Error during Production Order Confirmation mfbf ( backflush)
in my company in sap when i using mfbf for production Order confirmation of tractor then during backflush using mfbf tcode order confirm but in my store dept no metiral cunsume so please regards this problem
with warm regards
pritpal singh
Dear Pritpal,
sorry dear,today i cant check my inbox immediately. Anyway my mail id is [email protected]
have checked as per my previous post.
regards
pradeep
Similar Messages
-
Error during Production Order Confirmation
I get a real wierd error during production Order confirmation. The error message is
"Additional items are not allowed
Message no. ZOAL010"
Can anyone throw some light on this?
Regards
Rajit is not std SAP message.
you can check the user exit for confirmation.
check in transaction code CMOD/SMOD for CONF* -
Error during production order confirmation - costing related
Dear All,
When i am confirming a production order through CO15 following error is coming and system is not allowing to proceed further
Enter rate EUR / SAR rate type M for 01.01.1998 in the system settings
Kindly guide me how to avoid this errorDear,
Please go to OB08
Then enter the details Currency Type M
Then put the valid date from date
Then put the currency from
Then put the currency to
in last columan put the rate
as
Exc rate Valid From Ratio(From) From Dir.Quot Ratio To
M 01.01.2011 X 1 AED (Currency) = x 1 EUR (Currency)
Thanks,
MS -
Production Order confirmation - GI - Backflushing
Hello,
Our requirement is that during, production order confirmation, even if materials are not available, system should allow us to confirm the order. Later will issue GI through COGI.
In OPK4, in the tab "Individual Entry General" we have not checked the boxes in 1) Goods Movements & 2) Termination for Incorrect movements.
Here the important point is , we are making use of the functionality "Back Flushing". Iam afraid system should support our requirement?
Pl. let me know, what config, should i do for this to happen?
Best regards,
K.kumar.1 Our requirement is that during, production order confirmation, even if materials are not available, system should allow us to confirm the order. Later will issue GI through COGI.
This setting is enough for above Requiremnt
In OPK4, in the tab "Individual Entry General" we have not checked the boxes in 1) Goods Movements & 2) Termination for Incorrect movements.
2) we are making use of the functionality "Back Flushing". Iam afraid system should support our requirement?
No, Backflushing is not a problem, System will support your requirement.
There is no configuration is reqd to meet your requiremnt
Regards,
Sundaresan -
Change Work Center during production order confirmation
Dear All,
I must to modeling this situation:
I created an production order. In routing I used an work center A.
After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
Thank you for your answer!
Regards,
Marianonce a Order is released, the Process order detaisl for that order is frozen.
however if you want to do it, change the order status to CRTD after reversing the Movements done.
Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
if the change is long term.
or
Just manually add the new work center and do the processing. if the change is temporary. -
Serial nos entry during production order confirmation in CO15 - User Exits
Hi all,
Is there any user exit existing for a serial nos screen pop-up during production order confirmation.
Regards,
Sravan Kumar VHi,
For serial numbers at the time of goods receipt, u have to activate sr. no. mgt for that particular finished product. This can be done by assigning sr. no. profile in the material master record of that material in work scheduling view. once this is done , system will automatically prompt for sr. nos at the time of goods receipt. I am not aware about any user exit.
Thanks & Regards,
Vijay Patil -
Equipment as PRT's during Production Order Confirmation
Hi Gurus,
During Production Order confirmation I cannot see whether I have consumed equipments as PRT which are attached to operation.
The operation is showing CNF status as well the Order.
How can I see whether which Equipment was used for each operation since there can be more than one equipment as a PRT's for a single operation.
Regards
NileshI use Production Order confirmation hence saw it in CO14 and checked that PRT's are in PRT REL status..I guess this is what you mean to say right??
Thank you so much for your response.
Regards
Nilesh -
Recording shift during Production order confirmation
Hi All,
Is there a way I can record the shift during production order confirmations using CO15, CO11 or CO11N? I do not see the shift field in the confirmation screen.
Thanks & Regards
Subbu SPDear,
If you don't want to use the standard functionality of SAP or you are on lower version then you can go ahead with enhancement.
CONFPP07 Single Screen Entry: Inclusion of User-Defined Subscreens by using this you can define shift in confirmation.
