BT Infinity date changed again?

Hiya, Can you tell me if its still end June we get Infinity in Banbury or has it been delayed till end Sept please? Just I have 2 different dates now, thanks  

September 11 thats nothing.
We have been pushed back every 3 months since Septmeber 2010 !
I did manage to get a reply from someone at BT on why this was the case though.
They said it was 'beacuse of engineering issues'.
What the hell is that if not a fob off...
BT have switched over loads of cabinets in the town, but seemed to have missed 10 or so here.
Guess they have moved on to other towns and we wont see them back anytime soon.
If they could just do the cabinets and finish the job they started or tell me that NO I wont be getting FTTC then that would be fine, but to shift the date 3 months every quarter for 2 years is a joke!
Come on BT sort yourselves out!!

Similar Messages

  • Date changes with iphoto 6

    When I send photos from my Samsung D900 to my Mac (via bluetooth) the date info does not seem to come with it. Instead the file is dated as per the date of import onto my computer. When I then put this into iphoto the date changes again to 01/01/06. I know I can manually change the date back again in iphoto for individual photos or batches but this is tiresome. Any ideas?

    Crossie:
    Have you tried importing via cable to see if the wireless has anything to do with it? The capture date as assigned by the camera should be recognized. If the file gets copied from one media to another sometimes the modified or created date will be used. Trying a cable can either rule out the bluetooth aspect or confirm that that's the culprit.
    Do you Twango?
    TIP: For insurance against the iPhoto database corruption that many users are experiencing I recommend making a backup copy of the Library6.iPhoto database file and keep it current. If problems crop up where iPhoto suddenly can't see any photos or thinks there are no photos in the library, replacing the working Library6.iPhoto file with the backup will often get the library back. By keeping it current I mean backup after each import and/or any serious editing or work on books, slideshows, calendars, cards, etc. That insures that if a problem pops up and you do need to replace the database file, you'll retain all those efforts. It doesn't take long to make the backup and it's good insurance.

  • Delivery date changed 4 times-called to ask what is going on and then best buy cancelled order

    I ordered a 55 inch aquos  with free ROKU stick for $599.00 on Sept. 22   (removed per forum guidlelines) and got a confirmed delivery of Sept. 26.  Unfortunately, I received a call in the morning of the Sept. 26 and was told that delivery was pushed to Tues, Sept. 30.
    On Monday, Sept. 29, I received an automated call informing me that the Tv will be delivered on Sept. 30 between 3:30 and 5:30. and I also received an email with the same information. Thirty minutes later I received another email stating that the delivery is again being pushed to Oct. 13. so I called customer service. I was told he can change the delivery date to Oct. 3 but call in the morning to confirm availability with warehouse.I called customer service on Sept. 30 to confirm availability and was assured that the Tv will be delivered on Oct. 3.
    On Thursday Oct. 2nd, I received another email stating the order will not be delivered until Oct. 16. I remained calm and called customer service and after a very long hold time I was able to speak with a representative and again after a long hold to check what is going on, she informed me that the order is now cancelled since the item is  discontinued. I told the representative that I already lost 3 days of work due to the delivery dates changing and since the TV has to be accepted by somebody 18 years or older I needed to be home. I asked if it is unreasonable to ask for the same exact TV but 1 size bigger since the 60 inch is available and in stock (but without the ROKU stick) but unfortunately I was told it is not possible. I asked to speak with a supervisor but they are all busy but she asked for my phone number so they can call me back in 20 min.. I waited but did not get a back from the supervisor the same day.
    I called again today,  Friday, Oct. 3 and I was assisted by a nice lady who after explaining my situation was sincere with her apology. She told me that she will call me back so she can speak with a supervisor about my situation. I asked her too if it is unreasonable to ask for the same exact TV but next size bigger since the one I was sold is no longer available and I lost 3 days of work due to the 3 changes in delivery dates. She affirmed that it is fair but have no authority to make decissions but will relay the history of the order to her superior so they can make a proper resolution. 
    After about 15 minutes I got a call  back and was told that since the bigger TV is priced at 799.00 they will give me a 50.00 dsicount for the trouble. I declined the offer since I feel that  $50.00 dollars for getting the run around and missing 3 days of work is not proper compensation and is an insult to any customer. I thanked her for trying and informed her that I am aware that it is not her fault and it is management who made this decission. 
    I sincerely feel  that I should have been given the next size TV for the same price of my original purchase and I should have been given a ROKU stick (which I did not ask for) for my unpleasant experience.
    We are  $150.00 apart from getting a resolution but management feels like it is the right thing to do for cases like these. Being a best buy customer for many years, spending many thousand of dollars,  I am  puzzled why best buy would treat any customer the way they treated me. Please explain the policy so I can have a better understanding. The $150.00 difference can easily be recopued from my next purchase. In my opinion, it is not a very smart business practice to lose a customer this way. Again, please explain the policy to me so I can understand better.

