Change Audio Code to G.729 on Lync 2013

I found the Audio code is G.722. whether Lync 2013 can change the code to G.729?

Yes. If you are receiving G.729 from your telephony carrier, you will need a qualified Lync gateway to handle the conversion from G.729 to G.711 as Phil Sharp posted.
Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading the thread.

Similar Messages

  • Lync 2013 on RDP

    I am running in a terminal server environment with Citrix XenApp, on Windows 2008 R2, with Lync 2013 client installed. When I attempt to do a screen share, the screen shows the desktop of the TS server.
    I attempted to load the VDI plugin for Lync, but it seems to be for desktop OS. Is my configuration supported, and if so, what do I need to do in order to redirect video from the server desktop to end-client?

    Hi,
    Thank you for posting in Windows Server Forum.
    To support enterprise-grade audio and video over VDI with Lync 2013, Microsoft implemented a new Media Redirection architecture and built a VDI plugin that runs on thin clients and pairs with the Lync client running in the remote desktop to which the end user
    has connected. 
    In addition to TP’s reply, please check below articles for information.
    XenDesktop 7, XenApp 6.x and Citrix Receiver 4.0 Support for Microsoft Lync 2013 VDI Plug-in
    http://support.citrix.com/article/CTX138408.html
    Update: Microsoft Lync 2013 in a Virtual Desktop Infrastructure
    http://blogs.technet.com/b/nexthop/archive/2012/07/31/microsoft-lync-2013-preview-in-a-virtual-desktop-infrastructure.aspx
    Deployment Details for the Lync VDI Plug-in
    http://blogs.technet.com/b/nexthop/archive/2013/09/23/deployment-details-for-lync-vdi-plugin.aspx
    Hope it helps!
    Thanks.
    Dharmesh Solanki

  • Audio and video not synchronized in recording made with Lync 2013

    There appears to be no forum for the Lync 2013 client yet, so I am posting this in the Lync 2013 server forum.
    Environment: Lync 2013 Server and Lync 2013 32-bit client. Only one Lync pool. Conference call was scheduled using "Lync Meeting" in Outlook about a week before the call. Call recorded on a laptop that was plugged into our LAN with an Ethernet
    cable.
    Problem: User scheduled a conference call with screen sharing (PowerPoint) and recorded the call. The audio and video are not synchronized in the recording. There is several minutes' delay, with the audio lagging behind the PowerPoint. The last slide
    on the call was presented, the call ended, and the presenter ended the recording (I was present for all this and can confirm no user error in these steps); however, in the recording, the slides change before the speaker talks about it, and the last
    couple of minutes are cut off. 
    Any ideas on why this happened? Web research has failed me. Thank you.

    You may need to lower the recording quality as your PC might not be able to keep up the pace.
    Go to Options in Lync client -> Recording -> Select 480p
    Then test again
    - Belgian Unified Communications Community : http://www.pro-lync.be - MCM/MVP/MCT

  • Steps to enable lync 2013 QOS for audio

    Experts,
    I am on the way to enable lync 2013 QOS for audio only. We have already decided the ports ranges and make sure that its not override.
    I just want to now, what will be happen to existing users using eEnterprise voice during i will lock the ports in servers and clients with GPO.
    What is user impact during the implementation. I can't see any TechNet article for same. Do we have some recommended steps to follow to avoid any issue to existing users ??
    Anil MCC 2011,ITIL V3,MCSA 2003,MCTS 2010, My Blog : http://messagingschool.wordpress.com

    While you configure QoS nothing will happen with existing users or even existing calls.  All that happens when you set a port range for Audio in the Lync is the next calls after the user picks up the change (client refreshes policies every 8 hours or
    on log out/in) will us that port range.
    If you have already decided on the port range you simply need to create the corresponding GPOs for both Server and Client as you mention.  There is no harm in doing it mid-day unless you had defined ports before/specific firewall rules across the environment
    for those ports - but that doesn't sound like the scenario here.
    Thanks,
    Richard
    Richard Brynteson, Lync MVP | http://masteringlync.com | http://lyncvalidator.com

  • Lync 2013 : two problems 1) quicked off from meeting when presenter change 2) Freeze when leaving first call of day

