Hi
I am New to this. Please explain what are these and when we use these (split, Or Split, Conditional, Multiple ) when developing a BPM Process. Also where we define rules in BPM

The Studio documentation might help a little (download it from http://download.oracle.com/docs/cd/E13154_01/bpm/docs65/index.html -> click "PDF" beside the "BPM Studio Guide" link).
At a high level, the Split activity speeds the process by allowing multiple parallel processing of an instance.
The Or Split activity is similar to a Split but the Conditional transitions create the copies going through the circuit. Only if all of the Conditional transitions are false is the one Unconditional transition taken.
The Multiple activity allows any number of instances to be created from a single instance using logic hit at runtime. This is useful in processes that must solicit information from a number of different sources and these sources may not be known until runtime (for example, collecting bids from multiple suppliers). Only one outgoing transition is allowed from a Mulitple activity. A Subflow activity is often used after a Mulitple, which enables you to send the copied instances to multiple processes depending upon the information you need to retrieve.
All three of these must be paired with a Join activity. The Join activity rejoins the copies of the replicated instances with the original parent instance after they have completed the Split, Or Split or Multiple circuit
The "Conditional" activity is similar to the traditional decision diamond that has been drawn on flow charts for years. Unlike the Split, Multiple and Or Split activities described above, the Conditional only has one instance flowing out of it via one transition at runtime. Typically in the process's design you might have a Conditional activity with an unconditional transition going to an activity downstream and a conditional transition going to another activity downstream. At runtime when the work item instance reaches the Conditional activity the work item instance either flows through the conditional transition (if it evaluates as true) or else the unconditional transition if the conditional transition evaluated as false.
The key thing to remember is that coming out of a Conditional activity, the work item instance can only exit via one transition (one path). This is the different when work item instances leave a Split, Or Split or a Multiple activity. For these three gateway activities, copies of the work item instance can flow out of these activities via several paths concurrently.
Hope this helps,
Dan

Similar Messages

  • NW BPM. - Split Multiple messages into 1.

    Hi,
    My requirement is take XML Message (Multiple Message ) into NW-BPM and split it into multiple reocrds( 1 Message each ).
    further on each employee i will apply mapping logics and then again recombine it and pass it to Target Message.
    Kindly Suggest.
    Regards
    PS.

    Hi Sriram,
                  I followed the above blog and successfully deployed my BPM in NWDS. I've been educated that I've create two ICOs:
    First ICO->
       Sender system(SOAPUI Tool)->PI->BPM
    Second ICO->
       BPM->PI->Receiver system(Local File system)
    I create the Second ICO as mentioned above. Basically I used the same Sender SOAP channel in both the Inbound Processing of ICO and in the second ICO I used my local file system to send the final individual files. As per the below link(Possible cause 4:)
    PI Messages are not delivered to SAP NetWeaver BPM - Technology Troubleshooting Guide - SCN Wiki
    Today I re-imported my Service Interface from ESR and again created the BPM  and deployed it successfully. But while testing I'm seeing the below Error from yesterday.
    Note : I created wsdl file from my first ICO. I'm testing from SOPUI tool.

  • Why does a mail-merge in MS Publisher split into multiple files when printed as a pdf file?

    Why does a mail-merge in MS Publisher split into multiple files when printed as a pdf file?

    'Cuz that's what mail merges do.  They create multiple documents based on the parent doc and all the names/addresses in your data tables.
    Perhaps if you describe exactly what you're trying to do & why you need PDF, we can point you to relevant tutorials.
    Nancy O.

  • Can I split to multiple monitors?

    I just bought a Mac Mini and I want to split out to multiple monitors.
    Preferably I want to go out with a VGA and DVI or 2 VGA's if possible. Can it split to multiple monitors?
    I am trying using a presentation program to send the signal to multiple wall monitors. Kinda like a hotel with the convention monitors...
    Thanks for any help!