    Hello romcarlos1,
    While unforeseen complications can cause unexpected delays, it seems something went wrong at every turn. Misinformation and multiple missed appointments would frustrate me too, and I can only imagine this frustration turned into aggravation with the poor service you describe. After pulling up your account, I noticed that has been two weeks since your TV purchase, and I’m sorry for any inconvenience this may have caused. I appreciate you allowing me the opportunity to explain what should have happened.
    When your delivery day arrives, you should receive a call from us to narrow down the time frame to a 4-hour window.  This is done because our delivery agent’s schedule isn’t fully determined until the day of service as our customer’s needs may change prior to the delivery date. These routes are then best optimized to fit the appointments scheduled for the day. The particular television you wished to purchase is quite popular, however, and due to high demand, it’s currently on backorder in some areas of the country.  This may explain why your delivery date was continuously pushed back unexpectedly, and why we needed to reschedule multiple times.
    While in backordered status, however, an online order may be cancelled if you don’t wish to wait any longer and a different model may be purchase. Upon review of your order, I noticed that it was canceled upon your request. If you have since changed your mind and wish to wait for one to arrive, you may place a new order here. 
    It sounds like you wish to purchase a new TV entirely though, so I understand if you don’t wish to attempt a new order. While I cannot guarantee you a different outcome than the resolution already offered, I’d be glad to look into your case to see what other options may be available. Please know I have sent you a private message to collect further information from you. You may view this by logging into the forum and clicking on the envelope in the upper right-hand corner of the page.
    Respectfully,
    Alex|Social Media Specialist | Best Buy® Corporate
     Private Message

  • Is anyone else having problems with an iPhone 6 delivery date changing on them?

    I sat up until 12:01am to pre order (2) iPhone 6's and (2) iPhone 6 +'s and they had a delivery date of 9/19 for both of the phones at the time I logged on to Verizon's preorder site. The system would not allow me to log in as an existing customer but it would allow me to order as a new customer. I kept trying to order new phones as an existing customer on two different computers and three different browsers without any luck. I finally decided to order them as a new customer and the order went right through the Verizon system without any problem. Two minutes later I received an email from Verizon requesting that I call them as soon as possible to complete the order. I called in and spoke to a rep that explained that I already was an existing customer and that I would need to use the "Existing Customer" preorder link. I explained the issues I was having and she said that I would still need to use that system when it was available. So I tried the existing customer link and it now let me through but the date for the iPhone 6 plus had slipped to 10/7 (It is now 1:30 am). I completed the transaction and it stated 9/19 delivery for iPhone 6 and 10/7 for the iPhone Plus. However once I received the email confirmation it stated that the delivery date for the phones was 10/7. I called Verizon customer service and stated my concern about the later delivery date for the iPhone 6 and they told me that the iPhone 6's would arrive on the 19th and the pluses would arrive on 10/7 so I did not change my order. This morning 9/19 8:00am I called in to inquire about my shipping confirmation numbers for the (2) iPhone 6's and the customer service rep (Robanya) told me that he would call me back at 1:00pm PST and give me the shipping confirmation numbers. He asked specifically which phone number he should call me back on and I gave him my cell number. After not receiving a call back from Robanya, I called Verizon customer service at 5:30pm and spoke Ryan James and he confirmed that the orders were placed on the 12th of Sept and that one system showed all of them due to be delivered 10/7. After insisting that Robanya that I spoke with earlier in the day said they were shipping today, Ryan got off the phone for 5-10 mins and then got back on and said that the iPhone 6's shipped yesterday on the 18th but he did not have a confirmation number. After pressing him that someone should have this confirmation number in Verizon he stated that the delivery dates were subject to change and that all the phones would probably ship on 10/7 and left it at that.
    So after loosing sleep to pre order phones on Verizon, speaking with (3) different Verizon reps, I am rewarded by having my delivery date changed to 10/7 on my iPhone 6's which is the same delivery date they were quoting yesterday 9/18.
    Did any one else have the same disappointing experience that I had?

