Mass change of cost center assignment

in OKB9, we have around 1000 lines for different company code and cost center, we want to change around 300 cost center assignement, how can we effectively do mass change ? can we do txt file upload?
in excel, we can do search and do mass replacment, but in okb9, my find button is greyed out
also before/after I change the assignment, I export TK3A table into excel, my old/new cost center is in column A/B, so how to ensure every cost center in column A is not appaer in column B?

Hi
(1) may i know which table store this set id and relevant from and to cost center?
Table SETLEAF
(2) may I know the t-code to create additional set used in the FI substitution rule?
t Code GS01
Hope this addresses your query
Regards
Ajay M

Similar Messages

  • Change of Cost Center Assignment for Organization Unit in HR

    Hi,
    Recently my client is changing their cost center number from 6char to 5 char format. I have created customized mapping table to link between old cost center number and new ones.
    Create new cost center referencing to old cost center is done too.
    However, for each Personnel Number, i need to change the cost center assignment which link to org unit. I have done this too manually at t-code PPOM. How can I do this for mass change? I have a list of org unit number with me. Is there any standard program to do this or i should use LSMW ?
    How do I make sure for each Personnel number, their cost center assignment will change to new 5 char format in the end as required?
    I am new to HR module.
    Thank you for your help.

    Hi,
    As Sikandar said, you will have to write an LSMW or BDC ( where in you can check and validate the input Cost centers) using PP01 or Po10.
    Also I think if you use BDC or LSMW you will have to run the RHINTE30 report. Check the documentation on RHINTEXX reports to get better idea.
    Cheers..
    Ajay

  • Mass change in Cost Center

    Hello Experts
    I would like to change the certain fields in cost center for group of cost centers. I planned to change through T.Code MASS. However, i am being unable to find any object type in T.Code MASS to carry the same.
    Is there any option to do the MASS CHANGE in Cost center Master data with out LSMW / BDC etc.
    Regards
    Anil

    Hi
    Thanks for your reply.
    I have choosen T.Code KS12 and created the new variant to bring the "Department Field CSKSZ-ABTEI"  - by copying the existing  screen variant through T.Code 0KM1"
    Regards
    Anilkumar

  • Cost center assignment in subcontracting ??

    hi Experts
    i want to change the costcenter assignment in subcontracting scenario.
    Here my query,
    1.I have created subcontract PO
    2.GR done. accounting docs been gnerated.
    3.In GR document display , u can view line item1 as finished material, then in 2nd line item the consumption of raw material will be generated automatically with 543 movement type.
    In this 2nd line item i want to change costcenter assignment for consumption of raw material account .
    Where trhis configuration setting been done ??
    How and where i can change this cost center assignment ??
    Thanks
    SAP-MM

    Hi,
    Use t.code OKB9 and assign G/L ACCt to cost object with ur company code and save.
    Now try ur transaction.
    OR
    Check the field status of the account  in FS00. If this account requires CO object as mandatory then check whether a cost element is created or not , this error normally occurs when CO object is mandatory but relevant cost element is not created.
    Example: CO object may be cost center, cost element, WBS element
    OR
    Use transaction code: KA02: enter(Cost element) and in default acct assinmt TAB,assign the Cost Center and save.
    For more check the link
    http://www.sap-img.com/financial/requires-an-assignment-to-a-co-object.htm
    Vipin

  • Is it possible to change the cost centre assigned to profit centre?

    hi all ,
    We have a requirement to change the old profit centre which was assigned to cost centre , with the new profit centre ... is it possible ? ... is there any problem in doing so ?... what will be the effect of this ? ...
    thank u ... in advance

    Hi,
    u can only change the cost center assigned to profit center before any document posting,
    If even single document is posted or any other postings has done then u cannot change it.
    Regards,
    Pavan.

