need to find the user exit for Equipment master creation. Equipmentmaster will be created when the goods movement 101 happens. can someone help me out to find the user exits. thanksHi,
Ok thanks for that.For Co11n please find the user exits below.But i am not sure which will suit your requirment.Please let me know for any further help.
CONF0001 Enhancements in order confirmation
CONFPI01 Process order conf.: Calculate cust.specific default va
CONFPI02 Process order confirmation: Customer spec. input checks
CONFPI03 Process order conf.: Cust. spec. check after op. select
CONFPI04 Process order conf.: Customer specific input checks 2
CONFPI05 Process order conf.: Cust. spec. enhancements when savi
CONFPI06 Process order confirmation: Actual data transfer
CONFPM01 PM/SM order conf.: Determine cust. specific default val
CONFPM02 PM/SM order confirmation: Customer specific input check
CONFPM03 PM/SM order conf.: Cust. spec. check after op. selectio
CONFPM04 PM/SM order conf.: Customer specific input check 2
CONFPM05 PM/SM order conf.: Cust. specific enhancements when sav
CONFPP01 PP order conf.: Determine customer specific default val
CONFPP02 PP order conf.: Customer specific input checks 1
CONFPP03 PP order conf.: Cust. specific check after op. selectio
CONFPP04 PP order conf.: Customer specific input checks 2
CONFPP05 PP order conf.: Customer specific enhancements when sav
CONFPP06 PP Order Confirmations: Actual Data Transfer
CONFPP07 Single Screen Entry: Inclusion of User-Defined Subscree
CONFPS01 PS confirmation: Determine customer specific default va
CONFPS02 PS confirmation: Customer specific input checks 1
CONFPS03 PS confirmation: Customer specific check after op. sele
CONFPS04 PS confirmation: Customer specific input checks 2
CONFPS05 PS confirmation: Customer specific enhancements when sa
Thanks, -
INBOUND FM is required for production order confirmation ( CONF21 )
Hello,
Can anyone tell me the name of the stadard inbound FM(used in processing inbound IDOC) used for order confirmation . CONF21 is the idoc type being used.
Thanks.
KrishnakumarHi,
Iam not sure,try this
KK2A_GET_DATA_FROM_IDOC
Regards,
Raj. -
Automatic GR Problem for Production Order - Missing PARTS
Hello
Stocks are available in the QA stock, The Availability check is considering this stock also, but during Production order confirmation,( CO11N) we are getting error message missing parts , we have two problem
1) we don't want to consider the different storage location / QA stock for availability check
2) Once we transfered the stock to Unrest stock , we can't do CO11N , we have to do manual GR / GI , how to overcome this.
Thanks
NiHy Nick,
For your First Qustion,
For this go to OPJJ - Avaibility Check Control
Select Chcking Group which you have assign to your Order type
(OPJK) and remove tick from Incl. QI stock.And for Storage location don't tick No Storage Location after doing system will check Material availability in only production storage location (Which you have maintain in MRP - 2 view of Material Master) .
For pop up option, go to T.Code OPJK Slect your Plant , Order type and option 1 or 2 (At the time order Creation or Release).
Material Availability checks,
Don't tick No check option,
This setting will give the option of Pop up screen with Massage of Missing Parts.
For your Second Question
Sorry still I still don't under stand your Problm.
But I guess you want to restrict the GR until GI is not done due to Missing parts.Correct or not?
If yes then do the below settings,
go to t.code OPK4 (Parameters for Order Confirmation):-
Go to second tab General Individual Entry,
Tick Goods Movement selecttion and then also tick Terminate for Incorrect Goods movement.
This setting will help to terminate any confirmation for which goods movement containes any error.
Hope it will help to solve your problem.
Regards,
Dhaval -
Checks in userexits of production order confirmations from PDC in CO16N
Hi,
we are using PDC interface for production order confirmations. This is done by Idoc type PPCC2PRETTICKET01 (time ticket) based on BAPI BAPI_PRODORDCONF_PDC_UPLOAD_TT. Standard confirmations are working well. In case of SAP detected errors the confirmations are registered for error handling in CO16N.