For more details refer this link,
Re: Shift usage in confimation.
<< Moderator message - Point begging removed
Points unassigned >>
Regards,
R.Brahmankar
Edited by: Rob Burbank on Oct 20, 2010 4:28 PM -
Error during Production Order release
Hi Experts,
When I am releasing one production order follwoing messege appearing.
Error during availability check for order xxxxx (see log)
co02>goto> logs--> release
Date 22000504 lies after the end of the valid factory calendar (please correct).
I have checked routing, pv, bom etc. availability check indicator 02 is alreadly maintained in mm03. Earlier we have confirmed several order of this material in the past, now suddenly this error is appearing.
Kindly help me to solve this problem.
Regards
GRHi,
Chk for following :
01. Timings in Routings/Factory calender
02. Chk for all components in order . It may be possible that one of component is having some MRP elelment dated beyond factory calender
03. Also chk all receipt /issue elements with dates .
Regards,
Milind. -
Batch split during production order confirmation
Hi All,
This is the process which is followed at our customer end, they want to split the batches during confirmation,
1.Production order created
2.While going through each operation, some components are failing in the in-process inspection and they need to be quarantained for further process,(it may be rework, scrap, etc)
3.Now the question is we want to create individual batches, say for example out of 100qty which went operation number 10, 50 were found to be o.k. and the remaining 50 are having defects, we want to create two different batches for this scenario at the time of confirmation.
Is there anyway in SAP todo this , like userexit
Has anybody has gone through similar scenario's
Thanks in advance
Regards
Venkat.Dear Vanket,
In the operation you can confirm Yield, Scrap and rework quantity.
In your case in each operation you need to create a batch for each qty what you enter.
As I told you before batch can be created either production order release or during GR.
In each operation you are not going to perform GR, hence batch creation is not possible.
You have 2 options as I see.
1. Create different intermediate materials and have production orders for each operation so that you can do the GR for each production order.
You can have the same batch for each stage material so that issuing material and production materials are different but batch is same.
If there is any defective quantity you need to decide you want to scrap it or you want to go for rework. If you want to go for rework then, using trigger point function you can create a auto rework order for the qty of rework entered during confirmation.
2. Second option is you can create a production order as you are doing now, but you need to create batch manually in MSC1n transaction for rework as well as yield qty.
You can confirm the yield qty and rework qty, but you cannot assign the batch as you are not performing GR. You can enter the batch number in the confirmation text field for information purpose. During the final operation when you do the GR, assign the batch to yield qty and post. About the rework qty you are not going to post qty to store, you need to create rework order and confirm the qty, during GR you can assign the batch and do GR.
If you ask me if you need to strict process to represent your case you need to go for first case.
Please go through the above carefully and test the cycle and come back if you need any clarification. -
Error during Production Order creation
Hi All,
Our's is MTO scenario. We have maintiain Account Assigment Category as 'M' in Requirement Type. During creation on production order with ref to sales order system gives error "Account assignment cannot be carried out because of different origin no."
If I create the production order with ref to quotation system does not gives any error. But my requirement is to create the prod order with ref to sales order.
Please guide
RegardsdHi Bala,
In SPRO goto>Sales and Distribution> Basic Functions-->
Availability Check and Transfer of Requirements
-->
Transfer of Requirements
-->
Define Requirements Classes
Define Requirements Types
--> Determination Of Requirement Types Using Transaction
Determination Of Requirement Types Using Transaction
In the standard system, requirements types are determined according to a specific search strategy beginning with the material strategy group.
Strategy for Determining the Requirements Type
1. First, an attempt is made to find a requirements type using the strategy group in the material master.
2. If the strategy group has not been maintained, the system will determine it using the MRP group.
3. If the MRP group has not been defined, the system uses the material type instead of the MRP group when accessing the corresponding control tables.
4. If no requirements type is found here, the system assumes a special rule and attempts to find a requirements type with the aid of the item category and the MRP type.
5. If this is not possible, a last attempt is made to find a requirements type with the item category only.
6. If the last attempt fails, the system declares the transaction as not relevant for the availability check or transfer of requirements.
Note
You can select an alternative search strategy in the 'Source' field, for example a transaction-related procedure for determining requirements type (source = 1 or 2).