    Yes, pre-ordered iPhone 6 with a guaranteed delivery date of 19 September; took screen shots after the order just to have record of it.
    Called Verizon 18 Sept because I hadn't received a tracking number yet, and was informed my phone would now ship 7 October.  When I expressed that was different than what was promised and had proof, a manager came on the phone and confirmed that I should have a 19 Sept delivery date based on their records.  She told me however she could not confirm when my order would ship.
    19 Sept came and went with no phone delivery.  I have tried calling Verizon, posting here, and posting on their FB page for customer service.  Every rep I talked to (except for the first manager on 18 Sept) has been unable to admit that they mislabeled their product sales page, and mislead the customer.  One rep told me the guaranteed delivery date was an "estimate"; when I asked her to show me on the website where it uses the term "estimate", she admitted it didn't communicate that, but still was unable to utter the words "we made a mistake".
    VZW needs to take a 101 class in customer service and crises management; rule #1 is if you screw up, admit it!  I know I am not going to get my iPhone as promised, but pretending like there is nothing wrong with that customer service experience is just making things worse. Not a single employee I have communicated with to date has attempted to do anything proactive to correct or mitigate the customer failure.  I am truly amazed at how poorly VZW has been handling this to date; again (removed) happens with supply/demand, website errors, etc, but the failure to acknowledge how the screw up shafted a lot of (formally) loyal long time customers is criminal.
    >> Edited to comply with the Verizon Wireless Terms of Service <<
    Edited by:  Verizon Moderator

  • Problem writing meta data changes in xmp in spite of enabled settings

    Dear Adobe Community
    After struggling with this for two full days and one night, you are my last hope before I give up and migrate to Aperture instead.
    I am having problems with Lightroom 5 writing meta data changes into xmp and including development settings in JPEG, inspite of having ticked all three boxed in catalog settings.
    In spite of having checked all boxes, Lightroom refused to actually perform the actions. I allowed the save action to take a lot longer than the saving indicator showed was needed, but regardless of this no edits made in the photo would be visible outside Lightroom. I also tried unticking and ticking and restarting my compute.
    Therefore, I uninstalled the program and the reinstalled it again (the trial version both times). I added about 5000 images to Lightroom (i.e. referenced). After having made a couple of changes for one photo in development settings, I tried closing the program. However, then this message was then displayed:
    I left the program open and running for about 5-5 hours, then tried closing the program, but the message still came up so I closed the program and restarted the computer. I tried making changes to another photo, saving and then closing and the same message comes up. The program also becomes unresponsive, and of course still no meta data has been saved to the photo, i.e. when opening it outside Lightroom, the edits of the photos is not shown.
    What do do? I would greatly appreciate any insights, since I have now completely hit the wall.
    Oh yes, that´s right:
    What version of Lightroom? Include the minor version number (e.g., Lighroom 4 with the 4.1 update).
    Lightroom 5.3
    Have you installed the recent updates? (If not, you should. They fix a lot of problems.)
    I installed the program two days ago and then for the second time today.
    What operating system? This should include specific minor version numbers, like "Mac OSX v10.6.8"---not just "Mac".
    Mozilla/5.0 (Macintosh; Intel Mac OS X 10_8_5) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/31.0.1650.63 Safari/537.36
    What kind(s) of image file(s)? When talking about camera raw files, include the model of camera.
    JPEG
    If you are getting error message(s), what is the full text of the error message(s)?
    Please see screen dumps above
    What were you doing when the problem occurred?
    Trying to save metadata + trying to open images that it seemed I had saved meta data to
    Has this ever worked before?
    No
    What other software are you running?
    For some time Chrome, Firefox, Itunes. Then I closed all other software.
    Tell us about your computer hardware. How much RAM is installed?  How much free space is on your system (C:) drive?
    4 GB 1333 MHz DDR3
    Has this ever worked before?  If so, do you recall any changes you made to Lightroom, such as adding Plug-ins, presets, etc.?  Did you make any changes to your system, such as updating hardware, printers or drivers, or installing/uninstalling any programs?
    No, the problems have been there all the time.