So far so good but we have some own check logic implemented in confirmation user exit CONFPP04 and BADI WORKORDER_CONFIRM. These checks are working fine whith online confirmations in CO11N but not in background PDC Idoc processing. I checked the function module EXIT_SAPLCORF_104 for exit CONFPP04 but it has got no exception. The call in SAP processing is like this:
CALL CUSTOMER-FUNCTION '104'
EXPORTING
CAUFVD_IMP = I_CAUFVD
AFVGD_IMP = I_AFVGD
AFRUD_IMP = E_AFRUD
IMPORTING
AFRUD_EXP = LS_AFRUD
EXCEPTIONS
ERROR_MESSAGE = 01
OTHERS = 02.
CASE SY-SUBRC.
WHEN 0.
WHEN 1.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO WITH
SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4
RAISING CONF_DATA_FALSE.
WHEN 2.
MESSAGE E174 RAISING CONF_DATA_FALSE.
How can I throw the exception when there is no exception defined in the function module interface without modification?
As 2. option I wonder if it is better to implement the check logic in the BADI WORKORDER_CONFIRM Method AT_SAVE. This has got an exception ERROR_WITH_MESSAGE. But I don't know if this will lead to CO16N registration of the confirmation.
Any hint how I can solve the problem to apply the online checks in CO11N also to PDC interface confirmations with CO16N in error case?Hi Michael,
First, I think that the BAPI that you are looking for is: BAPI_PRODORDCONF_CREATE_HDR
Second,
I don't think that in the framework of such a forum it can be explained in detail how to use BAPIs; nevertheless, here are some highlights:
A BAPI is an executable piece of code that can be called from either an external program within SAP (Z program), or called from an external system either via RFC, or as a web service (depends on your NetWeaver release).
As such, it has input (import) data that you transfer when you call it, and output (export) data that you recieve when it ended processing.
More detailed information, documentation, and a description of the import/export parameters, as well as error handling, one can find in SAP by calling transaction BAPI.
Regards,
Mario -
Any function module or BAPI for PM order confirmation
Hi all,
I'm trying to confirm a PM order (IW41) background. Is there any existing BAPI or FM for me to do that? Thanks in advance.Mil,
check this
BAPI_PRODORDCONF_CREATE_TT,
below are other ones which may use for you...
BAPI_PRODORDCONF_CREATE_ACT Enter Activity Confirmation
BAPI_PRODORDCONF_CREATE_HDR Enter Order Confirmations
BAPI_PRODORDCONF_CREATE_TE Enter Time Event Confirmation
BAPI_PRODORDCONF_CREATE_TT Enter Time Ticket Confirmation
BAPI_PRODORDCONF_EXIST_CHK Existence Check for Confirming Production Order
BAPI_PRODORDCONF_GETDETAIL Detailed Data for Production Order Confirmation
BAPI_PRODORDCONF_GETLIST Confirmations List
Don't forget to reward if useful.... -
Error during Production Order Confirmation mfbf ( backflush)
in my company in sap when i using mfbf for production Order confirmation of tractor then during backflush using mfbf tcode order confirm but in my store dept no metiral cunsume so please regards this problem
with warm regards
pritpal singhDear Pritpal,
sorry dear,today i cant check my inbox immediately. Anyway my mail id is [email protected]
have checked as per my previous post.
regards
pradeep -
Production Order Confirmation Default
Hi PP Guru,
I am a functional support and currently we have an existing issue or clarification on the defaults of Production Order Confirmation (CO11N). In the current default, Partial Confirmation is automatically ticked, what we wanted to happen is that the Final Confirmation and Clear Open Reservation be automatically ticked and should be the default whenever we access CO11N. My question is that is there any setting or configuration that we may need to change in order to fulfill the desired change?