Example
There are business transactions, such as consignment stock processing, in which the material with its planning characteristics is not important, rather the transaction itself. An issue from the customer's consignment stock should not trigger an availability check against planning at the plant as layed down by the planning strategy but rather against special stock.
Actions
1. Assign the item categories and MRP type to the requirements types.
2. Select an alternative search strategy in the 'Source' field if necessary.
By assigning the 1 or 2 to the Source you can have the requirements in MD04 refered to order instead of the initial source document which is usually quotation. If we don't assign this then the system by default refers to the initail document created i.e. Inquiry or Quotation whichever is the first document.
Regards,
Karthik. -
Error during Production order settelment
I am getting error while settlement of production order " GL Account required valid Tax code",
waiting for your advice.
Thanks1. This should be solved by the FI consultant.
2, Check the setting of the Tax in teh Control data tab of the respectiev Gl account in FS00.
let me knw the feedback
reg
satheesh -
Serial Nos entry for FG during Production order confirmation in CO11N
Hi all,
Can anybody explain me how can we confirm the assemblies serial no wise for FG in CO11N. this is a stringent requirement for my client.
Withthis they can track which assembly n upto which operation was that confirmed.
Thank youHi,
In OIS2 define a profile and assign procedure PPAU and configure PPAU as
usage = 03,
EQ re = 01.
Assign this profile to assembly as well as product, that profile u have to assign it in material master work scheduling screen.
Now when you go for confirmation in co11n system will ask you the serial no.
Now you do the confirmation...you can get what you described.
This is a standard Sap functionality.First do confirmation and then do goods receipt in MB31 where you assign serial numbers.
OR.
An other way is go to COIB here u have to enter the the serial number and material then it will display the this serial number generated against which production order.and if ur generating number of serial number against single production order then it will dispaly all serial number.
COIB -
> enter material number and serial number -
> click on list<>tree--
>again enter the serial number and material -
>click on explode it will display the production order and if number of serial numbers are their then it will display at the bottom
Please check it and refer to below link
http://help.sap.com/saphelp_470/helpdata/en/dd/f8c817b3f911d1896e0000e8284931/frameset.htm
Hope will work for you.
Regards,
R.Brahmankar -
Serial number assignment to components during production order confirmation
Dear all,
When confirming a production order (Tcodes CO11, CO11N, CO15) the user should have the possibility to add serial numbers for components directly in the goods movements overview.
A modification for that is describe in the SAP Training documents SCM 310, p. 485-487.
Do you have any details on the described modification and/or any experience with similar modifications?
Thank you in advance.
Best regards,
KlaudiaHi friend,
Use t-code OIEN... Thr u can see the external number range given for various groups of equiments..
hope this will help.
Regards,
Ravi Thakkar
INCAT -
Scrap During Production order confirmation.
When I Put scrap qty in Co11 screen or co15 Screen, Is movement type 551 gets automatically activated??What are the accounting effects and by what transcation can I see these accounting effects.
Hi,
Please check production order header screen Go to --> documented goods movements.
Regards
Ranga
Maybe you are looking for
-
Can Wireless Home Audio products be controlled via IP with any other devices?
I'm interested in knowing if the Wireless Home Audio Director, Conductor or Player can be controlled via IP with alternative controllers? Specifically, I'm interested in integrating the products into a universal remote control or home control system
-
Cannot get iWork beta on my iPhone
Perhaps I am not understanding something, but I thought that iWorks beta was to be accessable from my iPhone 4S. Apple states that it is available, but I cannot seem to get it to install on my iPhone. my iCloud account has been setup on my iPhone.
-
PLEASE HELP-problem with downloaded files!
I have downloaded some games and stuff from the internet to my new iMac(Leopard10.5.1). I open the files, copy to applications, or install from the folder-and that should be it, right?? Unfortunately, this is not so! I have to go through this same pr
-
Ringtones and background images not available after call manager upgrade
Hi, We have upgraded our call manager from version 8.5 to 10.5. Once after the upgrade we lost all the Ringtones and background images except the two default ringtone and background images. we got 8945 sccp phones(running 9-3-1 firmware) and
-
Do I need a cluster license if I'm runnning a cluster for testing and evaluation purpose?