    AnnaK wrote:
    Hi Rob
    I think you succeeded in partly convincing me. : ) I think I will go for a non-destrucitve program like LR when I am back in Sweden, but will opt for a destructive one for now.  Unfortuntately, I have an Olypmus- so judging from your comment NX2 might not be for me.
    Hi AnnaK (see below).
    AnnaK wrote:
    My old snaps are JPEG, but I recently upgraded to an Olympus e-pl5 and will notw (edited by RC) start shooting RAW.
    Note: I edited your statement: I assume you meant now instead of not.
    If you start shooting raw, then you're gonna need a raw processor, regardless of what the next step in the process will be. And there are none better for this purpose than Lightroom, in my opinion. As has been said, you can export those back to Lightroom as jpeg then delete the raws, if storage is a major issue, or convert to Lossy DNG. Both of those options assume you're willing to adopt a non-destructive workflow, from there on out anyway (not an absolute requirement, but probably makes the most sense). It's generally a bad idea to edit a jpeg then resave it as a jpeg, because quality gets progressively worse every time you do that. Still, it's what I (and everybody else) did for years before Lightroom, and if you want to adopt such a workflow then yeah: you'll need a destructive editor that you like (or as I said, you can continue to use Lightroom in that fashion, by exporting new jpegs and deleting originals - really? that's how you want to go???). Reminder: NX2 works great on jpegs, and so is still very much a candidate in my mind - my biggest reservation in recommending it is uncertainty of it's future (it's kinda in limbo right now).
    AnnaK wrote:
    Rob Cole wrote:
    There is a plugin which will automatically delete originals upon export, but relying on plugins makes for additional complication too.
    Which plugin is this?
    Exportant (the option is invisible by default, but can be made visible by editing a text config file). To be clear: I do not recommend using Exportant for this purpose until after you've got everything else setup and functioning, and even then it would be worth reconsidering.
    AnnaK wrote:
    Rob Cole wrote:
    What I do is auto-publish to all consumption destinations after each round of edits, but that takes more space.
    How do you do this?
    Via Publish Services.
    PS - I also use features in 'Publish Service Assistant' and 'Change Manager' plugins (for complete automation), but most people just select publish collections and/or sets and click 'Publish' - if you only have a few collections/services it's convenient enough.
    AnnaK wrote:
    Would you happen to have any tips on which plugins I may want to use together with Photoshop Elements?
    No - sorry, maybe somebody else does.
    Did I get 'em all?
    Rob