I would greatly appreciate your feedback on this matter.
Thank you.
JMTafallaHello Gurus
I have tried to go on transaction OPk0 and entered confirmation profile as this is a required field, I left the Postprocessing box unmarked, Then choose CONFIRMATION/ORDER/SEQUENCE/OPERATION/WORKCENTER as the header, then go to the default tab- confirmation function-select final confirmation and enable Post Open reservations. Then after saving, when i cheked it on CO11, still the default is Partial Confirmation. Is there other ways on how we can set the Final Confirmation and Post Open Reservations to be the default of CO11?
Your response is very much appreciated. Thank you... -
BDC for mass-upload on production order confirmation
Hi ALL
Is there any standard Program for the mass-upload on production order confirmation for labor and machine hours.
the T-code to do this is Co12.
thanks in advance !hi,
You can use standard SAP program RCCLBI03 to do mass upload
see these link
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8046aa90-0201-0010-5e99-962948c83331
thanks
karthik -
Reg:Bapi for mass creation of production order/confirmation
Dear Experts,
I wanted to know with the following BAPI is it possible to create Multiple production orders for different semifinshed Materials along with material availability check and other functions similar to CO01 transaction.
I knew there are standard transactions for mass confirmation for production orders. But i need a confirmation on this BAPI . As i am planning to go-ahed with ,mass creation of production order creation / Order confirmation in single custom transaction.Need back flush activity even supported.
BAPI_PRODORD_CREATE to create the orders.
BAPI_PRODORD_RELEASE to release the orders.
BAPI_PRODORDCONF_GET_TT_PROP to get the default data for the confirmation.
BAPI_PRODORDCONF_CREATE_TT to ost the confirmation of production order.
Along with this BAPI do i need to commit any other BAPI to carry out back flush for components.
Need your suggestions to take it further.
Regards,
Daya.Dear SAP Daya
If the issue has been solved, please close this thread.
You have already mentioned that the issue has been resolved, thefore, you should not ask for help on another thread before closing this one, as it looks like you are trying to force people to answer your threads.
Users are always trying to answer as many threads as possible on good will we don't need this kind of "incentive".
Please read carefully the The SCN Rules of Engagement, especially point 8:
Be responsive. If an SCN member has answered your question, please mark the answer as "helpful” or “correct”. Mark the discussion as “answered,” so that other members can find the answers more easily
Also, I checked your old threads and I could observe that there is only one closed. Please review your old threads and close those already solved.
BR
Caetano
Maybe you are looking for
-
Sharepoint 2013 Public Facing Website With Managed Metadata Navigation on Office365 E3 Trial Online
Warning: I am a complete novice in sharepoint I have subscribed to office365 online trial Enterprise edition to learn sharepoint I have created a Public facing Website Through the site-collection setting -> navigation created a new metadata group nam
-
Can't Search in Mac App Store & Can't Not Open Menu In Mac App Store
today, I wanna update some software, when i bring up the Mac App Store, it will not let me click in the Search box. Also, when I click on "Categories" "Update", etc. at the top of the page, they will highlight but not go to those pages. Help, i use
-
Older HP Laptop....Need help identifying FCC ID
Hey Guys. I am hoping somebody can help me. I'm from the UK but in possesion of an american laptop (actually the fiance's) She sent me it asking if I could fix it for her. It's a HPze5200. I tried to send it back to her just before christmas but cust
-
Not delivered error when sending photos via messages-photos being received
When using messages on iPhone 5 to send photos, I receive a not delivered error but the recipient tells me it has been received. I have tried turning phone off/on, signing out of messages on all devices then signing back in. Still occurring. Any idea
-
hi, im new to JSF. i like it, but i wonder how to debug. how do i find the exact line of code in a bean/jsp where the problem is? eg i got a log like this (via log4j i did set debug-level for com.sun.faces to all ) - how do i find the jsp/bean that c