Best strategy for using ACR7 in LR4 with CS5?

Although all my cameras are supported by ACR6, I would like to use the new process 2012 of ACR7.  I would like to try LR4 (giving ACR7) but don't really want the expense of upgrading from CS5 to CS6 since I don't need any of the CS6 new facilities.  But I would like to try the file organisation facilities of LR4 instead of Bridge (as well as having ACR7 of course).
I read that PSD files exported from LR4/ACR7 are not compatible with CS5.  Is this correct?  If so, is there a way around this, so that I can do final tweaks in CS5 to a 16bit file processed and output by LR4/ACR7?
Thanks for any advice you can offer.

As far as I've heard, you should get PS CS6 if you plan to use LR4. Full stop.
But, I did hear that there is a 'release candidate' version of ACR6.7 you can get from here: http://blogs.adobe.com/lightroomjournal/2012/03/adobe-camera-raw-6-7-and-dng-converter-6-7 -available-on-adobe-labs.html. This wont show up if you try 'Auto Update' for whatever reasons. Hasn't for me, at least!
There have been no complaints with the compatibility of the ACR6.7 RC with LR4 and PS CS5.

Similar Messages

  • What is the best practice for using the Calendar control with the Dispatcher?

    It seems as if the Dispatcher is restricting access to the Query Builder (/bin/querybuilder.json) as a best practice regarding security.  However, the Calendar relies on this endpoint to build the events for the calendar.  On Author / Publish this works fine but once we place the Dispatcher in front, the Calendar no longer works.  We've noticed the same behavior on the Geometrixx site.
    What is the best practice for using the Calendar control with Dispatcher?
    Thanks in advance.
    Scott

    Not sure what exactly you are asking but Muse handles the different orientations nicely without having to do anything.
    Example: http://www.cariboowoodshop.com/wood-shop.html

  • Best Strategy for Integrating Crystal/Business Objects with OpenACS Environment

    Post Author: devashanti
    CA Forum: Deployment
    I'm working for a client that uses AOL server and OpenACS for their web services/applications. I need suggestions on the best strategy to integrate a reporting solution using Business Objects XI. Ideally I'd like to send an API call from our web application's GUI to the Crystal API with report parameter values to pass into specific reports called via the API - I can get it down to one integer value being passed - or if this is not possible a way to seamlessly, from the end user perspective, move into a reporting module. We are using an Oracle backend database. I'm experienced with creating stored procedures and packages for reporting purposes.
    Although I have many years of experience integrating the Crystal active X controls into n-tier client server applications, the past few years I have had little opportunity to work with Business Objects and the newer versions of Crystal or web based solutions with Crystal Reports. I signed up to try out crystalreports.com, but I doubt my client will find this solution acceptable for security reasons as the reports are for an online invoicing system we are developing. However we can set up a reports server in-house if necessary, so it gives me some testing ground.
    Can anyone provide suggestions for a doable strategy?

    Please post this query to the Business Objects Enterprise Administration forum:
    BI Platform
    That forum is monitored by qualified technicians and you will get a faster response there. Also, all BOE queries remain in one place and thus can be easily searched in one place.
    Thank you for your understanding,
    Ludek

  • Best strategy for ID based video source with a plugin

    Hi,
    What would be the best strategy to load a video file based on an ID instead of source URL.  The plugin would use a webservice to lookup the ID and retrieve the url for the video.  The ID would be passed to the player via a flashvar.
    Thanks,
    Peter

    Hello!
    I guess LoadFromDocumentElement would be optimal...
    SMIL plugin is based upon it - so you may want to refer to it.

  • Best strategy for using external drive to speed up painfully slow mac mini

    I have Intel core duo, and LaCie external drive. Many programmes are almost unusably slow. Like Adobe Photoshop, Garageband, Logic Express, SecondLife etc... (would have been nice if apple had told me the 'improved spec' would mean so many programmes would no longer work!)
    I am looking for the best way to utilise the external drive. I have now set up to boot from the LaCie, but it is no better. Id like to know whats best to do with the two drives. Would one be best kept as clear as possible? And should that be the bootup drive? Originally, the idea was to increase storage and backup. Now it is anything at all, that will make this computer faster. My old G4 PowerMac is actually faster and more reliable!
    powerMac G4   Mac OS X (10.3.9)  
    powerMac G4   Mac OS X (10.3.9)  
    powerMac G4   Mac OS X (10.4.9)  
    powerMac G4   Mac OS X (10.3.9)  
    powerMac G4   Mac OS X (10.3.9)  
    powerMac G4   Mac OS X (10.4.9)  