  • SQL Server data change and Security

    in our environ any user who login with sa they can change any table data.
    so i write trigger to capture changed data like who change, from which IP etc this
    CREATE TRIGGER [TRG_Users]
    ON [dbo].[UserRights] AFTER INSERT, UPDATE, DELETE
    AS
    DECLARE @strIP VARCHAR(MAX)
    SET @strIP=(SELECT dbo.GetCurrentIP())
    IF EXISTS (SELECT * FROM INSERTED) AND EXISTS (SELECT * FROM DELETED)
    --PRINT 'Update happened';
    INSERT INTO Logger(IPAddress,Status)
    VALUES (@strIP,'UPDATE')
    ELSE
    IF EXISTS (SELECT * FROM INSERTED)
    --PRINT 'Insert happened';
    INSERT INTO Logger(IPAddress,Status)
    VALUES (@strIP,'INSERT')
    ELSE
    --PRINT 'Delete happened';
    INSERT INTO Logger(IPAddress,Status)
    VALUES (@strIP,'DELETE')
    CREATE FUNCTION [dbo].[GetCurrentIP] ()
    RETURNS varchar(255)
    AS
    BEGIN
    DECLARE @IP_Address varchar(255);
    SELECT @IP_Address = client_net_address
    FROM sys.dm_exec_connections
    WHERE Session_id = @@SPID;
    Return @IP_Address;
    END
    but the problem is user can change data after disabling the trigger on specific table. so trigger will not fire and user can seamlessly change data.
    so guide me what is the best way to capture data change and log them. so no one can bypass the security. please do not tell me disable sa account because i am looking for different approach to capture the change data. is there any secure way exist in sql
    server 2005/2008 if yes then please discuss here. thanks

    If you have shared SA password with different users you are bound to get these scenarios.Instaed of focussing on how to capture I would like you to talk with different users and only provide them access which is required.Follow policy f minimum privilege
    your environement will be less complex .
    You can use combination of Logon trigger and CDC to capture it.But again why o make things complex by sharing SA password with many users.
    https://www.simple-talk.com/sql/learn-sql-server/introduction-to-change-data-capture-%28cdc%29-in-sql-server-2008/
    Please mark this reply as the answer or vote as helpful, as appropriate, to make it useful for other readers

  • Why does my Infinity date keep getting put back

    Hi I am wondering if somebody can tell me why my Infinity due date kees getting put back.  I was originally told it would be in my area last year, then by Sept 2013, then the end of the year, then Feb/Mar 2014 then The end of Mar then low and behold today it is beween Mar to June 2014. 
    I can understand some delays but the variation of these dates is ridiculous I feel BT are picking dates out of the air to stop customers moving elswhere.  I am relly fed up waiting and being strung along with ficticious dates and promises. 
    I have seen engineers working in the Bt boxes in my area for many months.
    As for signing up for information on Infinity from BT that is a Joke I signed up for that 2 years ag and have so far had not one single bit of information of any kind from them.  I would have expected some feedback on how well the roll out is going etc to encourage potential customers of the benefits etc.  very very poor customer service on this front I feel

    This is a BT Retail residential customer to customer forum. The problem of dates changing is an Openreach responsibility and not BT Retail.
    There are various reasons for this to happen such as planning permission for cabinets, power supplies and commercial reasons.
    Up until recently you could email Openreach and ask when your cabinet was likely to be upgraded however Openreach are no longer giving out that information, instead they are replying:-
    Thank you for your contact to us. Please note that we will not be responding to you by email but, would like to point you to the Openreach Superfast Fibre website and the FAQ section that will provide answers to the most commonly asked questions. It will also provide links to those service providers that sell fibre broadband at the moment so you can check if your particular line is enabled.
    http://www.superfast-openreach.co.uk/where-and-when/
    So in short, you just need to keep checking to see if your cabinet has been up graded.
    If you use this checker it will tell what cabinet you are on and what services it can receive
    http://www.dslchecker.bt.com/adsl/adslchecker.welcome

