Change of Cost Center Assignment for Organization Unit in HR

Hi,
Recently my client is changing their cost center number from 6char to 5 char format. I have created customized mapping table to link between old cost center number and new ones.
Create new cost center referencing to old cost center is done too.
However, for each Personnel Number, i need to change the cost center assignment which link to org unit. I have done this too manually at t-code PPOM. How can I do this for mass change? I have a list of org unit number with me. Is there any standard program to do this or i should use LSMW ?
How do I make sure for each Personnel number, their cost center assignment will change to new 5 char format in the end as required?
I am new to HR module.
Thank you for your help.

Hi,
As Sikandar said, you will have to write an LSMW or BDC ( where in you can check and validate the input Cost centers) using PP01 or Po10.
Also I think if you use BDC or LSMW you will have to run the RHINTE30 report. Check the documentation on RHINTEXX reports to get better idea.
Cheers..
Ajay

Similar Messages

  • Mass change of cost center assignment

    in OKB9, we have around 1000 lines for different company code and cost center, we want to change around 300 cost center assignement, how can we effectively do mass change ? can we do txt file upload?
    in excel, we can do search and do mass replacment, but in okb9, my find button is greyed out
    also before/after I change the assignment, I export TK3A table into excel, my old/new cost center is in column A/B, so how to ensure every cost center in column A is not appaer in column B?

    Hi
    (1) may i know which table store this set id and relevant from and to cost center?
    Table SETLEAF
    (2) may I know the t-code to create additional set used in the FI substitution rule?
    t Code GS01
    Hope this addresses your query
    Regards
    Ajay M

  • PPOME Cost Center Assignment

    Hi Experts,
    We face the following prblem when trying to assign a Cost Center to an Organizational Unit. The Scenario is the following:
    Org Unit A - Cost Center A
        is line supervisor of Orgunit B - Cost Center B
        is line supervisor of Orgunit C - Cost Center B (the problem occurs when trying to assign Cost Center B which is different from the inherited cost center of Org Unit A and the same as the Org Unit B. In this case the assignment of Org Unit B to Cost Center B is deleted! )
    I searched for a note but found nothing relevant.
    Please advice.
    Evaggelia

    Hi Evaggelia
    I think the relationship between O to K (Org Unit to Cost Center) is one-seided, means Unilateral Reporting Structure.
    You need to use A011 while assigning the Relationship between them either from top to bottom, or bottom to top.
    Regards
    Venu

  • Cost center assignment in subcontracting ??

    hi Experts
    i want to change the costcenter assignment in subcontracting scenario.
    Here my query,
    1.I have created subcontract PO
    2.GR done. accounting docs been gnerated.
    3.In GR document display , u can view line item1 as finished material, then in 2nd line item the consumption of raw material will be generated automatically with 543 movement type.
    In this 2nd line item i want to change costcenter assignment for consumption of raw material account .
    Where trhis configuration setting been done ??
    How and where i can change this cost center assignment ??
    Thanks
    SAP-MM

    Hi,
    Use t.code OKB9 and assign G/L ACCt to cost object with ur company code and save.
    Now try ur transaction.
    OR
    Check the field status of the account  in FS00. If this account requires CO object as mandatory then check whether a cost element is created or not , this error normally occurs when CO object is mandatory but relevant cost element is not created.
    Example: CO object may be cost center, cost element, WBS element
    OR
    Use transaction code: KA02: enter(Cost element) and in default acct assinmt TAB,assign the Cost Center and save.
    For more check the link
    http://www.sap-img.com/financial/requires-an-assignment-to-a-co-object.htm
    Vipin

  • Is it possible to change the cost centre assigned to profit centre?

    hi all ,
    We have a requirement to change the old profit centre which was assigned to cost centre , with the new profit centre ... is it possible ? ... is there any problem in doing so ?... what will be the effect of this ? ...
    thank u ... in advance

    Hi,
    u can only change the cost center assigned to profit center before any document posting,
    If even single document is posted or any other postings has done then u cannot change it.
    Regards,
    Pavan.

  • Change of Cost center for Assets --- AS02

    Hi,
    I have one asset 1234. for that Already we closed the year 2008.
    In the Asset master we are using Cost Center -- ABCD, but from 2009.04.01 m i want to change the Cost Center -- XYZ. For that i tried to change the cost center in following way;
    1. In AS02-- Time independent data-- i enter the new interval effective from 2009.04.01 then i was saving the asset master,
    But while saving one error Msg is coming
    "Automatic Transfer is not Possible for Asset 1234. "
    Details of SAP message :
    "   Automatic transfer is not possible for asset E8 840200000066-0
        Message no. AMOC 001
    Diagnosis
        You changed assignments to organizational units for asset E8
        840200000066-0. The indicator for 'time-independent organizational
        units' is set for this company code in Asset Accounting Customizin
        This means that the system is supposed to create a transfer docume
        automatically.
        However, asset E8 840200000066-0 manages one of the following:
        o   Open items
        o   Investment measures
        o   Down payments
        Therefore, the system could NOT automatically create a transfer document. "
    So please tell me , How can i change the Cost center in Asset Master.
    Sachin

    We have many company codes and all company codes have same configuration and All company code have time independent settings.So why this message is only coming for this asset class and in this company codes only. I tried in other company codes with same asset class, but its working, No error message is coming.