    There is no way to improve on the graphics card in your mini - it's built into the logic board and can't be bypassed. However, while that may be a disappointment, it has to be said that by and large the graphics system in the mini is actually very capable, and is probably not the cause of the problem.
    What IS the primary issue I suspect is the 512Mb RAM, which on a Core Solo running applications such as Photoshop is so woefully inadequate that it would be a surprise if your old G4 wasn't somewhat faster!
    The problem is that Photoshop (the version you have) is not Intel-native, so while it runs, it requires Rosetta. Thus you have a RAM-hungry operating system, a RAM hungry application and a RAM-hungry translation package, all running at the same time. To add to that, since the software is not Intel-native, it has to be translated on-the-fly so considerable CPU time is needed to devote to that process in addition to all the other things the system needs to do in order to run.
    Thus your external drive would not help much when used as a boot drive because even though it is likely to be somewhat faster than the internal, the limited RAM of the system will be forcing so many 'paging' actions (writing and reading memory blocks to the hard drive) that any speed gains will be rather heavily masked.
    Most of the performance problems you experience can be resolved by upgrading RAM to 2Gb, simply because that will allow MacOS, Rosetta and your software a lot more room to breathe and significantly reduce the paging activity of the system such that then booting from the external will show notable improvements in responsiveness.
    Alternatively, you may find that there are Intel-native alternatives to your software which may be available at reasonable cost and provide the features you need. Good examples are such things as GraphicConverter, which is shareware and does much of what Photoshop can do, and NeoOffice, which is open source and free, which is a good alternative to MS Office. These would run without Rosetta and provide you with much improved performance as a consequence.

  • What's best strategy for dealing with 40+ hours of footage

    We have been editing a documentary with 45+ hours of footage and presently have captured roughly 230 gb. Needless to say it's a lot of files. What's the best strategy for dealing with so much captured footage? It's almost impossible to remember it all and labeling it while logging it seems inadequate as it difficult to actually read comments in dozens and dozens of folders.
    Just looking for suggestions on how to deal with this problem for this and future projects.
    G5 Dual Core 2.3   Mac OS X (10.4.6)   2.5 g ram, 2 internal sata 2 250gb

    Ditto, ditto, ditto on all of the previous posts. I've done four long form documentaries.
    First I listen to all the the sound bytes and digitize only the ones that I think I will need. I will take in much more than I use, but I like to transcribe bytes from the non-linear timeline. It's easier for me.
    I had so many interviews in the last doc that I gave each interviewee a bin. You must decide how you want to organize the sound bytes. Do you want a bin for each interviewee or do you want to do it by subject. That will depend on you documentary and subject matter.
    I then have b-roll bins. Sometime I base them on location and sometimes I base them on subject matter. This last time I based them on location because I would have a good idea of what was in each bin by remembering where and when it was shot.
    Perhaps, you weren't at the shoot and do not have this advantage. It's crucial that you organize you b-roll bins in a way that makes sense to you.
    I then have music bins and bins for my voice over.
    Many folks recommend that you work in small sequences and nest. This is a good idea for long form stuff. That way you don't get lost in the timeline.
    I also make a "used" bin. Once I've used a shot I pull it out of the bin and put it "away" That keeps me from repeatedly looking at footage that I've already used.
    The previous posts are right. If you've digitized 45 hours of footage you've put in too much. It's time to start deleting some media. Remember that when you hit the edit suite, you should be one the downhill slide. You should have a script and a clear idea of where you're going.
    I don't have enough fingers to count the number of times that I've had producers walk into my edit suite with a bunch of raw tape and tell me that that "want to make something cool." They generally have no idea where they're going and end up wondering why the process is so hard.
    Refine your story and base your clip selections on that story.
    Good luck
    Dual 2 GHz Power Mac G5   Mac OS X (10.4.8)  

  • HT1229 what is the best method for using a iphoto with an external hard drive for greater capacity?

    what is the best method for using a iphoto with an external hard drive for greater capacity?