  • Splitting events after batch date change causes event to disappear

    Hi all,
    The basic (repeatable) scenario is this:
    o I scan in a bunch of old pictures I want to keep in iPhoto (lets say 10)
    o I import them into iphoto (no problems with import) 1 event with 10 pictures is created.
    o I then take a specific set of 4 photos and split them out of the main event into a new event (everything still ok) - 2 events, 4 and 6 events respectively.
    o I open the new event and do a batch date change on the 4 pictures, changing the date to the correct date of the picture
    o I exit the event expecting it to move up in the list of events (I sort by date). It's gone! iPhoto lists the 1 new event and its 6 photos
    o I change my sort (by time, by name, etc) and still not there.
    o I find my library in finder, open the package, and the files are still there.
    o I go back to iPhoto and click on "Photos". Walla! 10 pictures!
    o I undo the data change and they show up again in events - 2 new events, 10 total pictures.
    I've already done all the obvious checks (are you sorting by date, look up by even name, search by file name through all events etc.) I've talked with a product specialist and they said the standard "rebuild the library" which did not resolve the issue.
    I can repeat this until the cows come home in the existing library. I've created a brand new library and it does not repeat, do there is something in my library not right. But I don't buy the standard "redo your library from scratch" (36K pictures, 50 faces and hundreds of places). Just like with faces, you can discard the db files, there must be something besides "rebuild automatically and if that doesn't work sorry start over". Was iPhoto coded in Redmond?
    Has anyone had anything similar to this? I looked through the forums and couldn't see anything. If I have to rebuild this, I am done with iPhoto after having to rebuild due to faces too many times, and my question changes to what are folks recommendations for a more stable photo management software suite?
    Thanks!
    HOTG

    If the problem doesn't repeat in another Library then obviously the issue is with that library.
    As you've tried the basic rebuild: Back Up and try rebuild the library: hold down the command and option (or alt) keys while launching iPhoto. Use the resulting dialogue to rebuild. Choose to Rebuild iPhoto Library Database from automatic backup.
    The obvious solution is to restore a good version from your back up and, er, Walla! as you say yourself.
    Next least destructive option: Download iPhoto Library Manager and use its rebuild function. This will create a new library based on data in the albumdata.xml file. Not everything will be brought over - no slideshows, books or calendars, for instance - but it should get all your albums and keywords back.
    Because this process creates an entirely new library and leaves your old one untouched, it is non-destructive, and if you're not happy with the results you can simply return to your old one.
    Regards
    TD

  • Modified Date changes to now by selecting (not opening) vmwarevm file

    Yosemite OSX 10.10.2
    VMware Fusion is currently not running, and it's disabled (an older version not compatible with Yosemite has not yet been upgraded) so I don't think Fusion is doing this....
    I have VM files (.vmwarevm) that were not opened for months. I want to see which is which by viewing the date stamp in Finder. Clicking once shows the old date, then almost instantly it is changed to Now.  Like this:
    Created 2009-04-13, 1:23 PM
    Modified Today, <now>
    Last Opened Today, <now>
    ... but once changed those dates do not change again.
    I found an un-clicked one and it did the same thing, with <now> as the time stamp on that one. Now I have files with slightly different "today" date stamps which is incorrect and not helpful to determine the age of these files.
    It appears something (Preview?) is opening the file to access the content and generate a "recent screenshot" for the current state of the VM.
    I found no other files [edit: no other file types] that behave this way.
    I duplicated and renamed an odt file to .vmwarevm and it does not result in a Modified or Last Opened date change.
    (one of the VMs also doesn't change so I suspect a bad file format).

    Acrobat 9 makes PDF versions 4.0 and higher. You need a PDF version 5.0 to handle transparencies well. PDF version 4.0 doesn't handle transparency effects well at all.
    Pagemaker needs Acrobat 5 to be able to directly export PDF's with custom job settings. It only generates a PDF version 4.0, but works for our needs in Pagemaker.
    I choose to keep both Distiller versions to make our work easier. When you have 20 ads open in Pagemaker, and you send the first one as a postscript through the print window, it sets up the "File, Export" in Pagemaker to use the correct PDF job setting, and then you can just do "File, Export to PDF" for the next 19 ads and it makes perfect PDF's. Works slick instead of having to make postscripts of all 20 ads first and then run them through Distiller. If you only have Distiller 9 installed, it doesn't let you select any custom job settings from your Distiller. Crazy, I know, but that's what I've figured out we have to do to get it to work. Have to have Distiller 5.0 to control PDF settings in Pagemaker and still be able to export from the file menu directly to PDF.
    Distiller 9 is used for all other more advanced design pieces created in InDesign or Photoshop that are saved as a postscript first and PDF's are made the long way in those cases (running postscript through Distiller 9 at the end).