    Welcome to the Apple Discussions!
    The new Mac mini has two video ports and supports using two displays at once. There is a mini-DisplayPort and an HDMI port. You will need the appropriate adapters for the two ports to convert the signals to either DVI or VGA. Apple and a number of 3rd party venders sell these adapters.
    Dah•veed

  • I use Exchange to sync my iphone4S with Outlook.  On my iphone, my contacts are split into multiple records if they have more than one email address - how can I consolidate them on the iphone

    i use Exchange to sync my iphone4S with Outlook.  On my iphone, my contacts are split into multiple records if they have more than one email address - how can I consolidate them on the iphone

    I have loaded my Firefox bookmarks into Internet Explorer Favorited. I also uninstalled Safari.
    I go to iTunes on my phone and see no wat to connect my iPhone to my laptop. I see Music, Shows, etc., the kind of stuff I would expect, but no clue as to how to proceed.
    Would you please be so kind to fill me in on how to "That syncing is done via iTunes. Connect the device to iTunes, select it, then go to the Summary page and select to sync bookmarks."?
    I am not sure what you mean by "Summary Page"
    Thank you

  • I am using  MacBook Pro and running 10.8.4. iTunes version 11.0.4. Several of the cd's i have imported recently have been split into multiple albums by ITunes. How do I bring all the bonus tracks together with the original album?

    I am using a MacBook Pro and running 10.8.4. iTunes version 11.0.4. Several of the cd's i have imported recently have been split into multiple albums by iTunes where it has identified bonus tracks. How do I bring all the bonus tracks together with the original album?

    Hello there, Fineshot.
    The following Knowledge Base article might provide some information that should help you resolve the issue you're having:
    Why aren't songs with the same album art grouped together?
    http://support.apple.com/kb/TS1468
    Thanks for reaching out to Apple Support Communities.
    Cheers,
    Pedro D.

  • Single Class Split Over multiple non-consecutive Days??

    How do I setup in OLM  a class split over multiple days for Example:
    I have a Diversity Awareness Course and Offering. The Class is 2 days long, but not on consecutive days, they are a week apart.
    Do I create a Day1 Class and Day2 class under the same course and make it a prerequisite to attend day 1?
    From a reporting point of view this now shows as 2 classes when it is only 1; inflating the class figures.
    Or Can I split it into 2 sessions under the same class?
    What is the best way to do this?

    Hi!
    You can create a Class with two Sessions underneath it (one for each day).  Make the Start Date for the Class the day the Class begins and set the End Date to correspond to the last day.  Your Duration should be set to 2 Days.  Learners will be able to view details for each session, and you can assign different instructors and rooms for each day if you use Resource Bookings in OLM.
    Anne
    Anne Saulnier | Synergy Codeworks LLC
    [email protected]
    603-864-9942

  • Hello  can you please advise how to split a multiple VCF card (that includes 1000s of indivudual cards)

    hello 
    i am using MCbackup on my iphone4 and did backup all my contacts into 1 single VCF card (consisting of 1000s individual vcf cards)
    can you please advise how to split a multiple VCF card (that includes 1000s of indivudual cards) in order to save them in outlook 2007 as backup thanks

    This is more related to Office issue, I’d like to suggest you post this issue to Office forum. 
    Here is the link: http://support.microsoft.com/gp/gp_newsgroups_master
    ***Don't forget to mark helpful or answer***
    **Note:(My posts are provided “AS IS” without warranty of any kind)

  • BPM Process - Exception handling or timeout issues?

    Hi Guys,
    I have a BPM process as below.
    1. Receive step: Receive the file with multiple transactions.
    2. Transformation step: Split the file into individual transactions
    3  Block step which includes  -- par for each mode
    1. Send Step (Synchronus): Each individual transaction needs to contact the 3rd party system and get the response. --  Do i need to handle any exceptions here  ?
    2. Container : Collect all the responses 
    Block ends
    4. Transformation: combine all the responses in to a single file
    5. Send Step: synchronus -- send the above single file and get the response back
    6. Transformation : Transform the above response into the target structure.
    7.  Send: send the message asynchronusly to the target system
    I need suggestion regarding the exceptional handling or any time out issues, i need to take care of.
    any suggestions would be really appreciated
    Thanks,
    Raj
    Edited by: raj reddy on Feb 12, 2009 10:12 PM

    Hi,
    I) For the Block holding the Sync Send, create an Exception Block. (right click on Sync Send -> Insert   -> Exception Branch)
    II) Name the Exception block (ex: exceptionHandler).
    III) in the Sync Send step ->Properties -> Exceptions -> in System Error - add exceptionHandler.
    IV) Now within the Exception handler block you can create containers to hold values from payload, throw exception as email etc).
    This will cover your sync send step incase there is an error while sending the request of a timeout during receiving the response.
    You can also do the same for the Step 7) Asycn send - if required.
    Another suggestion in your question Step 6) can be done outside the bpm, when you do the interface determination for that Asycn Send you can add the Interface mapping that will map the responses to the target structure.
    Doing this will reduce one step in your BPM. For further information in how more you can fine tune your bpm, read this blog - https://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/5113. [original link is broken] [original link is broken] [original link is broken]
    All the best.
    Regards,
    Balaji.M

