Capital purchase for subcontracting
hi experts,
please let me know the process in SAP for the capital material purchase, which will be send to subcontractor after procuring.
awaiting your reply..
Thanks in advance
Hi,
Please refer the below links.
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/808c60ca-013b-2c10-34a2-94d1eb442e6f?QuickLink=index&overridelayout=true
http://www.sap-basis-abap.com/sapmo005.htm
Thanks.
Similar Messages
-
Problem for Goods Receipt for Subcontracting Purchase Order
Dear all,
Presently, we are using SAP version 4.6C and we need to introduce GR for
Subcontracting Purchase Order. We have developed a ABAP program to handle
subcon Goods Receipt by uploading flat-files from our subcontractor. The
scenario is as follows :
Goods Receipt for Subcontracting Purchase Order
1. In the ABAP program, function BAPI_GOODSMVT_CREATE will be used for goods
movement.
2. Data provided to the function are as follows :
- Posting date
- Document date
- Material number
- Plant
- Storage location
- Batch
- Movement type (101)
- Quantity
- Purchase order number
- Purchase order item
- Movement indicator (B - Goods receipt for purchase order)
3. The function will do data verification and automatically determine GI
item for subcon stock:
- Movement type (543)
- Special stock (O - parts prov. vendor)
- Material
- Quantity
- Plant
Our problem is that :
Only the GR item in the interface is to be transferred and the GI item is
determined by the system. So, the quantity for subcon stock cannot be
changed using this BAPI. Then the system will continue processing the goods
receipt and create material document.
Manually, by using transaction code MIGO, the user can display the subcon
stock data and then change the quantity.
By using transaction code MB01, after the user fills in all the GR fields,
the system comes to line item 002 (subcon stock data) and then quantity can
be changed.
As per user requirement, quantity for GI item must be same with the quantity
that has been transferred to subcon vendor in Delivery for Subcon
(transaction code VL02N).
We cannot achieve this requirement by using the BAPI mentioned above. Would
appreciate any valuable help from anyone who is able to help us on this
matter. Are there any other BAPI's that can help us to achieve the same
result ?
Thank you in advance and best regards.As far as i understood the problem I suggest u to create the
BDC according to user actions that are performed in he manual
operation.
I can't say that the BAPI performs the exac solution what you want.
I have done some BDC work using MB01 and suggest you to be careful
and try to keep the complete in the logic as some chages in rows in BDC will
change the complete scenario.And throw correct quantity val in correct
material
row.
This methodology will help u even in mass uploads.
Or in case of automation u can perform the call transaction BDC in
background mode.
so As per my understanding bdc program is the solution. pls try and let me
know. -
Good receipt problem for subcontracting purchase order
Good receipt problem for subcontracting purchase order
with account assignment type E.
After update to ECC 6.0. Do good receipt for subcontracting purchase order with account assigment 'E'.The system show the error message(KI235)----Two cost elements (Change in Stock (Subcontracting)&Outside processed fee) haven't CO account assignment.but the field status for sale order is option entry , when I default cost center for the cost element in OKB9.the system post the material document and generate the following accounting document.
Doc.Type : WE ( Goods receipt ) Normal document
Doc. Number 5000056065 Company code 1000 Fiscal year 2007
Doc. date 2007.12.04 Posting date 2007.12.04 Period 12
Calculate Tax
Doc.currency HKD
tm PK Account Account short text Tx Cost Ctr SaleOrder Amount
1 89 13500000 Stock-Work in proces 1007823 10 274.4
2 96 21210010 GR/IR Clearing 1007823 10 205
3 91 41010102 Chg in Stock(Subcon) 10901099 1007823 10 274.4
4 86 41031000 Outside processed fe 10901099 1007823 10 205
5 99 13500000 Stock-Work in proces 1007823 10 69.4
6 81 41010101 Cost of Prod (Subco) 1007823 10 69.40
My problem is:
When use MIGO to do good receipt for subcontracting Purchase order, for consumption account((Change in Stock (Subcontracting)-41010102&Outside processed fee--41031000) ,why the system dont recognize the sale order filled as CO account assignment?Dear fanny chen
Did you get a solution for your open question?