  • Event Data Change triggering process hangs in the process chain

    Hi,
    In a daily running process chain we have an event data change trigger for broadcast setting which goes to long running status very often and ultimately we have to cancel the job in precalcserver and manually execute the reports based on it. This step fails very often and  rarely it gets executed in the chain with a green status. I want to know the reason for the failure and the solution for permanent fix.
    On digging through the respective logs thru SLG1 I found the following error messages for the same. Please find it below if it can help u in analysis
    Any inputs will be a great help!!
    Thanks
    Kavya

    it's related to precal server, I guess it failed due to lack of memory or setting issue.
    Please do following
    1 Clear all precal server pendings
    2 After this, restart the server.
    3 Execute again.

  • Date change problem on 6110 Navigator

    Hi,
    On Sat morning I noticed my phone had not changed date and still showed Fridays date, yet the time was correct. I changed the date to Sat, and again on Sunday I noticed the same thing - still showed Saturdays date. On Monday and other days of the week the date changes correctly to the next day.
    I tried setting the clock to 23h59 on Friday and watched the date change to Saturday correctly. I also tried this with the phone off and it was correct. Yet if I leave it to run its course there is a problem.
    Can't find any help with this on the net and hoping someone else has experienced this and knows how to fix it. I have the latest firmware for this phone.

    Mine is set to off and always has been. I don't know if my network actually broadcasts time / date for update anyway.
    Either way the phone is OFF when the date change is supposed to happen so cannot get incorrect time from network.
    I have also tested with the phone off. i.e. Set time to 23h59 on Friday, switched off phone and when I switched it back on again the date was correct. Don't know what the difference is between this and just leaving it to run as normal. Its all too weird.

  • Report on Opportunity Close Date Changes

    I would like to create a report showing all deals that have had changes made to the Close Date. I am trying to create it from the Pipeline History section of the Analytics, but I am not sure which fields I can use, if any.
    Any suggestions?

    That is a very creative solution, Dale. I do have a couple of "what ifs" for you.
    What if the Close Date is 10/30/2007... I change this to 10/15/2007 - a change of -15 days. Then I realize that I meant to change it to 11/15/2007 and changed it again. Would this create a problem for the report since the change amount would now show a 30-day change when it is really a 15-day change?
    Another scenario has the date change twice in one week, between times that the report is run. The original date of 10/30/07 changes to 11/15/07 and then the next day changes to 12/15/07. How does this affect the report?
    When we get to the point that the audit trail becomes reportable, this problem is solved. Until then, it is quite the puzzle. I think your solution potentially solves part of the problem, but depending on how much that date field actually changes and how often you run your report and which fields are needed in that report, it could return misleading data as well.
    This is a very interesting problem. Dale has come closest to a solution so far. Any other suggestions for DavidG? I am drawing a blank on it so far.

  • Employee date change after pay roll run

    HI sapiers,
    i have an issue
    one employee join on 10th of the may but in sysytem it was enterd as 13th of the may
    and pay roll was processed to that employee
    now can we change the employe join date now
    if yes how can we do this
    please help me its urrgent
    thanks in advance
    shjish khan

    Hi Shajish,
    There are three scenarios when you may need to change hiring date:
    1) After payroll is run - when hiring date is before actual Hiring date.
    2) After payroll is run when hiring date is after actual Hiring Date.
    3) Before the payroll is run.
    1) PA30 -- Copy actions info type - action type - incorrect entry -- save and come out PA 30 copy actions info type -- action type - correct entry - now correct your entries, save your date is changed.
    2) PA30 - Utilities - change payroll status - delete accounted to field, save and come out - then again utilities change entry leaving date - correct the hiring date - save and come out.
    3) PA30 - Utilities change entry/leaving date change your date and save.
    Try this aslo
    Go to PA30
    Enter personnel number.
    Select action infotype.
    Select subtype hire mini master record.
    Change to new date.
    Under reasons, select new position.
    Click save.
    Please refer the below links:
    http://help.sap.com/saphelp_470/helpdata/en/48/35c5c34abf11d18a0f0000e816ae6e/content.htm
    http://help.sap.com/saphelp_470/helpdata/en/48/35c5c34abf11d18a0f0000e816ae6e/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/1b/3e5c16470f11d295a100a0c9308b52/frameset.htm
    Also we have several threads in the forum related to this.
    http://scn.sap.com/thread/1185695
    http://scn.sap.com/thread/1185695
    http://scn.sap.com/thread/2012142
    http://scn.sap.com/thread/1466306
    Thanks,
    Madhav

