Change Number Release (JS41)

Hi All,
I am trying to release a change number from js40, but within
500 secs it gives me the following Dump message saying..
"ABAP/4 processor: TSV_TNEW_PAGE_ALLOC_FAILED"
please suggest any soution to it.
thanks,
Abhay Mehta.

Dear Abhay ,
I have Observed your system closely and found that the table "JGTSADR  " contains too many entries (Approx 23 Lacs).
And the program tries to fetch all these entries in the internal table which overflows the internal table memory.
The query which is fetching these records does not contain any filters. Please try to Apply some filters on the select query in consultation with SAP (OSS ) so that you will not face such problems in future.
Reward if Helpful.
Regards,
Nikhil

Similar Messages

  • FM for the engineering change number to change status message to release

    Hi,
    I have a requirement to change the status message of engineering change number(transaction CC31 or CC32 ) automatically through a program. I have a thought of doing BDC but still i want to know any standard FM or class is available. Please help me if you have any suggestions.
    Thanks in advance for your help.
    Regards
    Syed Samdani

    Siva,
    Did you check in Tcode OMSR.
    Assign Fields to Field Selection Group - (OMSR)
    Here you can define whether a field is hidden or displayed, or whether an entry is mandatory or optional in material master maintenance by assigning the field to a field selection group in OMSR.
    Hope this Helps.
    Vinodh Balakrishnan

  • Error while changing BOM with change number

    Hi ALL, Please help me with followed error message, I am using ECM. I created ECR and converted to ECO and then released.
    Object management record cannot be generated
    Message no. 29046
    Diagnosis
    You want to change the BOM with the entered change number.
    One of the following situations triggered this error message:
    1. The indicator that allows automatic generation is not set for object type BOM in the change master.
    2. The indicator generation only on initial creation is set for object type BOM
    3. You are processing a change request.
    System response
    The system checks whether the indicator object management record will be generated is set in the change master.
    If the indicator generation only on initial creation is set, the system checks whether the BOM exists in the system.
    Procedure
    If you are authorized to change the change master, execute the following steps:
    For 1.)
    Set this indicator for object type BOM or create the control record in the change master.
    For 2.)
    If the BOM already exists in the system and the generation only on initial creation indicator is set, the system can no longer generate the control record automatically.
    In this case you have to add the object control record to the change master first, then you can change the BOM in relation to the change number.
    For 3.)
    You cannot generate any object control records for a change request.

    Hi
    With your question regarding changing BOM with change number  it looks lke there may be problem in defining the Object types,objects.Moreover whenever converted to ECO you need to enter into cs02 tcode for changing the bom with relevant change number and valid from date.
    Hope this gives you a clear idea.let me know if you need anyfurther inputs.
    Regards
    Praveen

  • Change number in material master required steps to use

    Hi All.
    Thanks in advance sap  mm dudes.
    Need steps in sap mm material master change number.
    creation of change number  and usage  of change number
    Display of list of changes.
    Regards.
    parameshwar

    Dear Parameshwar,
    1.I assume you have created a change number without release key in CC01.
    2.In CC02,for the same change number goto object types and include the check box against material for the first 3 check box and
    save the change number.
    3.Now check in MM02 for any material master changes or I would suggest you to create a new change number with valid from
    date as current date,include the settings for material under object types and then check in MM02.
    Check and revert.
    Regards
    Mangalraj.S

  • Change the validity date in change number

    hi team,
    I want to change the validity date of a change number from 01.01.09 to 01.03.09. I am getting an error "A BOM has already been changed using a change number with the same valid-from date as the selected date 03.01.2009".  I can change the date to before 01.01.09 but cannot after 01.01.09.
    Can you please help me.
    thank you,
    Satish

    Dear Mamiditi Satish Kumar,
    Is it a change number with release key or without release key?
    Do you want to assign a different validity date for the changes made using that change number?
    Try using alternative date field in CC02.and you have to select the object to assign the alternative date.
    Say if you want to assign an alternative date for a processed BOM,you have to select that object and
    enter the alternative date.
    Regards
    Mangalraj.S

  • Daily Change Number.

    Is anybody using this functionality in your SAP system ? This is different than regular change number.

    Dear Vinay,
    I will explain very clearly,
    1.If there are changes in material master which will become effective immediately,then ECN without release key will be created and the
    changes will be made with respect to that Change number.
    2.If the Changes are for a BOM ,then ECN will be created with Release key and the changes will be made.
    3.Once if the changes are to be made effective,then in CC02,by entering the Change number the same will be released and the
    changes made with respect to that ECN will become effective.
    4.IF the BOM changes are to be made effective immediately,then ECN without release key itself can be used and the changes can be
    made or create with release key ,but after making BOM Changes,the same has to be released.
    5.Daily an ECN will not created,if needed then it will be created on that particular day.
    6.Revert back if more clarifications are needed.
    Regards
    Mangalraj.S