    Moving the iPhoto library is safe and simple - quit iPhoto and drag the iPhoto library intact as a single entity to the external drive - depress the option key and launch iPhoto using the "select library" option to point to the new location on the external drive - fully test it and then trash the old library on the internal drive (test one more time prior to emptying the trash)
    And be sure that the External drive is formatted Mac OS extended (journaled) (iPhoto does not work with drives with other formats) and that it is always available prior to launching iPhoto
    And backup soon and often - having your iPhoto library on an external drive is not a backup and if you are using Time Machine you need to check and be sure that TM is backing up your external drive
    LN

  • Best strategy for variable aggregate custom component in dataTable

    Hey group, I've got a question.
    I'd like to write a custom component to display a series of editable Things in a datatable, but the structure of each Thing will vary depending on what type of Thing it is. So, some Things will display radio button groups (with each radio button selecting a small set of additional input elements, so we have a vertical array radio buttons and beside each radio button, a small number of additional input elements), some will display text-entry fields, and so on.
    I'm wondering what the best strategy for tackling this sort of thing is. I'm sort of thinking I'll need to do something like dynamically add to the component tree in my custom component's encodeBegin(), and purge the extra (sub-) components in encodeEnd().
    Decoding will be a bit of a challenge, maybe.
    Or do I simply instantiate (via constructor calls, not createComponent()) the components I want and explicitly call their encode*() and decode() methods, without adding them to the view tree?
    To add to the fun of all this, I'm only just learning Faces (having gone through the Dudney book, Mastering JSF, and writing some simpler custom components) and I don't have experience with anything other than plain vanilla JSP. (No EJB, no Struts, no Tapestry, no spiffy VisualDevStudioWysiwyg++ [bah humbug, I'm an emacs user]). I'm using JSP 2.0, JSF 1.1_01, JBoss 4.0.1 and JDK 1.4.2. No, I won't upgrade to 1.5 (yet).
    Any hints, pointers to good sample code? I've looked at some of the sample code that came with the RI and I've tried to navigate the JSF Blueprints stuff, but I haven't really found anything on aggregating components into a custom component. Did I miss something obvious?
    If this isn't a good question, please let me know how I can sharpen it up a bit.
    Thanks.
    John.

    Hi,
    We're doing something very similar. I had a look at the Tomahawk Date component, and it seems to dynamically created InputText components in the encodeEnd(). However, it doesn't decode this directly (it only expects a single textual value). I expect you may have to check the request yourself in decode().
    Other ideas would be appreciated, though - I'm still new to JSF.

  • Best strategy for migrating GL 6 DW CS4?

    First I gotta say that -- as decade-long user of several Adobe products -- Adobe has really screwed over long-time users of Adobe Golive. After a week of messing around with something that should be a slam dunk (considering the substatial amount of $ I've paid to Adobe over the years for multiple copies of GoLive 5, 6 and CS2), I can tell you Adobe's GL > DW migration utility ONLY works for sites created FROM SCRATCH in GL CS2 (they must have the web-content, web-data folder structure). This means that Adobe's migration utility only works for maybe 10% - 15% of the GoLive sites out there, and about 10% - 15% of Adobe's loyal GoLive customers, and it particularly screws over Adobe's longtime GoLive customers. Sweet! ( (Just like Adobe screwed over users of PhotoStyler -- which was a better image editor than PhotoShop, BTW.) Obviously, I would walk away from Adobe and make sure I never ever paid them another cent, but the Republican-Democrat "free market economy" has made sure I don't have that option.
    So I've gotta make Dreamweaver work, which means I've gotta migrate several large sites (the biggest has 5,000 static pages and is about 2 gigs in size) from GoLive 6 (or GoLive CS2 with the older folder structure) to Dreamweaver CS4.
    Which brings me to my question -- what's the best strategy for doing ths? Adobe's migration utility is a bad joke, so here's the alternative, real world plan I've come up with. I'd apreciate any suggestions or comments...
    1) create copies of all my GL components in the content folders for my GL site (not in the GoLIve components folder)
    2) replace the content of all GoLive compnents (in the GoLive components folder) with unque character strings, so that instead of a header with images and text, my old header would look something like xxxyyyzzz9
    3) create a new folder called astoni in the root of my hard drive. Copy all my GoLIve web site content (HTML, images, SWF, etc.) into astoni in exactly the structure it was in with GL
    4) create a new Dreamweaver site by defining astoni as the local location for my site, astoni\images as the location for images, etc.
    5) use Dreamweaver and open the newly defined astoni site. Then open each of the GoLive components I copied into a content level folder in astoni, and drag each into the Dreamweaver Assets/Library pane, in order to create library items just like my old GoLive components
    6) use Dreamweaver to Search & Replace out the unique text strings like xxxyyyzzz9 with the content of my new DW library items
    7) refresh site view to make all the links hook up...
    Thanks for your help. Hope this discussion helps others too...