  • Re-assign/Change Master Cost Center

    Hi,
    How do we re-assign / change the Master Cost center for a root level org unit under its COST Distribution tab while using PPOME.
    Would like to know where do we do the changes from the available Cost Centers.
    Thanks

    See, yes you can change,
    whenever  you want to change the Master Cost center follow the step
    PPOSE-SELECT START DATE whatever you want Eg. 01.04.2009 , - time Period Complete & Execute-
    Click top left side change button 
    Search you Position -- Double click-go to Account Assignment - Change valid from date (which date from you want to change the cost center)
    Change the cost center & Save 
    This process for follow Org Unit & Position also
    Check the records of the date in Valid from or To there is small arrow First record & previous record other wise select period
    MHPO

  • Using Substitution (GGB1) to change Cost Center assigned in (OKB9)

    Dear all,
    SAP Platform: ECC6
    I've configured both VKOA (GL assignment) and OKB9 (auto acct assignment) for sales billing. In OKB9, I've mapped one cost center to one GL, i.e. GL-123456 = Cost-center-A.
    Alright, now that I've a specific condition that requires to change the cost center at ad-hoc basis, i.e. for material # 2345678 only, I need to assign to GL-123456 but Cost-center-B instead. So, I attempt to use the substitution rule - GGB1 to replace the cost center based on material #. I did the configuration under Cost Accounting | Line Item by creating a new substitution and defaulted the constant to Cost-center-B when material # = 2345678.
    So, I ran the billing in VF01 but the Cost-center-A was pickup instead of Cost-center-B. It appears that the substitution hasn't been triggered. Did I miss a step?
    Thanks.
    Steven

    Hi,
    Have you tried after removing the cost center assignment in OKB9? 
    Thanks,
    Krish.

  • Changes to Profit center assigned to cost center

    Hi
    We have a scnario in which the profit center assigned to the cost center master has to be changed. We have been advised also to  change the validity period of the same from the date of change of the profit center .However, the cost center has been used to for some data postings with the old profit center maintained in the cost center master. Now my query is:
    1. What is the impact of changing the profit center in cost center master? In our case, some data has been posted to the cost center when the old profit center was maintained.
    2. Why should we change the validity period of the cost center after changing the profit center assigned to the cost center?
    3. Also, what is the way to transfer the entries which have been posted to the old profit center to the new profit center?
    Regards
    Sanil Bhandari

    hi,
    1) The impact of profit center is more in the cost center. when ever we assign profit center to cost center. the cost will be updated automatically. so there is no direct posting in profit center only statstical posting are generated.
    2) second one when we want to create profit center first chek it out profit center valid and upto. if same is not maintained in creation of cost center . so u must have to change the validity periods
    3) i am not sure this one i thing 7KEH OR 1KEF TC is there any way tommorow i will give the answer this questions.
          if my answers are wrong plz correct and replay to my id [email protected]
    thank you

  • Change of Cost Center in Asset Master for Investment measure (AuC) Assets.

    Hi,
    We have an asset class 4001 which has been maintained as an investment measure for AuC. I want to change cost center for all the assets that are maintained in the asset class 4001. The system is showing cost center field in display mode in change transaction of the asset AS02 for all the assets in the asset class. I want to replace the old cost center with new cost center in the asset master record. How can I make the cost center field changeable ? 
    Can anyone help me ?
    Regards,
    K.S.K

    Hi Kattula,
    We can change the cost center for AUC with Investment Measure. To do this you need to identify the relevant WBS element assigned to your asset. You can find the WBSE in Origin tab of your asset master record.
    Then go to the change WBS element Transaction CJ12 and change the cost center. Once you change the cost center of the WBSE, the change would automatically get reflected in the correspondind asset master record.
    This would solve your issue.
    Thanks & Regards
    FICO GSupport team.
    RK & IK.

  • Table for change in cost center in Kb61

    Dear friends,
    I changed the cost center using t code KB61, From which table i can get the details of change in cost center
    Rgds
    Madhavan

    Hi,
    KB61 will post the document with the change from old cost object to new cost object in CO documents, so you can check the following tables for this posting.
    CO document Header: COBK
    CO document items:COEP
    CO summary table:COSP (or COSS)
    best regards, takashi

  • Assigning Finance manager position to a cost center in Org. Unit.

