Change in operation sequence- routing

If at 3 rd operation m/c is under maintenance, we can skip 3rd operation and go for 4th and 5th operations. after 5th opration we want to do 3rd operation. what will be best way to map?

YS,
In SAP, generally the seuqence of operation is supposed to follow.
Your requirement can be mapped by two ways,
1. System won't restrict you confirm in between operations untill & unless you sepcify the same in the define confirmation parameters.
So you can directly confirm the 4th & then 5th operation without confirming the 3rd operation. While confirming the 4th operation the system will issue the warning message mentioning that the preceding operation is yet to confirm. Same can be ignored.
After this the 3rd operation can be confirmed as & when you performed the same. 
You will have data of confirmation date wise for every operation.
2. The other way around is to delete the operation no. 3 from the order & reinsert it when it is planned i.e. after 5th operation.
This way you can process the operation 4 then 5 & the new operation representing the 3rd operation.
I would recommend you to go for second solution if this situation arises once a while or first one is better.
Hope this helps you.
SmanS

Similar Messages

  • Branch operation and return operation for routing in alternative sequence

    Hi all experts.
    I would like to ask which table and field store the value of branch operation and return operation for routing in the alternative sequence. I can only find them in structure (PLFLD-VORNR1 and PLFLD-VORNR2) but I want the table field of them. Would anyone please suggest a solution? Thank you.

    Hi,
    look in table AFFL, here the BKNT1 and BKNT2 refer to those vornr1 and vornr2 of the operation. For example in user-exit ZXCO1U01 you will find the values (BKNT1/2) in the sequence table, and when, for example, filling the LOIPRO01-Idoc, you can use the found VORNR for the E1AFFLL-segment.
    See coding for example on determining VORNR1/2 (sequence_table/operation_table as in user exit EXIT_SAPLCOBT_001):
    SORT operation_table BY vornr.
      LOOP AT sequence_table INTO l_sequence.
        MOVE-CORRESPONDING l_sequence TO l_affl.
    * Read the operation table to determine the vornr1 and vornr2
    *via the value of field BKNT1/2
        IF NOT l_sequence-bknt1 IS INITIAL.
          READ TABLE operation_table INTO l_operation
          WITH KEY aufpl = l_sequence-aufpl
                   aplzl = l_sequence-bknt1.
          IF sy-subrc = 0.
            l_affl-vornr1 = l_operation-vornr.
          ENDIF.
        ENDIF.
        IF NOT l_sequence-bknt2 IS INITIAL.
          READ TABLE operation_table INTO l_operation
          WITH KEY aufpl = l_sequence-aufpl
                   aplzl = l_sequence-bknt2.
          IF sy-subrc = 0.
            l_affl-vornr2 = l_operation-vornr.
          ENDIF.
        ENDIF.
    Cheers,
    S.

  • Scrap quantity to be minus with operation sequence is not check in co01

    hello!
    PP experts
    i have problem in confirmation of production order.
    suppose i have production order  of 15 qtys.with four operation to be confirmed (co11).
    operation  qty.yield  srcap qty.
    0010          1 5              0
    0020          14              1
    0030          14              0
    now, in 0020 operation i have 14 yield & 1 srcap quantity & when i go for 0030
    operation for confirmation it will show the default quantity of previous operation,0020 qty. i,e 14 qtys.but if i put the quantity 15 in this operation (0030)
    its allowing to confirmed 15 qtys. because the plan qty is 15.but i want to minus the 1srcap qty. from 15 plan qty. & system should allowed only 14 qtys
    (15-1=14) for confirmation.plus i want the flexibility of operation sequence not to checked.
    i set operation sequence - error when operation sequence is not adhered to in OPK4,its minus the scrap qty. but not allowing the flexibility of operation sequence
    confirmations.
    please send me the setting for the above query in the confirmation (co11)
    regards,
    mangesh
    thsnks

    Mangesh
    1) you have confirmed yield qty14 nos in operation 020 , scrap Qty 1
    2) Automatically in during confirmation of operation 030, in yield qty field 14 nos is coming
    3) If you want to change that operation 030, yield qty into 15, system giving error message
    4) you want the system to accept the 15 nos in operation 030
    Pl state whether my understanding is right

  • Operation sequence in BOM

    Hi friends,
    while defining Bill of material, operation sequence number is populating by default as 1, does it really matter to exactly use operation sequence number (10) from routing?
    Will it be any issue from planning or mfg perspective If I setup bill of materials with operation sequence as 1 (as default) and operating sequence numbers in routing are set up as 10, 20, 30 etc... ???
    Please let me know.
    Regards,
    kumar