  • Processing large volume of idocs using BPM Processing

    Hi,
    I have a scenario in which SAP R/3 sends large volume say 30,000 DEBMAS Idocs to XI. XI then sends data to 3 legacy systems using jdbc adapter.
    I created a BPM Process which waits for 4 hrs to collect all the idocs. This is what my BPM does:
    1. Wait for 4 hrs Collect the idocs
    2. For every idoc do a IDOC->JDBC Message transformation.
    3. Append to a Big List
    4. Loop at the Big list from step 4 and in the loop for
    5. Start counter from 0 and increment. Append to a Small List.
    6. if counter reaches 100 then send a Batch JDBC Message in send step.
    7. Reset counter after every send.
    8. Process remaining list i.e if there was an odd count of say 5300 idoc then the remaining 53 idocs will be sent in anther block.
    After sending 5000 idocs to above BPM following problems are there:
    1. I cannot read the workflow log as system does not respond.
    2. In the For Each loop which loops through the big list of say 5000 idocs only first pass of 100 was processed after that the workflow item is not moving ahead. It remains in the status as "STARTED" but I do not see further processing.
    Please tell me why certain Work Items are stuck is it becuase I have reached upper limit and is this the right approach? The Main BPM Process is also hanging from last 2 days.
    I have concerns about using BPM for processing such high volume of idocs in production. Please advice and thanks in advance.
    Regards
    Ashish

    Hi Ashish,
    Please read SAPs Checklist for proper usage of BPMs: http://help.sap.com/saphelp_nw04/helpdata/en/43/d92e428819da2ce10000000a1550b0/content.htm
    One point i'm wondering about is why do you send the IDocs out of R/3 one by one and don't use packaging there? From a performance stand point this is much better than a bpm.
    The SAP Checklist states the following:
    <i>"No Replacement for Mass Interfaces
    Check whether it would not be better to execute particular processing steps, for example, collecting messages, on the sender or receiver system.
    If you only want to collect the messages from one business system to forward them together to a second business system, you should do so by using a mass interface and not an integration process.
    If you want to split a message up into lots of individual messages, also use a mass interface instead of an integration process. A mass interface requires only a fraction of the back-end system and Integration-Server resources that an integration process would require to carry out the same task. "</i>
    Also you might want to have a look at the IDoc packaging capabilities within XI (available since SP14 i believe): http://help.sap.com/saphelp_nw04/helpdata/en/7a/00143f011f4b2ee10000000a114084/content.htm
    And here is Sravyas good blog about this topic: /people/sravya.talanki2/blog/2005/12/09/xiidoc-message-packages
    If for whatever reason you can't or don't want to use the IDoc packets from R/3 or XI there are other points on which you can focus for optimizing your process:
    In the section "Using the Integration Server Efficiently" there is an overview on which steps are costly and which steps are not so costly in their resource consumption. Mappings are one of the steps that tend to consume a lot of resources and unless it is a multi mapping that can not be executed outside a BPM there is always the option to do the mapping in the interface determination either before or after the BPM. So i would sugges if your step 2 is not a multi mapping you should try to execute it before entering the BPM and just handle the JDBC Messages in the BPM.
    Wait steps are also costly steps, so reducing the time in your wait step could potentially lead to better performance. Or if possible you could omitt the wait step and just create a process that waits for 100 messages and then processes them.
    Regards
    Christine

  • Wait for a message to proceed to the next activity in BPM Process??