I`m facing the same problem, so any help yould be appreciated.
Regards -
Check on level of WBS element for capital purchase PO
Hi Experts,
We are facing a problem. While creating Capital purchase PO, all WBS elements are allowed. Although, system is configured in such a way that GRN can not be done for Level 1 WBS( Parent project). We want to introduce a check at PO creation level only, so that it should not take Level 1 WBS element. How can it be done( validation check can do here or not) .How did you set up the derivation rule???
I think that is where you specify a level of expenditue or procurement.
Thanks -
Message type for generating IDOC for SUBCONTRACTING PURCHASE ORDER
Hi All,
I have to generate IDOC for PO creation or change .
I am using IDOC_OUTPUT_ORDERS and IDOC_OUTPUT_ORDCHG.
The messagetype.idoctype I am using is ORDERS. ORDERS05 and ORDCHG. ORDERS05.
Now the confusion is regarding whether this message type will work in case of SUBCONTRACTING PURCHASE ORDER as well ?
As I have gone through some websites and came to know that I will have to use PORDCR1.PORDCR102 specially for subcontracting.
And programs we need to use is BUS2012_ICH_R3 instead of RSNASTED and Form Routine SEND_PORDCR1 instead of EDI_PROCESSING.
Purchase Order Collaboration scenario - Not generating IDOC in ECC
http://www.erpgenie.com/faq/edi_purchasing.htm on this site question no 8.
Subcontract PO IDOCs
I hope your experience will help me .
Please reply ASAP.
Edited by: uttam27 on Dec 4, 2011 1:47 PMThere is a generic function to create change pointers for all message typs - 'CHANGE_POINTERS_CREATE_DIRECT'. This is triggered only if you configure your message type to create change pointers from BD50.
Once you activate it do any change to orders you can see change pointer tables BDCPV filled. Then BD21 will read the changes and generated outbound idocs accordingly. -
Condition types for capital purchase
Dear All,
we have a capital purchase process for which JCI1 & JCI2 conditions are created for 1st year and 2nd year similarly we have condition type for ECESS JCC1 & JCC2 but i need SHECESS conditon types for the same
please help
RegardsHi,
You maintain your material in J1ID as a Capital goods insted of Raw material than the functionality of your requirement will be fullfilled. -
Posting of Components made compulsory for Subcontracting Purchase orders
Hi
I am working in ECC 6.0. In case of Goods receipt for subcontracting Purchase Orders, does the child quantities automatically changes when i change the default quantity of Header material according to the BOM relation ? I found it is not happenning.Please inform is this standard?
Also i can post the documentfor header material without the components,by manually changing the quantities for Child items .Kindly give a me suggestion by which this can be controlled.
Regards
ArvindHi,
1.
The component changes as per the header material in MIGO when you want to do GR. Please take care that the components musn't be exploded when you change the qty of the BOM header material. If they are exploded, collapse them ("close the explosion"), after that change the qty of header material and when you explode the components again you should get the proper quantities (this button is in the line of BOM header material).
2.
As per my best knowledge, in standard system you cannot restrict/control the change of component quantities. The cause of it might be that the quantity of components may differ from the rates defined in the BOM and the user HAVE TO CHANGE the quantities as per the real consumption.
Solution might be training. If the user intentionally changes the component quantities, this is a HR issue..
Regards,
Csaba.
Edited by: Csaba Szommer on Dec 26, 2008 5:14 PM -
Creation of delivery for subcontract Purchase Order
Hi All,
I am trying to create delivery for subcontract PO. ME2O transaction creates delivery but doesn't link PO to delivery . Is there any SAP table where we can see link of subcontract PO to delivery created throug ME2O?
Business don't want to use MB1B transaction because it doesn't create delivery inturn doesn't create any paper work(Pick list or Packing list).
Is there any way to create delivery based on subcontract PO?