    Instead of ragging on people who are familiar with DW and Site Development, you should be gracious and accept the practical advice you've been given.  A "best strategy" would be to read some tutorials and learn how to work with HTML, CSS and server-side technologies. Without some basic code skills, you're going to find DW an uphill, if not impossible battle.
    Frankly, I don't have free time to hand-hold someone through the excruciating process of migrating a 5,000 page static site from GoLive  to DW. And I doubt anyone else in this forum has either.  We're not Adobe employees.  We don't get paid to participate here.  We are all product users JUST LIKE YOU.
    I'm sorry you're frustrated.  I'm also sorry for your clients. But the problem you have now isn't Adobe's fault. It's yours for not keeping up with server-side technologies or handing-off these huge static sites to more capable web developers.  I'm not saying you need to buy anyone's books, but they are good resources for people willing to learn new things.
    That said, maybe you should stick with GoLive.  The software doesn't have an expiration date on it and will continue working long into the future.  If you're happy using GL, keep using it to maintain your legacy sites. At the same time learn X/HTML, CSS & PHP or ASP.  Use DW CS4 for the creation of new projects.
    FREE Tutorial Links:
    HTML & CSS Tutorials - http://w3schools.com/
    From   Tables to CSS Web Design Part 1 -
    http://www.adobe.com/devnet/dreamweaver/articles/table_to_css_pt1.html
    From   Tables to CSS Web Design Part 2 -
    http://www.adobe.com/devnet/dreamweaver/articles/table_to_css_pt2.html
    Taking  a Fireworks (or Photoshop) comp to a CSS based layout in DW
    http://www.adobe.com/devnet/fireworks/articles/web_standards_layouts_pt1.html
    Creating  your first website in DW CS4 -
    http://www.adobe.com/devnet/dreamweaver/articles/first_cs4_website_pt1.html
    Guidance  on when to use DW Templates, Library Items and SSIs -
    http://www.adobe.com/devnet/dreamweaver/articles/ssi_lbi_template.html
    Best of luck,
    Nancy O.
    Alt-Web Design & Publishing
    Web | Graphics | Print | Media  Specialists
    www.alt-web.com/
    www.twitter.com/altweb
    www.alt-web.blogspot.com

  • Best strategy for buring dual layer DVD

    I've got a project that won't fit on a single layer DVD, so I've got it set up for dual layer and "best quality" which results in a 7.38GB disk image.  However, iDVD 8 warned me when burning the disk images that some utilities may not be able to burn a reliable dual layer disk copy and to use iDVD instead, does this include Disk Utility?
    I always use Disk Utility to make copies, iDVD took almost 7 hours to burn the disk image, I can't afford to wait that long for each copy.  So what's the best strategy for burning dual layer DVDs?

    subsequent copies burn in far less time immediately after the first provide you don't quit iDvd
    If you know ahead of time you'll need more than a few copies, I'd recommend burning from a disc image to the desktop and reducing the burn speed (4x or lower) I prefer to use Roxio Toast myself. But others have had success with Apple's Disc Utilities as well.

  • What are the best practices for using the enhancement framework?