    Hi,
    1. After a BPM process is initiated, is it possible to have a "Wait step" in the process ?...That is, I would like to continue to the next activity in the BPM process ONLY after I have received a certain message...
    We do have a "Wait" step in ccBPM(PI) wherein , we could wait until a certain message is received(based on correlation) and then proceed to the next step....
    Is this possible in BPM ???
    There was a query similar to this in the forum :
    Inter-Process Asynchronous Event
    (or search for "Inter-Process Asynchronous Event "  - Ingo Taraske)
    and a suggestion was provided by David Conil which I didn't quite get...
    Would be great if some one could throw more light on if this is possible in EhP1...Thanks.
    Best Regards
    Arun

    Hi Arun,
    In a nutshell, wait steps are not supported in EhP1. The workaround consists of splitting the process in two processes. In BPMN 1.1, wait steps are modeled using "Intermediate Message Events". The idea is to consider the intermediate message event as start event of the second process. The asynchronous aspect would be covered using PI.
    Best regards,
    David

  • Calling ADF page Custom Listener (Ex: ActionListener) from BPM Process Task (APPROVE/REJECT)

    Hi All,
    Jdeveloper version - 11.1.1.7
    I am very new to BPM / SOA development, but I have very good development skills on ADF.
    I am not using ADF BC, using EJB for business services and also using custom ADF pages for HumanTasks.
    Usecase:
    From the BPM Process task, when process submission (APPROVE / REJECT) , I need to invoke a Custom listener (Ex.Action Listener - a EJB call) in the ADF page.
    I am trying to use BPM APIs.
    Please clarify me how this will achieve using BPM APIs. I need detail guidelines to do it. Please make to understand this process.
    Provide some useful documentation or links to understand the following:
    1. Custom Human task pages
    2. BPM APIs - 11.1.1.7
    3. Call a BPM process task from ADF Listener and Call a ADF Listener from BPM Process task - Using BPM APIs.
    Please revert more clarifications needed.
    Thanks and Regards
    Mohanraj N

    Hi Joonas.
    Plese let me explain me better for your understanding
    A big summary for what I meant it's the following:
    1- In the procces you made, when you add the HT activity, you have to implement it, this means declare the input(s) parameters you want. This implementation create the .task file.
    2- Create an application, and projects as HT you have. Each poject are based on the .task file, and automatically create a Data Control (for each project based on a .task) with all you need.
    This w'll be an empty application, so you can customize it all you want. The task selected should have all the parameters previously defined. Those parameters can change if you want.
    2- Create a page(s) in the task flow for the task implementation. You can even split the the payload of the task in differents pages, create your custom pages and any logic you need.
    3- An important aspect is how to match these application with the HT implemented in the process. It's possible, it's a configuration en the Enterprise Manager.
    4- Deploy your application
    All these are explain in the book I mentioned
    Th book you can find it here:
    https://blogs.oracle.com/soacommunity/entry/oracle_soa_suite_11g_handbook_1
    Regards Dariel.
    PS: Please, let me know if you need more details.

  • Problem with array param when calling a webservice from a BPM Process

    Hi. I have a web service and uses an array as parameter.
    The array (named "atributos") as part of a business object is defined here:
    <xs:schema targetNamespace="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/TrackPCPDOTrans" ...>
    <xs:complexType name="TrackPCPDOTransType">
    <xs:sequence>
    <xs:element name=... />
    <xs:element name="atributos" nillable="true" type="ns2:AtributosType" maxOccurs="unbounded"/>
    </xs:sequence>
    </xs:complexType>
    <xs:element name="TrackPCPDOTrans" type="TrackPCPDOTransType"/>
    </xs:schema>
    <xs:schema targetNamespace=... >
    <xs:complexType name="AtributosType">
    <xs:sequence>
    <xs:element name="key" nillable="true" type="xs:string"/>
    <xs:element name="value" nillable="true" type="xs:string"/>
    </xs:sequence>
    </xs:complexType>
    <xs:element name="Atributos" type="AtributosType"/>
    </xs:schema>
    In the service task activity, I pass the params to the web service:
    "descripcion" --> TrackPCPDOTrans.atributos[1].key
    DataObject.descripcion --> TrackPCPDOTrans.atributos[1].value
    "estado" --> TrackPCPDOTrans.atributos[2].key
    DataObject.estado --> TrackPCPDOTrans.atributos[2].value
    "justificacion" --> TrackPCPDOTrans.atributos[3].key
    DataObject.justificacion --> TrackPCPDOTrans.atributos[3].value
    But when I test the process, an error ocurrs:
    <auditQueryPayload auditId="8712004" ciKey="380019">
    <dataState>
    <dataObject name="FaultMessage" isBusinessIndicator="false">
    <value> oracle.bpm.bpmn.engine.model.runtime.microinstructions.TrappableException: faultName: {{http://schemas.xmlsoap.org/ws/2003/03/business-process/}selectionFailure} messageType: {{http://schemas.oracle.com/bpel/extension}RuntimeFaultMessage} cause: {faultName: {{http://schemas.xmlsoap.org/ws/2003/03/business-process/}selectionFailure} messageType: {{http://schemas.oracle.com/bpel/extension}RuntimeFaultMessage} parts: {{ summary=<summary>empty expression result. The expression bpmn:getDataInput('trackPCPDOTrans')/ns:atributos[2]/ns1:key is empty. An attempt to read or copy data referenced or computed by the XPath expression either had invalid data, according to the XML schema, or did not contain certain optional data. Ensure that the variable or expression result named in the error message is not empty. Enable XML schema validation of related data elements to ensure the run-time data is valid. </summary>} } </value>
    </dataObject>
    </dataState>
    </auditQueryPayload>
    What is wrong?
    Thanks for your help.