  • Explain change number in MM01

    hi
    can u explain the change number option in mm01
    explain in steps
    thanks
    ganesh

    Change Number
         Number used to uniquely identify a change master record.
    Engineering Change Management (LO-ECH)
    Data record that contains all the information required
    for managing a change.
    A change master record contains descriptive data, such
    as the reason for the change, and data with control
    functions, such as valid-from date and indicators for
    object types. In addition to this data, which you can
    maintain directly, there is data that the system updates
    automatically, such as administrative data.
    Use
         If you make a change with reference to a change number, or create an
         object with a change number, the following functions are at your
         disposal:
         o   The system determines the validity conditions
         The conditions that the change is effective under can be defined in the
         change master record as follows:
             -   Changes with a date validity (valid-from date)
             -   Changes with parameter effectivity (for example: serial no.
                 effectivity)
         o   Log of the changes made
    o   Documentation of the changes
    o   Assignment of a revision level to a change state of a material or
        document
    o   Release of changes for the different areas in the company

  • Change number in mm02

    I want to change a material (mm02) with a change number with a valid from date which is a future date.
    But the system gives an error message saying that the valid from date is in future.
    Is it possible to change the material with a valid from date, which is a future date?

    Dear Amit,
    1.Create a Change number without release key as per the system's date as the
    valid from date.
    2.Use that change number in T code MM12 and make the changes and save the
    data for the material.
    3.Even if you want to create a change number as on system's date and assigning
    the alternative date,this will work out only using T code MM12 and not through
    MM02.
    Please revert back to forums in case if there is any more problem.
    Regards
    Mangal

  • Change Number Creation

    Hi,
    Can anyone worked on CC01 transaction which will create Change Number. I have written BDC for this. Now i got a scenario like i will get the file and in that we have MatBom, Material and Alternate dates. I need to assign alternate date to the respective MatBom and Material according to the input file.
    I have created a BDC for this but i have problem with transaction while assigning the first alternate date to the corresponding MatBom and Material.
    I am looking a BAPI for this. In that BAPI we need this functionality assigning alternate dates to the corresponding MatBom and Material.
    or else can anyone knows how to handle this assigning each alternate date to the  corresponding MatBom and Material.
    Please do the needful.
    Thanks & Regards,
    Krishna chaitanya.

    Dear Madhukiran,
    As I have mentioned include the check boxes for Revision Level Active , Release active and then save the
    datas.then referehs the SAP menu or else logout and then login and then execute CC01 T code and check
    whether now in the input screen are you able to see the the options for without release key & with release
    key.
    Select the radio button for with release key and create the change number and then after saving and then
    creating the BOM,then you can come to CC02 T code enter the change number set the Release key
    values as 01.
    check & revert back.
    Regards
    Mangalraj.S

  • [Fake News] Arch Linux to change its release cycle

    Today the Arch Linux community proclaimed that Arch Linux will change its release cycle and version numbering, as this was requested by billions of corporate goonies, Freemasons and Illuminati throughout the universe.
    Releases will henceforth be scheduled in intervals deemed posh by the GNU/Linux community at the particular moment. The version numbering will be based on year the a new release is being published. Arch Linux "2016" will be released in early 2006. All following releases will have an offset of at least 10 years to underline how much more pure dead brilliant Arch Linux is compared to Mandrake.
    To achieve a smooth transition, an transitional release will be made at once, named "Useless Marketing Edition". The Arch Linux FTP server will be configured allow one download of the iso image only. This will also be an experiment to find out how the community will be able to spread such a limited edition.
    An Arch Linux user who wishes to remain nameless said in an exclusive interview with the almighty incinerator: "This is a great opportunity for Arch Linux, the new release numbering will confuse and divert computer illiterate lusers from installing our beloved Arch Linux, freeing us from answering stupid support requests. Now we can finally start to work towards our ultimate goal: To become the only GNU/Linux community being as elitist as OpenBSD's."

    Ach guys, you don't get it :-(
    The version numbering scheme was supposed to mock the fact Mandrake plans to release their "2006" version in 2005. That reminds of old times, when (computer) magazines were trying to beat each other releasing the most up-to-date issue to the market. The whole affair became absolutely silly, there were magazines that had the "April" issue hitting the shelves at the end of January. These "issue number wars" occur every now and then.
    The funny scenario I can imagine is that other (GNU/Linux) vendors could jump onto that train and "predating" their releases further and further.
    The rest is just various mockery about lusers and other things found in the Mandrake's press release. And of course the arrogantly elitist OpenBSD community always deserves getting their arses whipped ;-)

  • Delete Configuration Profiles from Change Number.