    Hello enhancement framework experts,
    Recently, my company upgraded to SAP NW 7.1 EhP6.  This presents us with the capability to use the enhancement framework.
    A couple of senior programmers were asked to deliver a guideline for use of the framework.  They published the following statement:
    "SAP does not guarantee the validity of the enhancement points in future releases/versions. As a result, any implemented enhancement points may require significant work during upgrades. So, enhancement points should essentially be used as an alternative to core modifications, which is a rare scenario.".
    I am looking for confirmation or contradiction to the statement  "SAP does not guarantee the validity of enhancement points in future releases/versions..." .  Is this a true statement for both implicit and explicit enhancement points?
    Is the impact of activated explicit and implicit enhancements much greater to an SAP upgrade than BAdi's and user exits?
    Is there any SAP published guidelines/best practices for use of the enhancement framework?
    Thank you,
    Kimberly
    Edited by: Kimberly Carmack on Aug 11, 2011 5:31 PM

    Found an article that answers this question quite well:
    [How to Get the Most From the Enhancement and Switch Framework as a Customer or Partner - Tips from the Experts|http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/c0f0373e-a915-2e10-6e88-d4de0c725ab3]
    Thank you Thomas Weiss!

  • Best practice for use of spatial operators

    Hi All,
    I'm trying to build a .NET toolkit to interact with Oracles spatial operators. The most common use of this toolkit will be to find results which are within a given geometry - for example select parish boundaries within a county.
    Our boundary data is high detail, commonly containing upwards of 50'000 vertices for a county sized polygon.
    I've currently been experimenting with queries such as:
    select
    from
    uk_ward a,
    uk_county b
    where
    UPPER(b.name) = 'DORSET COUNTY' and
    sdo_relate(a.geoloc, b.geoloc, 'mask=coveredby+inside') = 'TRUE';
    However the speed is unacceptable, especially as most of the implementations of the toolkit will be web based. The query above takes around a minute to return.
    Any comments or thoughts on the best practice for use of Oracle spatial in this way will be warmly welcomed. I'm looking for a solution which is as quick and efficient as possible.

    Thanks again for the reply... the query currently takes just under 90 seconds to return. Here are the results from the execution plan ran in sql*:
    Elapsed: 00:01:24.81
    Execution Plan
    Plan hash value: 598052089
    | Id | Operation | Name | Rows | Bytes | Cost (%CPU)| Time |
    | 0 | SELECT STATEMENT | | 156 | 46956 | 76 (0)| 00:00:01 |
    | 1 | NESTED LOOPS | | 156 | 46956 | 76 (0)| 00:00:01 |
    |* 2 | TABLE ACCESS FULL | UK_COUNTY | 2 | 262 | 5 (0)| 00:00:01 |
    | 3 | TABLE ACCESS BY INDEX ROWID| UK_WARD | 75 | 12750 | 76 (0)| 00:00:01 |
    |* 4 | DOMAIN INDEX | UK_WARD_SX | | | | |
    Predicate Information (identified by operation id):
    2 - filter(UPPER("B"."NAME")='DORSET COUNTY')
    4 - access("MDSYS"."SDO_INT2_RELATE"("A"."GEOLOC","B"."GEOLOC",'mask=coveredby+i
    nside')='TRUE')
    Statistics
    20431 recursive calls
    60 db block gets
    22432 consistent gets
    1156 physical reads
    0 redo size
    2998369 bytes sent via SQL*Net to client
    1158 bytes received via SQL*Net from client
    17 SQL*Net roundtrips to/from client
    452 sorts (memory)
    0 sorts (disk)
    125 rows processed
    The wards table has 7545 rows, the county table has 207.
    We are currently on release 10.2.0.3.
    All i want to do with this is generate results which fall in a particular geometry. Most of my testing has been successful i just seem to run into issues when querying against a county sized polygon - i guess due to the amount of vertices.
    Also looking through the forums now for tuning topics...

  • What is the best option for tethering my IPhone 4s with my iPad? (the iPad is wifi only)

    What is the best option for tethering my IPhone 4s with my iPad? (the iPad is wifi only)

    #1. Understand that if you switch carriers, you can NOT take your existing iPhone with you. It won't work. You will need to purchase a new one.
    #2. Your only choices are Sprint and Verizon. Decide who has the better coverage in your area. Keep in mind that you will NOT be able to get simultaneous voice and 3G data on either of these, as their CDMA networks do not support it. The U.S. T-Mobile network is not supported and is not fully compatible with the iPhone as it operates on a rarely used frequency compared to the rest of the world.
    #3. What in the world are "niners"? Do you mean you want to be able to keep your existing "phone numbers"? If so, that should be no problem. Most numbers in the US are now portable.
    #4. Consider WHY you want to switch. If the issue is really price, you're not going to see much of a difference. A few dollars a month at best for comparable voice and data plans.