    I did the assignment in XPATH:
    oraext:parseXML(concat('<AtributosTracking xmlns="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/AtributosTracking">
    <arrayAtributosTracking>
    <key xmlns="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/Atributos">','descripcion','</key>
    <value xmlns="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/Atributos">',bpmn:getDataObject('DataObjectDDSAO')/ns:descripcion,'</value>
    </arrayAtributosTracking>
    <arrayAtributosTracking>
    <key xmlns="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/Atributos">','estado','</key>
    <value xmlns="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/Atributos">',bpmn:getDataObject('DataObjectDDSAO')/ns:estado,'</value>
    </arrayAtributosTracking>
    </AtributosTracking>'))
    AtributosTracking.xsd:
    <?xml version="1.0" encoding="UTF-8"?>
    <?bpmo version="11.1.1.6.0.15.53" build="15.53" fullName="DataTypes.AtributosTracking" modifiers="268435456"?>
    <xs:schema targetNamespace="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/AtributosTracking" elementFormDefault="qualified" xmlns:xs="http://www.w3.org/2001/XMLSchema" xmlns="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/AtributosTracking" xmlns:ns1="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/Atributos" xmlns:bpmo="http://xmlns.oracle.com/bpm/bpmobject/" >
    <xs:import namespace="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/Atributos" schemaLocation="Atributos.xsd"/>
    <xs:complexType name="AtributosTrackingType">
    <xs:sequence>
    <xs:element name="arrayAtributosTracking" nillable="true" type="ns1:AtributosType" maxOccurs="unbounded"/>
    </xs:sequence>
    </xs:complexType>
    <xs:element name="AtributosTracking" type="AtributosTrackingType"/>
    Atributos.xsd:
    <?xml version="1.0" encoding="UTF-8"?>
    <?bpmo version="11.1.1.6.0.15.53" build="15.53" fullName="DataTypes.Atributos" modifiers="0"?>
    <xs:schema targetNamespace="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/Atributos" elementFormDefault="qualified" xmlns:xs="http://www.w3.org/2001/XMLSchema" xmlns="http://xmlns.oracle.com/bpm/bpmobject/DataTypes/Atributos" xmlns:bpmo="http://xmlns.oracle.com/bpm/bpmobject/" >
    <xs:complexType name="AtributosType">
    <xs:sequence>
    <xs:element name="key" nillable="true" type="xs:string"/>
    <xs:element name="value" nillable="true" type="xs:string"/>
    </xs:sequence>
    </xs:complexType>
    <xs:element name="Atributos" type="AtributosType"/>
    </xs:schema>
    But a new error occurrs when I run the BPM process:
    <auditQueryPayload auditId="8724004" ciKey="380025">
    <dataState>
    <dataObject name="FaultMessage" isBusinessIndicator="false">
    <value> oracle.bpm.bpmn.engine.model.runtime.microinstructions.TrappableException:
    faultName: {{http://schemas.xmlsoap.org/ws/2003/03/business-process/}selectionFailure}
    messageType: {{http://schemas.oracle.com/bpel/extension}RuntimeFaultMessage}
    cause: {faultName: {{http://schemas.xmlsoap.org/ws/2003/03/business-process/}selectionFailure}
    messageType: {{http://schemas.oracle.com/bpel/extension}RuntimeFaultMessage}
    parts: {{ summary=<summary>XPath query string returns multiple nodes.
    The assign activity part and query bpmn:getDataObject('AtributosTracking')/ns:atributosTracking are returning multiple nodes.
    The assign activity part and query named in the error message returned multiple nodes. It should return single node.
    According to BPEL4WS specification 1.1 section 14.3, the assign activity part and query named in the error message should
    not return multiple nodes. Verify the part and xpath query named in the error message at line number -1 in the BPEL source. </summary>} } </value>
    </dataObject>
    </dataState>
    </auditQueryPayload>
    Any idea?
    Thanks
    Edited by: César on 10/01/2013 11:02 AM