  • Master data change

    Dear all,
    Master data for 0mat_sales missed the procuct hierarchy
    i have maintained it  ,but i found the masterdata changed again for that material again with wrong values , can we identify who is the person last changed the master data any clue,
    Thanks
    Koppireddy

    Hi Koppireddy
    Look at this link
    http://help.sap.com/saphelp_bw31/helpdata/en/fe/4b284837bf11d5b3bf0050dae02d7c/content.htm
    and this previous thread for ods
    How to know who would be the last person to modify an ODS?
    may be helpfull
    and u can also see the person last changed by going to rsa1->infoobjects->right click on ur info object->select change
    here u can see at bottom
    *Do assign points for helpfull answers
    Message was edited by: NR

  • Quirky date changes when resizing columns

    I have a new eMac, when I make the date modified and date created columns small, the date goes to 7/31/05 for all files.
    When I expand the columns then the dates change to this format Nov 7, 2005 9:00pm. This happens on both the "date modified" and "date created" columns. But the some dates don't reflect the actual date of creation or modification.
    I also noticed that when I download files, the modified and created dates don't reflect the actual date I downloaded them. Some items I have downloaded recently, have 2003, 2002, 2000 dates associated with them.
    On my G3, all downloads would reflect the actual date download for the modified and created date. Is this not the case with the eMac?
    Could it need a battery this soon?
    Thank you in advance,
    Deb
    Update:
    I just ran System Profiler and up in the top right hand corner the date says 7/31/05.

    Hi JMVP, thanks for replying.
    I'm running the org 8.5 on the G3 but have 9.0, 9.2 and 9.22 on my external hd's.
    Yes set date automatically is checked. I tried unchecking it and nothing changed.
    Timeserver is Apple America/US (time.apple.com)
    My biggest concern is why are all the dates changing to 7/31/05 (style, format and using the actual date of 7/31/05) when I squeeze the column width down. But once I start expanding the columns the dates change to, what I'm assuming is the date of their creation and modification, and not the downloaded date.
    This may be a stupid question, but what is a relative date, compared to, what a normal date? Every time I check or uncheck this box the dates don't change format, style or anything.
    Thanks again for your help.
    Deb

Maybe you are looking for

  • Set top and bottom inset spacing values in Text Frame Options via jsx script

    I am looking for a way to set the top and bottom inset spacing values only to 2 points in Text Frame Options via a .jsx scrpt. For years, I have used a script that sets Preferences, such as: with(app.storyPreferences){     opticalMarginAlignment = fa

  • Can I connect two apple tv on same network and same apple ID at a time ?

    Can I connect two apple tv on same network and same apple ID at a time ?

  • Sync my BB with Windows Media Player

    When I connect my BB with my laptop it reconizes a device is hooked up but doesnt reconize what type of device. Therefore, it will not allow me to sync music on windows media player like I have done before. It does not reconize the device at all. Wha

  • Split transfer order on the basis of Storage Unit type(SUT)

    Hi, I got one problem and want the solution for that immediately.the problem is as follows:- The transfer Order needs to be split by quantity according to the quantity per Storage Unit Type. I have to do this making chages in the SAP standard user Ex

  • Regarding Message Flow in XI

    Hi Experts, I was go through the Blog given by Siva Maranani /people/siva.maranani/blog/2005/05/25/understanding-message-flow-in-xi But in this After sending the Xi Message from send Queue to Integration Engine... What wi be the process inside this I