    Hi Guys,
                  How to Assign Finance manager position to a cost center in Org. Unit.
    I am using this assignment in a workflow, selecting finance manager from table HRP1001.
    Thanks
    Senthil

    Senthil
    We dont assign the Cost Centre to positon directly
    We assign the Cost Centre to the Org Unit
    later while assigning the Position to the Org Unit  the cost Centre will auotmatically gets defaul to Positions which belongs to that Org Unit
    try thru tcode PP01  give ur Object id of ur org unit and select Cost Centre Assigment infotype  gibve the dates
    ther give the Relationship A 011  and select ur Cost Centre  (K) 
    or u can also do thru Expert Mode P010 also
    Check this one and let me know if there is anything else
    Edited by: Sikindar on Apr 8, 2009 8:34 AM
    Edited by: Sikindar on Apr 8, 2009 8:34 AM

  • Why can't I change the cost center in PA0001 using PA30?

    Hi Gurus,
    Please help.  I cannot seem to find the means to enter the cost center in the organizational assignment infotype PA0001.  It is showing as greyed out/display only. 
    As background, these personnel files were setup for time entry.  Other infotypes populated that might be impacting it are 0315.  We are not setup for organizational management within SAP.
    As I remember if I don't populate sender cost center/create infotype in 0315, I can change the cost center in PA0001 using PA30, but if I do I'm greyed out.
    Can anyone provide some insights and a possible fix for this?
    Thanks.

    Try turning it OFF by removing the X and saving it.
    Then check on PA30 if the cost center field is enabled for you to enter.
    If this doesn't work, please put the X back in the table and save it.

  • How to change a cost center ?

    Hi
    Currently one of our Price variance account is updated in a cost center. We want to change the cost center ?
    Any input will be highly appreciated
    Thanks
    Ni

    HI,
    the corresponding cost element to your price diff. account has a cost center assigned as default CO-object.
    Check:
    1: if its on cost element master level (KA02) and change it
    2: if it is defaulted for the combination of company code+cost element (T-Code OKB9) and change it
    3: if the cost center is substituted via substitution rule ( T-Code OKC9) and change it.
    Best regards, Christian
    Edited by: Christian Ortner on Jan 21, 2010 1:06 PM

  • Cost Center Inheritance from Org Unit

    Good day all,
    Can someone please advise regarding cost center inheritance from org units?
    I understand the inheritance concept, however simple need to know if the CCenter is added to the org unit via A011 relationship, does the system physically create a A011 relationship on the position inhertiting the cost center from the org or does the system simply pick up the realtionship from the org unit relationsip for use in IT0001 field KOSTL (cost center)?
    Thanks guys, have a lovely day!
    Christy

    Hi Christy,
    As we know cost centre(K) is an unusual object in OM.Two type of objects internal  whose master record are in database table beloging to sap erp hcm and eexternal object whose master data belong to other application areas.Cost centre is an external object that is used to represent origin of costs.Inheritance concept is on the basis of whoch cost centre are assigned in org plan.
    directly related cost centre is called master cost centre and they are made via A011 cost centre assignment relationsip.they can be made at org unit,position or work centre and nornmally its org unit that common.Org unit at the top are asisgned the cost centre as a best practise so that all the org units below or reporting will inherit the same.
    Similarly multiple cost centre assignments can also e made through 1018 infotype(cost centre distribution).Inheritance also applied to them aswell.
    Hope this helps.
    No Worries
    KG

Maybe you are looking for

  • I would like to send a message to my personal Apple ID from my personal Website? Is this possible?

    I've been building websites for some time. I've started re-coding everything in HTML 5 using CSS3. I would like for my site to work for me in the best possible way.  I've got an iPad, iPhone & well just about every iDevice you can think of. I would l

  • I deleted time capsule files that were old, but now they won't delete from the trash

    I deleted some time capsule files from the drive I am using for time machine.  It placed them in the trash, but it won't delete them.  It is asking if I want to delete only locked files or if I want to delete all files.  I have tried both, but they a

  • BDC is not working for transaction ME01

    I have done through shdb all recording.But i dont know why this error is coming. Please give solution for the above. CALL_TRANSACTION ME01 Return code =     0  RECORD:          0                    S Field EORD-VDATU . not found in loop of screen SAP

  • COGI Log not clearing after G.R.

    Hi, I am Doing a G.R. for the records Which are exist in COGI with error as NO SUFFIECENT STOCK, I am doing a G.R. using a BAPI -  BAPI_GOODSMVT_CREATE, G.R. document has got created, Stock has posted every thing is fine, But the respective Record ap

  • Block cost center for overhead account

    Dear Experts, My user would like to block the cost center for overhead account, gl account number 3xxxx. My question is, should the cost center blocked to be changed to other account? If yes, where to change the setting/configuration for overhead acc