Calculate average of values below a specified percentile

Is there a way to calculate a crosstab summary of average while excluding the highest 10% from the record selection? I.e., I would like to find the average of the values below the 90th percentile.

Calculate the 90 percentile value
pass this ( and any other parameters) to a sub report
which then filters by the percentile

Similar Messages

  • How to calculate average if some of measure values are 0

    Hi
    I created a webI report on top of a Bex query, I have a more than 10 different measure in WebI report column on which i need to calculate average.
    If I  use the Average function provided with in WebI report it is calculating average for the measures which are having 0  values too, but i need to calculate average on a column only for those values which are not 0
    Ex:  Measure Quantity has values in the report like
    100
    100
    0
    100
    100
    Average function is calculating as 400/5
    but I need 400/4, because one of the value is 0, so i need to avoid that count which is zero and should divide it by 4 but not 5.
    One way is to custom create measure for all measures and make a if else condition and divided by that custom measure, but is there any other procedure?

    i hope this can help
    =Average([myMeasure]) Where ([myMesyre] <> 0)
    good luck
    Amr
    before the 0 add <> not Equal too sign < and >
    Edited by: Amr Salem on Jan 19, 2011 9:29 AM
    Edited by: Amr Salem on Jan 19, 2011 9:30 AM

  • How to calculate Average value stock value - MC.B

    Hi All,
    When we execute T code MC.B  we get material analysis report . In it we have a column AVG VAL STOCK VALUE.
    Can some one explain how it is calculated. I see the formula
    The average stock value of the valuated stock is calculated using the formula:
             beginning stock value + n stock value at month´s end
                                    n + 1
    Can Some one explain how it is calculated and what 'N' stands for?
    Thanks,
    Vengal Rao.

    MC.B is inventory turnover.
    In the selection screen you enter how many periods to analyze.
    by default it is today 06/11 to 08/11
    n is the number of periods
    so you have a beginning stock of period 06/11
    + end stock of period 06/11
    + end stock of period 07/11
    + end stock of period 08/11 (which is todays stock)
    so the formula is:
    beginning stock value + 3 stock value at month´s end
    3 + 1

  • How the LMS 4.2 calculate average interface Utilization

    Hello!
    I have interface Tunnel1 with bandwidth 5000.
    How the LMS 4.2 calculate average interface RxUtilization or TxUtilization on this interface?

    Hi ,
    Below is how LMS calculates this value:
    RxUtilization = (ifInOctets*8*100)/ifSpeed   
    TxUtilization = (ifOutOctets*8*100)/ifSpeed
    Thanks-
    Afroz
    ***Ratings Encourages Contributors ***

  • How do I calculate averages in a form?

    Hi All,
    I'm throwing myself on the mercy of the forum.
    I'm new to form building and I don't know javascript.
    I'm working on a form and I can't seem to get it right.
    When I first enter values it seems to be working, but if I make corrections or changes the calculations go bad.
    I'm sure there is an easier/better way to calculate averages in a form.
    I think I need either a calculate/re-calculate button, or better javascript that processes the math line by line.
    I'm getting too close to the deadline to keep futzing around with it.
    Would anyone care to have a look at my form and help me?
    Here are the details...
    I'm using Acrobat 9 Pro
    I, and the administrators, are using Adobe Reader X. (10.1.4)
    I'm using a Macintosh running OS X (10.7.4, Lion)
    Teacher Evaluation Form:
    Teachers demonstrate proficiency in four domains.
    Evaluators assign scores (-, N, 0, 1, 2, and 3) to a number of items in each domain.
    N indicates the item is Not Applicable.
    A dash - indicates a score hasn't been given yet.
    Each domain has a weight value to be calculated into the final score.
    My job is to create a form that calculates the raw average and the weighted score for each domain, then a total for the performance evaluation total.
    What I did.
    I created:
    A drop down field to score each item under each domain.
    A hidden field that decides if the field for each item has a true number or another character.
    A hidden field that sums the scores of all the items in each domain.
    A hidden field that sums the number of fields that have a numeric value.
    A field that divides the total of the values from each domain and divides it by the number of of fields with numeric values to get the raw average.
    A field that multiplies the raw average by the appropriate amount to get the weighted score for each domain.
    Finally, a field that sums the weighted scores to produce the final evaluation total.
    Again, it seems to work at first, but if any changes are made to the scores the math goes bad.
    Here is a download of the form with all the hidden fields visible so you can see what is happening.
    https://dl.dropbox.com/u/783012/2_Evaluation%20Form.pdf
    Please help me!