    Hi,
    Benefits of keeping Operation sequence as 10, 20, 30 etc.
    1. End user will know at which operation particular material from BOM is required
    2. In case of Operation Pull, material will be consumed at appropriate operation sequence (This will not matter if you are using Assembly Pull, Push or any other Supply Type). This will impact costing.
    3. You will be able to add same components against different operations
    4. In case of planning, planning engine will give appropriate suggestions (if Mfg lead time is short then this will not matter)
    5. You will be able to print pick slips based on operation seq. i.e. If you want to issue components required at operation 10 only then you can achieve that using this method
    6. You will be able to scrap components effectively
    etc.
    Regards,
    swapnil Mehar

  • Check of operation sequence in order

    Hi all,
    I don't want to check of operation sequence in order. so  how can I do this? Are there any customizing for this case?
    Best regards,
    Hilal Çakır
    email : [email protected]

    Make the following changes in control key or use the control key which have this setting
    In OPJ8, for a control key
    Confirmation = Confirmation possible but not necessary
    In OPK4, for a plantb and production order type combination in Generally valid settings tab page -
    Checks sub page
    operation sequence = set operation sequence is not checked
    With this setting  it will work

  • We have had to change to a new router but the Macbook Pro still reverts to the old router.  How can this new one be made the default?

    We have had to change to a new router but the Macbook Pro still reverts to the old one. How can we lose this and make the new router the default?

    Go to "Network" under system preferences and choose "advanced"
    On the Wi-Fi tab you can sort the sequence of the preferred connections.
    Then just move your new router to the top of the list.

  • Operation sequence

    Hi, my operation sequence is mix of std and parellel, how to maintain the same thru ca01? when i click on sequence, always std is appearing and it is grade out, not changable. how to select diffenrt seq like parallel or alternative>?

    Dear Yadav,
    Plz refer this link
    [Routing;
    Regards
    kumar

  • Operation sequence restriction in CO19

    Dear Guys,
                We have 5 operations (10,20,30,40,50) for an material. I already assigned the value for confirmation field of control key "PP01" as "2 Confirmation required". But during production operation confirmation by using CO19, system allows user  to skip the operation confirmation process without confirming the previous operation. If i change the value of operation sequence as"Error when operation sequence is not adhered to" in "parameter for operation confirmation" screen, the  issue will be solved? what kind of values i want to set for this issue?
    current value as "operation sequence is not checked"
    Thanks

    Raja Sekaran wrote:
    If i change the value of operation sequence as"Error when operation sequence is not adhered to" in "parameter for operation confirmation" screen, the  issue will be solved? what kind of values i want to set for this issue?
    >
    > * current value as "operation sequence is not checked"
    >
    > Thanks
    yes, that setting in OPK4 should be enough.
    The following is the documentation
    Check of operation sequence in order
    Defines whether a system message is to be issued when the operation sequence is not adhered to and if so, which type of message.
    This key only applies to confirmations at operation level.
    Dependencies
    To find out whether the operation sequence has been adhered to, the following checks are carried out:
    Have preceding operations already been confirmed?
    Does the confirmed yield from the preceding operations exceed the total confirmed quantity of the operation to be confirmed?

  • Parallel Sequence Routing using RCPTRA01

    Hi all,
           I've a requirement where i need to Upload Parallel Sequence Routing .  I'm using RCPTRA01 for  created Standard Sequence Routing . Can anyone help me how to Upload Parallel Sequence Routing  using RCPTRA01.

    Two ways.
    1.  Use the parallel sequences you have created and apply 1/2 the time required to process a part to each operation.
    2.  Use a single sequence and create the first operation with 1/2 the time and a second operation immediately following with overlapping and zero offset time.

  • Add/change multiple operations on a released Production Order

    How can I add/change multiple operations on a released Production Order...I know how to add them manually one by one but is there a better way to add...like copy/paste since i am adding operations from an alternate route? Please advise?

    Hy Aziz,
    In process order go to operation screen go to Operation - Include Master recipe, then one pop up comes select required Master recipe and add operations of your interest.
    But there are some restriction which doesn/t allow it if Inspection Lot, Control Recipe are created..
    Regards,
    Dhaval

  • Order Component quantity gets changed after operation confirmation

    Order Component quantity gets changed after operation confirmation.
    We are using CO27 to issue the Material to the Order.
    When we do the confirmation of  operation. Component quantity attached to operation get changed.
    Any solution for this.