  • WHAT IS BEST STRATEGY FOR RMAN BACKUP CONFIGURATION

    Hi all,
    my database size is 50GB I want TAKe WEEKLY FULL BACKUP AND INCREMENTAL BACKUP
    WITHOUT RECOVERY CATALOG.by follwing commands
    weekly full database backup
    run
    backup as compressed backupset
    incremental level=0
    device type disk
    tag "weekly_database"
    format '/sw/weekly_database_%d_t%t_c%c_s%s_p%p'
    database;
    I want do CONFIGURE RMAN BY FOLLWING stragtegy
    CONFIGURE RETENTION POLICY TO REDUNDANCY window of 14 days.
    CONFIGURE BACKUP OPTIMIZATION OFF;
    CONFIGURE CONTROLFILE AUTOBACKUP ON;
    CONFIGURE CONTROLFILE AUTOBACKUP FORMAT FOR DEVICE TYPE DISK TO
    '\SW\AUTOCFILE_'%F';
    and other is by default
    sql>alter system set control_file_record_keep_time=15 days;
    os--aix6 and for two database 10g2 and 11g2
    what is best configuration strategy for rman backup.AND BACKUP WITH RECOVERY CATALOG OR WITHOUT RECOVERY CATALOG
    PLEASE TELL ME
    Edited by: afzal on Feb 26, 2011 1:45 AM

    For simply two databases, there really wouldn't be a need for a recovery catalog. You can still restore/recover without a controlfile and without a recovery catalog.
    From this:
    afzal wrote:
    CONFIGURE RETENTION POLICY TO REDUNDANCY window of 14 days.I am assuming you want to keep two weeks worth of backups, therefore these:
    alter system set control_file_record_keep_time=15 days;
    CONFIGURE RETENTION POLICY TO REDUNDANCY window of 14 daysShould be:
    RMAN> sql 'alter system set control_file_record_keep_time=22';
    RMAN> CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 14;22 would give you that extra layer of protection for instances when a problem occurs with a backup and you want to ensure that data doesn't get aged out.

  • Best practices for using the knowledge directory

    Anyone know when it is best to store docs in the Knowledge Directory versus Collab? They are both searchable, but I guess you can publish from the Publisher to the KD. Anyone have any best practices for using the KD or setting up taxonomies in the KD?

    Hi Richard,
    If you need to configure dynamic pricing that may vary by tenant and/or if you want to set up cost drivers that are service item attributes, you should configure Billing Tables in the Demand Management module in 10.0. 
    The cost detail functionality in 9.4 will likely be changed to merged with the new pricing feature in 10.0.  The current plan is not to bring cost detail into the Service Catalog module.

Maybe you are looking for

  • HP printer problem with Leopard

    Just upgraded to 10.5.5 and now can't get HP2015d printer to print off any Office documents (Word, Excel or Powerpoint). Othe HP printers work fine. I have installed updated driver and still can't solve. Help!

  • I keep getting "The server responded with an error" whenever I initially open iCal on my iMac.

    I have an iMac (2007 edition; wireless network). I reset my AppleID password, but still get the same message. I do not have the same problem with my MBP, also on the same wireless network. The software on both are updated. No problem opening Safari.

  • Set diferent font in a paragraph text.

    In xml file,there is the following element: When I open the xml file in FrameMaker,the font of string "ZCCC2.1" should Times new roman,the font of string "ADCCCCCCCC" should another font. In EDD,title element is a framemaker element.How Can I deal wi

  • It takes time before the system is working properly

    Hi, This morning something strange happened. Turn on the iMac, the chime is there but when using the audio control keys (F4-F15-F16), nothing happened. Trying to quit an application (like iMail) from the dock does not work either. The icon in the doc

  • Integration Frame work ERROR in Windows 8

    Hai Experts           When i m try to install Integration Framework in my local system i getting an error. Please help me out the Bug issue. I have enclose the screen. shot Best Regards, Dineshkumar kannan