    There are several problems with the calculation script for the "Test Total" field. Be sure to have the following user preference set: Edit > Preferences > JavaScript > Show console on errors and messages.
    Also check that the field calculation order is correct.

  • PDF Form Field calculates AVERAGE incorrectly

    I have a PDF Form field that is set to calculate the AVERAGE of 4 other fields. Each of those other fields has its validation set to allow only the values 1 through 3.
    The Average field is dividing the total by 4 even if a person only fills out 2 of the fields. I thought AVERAGE would only count the fields that have a value in them. But it's seeing the ones that are blank as containing a 0, even though that is an invalid value for that field.
    How can I fix this? The customer really wants the option of having up to 4 fields and wants an average of just the ones that are filled in. I thought that was what Average was supposed to do.
    Is there a way to tell Acrobat to ignore the fields if their value is less than 1?

    I responded to this question here: http://answers.acrobatusers.com/PDF-Form-Field-calculates-AVERAGE-incorrectly-q13211.aspx

  • How to calculate average not through basic formula

    Can any bodytell me how to calculate averge of 96 rows in the quey designer  not by hard coding them.
    Is there any formula for creating it through formula or through calculations .
    And also how to calculate the maximum value and minimum value of the entire 96 rows  which is picking from a Z table -ZDC_2100.
    Iam having time blocks of 96 for 24 hrs each of  15Min.

    Hi,
    You can achieve using a counter at baselevel and use exception aggregation at query level...
    Also check the below links might be useful:
    http://help.sap.com/saphelp_nw04/helpdata/en/75/21054da1392649948e5b94e4fc4bce/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/d2/e0173f5ff48443e10000000a114084/frameset.htm
    Hope this helps.......
    Rgs,
    I.Ravikanth

  • Rule to Calculate Average

    I need help writing a rule to calculate average units. I know the HFM admin documentation contains an Average Function, but my calculation needs to be a little different. I need to dynamically calculate average units based on the POV. Also, I need to always use "Beginning Units" in my calculation. I've listed some examples below...
    1.) Periodic AvgUnits for May 2008 = (Apr 08 Units + May 08 Units) / 2
    2.) QTD AvgUnits for May 2008 = (Mar 08 Units + Apr 08 Units + May 08 Units) / 3
    3.) YTD AvgUnits for May 2008 = (Dec 07 Units + Jan 08 Units + Feb 08 Units + Mar 08 Units + Apr 08 Units + May 08 Units) / 6
    Does anyone have any sugestions?
    Thanks,
    Clint

    You need to use 3 different formulas here are some examples, you can derive the quarterly from this two:
    Function Avg2(Acct)
    Avg2 = "(" & Acct & " + " & Acct & ".P#Prior) / 2"
    End Function
    Function AccumYTD(Acct,pov_period)
    AccumYTD = "(" & Acct
    Select Case pov_period
    Case 1
    AccumYTD = AccumYTD & " ) "
    Case 2
    AccumYTD = AccumYTD & " + " & Acct & ".P#CUR-1 ) "
    Case else
    For PastMonth = 1 to pov_period - 1
    AccumYTD = AccumYTD & " + " & Acct & ".P#CUR-" & PastMonth
    Next ' PastMonth
    AccumYTD = AccumYTD & " ) "
    End Select ' Case pov_period
    End Function

  • How to calculate Average of Keyfigure

    Hi Gurus,
    I have a requirement where I have to calculate average of key figure value for 1 material.
    I tried using 'Average' in exception Aggregation but it just sums up everything.
    Can anyone please explain?
    Thanks

    Hi
    1. Include the key figure you want to average into the columns; call it KF1
    2. Create a Formula; call it CTR1, and in the detail view put a 1. (This 1-value is not used except to avoid an error in the formula syntax checker.) On the Aggregation tab, choose Exception Aggregation: Counter for all Detailed Values, and for the Ref. Characteristic, choose the same characteristic as the lowest level characteristic in the initial view of the output. E.g. if you only have 0CALMONTH in the output, choose 0CALMONTH. When you run this, the total at the bottom of this column should be equal to the number of rows in that column. Note that we use Exception Aggregation here so that the total at the bottom is calculated before the output is generated and is available to other formulas in the query design; if we were to use the Calculation tab it would look the same to us in that the total would appear at the bottom, but the calculation would occur too late for us to use within the query.
    3. Create a second formula, call it AVG1. The formula will be:
    SUMGT KF1 / SUMGT CTR1
    SUMGT accesses the Overall Result value at the bottom of the KF1 and CTR1 columns. You can find the SUMGT function in the Data Functions folder - turn on technical names first; the description is Overall Result. You could instead use SUMRT; the difference is that SUMGT will use the filters applied in the filter block; SUMRT will ignore them.
    3. Run the query. You should see the Average in every cell in the Average column. You can use this formula as input to another formula, or just use ( SUMGT KF1 / SUMGT CTR1 ) within a formula to access the average value.
    Thanks