    Hello,
    I have two problems with Microsoft Lync 2013 (see level in screenshot). The first one appeared after May Windows updates and is so annoying that I decided myself to open a post in this forum, with the second one. The first problem is the most important for
    me (see why when reading) and the second one is the cherry on the cake if solved, but is minor.
    1) I'm kicked off from meetings when presenters change
    In an online meeting, when presenters change, I'm kick off since last May updates (very clear since it didn't happen before). I'm unable to specify if it occurs when I'm presenter or just attendee, but that could influence. I will try to report if/when I
    notice a difference.
    THIS IS REALLY IMPORTANT, Please help me solve this !
    2) Lync freezes for approx. 30' to 1min. when leaving first call of day
    I reboot my PC every day. I always notice that after leaving voice call from my first meeting of the day, Lync freezes (doesn't respond message) for 30' to 1min. This is when I leave audio, not meeting window. This never occurs again in the course of the
    day. Windows goes into hourglass, then it works again.
    Does anyone know about this ? Any action to help diagnose or solve this ?
    Again this is less important than first problem
    Thanks for help
    -Pierre

    The steps to remove the update:
    Open Control Panel, click Programs, and then, under Programs and Features, clicking View installed updates.
    Click the update that you want to remove, and then click Uninstall.
    For Lync 2013 May 2014 update, it is KB2880980.
    You can check the following website about the drivers:
    http://www.driverscape.com/download/plantronics-c320-m
    Note: Microsoft is providing this information as a convenience to you. The sites are not controlled by Microsoft. Microsoft cannot make any representations regarding the quality, safety, or suitability of any software or information found there. Please make
    sure that you completely understand the risk before retrieving any suggestions from the above link.
    Lisa Zheng
    TechNet Community Support

  • How to change the default window size display font size on Lync 2013 main window?

    Hi champs,
    Just a simple non-technical question: How to change the default window size display font size on Lync 2013 main window on Windows 7 desktop?
    Thanks,

    Hi,
    Did you mean change the Lync: Change the Default Font and Color of Instant Messages just as Edwin said above?
    If not, as I know, there is no natural way to change it.
    If yes, on the latest version of Lync 2013 client, there is a new option “IM” on Lync client “Options” list. And you need to change the default Font and Color of IM in the interface of “IM”.
    Best Regards,
    Eason Huang
    Eason Huang
    TechNet Community Support

  • Possible to override the remotes "change audio" button?

    I'm creating a DVD that has multiple audio tracks for a single video track. I'm also programming in subtitles for the same track(French). The two audio tracks have different versions of dialogue. So, that means that I need two subtitle tracks – one for each audio. I understand how I can use stories and scripts to associate the proper subtitle track with the corresponding audio track,
    BUT
    my problem is this: it is necessary to allow the user to switch back and forth between the audio tracks whenever they want. So, if a French user is watching with subtitles on, and switches the audio using their remote mid-stream, then I need a way to change the subtitles to match the now-active audio.
    The best way I can think of to do this would be to hi-jack the functionality of the "change audio" button on the remote, and make it run a script that changes audio, then checks subtitle settings and changes them as well, if appropriate.
    Can this be done in DVDSP? I've found promising entries in the advanced connections display, but they don't respond to my initial attempts.
    Thanks for any help.
    Patrick

    Hey. Thanks. I hit a ton of pages searching, but missed that thread post. It's exactly the same problem. I suppose my only hope is, fingers-crossed, more DVD players support the targeted scripting of remote buttons these days???
    Well. I noticed there were several other programs mentioned in that thread, which I'm going to look up now, but it seems that this is a "supported by DVD players" problem rather than a "my program can't do that" problem.
    Something occurs to me. Is this a problem that could be circumvented by going to Blu-ray? DVD SP has a lot of buzz about supporting Blu-ray projects, would Blu-ray players be more likely to support this remote-based scripting???
    P
    Message was edited by: poltrain

  • How to change tax code while processing sales order dynamically

    Hi
         we need to change the tax condition value whenever Value inclusive tax more than 5250  then it has to capture different tax code ( 12.5 percent ) else it should capture existing tax code ( 5 percent ), is there any user exits or can we do through configuration
    Regards,
    Sekhar.K

    Hi,
    Please change the Tax code in Purchase order instead in Invoice.
    There  is a facility available in Purchase order  for mass change of any field at PO level.
    Entere the Tax code V0 and keep the cursor in Tax code field , then select Fast Change icon besides Copy item Icon above, you will get New values, enter V0 here and then select the radio button all items below and execute it, you will find all your line items will be having V0 tax code.
    This is a best practise to change Tax code at PO level.
    AMIT

  • What are the ports required for the Audio, Video and A/V conferencing when the following end points are enabled for QoS in Lync 2013 server?