  • Using Substitution (GGB1) to change Cost Center assigned in (OKB9)

    Dear all,
    SAP Platform: ECC6
    I've configured both VKOA (GL assignment) and OKB9 (auto acct assignment) for sales billing. In OKB9, I've mapped one cost center to one GL, i.e. GL-123456 = Cost-center-A.
    Alright, now that I've a specific condition that requires to change the cost center at ad-hoc basis, i.e. for material # 2345678 only, I need to assign to GL-123456 but Cost-center-B instead. So, I attempt to use the substitution rule - GGB1 to replace the cost center based on material #. I did the configuration under Cost Accounting | Line Item by creating a new substitution and defaulted the constant to Cost-center-B when material # = 2345678.
    So, I ran the billing in VF01 but the Cost-center-A was pickup instead of Cost-center-B. It appears that the substitution hasn't been triggered. Did I miss a step?
    Thanks.
    Steven

    Hi,
    Have you tried after removing the cost center assignment in OKB9? 
    Thanks,
    Krish.

  • Changes to Profit center assigned to cost center

    Hi
    We have a scnario in which the profit center assigned to the cost center master has to be changed. We have been advised also to  change the validity period of the same from the date of change of the profit center .However, the cost center has been used to for some data postings with the old profit center maintained in the cost center master. Now my query is:
    1. What is the impact of changing the profit center in cost center master? In our case, some data has been posted to the cost center when the old profit center was maintained.
    2. Why should we change the validity period of the cost center after changing the profit center assigned to the cost center?
    3. Also, what is the way to transfer the entries which have been posted to the old profit center to the new profit center?
    Regards
    Sanil Bhandari

    hi,
    1) The impact of profit center is more in the cost center. when ever we assign profit center to cost center. the cost will be updated automatically. so there is no direct posting in profit center only statstical posting are generated.
    2) second one when we want to create profit center first chek it out profit center valid and upto. if same is not maintained in creation of cost center . so u must have to change the validity periods
    3) i am not sure this one i thing 7KEH OR 1KEF TC is there any way tommorow i will give the answer this questions.
          if my answers are wrong plz correct and replay to my id [email protected]
    thank you

  • Mass change of Profit center in Cost collector

    Hi
    On FERT materials profit center was and i have created cost collectors for all fert materials.
    How I can correct mass change of profit center on Cost collector.
    ty

    Hi,
    You can use the MASS transaction code for changing of Profit Center for your FERT Materials.
    Sateesh

  • Re-assign/Change Master Cost Center

    Hi,
    How do we re-assign / change the Master Cost center for a root level org unit under its COST Distribution tab while using PPOME.
    Would like to know where do we do the changes from the available Cost Centers.
    Thanks

    See, yes you can change,
    whenever  you want to change the Master Cost center follow the step
    PPOSE-SELECT START DATE whatever you want Eg. 01.04.2009 , - time Period Complete & Execute-
    Click top left side change button 
    Search you Position -- Double click-go to Account Assignment - Change valid from date (which date from you want to change the cost center)
    Change the cost center & Save 
    This process for follow Org Unit & Position also
    Check the records of the date in Valid from or To there is small arrow First record & previous record other wise select period
    MHPO

  • Mass data change of cost center in asset master record

    Hi Gurus,
    I followed all the steps suggested by sap library and the below link.  But the cost centers are not getting updated.  When refreshed in TC-ar31 the status is completed instead of ended, no errors. but no change in master record.  Pl suggest.  What woud be the problem?  I am awaiting for reply
    http://wiki.sdn.sap.com/wiki/display/ERPFI/AssetMasterRecordMassChanges

    Hi,
    You might have missed a step out of them.
    Anyway, you have another workaround to change the cost center using LSMW's batch input recording method.
    Regards,
    Srinu

  • How to change a cost center ?

    Hi
    Currently one of our Price variance account is updated in a cost center. We want to change the cost center ?
    Any input will be highly appreciated
    Thanks
    Ni

    HI,
    the corresponding cost element to your price diff. account has a cost center assigned as default CO-object.
    Check:
    1: if its on cost element master level (KA02) and change it
    2: if it is defaulted for the combination of company code+cost element (T-Code OKB9) and change it
    3: if the cost center is substituted via substitution rule ( T-Code OKC9) and change it.
    Best regards, Christian
    Edited by: Christian Ortner on Jan 21, 2010 1:06 PM