  • How to calculate average in result in BEx

    Hi Expert,
    I have 2 fields one is project and another # of days to finished project (I used formula to calculate the # of days from start to finished date. NOw in result need to calculate average of days took to finished all projects.
    I belive formula will be ( # of days / projects) but how we can apply in query. If anyone know please help out I really appericiate.

    Hi,
    Right click on your formula and go to properties, there you have the options as "Calculate Result as" and "calculate single value as" from the drop down box you can select option as "Average".
    Regards,
    Durgesh.

  • Can we calculate Average in VC

    Hi,
    Can we calculate average of all values of one data field itself, in VC.
    I had a keyfigure Quantity, now i need to display Avg of all Quantity according to calendar month.
    is this is possible in VC?
    Thanks
    Tulsi

    Hi
    yse you can do it using Aggreagate operator i.e Sigma Operator
    Drag the sigma operator from compose panel and it to the data service output port and set your settings
    Regards,
    Govindu

  • CDC Failed with Error ORA-01438: value larger than specified precision

    Hi,
    I have created Asynchronous Distributed Change Data Capture Set-up as per the Guildines from Oracle.
    Now My Change Set has become Invalid with error: ORA-01438: value larger than specified precision allowed for this column.
    I Compared Change Table Structures with Source Table on Source Database and the structure is matching.
    Now I am trying to Run below script:
    Begin
    dbms_cdc_publish.alter_change_set (Change_Set_name =><<Change Set Name>>,
    recover_after_error => 'Y'
    End;
    I am getting the below error:
    ORA-01438: value larger than specified precision allowed for this column
    ORA-06512: at "SYS.DBMS_APPLY_ERROR", line 147
    ORA-06512: at "SYS.DBMS_APPLY_ERROR", line 301
    ORA-06512: at "SYS.DBMS_APPLY_ADM", line 490
    ORA-06512: at line 1
    ORA-06512: at "SYS.DBMS_CDC_PUBLISH", line 580
    ORA-06512: at line 2
    Still the error is existing, I couldn't find any issues with Change Table structure as it is in Line with Source Table Structure.
    Can anyone please help me on this.
    Staging Database details:
    Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi
    TNS for Linux: Version 10.2.0.4.0 - Production
    Source Database details:
    Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi
    TNS for HPUX: Version 10.2.0.4.0 - Production
    Also Can anyone let me know if it is possible to run CDC Set-up without DBA Privileges. i,e once the CDC Set-up is done, if we revoke the DBA Privilege will the Capture work properly. I know that for creating Change Table, Set and Source we require DBA Access. But once the set-up is done, do we really require DBA Privileges?
    Thanks,
    Shashi
    Edited by: user8254952 on 09-Mar-2010 05:57
    Edited by: user8254952 on 09-Mar-2010 06:00

    Hi Shashi,
    As CDC is built on top of Oracle streams framework, for better responses you can post this ques under {forum:id=70} category.
    "ORA-01438: value larger than specified precision allowed for this column" is usually encountered for NUMBER datatype columns. At what level did you check the datatypes? Please confirm if the precision(for NUMBER datatype) are also similar.
    Please attach output for the following queries:
    select error_message from dba_capture;
    select error_number, error_message from dba_apply_error;Please re-validate the data types and then run the same API with remove_ddl = 'Y' option, like this:
    exec DBMS_CDC_PUBLISH.ALTER_CHANGE_SET(change_set_name=>'CHANGE_SET_NAME' , recover_after_error=>'Y' , remove_ddl=>'Y');
    Hope it helps!
    Cheers,
    AA