  • Call Enterprise service in BPM Process

    Hi,
    I define a BPM process for PO creation
    In the first Lane : Purchase requestor
    In the second Lane: Approve Process
    In the third Lane: Create PO(Enterprise Service)
    Here in the first lane iam giving the below attributes
    Requestor Name
    Requestor Country
    Product ID
    Product Descrption
    This will be send to second lane i.e Approver Process
    Once he approved it should create a PO in Hu2 if he reject it should goto first stage
    I consumed Enterprise Service from HU2 and i published in service registry
    Now i created automated activity and imported PO create service in BPM flow seccussfully.
    Now my problem is to write code in webdynpro.
    How to write code for below process?
    In the second lane i.e Approver Process i should write a code that if it approve goto third process i.e call webservice which which creates a PO .If it rejects goto first process??How to write this code?Plz can u help Iam new to coding moreover to webdynpro...
    Regards
    Shwetha.
    Edited by: Shwetha-Capita on May 1, 2009 1:28 PM

    Hi Shwetha,
    The following part of the documentation explains how to prepare your Web Dynpro DC so that it can be used in SAP NetWeaver BPM:
    https://help.sap.com/saphelp_nwce711/helpdata/en/48/cae1791e774da5e10000000a421937/frameset.htm
    The important thing to know is that SAP NetWeaver BPM is waiting for a complete event to be triggered in your application. Once this is received the process flow continues.
    So in your case you would simply create two Web Dynpro user interfaces. The first one for entering the data and the second one for reviewing / approving / rejecting the data.
    In the first case you would have some sort of "submit" button, which triggers the before mentioned 'complete' event. SAP NetWeaver BPM will then take the data that is visible in the Web Dynpro context of the interface controller and continue the processing.
    The second case basically works the same with one little difference: Here you would have two buttons -  one for the approval and one for rejection. Both will trigger the 'complete' event, but should set a field in the Web Dynpro context (e.g. "isApproved") differently. While the "approve" button should set it to "true" the "reject" button would set it to "false".
    So once this step is also completed you could make use of gateways and conditions (https://help.sap.com/saphelp_nwce711/helpdata/en/47/635cb242bf6831e10000000a421937/frameset.htm) in your proces model to determine if the data should be passed to the service for PO creaton or if it should handle a different situation in case of a rejection.
    If you're new to SAP NetWeaver BPM it might help having a look at the documentation first and also browse through some sample models as they are provided here:
    https://www.sdn.sap.com/irj/sdn/nw-bpm?rid=/webcontent/uuid/006a16ad-a3ad-2b10-4e9a-af2ee5820848 [original link is broken]
    Hope that helps,
    Martin

  • Error Emails from BPM Process Administration Console

    I am able to send error email to a single e-mail Id after configuring it in BPM Process Administrator(Engine-Networking tab).
    How do I sent e-mail to multiple user?
    I tried comma separated. It didnt work.
    Anyone can help on this?
    I get error something like below.....
    will be notified. Original exception is: Illegal address Caused by: Illegal address java.io.IOException: Illegal address at fuego.io.SMTPClient.sendMail(SMTPClient.java:323) at fuego.io.SMTPClient.sendMail(SMTPClient.java:341) at fuego.server.service.MailNotificationDispatcher.sendNow(MailNotificationDispatcher.java:157) at fuego.ejbengine.service.EJBMailNotificationDispatcher.send(EJBMailNotificationDispatcher.java:55) at fuego.server.service.ServerMailLogOutput.doOutput(ServerMailLogOutput.java:116) at fuego.log.LogOutput.output(LogOutput.java:187) at fuego.log.LogSystem$LogItemDispatcher.logItems(LogSystem.java:980) at fuego.log.LogSystem$LogItemDispatcher.run(LogSystem.java:863) Caused by: javax.mail.internet.AddressException: Illegal address in string
    Edited by: sideeque on Feb 16, 2011 7:56 AM

    Not the answer you wanted and sure you already thought of this, but try using a group email address inside the Process Admin email field.
    Dan

Maybe you are looking for