    Hi All,
    What are the ports required for the Audio, Video and A/V conferencing when the following clients are enabled for QoS in Lync 2013 server?
    Client Type
    Port range  and Protocol required for Audio
    Port range and Protocol required for
    Video
    Port range and Protocol required for
    A/Vconferencing
    Windows Desktop   Client
    Windows mobile App
    Iphone
    Ipad
    Andriod phone
    Andriod Tablet
    MAC desktop client
    Please advise. Many Thanks.

    Out of the box, 1024-65535 for all of the client ports.  :) 
    https://technet.microsoft.com/en-us/library/gg398833.aspx
    You'll want to tune your client ports a bit
    https://technet.microsoft.com/en-us/library/jj204760.aspx as seen here, and then the client ports would use those ranges which is easier to set QoS markings.  I'm not sure the mobile clients respect that setting.
    Elan's got the best writeup for Windows clients here:
    http://www.shudnow.net/2013/02/16/enabling-qos-for-lync-server-2013-and-various-clients-part-1/
    However, the marking of the packets is the tricky part.  Windows can do it via Group Policy, but for the other clients you'll need to have the network specifically prioritize ports regardless of DSCP markings.  You have to do it based on ports
    as the traffic could be peer to peer.
    Please remember, if you see a post that helped you please click "Vote As Helpful" and if it answered your question please click "Mark As Answer".
    SWC Unified Communications
    This forum post is based upon my personal experience and does not necessarily reflect the opinion or view of Microsoft, its employees, or other MVPs.

  • Need to change Tax code in po but GR and IR also completed

    Hi Gurus,
                I have one issue in the po, the line item "xxxxxxx" in the PO It shall be 36 instead of 39.but it is GR and IR also completed,now we need to change the Tax code,for this we need to cancel IR and GR or without cancel GR, IR also we can change Tax code,please guide me.,but  i am thinking this below mentioned steps to maintain for change the Tax code.
    (1) cancel IR
    (2) Cancel GR for line item  "xxxxxxx"
    (3) Change tax code for line item "xxxxxx" from 39 into 36
    (4) Re-post GR for line item "xxxxxx".
    (5)Re-Post invoice for line item  "xxxxxx"
    These steps are required to change the Tax code in the po or not
    please guide me,
    Thanks for your reply.
    Regards
    SAP MM

    Hi,
    If the Tax amount is merged to the expense/revenue account as per the Tax configuration.
    Then if the tax code is V1 --Tax amount is 100 Rs
    The system will post that amount to material account and same will be GR/IR.
    When you do the MIRO the GR/IR will match & vendor account will update.
    If the Tax amount is posted to seperate a/c then tax amount will not merge to material account so at GR tax amount has no reflection but in MIRO system will post the tax to seperate G/L account and vendor is updated with Material Price + Tax amount, GR/IR will be same as MIGO .
    hope you understand.
    rgds
    Chidanand

  • I live in the UK but visit the US regularly. The price of a new MacBook Pro is much less in the US, and is where I plan to buy one. However, I have read that a US machine will not play UK DVD's. Is this true and if so is it possible to change the codes?

    I live in the UK but visit the US regularly. I plan to buy a MacBookPro in the US but have read that it will not play UK DVD's. Is this so? If so, is it possible to change the codes?

    All modern & new Macs can play both PAL and NTSC DVDs.  I do it all the time and it works perfectly.
    The DVD drive is set to its first region code when you first play a DVD in it.  So when you buy a Mac, whatever type of DVD you play first will determine the initial region code that is set.   If it's a PAL/Region 2 DVD it will set the DVD drive to region 2.
    The only thing you have to watch out for is if you have a collection of DVDs that have different region codes.  In those cases you may be faced with changing the region code in the DVD drive in order to play one or more of the DVDs; and as others have noted there is a limit to the number of times you can change the region code (most modern DVD drives allow up to 5 changes; the 5th change becomes the permanent change).  This is due to industry licensing practices.
    If you have DVDs that are Region 0 or All Regions you don't have to worry about region codes.

  • How to change audio port output to input port on mac os x 10.9.2 to connect electric guitar on macbook pro for garageband

    How to change audio port from output to input port so that i can connect my electric guitar to play along with garageband. I couldn't the option to change it in my system preferences of sound as my mac os x is 10.9.2. So please help me!!!!!!!!!!!! I want to play electric guitar with my garageband so badly!!! :O
    Mac os x 10.9.2. ; Garageband 10.0.2

    There is no audio line input on your Mac, get a USB interface, get one that is specified for guitars.