Thanks in advance.
Sonali.You have to do Sub con PO setup in Img customization. You can be able to print all ur required documents during MB1B also. Presently I am doing exact the same setting for my present project. Complete Configuration required under
Img->MM->IM and PI->Output Determination.ABAP help will be required to design the layout for pick list and packing list.Let me know if you need more information.
Cheers! -
Standard Cost Estimate for Subcontracting
Dear Sir / Madam,
We are in the process of migrating from our normal R/3 operations for Production Planning to Execution inclusive of Costing of materials by using iPPE functionality for repetitive scenario. We have our BOMs for painted body currently in R/3. The painted body falls under subcontracting scenario.
In this scenario the body in white produced from our bodyshop is sent out to the subcontractor along with certain paint items and is received as painted body and consumption of the body in white and the paint items sent needs to be shown during the goods receipt of painted body.
For this we have maintained the BOM for the painted body in iPPE. Also in the costing variant "ZD01" in order to arrive at Standard cost (CK11N) for the painted body we have maintained the following settings for Valuation variant for subcontracting :
Priority Strategy Sequence
1 Net Quotation Price
2 Effective Price from Purchase Order
While running CK11N for the material (painted body) we are receiving the following message
Message no. 28501 : Error in dependency processing: condition 0000062388 is empty
We wanted to verify whether the message raised is normal or would it have any adverse impact.
Your assistance would be highly appreciated.
Regards,
Bhavika
Edited by: Bhavika Goyal on Feb 7, 2009 12:20 PMDear All,
Control Key is important for inhouse producrtion and Sub Contract. Check it once and when ever u have given the Product (semi fisished) to Sub Contractor, along with Paint.
Here one thing is important what is your process? how much portionis involced in Sub contracting. why because
Paint issue to the sub con is captured by the way for migo or miro
Payment to sub contract is capture all the cost of the Sub Con., then is there any cost is missed for this process. Let me know the remain things?
thanqu
raj -
Hi Gurus,
I have a Requirement for calculating the cost for Subcontracting Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
please suggest the user exit or Badi where i can change.
Please refer the below logic-
BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
If ‘V’ the price will be picked from the field “VERPR”
If ‘S’ the price will be picked from the field “STPRS”
Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
Br,
SuryaHi Surya,
Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
requirement:
VALUATION_CK BAdI for Valuation in Product Costing
CK_KALAMATCON2_CI BAdI for CI Fields for Table KALAMATCON2
COSTINGRUN_CK Edit Costing Run
COST_APPORTION_CK Maint Apportionment Structure Joint Production: Dist Rules
CO_PROD_COSTING_CK Cost Management for Joint Products (Costing, Target Costs)
DATA_EXTENSION_CK For Data Enrichment in Product Costing
DYNPRO_EXTENSION_CK BAdI for Interface Enhancement in Costing
ORDER_COSTING_CK Enables Header Data Changes in Preliminary Order Costing
QUANTITY_STRUCT_CK Enables Quantity/Structure Changes in Costing
SUR_STOCK_TRANSF_CK Overhead on Materials with Stock Transfer Between Plants
Thanks
Sri -
Error showing - No price could be determined for subcontracting in CK11N
Hi,
We are facing a problem in CK11N that while we are creating Material Cost Estimate with Quantity Structure, getting an error message..
No price could be determined for subcontracting
Message no. CK468
Diagnosis
The system could not calculate a price for the subcontracting because none of the valuation strategies in valuation variant 001 was successful.
System Response
If the system issues a warning message or an information message, the costing item is used in the cost estimate with a zero value.
If the system issues an error message, it sets the status "KF" (costed with errors).
If the system issues a termination message, the cost estimate cannot be processed.
Procedure
If you have authorization for Customizing, check the valuation strategy for subcontracting in valuation variant 001.
I read many thread already, but no solution is suit my requirement..
please help..We run the transaction OPN2 and select 001- Planned valuation - mat. Valuation Variant. Db Click on it and select Subcontracting tab.