  • How to calculate Average balance for an account

    Hi,
    How to calculate average balance for an account for a particular period say for JAN-12 period and after the end of that period for another two days 01-feb-12 and 01-feb-12 ?
    I'm using the following query :
    SELECT cc.segment1||'-'||cc.segment2||'-'||cc.segment3||'-'||cc.segment4||'-'||cc.segment5||'-'||cc.segment6 "Account_XX",
    nvl(sum(l.accounted_dr - l.accounted_cr),0) "Balance"
    FROM gl_code_combinations cc,
    gl_je_lines l
    WHERE cc.code_combination_id = l.code_combination_id
    AND l.set_of_books_id ='XX'
    and code_combination_id = replace it with code combination_id for account_xx
    AND l.effective_date <= '31-Jan-12' (january period end ??)
    GROUP BY cc.segment1||'-'||cc.segment2||'-'||cc.segment3||'-'||cc.segment4||'-'||cc.segment5||'-'||cc.segment6
    There are some discrepancies in "average balance" after end of month (Jan-12)?
    How to calculate average balances for a particular account (Account_XX above)from end of month of Jan to first two days of february?
    Thanks,
    Kiran

    Kiran,
    Please let me know first, is Average Balancing feature enabled in your GL Ledger?
    Regards
    Muhammad Ayaz

  • Valuation Procedure to calculate Fair Market Value

    Hi Treasury Experts,
    In the Treasury Hedge Management component we are looking for a valuation procedure which can handle the calculation of the Fair Market Value of the financial transactions in line with the standard FAS133 accounting standard.
    We have financial contracts that run over several months. From the contract start date to contract valuation date we need to value based on comparing the spot rate of the transaction against the close rate applicable at valuation date. We can use the Price Valuation Procedure for Forward Exchange Transaction with step 3000 (Rate Valuation Spot/Spot Hedge Accounting) to calculate this piece of the Fair Value.
    We also need to include in the calculation of the Fair Value a component from the valuation date to the contract maturity date. This piece of the valuation is based on an interpolation of the interest rates over the remaining days of the contract (from valuation date to maturity date).
    Can you advise if there is a valuation step or perhaps number of valuation steps that can be used to calculate the Fair Value of a financial contract in line with this requirement? That is to value the contract from inception date to valuation date based on comparing the PV at spot versus the PV at close rate and then to value the contract from valuation date to contract maturity date based on the PV by the interpolated interest rates over the remaining days of the contract?
    Thanks for your advice.
    Mik

    See what other similar ones are selling for:
    http://www.ebay.com/sch/i.html?_odkw=2011+macbook+-pro&_osacat=0&_from=R40&_trks id=p2045573.m570.l1313&_nkw=2011+macbook+-pro+-air&_sacat=0

  • How to get Basic salary amount in the Housing formula to calculate the housing value as I used the DBI (NICDP_EMPLOYEE_BASIC_SALARY_AMOUNT_ASG_ENTRY_VALUE) but when run the Quick pay for the housing element alone result come 0, How to get Basic salary amo

    How to get Basic salary amount in the Housing formula to calculate the housing value as I used the DBI (NICDP_EMPLOYEE_BASIC_SALARY_AMOUNT_ASG_ENTRY_VALUE) but when run the Quick pay for the housing element alone result come 0, How to get Basic salary amount in the Housing formula to calculate the housing value as I used the DBI (NICDP_EMPLOYEE_BASIC_SALARY_AMOUNT_ASG_ENTRY_VALUE) but when run the Quick pay for the housing element alone result come 0

    Hi,
    Is your formula attached to basic salary element or some other element? You need to make sure that basic salary element has some value and is processed before this formula is called. Are you able to see value for basic salary element after payroll run?
    Regards,
    Pawan

Maybe you are looking for

  • How to parse from different website??

    i want to write a code so that i can get info from different webapplication and display it on my page.. suppose user enters a name.. i would search that word in a particular page.. mybe on the homepage of sun site.. if that word appears there i would

  • Anyone had a pixel pop, smelled smoke?

    Recently, I turned on my year old Samsung 55" LCD, and heard a few pops, that resulted in pixels deadened and vertical lines distorting the screen.  Then I smelled smoke and turned off the TV.  Geek Squad is coming out to look at the TV soon.  Did an

  • Hotfix available now for Creator 2 and Creator 2 Update 1

    Have you accessed the AutoUpdate Center lately? Check out the latest hotfixes for both Java Studio Creator 2 and Update 1. Open the IDE, connect to the Internet and visit the Update Center to download the available modules. For Update Center instruct

  • PRT - Updation of Mea.Doc. in REM Process

    Experts I want the measurement document to be updated automatically when a production order is confirmed. I tried this by creating an equipment as a PRT attaching measurement point (counter) to it and a plan. The measurement document was updated when

  • Problem with type DEC

    Hi, I have a data of type DEC in a table, in MI Server. The value it is 3. When i sync the app this value is transformed in 786435 by MI Server. And this happen with all data of this type. Anynone knows what can be happen? Thanks..