    Dear
    Please Follow the Steps
    1. Go into Co02 there u do production order with qty select the Component overview u find the Materials there please check hhow much is the qty of that particular material
    EX: Production order qty for Header Material is 10 ea
    then ur Compannets Qty is 10 or 20
    depends on the Componet Qty the Operation takes place that is because u have maintatined a base qty in Routing and BOM
    With Regards
    Pushpalas

  • When I use the shortcut to open a new window in safari (command N), I get a 404 error message from Google. How do I change where 'Command N' routes to?

    When I use the shortcut to open a new window in safari (command N) on my Macbook Pro, I get a 404 error message from Google. How do I change where 'Command N' routes to? 

    It's not necessary to change the Command N keystroke..
    From your Safari menu bar click Safari > Preferences then select the Privacy tab.
    Click:   Remove All Website Data
    Then delete the cache.
    Open a Finder window. From the Finder menu bar click Go > Go to Folder
    Type or copy paste the following
    ~/Library/Caches/com.apple.Safari/Cache.db
    Click Go then move the Cache.db file to the Trash.
    Quit and relaunch Safari to test.
    If that didn't help, troubleshoot Safari extensions.
    From the Safari menu bar click Safari > Preferences then select the Extensions tab. Turn that OFF, quit and relaunch Safari to test.
    If that helped, turn one extension on then quit and relaunch Safari to test until you find the incompatible extension then click uninstall.

  • Is there any way to change user operations on multiple tracks at once?

    I have a complex project (99 tracks, dozens of menus and scripts). I need to make one version of this DVD for the end client (teenagers at health clinics) who will be forced to view it in a specified way, and another version for educators (staff at the clinics) who will be allowed to fast-forward and have access to a menu from which they can jump to different points in the DVD.
    I have different menus to serve as "first play" for these different versions so that I can easily switch between versions when burning disc images, and I have set up GPRMs to make navigation different for the two versions automatically. My problem now is that I want to disable forward scan, next program, root menu, and title menu for the client version. As far as I can tell, I have to do that independently for every single track and menu. Bleah. This is especially annoying since the DVD is still in development, so I am continuing to change small things and will need to keep both versions up to date as I do.
    Is there any way to select multiple tracks/menus and change user operations on all of them? Or any other work-around or script that could do it? I thought this would be a perfect task for the automator, but I'm not very familiar with that application and don't know how (or if it's possible) to create new actions other than the ones that are available.
    Any ideas?
    thanks!
    Julie

    Thanks. But the disc inspector only appears to let me change things like where the title menu button takes you, not detailed user operations. I have pretty much given up on this being anything other than a giant hassle, but if anybody knows whether a script could do this, I would be eternally grateful.

  • How do I download after changing my operating system from a 32 bit to a 64 bit system?

    I changed my operating system from a 32 bit to a 64 bit system and I need to re-purchase or trade my purchase for a different download -fridayjunior

    Hi fridayjunior,
    Which Adobe software are you trying to install?
    All 32 bit applications are compatible and can be installed on a 64 bit machine.

  • HT203175 My Ipod does not sinc with all of my Itunes library, only the first few albums. I recently changed my operating system to XP from Vista, which was a pain, and due to my fault had to reinstate most of my albums and all of the playlists.

    Ipod does not sinc with all of my Itunes library, only the first few albums. I recently changed my operating system to XP from Vista, which was a pain, and due to my fault had to reinstate most of my albums and all of the playlists. How do I get my Ipod to sinc fully when I access Itunes?

    Recover media from iPod
    See this post from forum regular Zevoneer for options on moving your iPod data back to your computer.
    tt2

Maybe you are looking for

  • Code Search HELP

    Here is my situation. I have a table that has a list of codes almost 100K. I have another table that has code listed in term of an in house regular expression. Example: 40a.[1,2,3] 12b Where a is 0 - 9 b is 1 - 9 I have tried using REGEXP_LIKE but I

  • Layout in Standard report s_alr_87012357

    Hi,     I just added few fileds that were hidden in this standard report by making a layout variant.    But these fields comes in the second line.     The report looks quite bad.     Can any suggest what else do I need to do so that it comes in the f

  • How to install and run Rules Manager in XE

    I tried using Rules Manager in XE. Soon realized it is not installed. I ran the install scripts. Now it complains that java is not installed. Could not find initjvm scripts in XE. Has any one tried running Rules Manager on XE?

  • Is it helpful to do a fresh install from time to time

    Just curious about this. Back when I was a Windows user it seemed to be a good idea to format and re-install the OS every couple of years. It seemed like it helped cleanup cobwebs in the system from programs I uninstalled or even programs I kept but

  • Open any file type

    I have come on a file that I can't open - and it has no extension as a clue. Even though it is only 24kb and so likely to be text I'd like to know what ut is before I dump it, so does any one have ideas as to how extract the contents? Cheers, Colin