  • How to configure roles at runtime without changing application code?

    Hi,
    We have implemented Custom Login Module security for our application. Our requirement is to configure the roles without changing the application code.
    Our Authentication Type is 'JAAS With Custom Login Module' and Authorization Type is 'JAAS'.
    According to 10.1.3 section of JhsDevGuide1013.pdf, we need to configure the roles in web.xml and also need to give the role in the 'Authorized roles/permissions' section of the group.
    We dont want to change the application definition once we go live just for adding roles. That is overhead for us as we may need to configure more roles according to our business requirements, but each time we dont want to change the code and re-deploy the application.
    Please let us know the way to meet our requirement.
    Thanks in advance.
    Thanks & Regards,
    Ramakrishna. P

    Hello,
    The JHeadstart Developers Guide has an excellent chapter about security to answer questions like these.
    For example, you could use the JHeadstart based custom security, with datatables, that will enable you to add roles and users at runtime.
    Regards,
    Evert-Jan de Bruin
    JHeadstart Team

  • Not able to change Company Code in f-58

    I have done a payment with T-code f-58 in Co. Code XXXX.
    Now I want to do a payment in Co. Code YYYY with f-58 but I am not able to change Co. Code.
    Co Code field is in display mode.
    I have searched on SCN but did not get any correct solution.
    Plz suggest

    Dear nisit shah,   Press F3 - then the company code will be in the edit mode and you can change the company code.    n.selvakumar.

  • Re: IMpact in changing company code to company relation not during monthend

    Hi Guru
    I would like to know your opinions about the impact that may arise in changing company code - company relationship during the mid month(not exactly mid month - anytime expect month end )? If there is an impact what would be the best approach. We suggested to the change at the month end and do the month end activities ..but due to management decision, situation may appear where it needs to be done during the month .  They have inter-company transaction .
    Here is the scenario :
    Company A has 1,2,3 and 4 as it's company code . The company code 4 now needs to be linked to a new company B . How can this be done during the middle of month ? How to get the reports for new company A and Company B and make sure the entries are correct one .For example on 18th of month company code 4 is been moved to company B. how will the assets depreciation will be posted that will reflect in Balance sheet . Let say total depreciation for the month is 300$( 30 days in month). I believe this will show up in both company B/L sheet as 300$. We are looking to differentiate 180$ being posted to Company A balance sheet and 120 to be posted to company B balance sheet .Your input on this will be highly appreciated.
    Thanks
    Gobi

    Hi
    Transaction <b>OX02 </b>changes the name.
    It is not easy to change your company code to a new one.
    You would need to copy your existing company code to the new one and go through the IMG and verify all settings. Then reconfigure all the modules that are using the old company code like purchasing, sales, etc. to point to the new code. Finally, you would need to transfer all the legacy data. Therefore it is far easier to keep the existing company code but give it a new text name.
    Copy all the customization in a new client, no transactions and no master data. So you’ll have the same settings   with your live system. 
    Created a new company code with the new currency, and copy all the customization. This step was to minimize step in re-customization. 
    Uploaded all the master data...and do a new transaction
    The suggestion is don't do that in a live system or else you’ll have a big problem then.
    Message was edited by:
            SHESAGIRI.G

Maybe you are looking for

  • Multi-document Application using JTextPane - Issue

    Hi. I'm making a java IDE as a class assignment where the user opens a certain project and all associated files open (i.e. all files in the requested folder). Opening is not an issue but here's the real problem. When a file opens (in the JTextPane),

  • Modvat and cenvat

    What is Modvat and cenvat?

  • Help converting stuff in Streamline for Flash

    Hi, need tips and a "how to", would like to convert my simple black and white line drawings into vectors using Adobe Streamline . I would like to be able to color and use these in Flash. I use to animate e-cards and this is how we'd do it but it's be

  • ISE Admin node Replication error

    Hello Everyone, I receive this alarm some times: Alarm Occurred At: Wed Mar 20 09:20:10 BRT 2013 Cause: Replication Stopped Details: Replication Stopped for the host PANVMGP3301B(Secundary Admin node) Today i go to Administration -> System -> Deplyme

  • Can't save library files

    iTunes is giving me an error message that reads something like: "Can't save iTunes library file. An unknown error has occurred: -48." What does this mean? What should I do? I had backed up my iTunes files this morning--copied them over to a portable