There Strategy Sequence is defined as under:
Priority......Strategy Sequence
1...............Effective price from Purchase Order
2...............Net Purchase Order price
3...............Effective price from Quotation
and in Quotation in Purchasing option, there is selected - Auto quota arrangement.
please guide. -
Goods receipt for subcontracting order! BAPI_GOODSMVT_CREATE
I wanna use BAPI "BAPI_GOODSMVT_CREATE" to create goods receipt for subcontracting order.
But it says that this combination is not possible. Combination of my movement type and this BAPI.
What can i do to solve it?
thanks in advance.>
Julia Nikiforva wrote:
> I wanna use BAPI "BAPI_GOODSMVT_CREATE" to create goods receipt for subcontracting order.
> But it says that this combination is not possible. Combination of my movement type and this BAPI.
>
> What can i do to solve it?
>
> thanks in advance.
Might work
report zbapi_goodsmovement.
parameters: p-file like rlgrap-filename default
'c:\sapdata\TEST.txt'.
parameters: e-file like rlgrap-filename default
'c:\sapdata\gdsmvterror.txt'.
parameters: xpost like sy-datum default sy-datum.
data: begin of gmhead.
include structure bapi2017_gm_head_01.
data: end of gmhead.
data: begin of gmcode.
include structure bapi2017_gm_code.
data: end of gmcode.
data: begin of mthead.
include structure bapi2017_gm_head_ret.
data: end of mthead.
data: begin of itab occurs 100.
include structure bapi2017_gm_item_create.
data: end of itab.
data: begin of errmsg occurs 10.
include structure bapiret2.
data: end of errmsg.
data: wmenge like iseg-menge,
errflag.
data: begin of pcitab occurs 100,
ext_doc(10), "External Document Number
mvt_type(3), "Movement Type
doc_date(8), "Document Date
post_date(8), "Posting Date
plant(4), "Plant
material(18), "Material Number
qty(13), "Quantity
recv_loc(4), "Receiving Location
issue_loc(4), "Issuing Location
pur_doc(10), "Purchase Document No
po_item(3), "Purchase Document Item No
del_no(10), "Delivery Purchase Order Number
del_item(3), "Delivery Item
prod_doc(10), "Production Document No
scrap_reason(10), "Scrap Reason
upd_sta(1), "Update Status
end of pcitab.
call function 'WS_UPLOAD'
exporting
filename = p-file
filetype = 'DAT'
IMPORTING
FILELENGTH =
tables
data_tab = pcitab
EXCEPTIONS
FILE_OPEN_ERROR = 1
FILE_READ_ERROR = 2
NO_BATCH = 3
GUI_REFUSE_FILETRANSFER = 4
INVALID_TYPE = 5
OTHERS = 6
if sy-subrc <> 0.
message id sy-msgid type sy-msgty number sy-msgno
with sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
exit.
endif.
gmhead-pstng_date = sy-datum.
gmhead-doc_date = sy-datum.
gmhead-pr_uname = sy-uname.
gmcode-gm_code = '01'. "01 - MB01 - Goods Receipts for Purchase Order
loop at pcitab.
itab-move_type = pcitab-mvt_type.
itab-mvt_ind = 'B'.
itab-plant = pcitab-plant.
itab-material = pcitab-material.
itab-entry_qnt = pcitab-qty.
itab-move_stloc = pcitab-recv_loc.
itab-stge_loc = pcitab-issue_loc.
itab-po_number = pcitab-pur_doc.
itab-po_item = pcitab-po_item.
concatenate pcitab-del_no pcitab-del_item into itab-item_text.
itab-move_reas = pcitab-scrap_reason.
append itab.
endloop.
loop at itab.
write:/ itab-material, itab-plant, itab-stge_loc,
itab-move_type, itab-entry_qnt, itab-entry_uom,
itab-entry_uom_iso, itab-po_number, itab-po_item,
pcitab-ext_doc.
endloop.