    Hi Gurus,
    i want to delete Configuration Profiles from Change Number.
    while executing tcode cc02, i am not able to find configuration profile under  object tab.
    would you please tell me how to delete Configuration Profiles from Change Number?
    Thanks
    Amit dhar

    Hello Amit,
    I'm not sure I understand your requirement quite well. But let me share some stuff I know and make a humble attempt to address your question. Firstly by configuring the profiles we are only making certain data entry easier for the end user and also making the change data manageable. By Configuring Profiles we can default the values such as,
    Change number status
    Authorization groups
    Reasons for change
    Status Profile
    Object type profiles
    Most of the above objects / values are modifiable using CC02 till it becomes ECO and few like status till the change number is released.
    I'm hoping this helps, if not please be little more descriptive about your requirement.
    regards
    C

  • Mat master-change number

    HI
    in mm01/mm02 initial screen Chnage number is there .
    i tried to eneter some no say 99 in change no field & mat code system says change no deosen't exist.
    wat is the use of Change number,
    where we need to do setting in order to use it

    hi
    1) change material no is come in to picture when there is change in PRODUCT , and that change is finalised & released thru ECN ( engg changed note ) .
    If the master for same product is avaliable and one has to go for Incorporate changes automatically in VALIDITY, PRODUCT CODES , EANs and so on by using this featre.
    in short is  reference no from which one can easily trace out the how many times mat. is changed ?
    2) is a one can easily control change type thru SPRO ,
    path is LOGISTIC GENRAL > Engineering change management > DEFINE statuses for change master records.
    records are continaing change type ..
    hence u have to define change statuses and change type also u have to define number ranges for change number.
    Kaustubh

  • Change Number, Frustration...

    tried million times to change number from MyVerizon...always always stopped at the last step...the system shows: we couldn't change your number online and please try again or call customer service....Call 800#, the answers were all the same...sorry the number you chose was not available....
    Can someone help me out?
    When is the best time to change number .... I suspect that Verizon releases numbers at certain time in a day, if I miss that time, although the number is still available on my screen, it actually is chosen by other users....
    Thanks,

    Hi newbility,
    I'm sorry for any trouble in changing your number online. I can provide you with some information on this process. 
    If you are changing to an area that is in another state, for example, and you need to change your number for that reason, that kind of change can only be done through Customer Service. If you are within the same "local area," the change can be completed online. A description of a "local area" is, for example, changing from a Chicago number to a number from the Chicago suburbs can be done online. But, changing from a Chicago number to a number that is based out of state, cannot be done online. 
    The best day to change your number is on the first day of your billing cycle. If you are unsure of what that day is, it is the day after the date listed on your bill. (If your last bill was dated October 24th, then the first day of your billing cycle is the 25th of the month). If changing your number on the first day of your billing cycle, you avoid prorated charges altogether for making the change. 
    If you continue to have issues with changing your phone number, please feel free to send me a PM and I will be happy to assist you further. 
    Thanks!

  • Using OCM twice with the same change number

    Hello all,
    We are using both the ECM and the OCM. Sometimes we must change the change number after releasing it. For example we expand the effectivity parameter by adding a new serial number (we allowed it in customization).
    Is there a way to run the OCM (transaction COCM) twice or more for the same change number?
    TNX,
    Eti

    Hi Khukoo,
    Currently your idoc is in status 52.right?
    Means it is not completely posted i.e. it has errors.First we have to find why these errors are coming?
    After getting the problem source we have to rectify it and reprocess it by using the T.Code "BD87" or the standard program name is "RBDMON00".
    Goto SE38 and key in this program name and then execute.
    So that if it is correct in all respects then the status will be changed to 53 without changing the IDoc number.
    Hope this helps you.
    Regards,
    Krishna.

  • How to find Change number for a Material

    Hi,
    If we know the material number and Revision level then how can we find the Change Number of that material.
    Is there any table in which i can find Change number for a revision level or is there any Function module available.
    Regards,
    Vaibhav

    Hi Vaibhav,
    Is there any table to find the change number and revision level of a material. I have change number and material and revision level coming from external system. But i need to check that with SAP whether it exists or not.
    Is there any table link to find whether a material has change number.

Maybe you are looking for

  • How do I move my iTunes library from one computer to another?

    Is it accessaible online or how do I do it?

  • Now I just need an internet connection

    Last night, after trying out Linux with Ubuntu, I loaded Arch Voodoo base. The installation went very smoothly (my compliments), except that like some others I was slowed down during the install, and am now when I boot, by the following: ata2.00: ATA

  • My Interface VLANS keep going up, and then down!

    I have an 1841 router and a 2950 switch and VLANing/trunking from scratch for the first time. Keep in mind that if you see any unnecessary config don't feel bad to point it out. I am just compiling bits and pieces of what I know and what I'm reading.

  • Using APEx with SQL Server

    Application Express 3.1.1.00.09 I am testing APEX. We also have SQL Server. I can see creating a DBLINK and using HS to access SQL Server like Oracle. Are there any other ways

  • SpamAssassin - JES4 & Solaris 10

    Hello - Any updated papers and/or steps to follow while installing SpamAssassin in Solaris 10. We can handle the JES setup with SpamAssassin. Just don't want to miss anything while building SpamAssassin under Solaris 10. Any suggestions will help. Th