call function 'BAPI_GOODSMVT_CREATE'
exporting
goodsmvt_header = gmhead
goodsmvt_code = gmcode
TESTRUN = ' '
IMPORTING
goodsmvt_headret = mthead
MATERIALDOCUMENT =
MATDOCUMENTYEAR =
tables
goodsmvt_item = itab
GOODSMVT_SERIALNUMBER =
return = errmsg
clear errflag.
loop at errmsg.
if errmsg-type eq 'E'.
write:/'Error in function', errmsg-message.
errflag = 'X'.
else.
write:/ errmsg-message.
endif.
endloop.
if errflag is initial.
commit work and wait.
if sy-subrc ne 0.
write:/ 'Error in updating'.
exit.
else.
write:/ mthead-mat_doc, mthead-doc_year.
perform upd_sta.
endif.
endif.
FORM UPD_STA *
form upd_sta.
loop at pcitab.
pcitab-upd_sta = 'X'.
modify pcitab.
endloop.
call function 'WS_DOWNLOAD'
exporting
filename = p-file
filetype = 'DAT'
IMPORTING
FILELENGTH =
tables
data_tab = pcitab
EXCEPTIONS
FILE_OPEN_ERROR = 1
FILE_READ_ERROR = 2
NO_BATCH = 3
GUI_REFUSE_FILETRANSFER = 4
INVALID_TYPE = 5
OTHERS = 6
endform. -
Hi Gurus
When a requisition is used to build a Sub-Contracting Repair Purchase Order, then subsequently a delivery u2013 a new requisition is raised, usually once the delivery has been post goods issued this new requisitions is automatically canceled on SAP, but recently this is not the case the requisition is still active.
Please suggest me what was the reason for this one.
Thanks & Regards
SadaHi,
I am not quite sure if I have understood the problem, but sometimes inconsistencies occur for dependent requirements for subcontracting purchase orders. Refer to SAP note 115899. Note explains types of such errors and there exists a program to correct these inconsistencies.
Edited by: Özgen Canan on Jul 21, 2011 11:47 AM -
Hi,
Created the capital Purchase Order and want to know how to capture the Freight charges, Clearing and Forwarding charges and Customs Charges against this Purchase Order.
Regards,All these charges should have been part of the PO Price you entered. This can be achieved provided your pricing procedure is enabled with the related condition types, if not then you have to create a PO for these and find a way link it with the original procurement.
-
BOM Explosion in PO for Subcontract.
Hello Gurus,
I have Created the BOM using CS01 for subcontract order. i could not able to explode it during my PO. I wantend to know weather there is any prerequsit to be made for the BOM Explosion in the PO..?
regards,
Mahesh.Dear Mahesh,
1.Create the BOM for the sub-contract material(header material) in T code CS01 for BOM usage 1.
2.Mention the procurement type as F and special procurement type as 30 in the material master of the header material(which you
recieve from sub-contractor) in MRP2 view.
3.Maintain the sub-contracting Purchase info record in ME11.
Check and revert
Regards
Mangalraj.S
Maybe you are looking for
-
Mix of different runtime problems on a mac.
Hi, I'm on a mac 10.3 and have no intentions of upgrading. When I try to start some demo's I get a lot of different errors, all as far as I can tell related to the JRE. I installed everything from the apple website: Java webstart 2.3.0 (modified the
-
Access of undefined method/property through reference with a static type Class
I get the following error: (it's not word for word but you get the idea) Error: Access of undefined method getStatus through reference with a static type Class. Here's what's happening in the code. I'm trying to create a User class that is instantiat
-
From which table i can get Customer No, Cust Ref, Contact name
Hi CRM Experts, I want some fields ie (Customer Number, Customer Reference, Contact Name, Account Manager) from which table i can get this fields according to the Object_id. Provide any Tables names or Functional Module
-
I'm starting to hate n97 and might sell it back ou...
too many bugs is annoying and nokia doesn't do anything with new patches ever.
-
My computer crashed. Need to reinstall CS5. Can I download it?
My computer crashed. Need to reinstall CS5. Can I download it?