  • VA01 Sales order (line items) and different Cost center assignment

    Hello gurus,
    im searching for solutions how to assign different cost center to sales order line items, but only thing that i found is the substitution (Using Substitution (GGB1) to change Cost Center assigned in (OKB9))
    Trying to do this i was unable to create something that could work, since there was no Logistic.
    Could somebody explain me the Line item in SO assignment to Different cost centers?
    I know alot about OKB9, VKOA and other transactions, but still cant find anything suitable to solve this issue
    Best regards
    Laurynas

    What i mean is that, on the end of every month we are gathering information for Statistical Key Figures (from Controlling) entering as CO document and then distributing the costs using KSV5 TC on Internal Orders according those entered statistical key figures.
    i.e. we got INCOME 1000000 from 10 internal order, which we distribute on even percentage parts like 10 cost center, each getting 10% of the income.
    I tried to create the SO, but the Profit center field, after i entered a number, was changed automatically into another.
    And the posting didnt reach Controlling and the assigned Cost center. I think it is a lack of configuration.
    Regards
    Laurynas

  • Why can't I change the cost center in PA0001 using PA30?

    Hi Gurus,
    Please help.  I cannot seem to find the means to enter the cost center in the organizational assignment infotype PA0001.  It is showing as greyed out/display only. 
    As background, these personnel files were setup for time entry.  Other infotypes populated that might be impacting it are 0315.  We are not setup for organizational management within SAP.
    As I remember if I don't populate sender cost center/create infotype in 0315, I can change the cost center in PA0001 using PA30, but if I do I'm greyed out.
    Can anyone provide some insights and a possible fix for this?
    Thanks.

    Try turning it OFF by removing the X and saving it.
    Then check on PA30 if the cost center field is enabled for you to enter.
    If this doesn't work, please put the X back in the table and save it.

  • Change of Cost Center in Asset Master for Investment measure (AuC) Assets.

    Hi,
    We have an asset class 4001 which has been maintained as an investment measure for AuC. I want to change cost center for all the assets that are maintained in the asset class 4001. The system is showing cost center field in display mode in change transaction of the asset AS02 for all the assets in the asset class. I want to replace the old cost center with new cost center in the asset master record. How can I make the cost center field changeable ? 
    Can anyone help me ?
    Regards,
    K.S.K

    Hi Kattula,
    We can change the cost center for AUC with Investment Measure. To do this you need to identify the relevant WBS element assigned to your asset. You can find the WBSE in Origin tab of your asset master record.
    Then go to the change WBS element Transaction CJ12 and change the cost center. Once you change the cost center of the WBSE, the change would automatically get reflected in the correspondind asset master record.
    This would solve your issue.
    Thanks & Regards
    FICO GSupport team.
    RK & IK.

  • Cost Center assignment to Business Area

    Hi,
    Please tell me the Cost Center assignment to Business Area.
    Also please let me know that in our system, it is configured or not???
    Plz guide..
    Anil Kumar
    Moderator: Please, do not use SMS language. The assignment of cost centre to BA is in the master data of the cost centre itself

    Hello Robert,
    You can have only one business Area in one Fiscal Year.
    So for the current year, you should  keep the Business Area, but you can change it for future FYs.
    To do that go to menu > Edit > Analysis Period and click "Other Analysis Period". Than you should be able to change the Business Area for future FY. You have to select the Analysis period, so it begins when FY is beginning...
    Pls reward if helpfull.
    I hope this helps.
    Richie.
    Message was edited by:
            Richie

Maybe you are looking for

  • How to get file from FTP Server using File Control

    Hi, Any one did getting file from FTP Server? Please let me know any one help me. I would need to get file from FTP Server. Thanks, Madhu

  • Best way to allow user to change text and image

    Hi, A friend wants to change his product images and pricing etc., on his static web pages. At the moment each product is within a cell in a table and the cell below is where the text for details and pricing is. This is the only area he will need to b

  • Where is the jQuery options in DW CS5?

    I installed Trial DW CS5, but unable to find options for jQuery and HTML 5. Is there any feature 'bout jQuery Intellisence and HTML 5?

  • Advisable to Exclude "Library" and "System" From TM Backup?

    In the event I need a complete restore, can I use the Leopard install disc with the TM backup? And if this is the case, can I exclude "Library" and "System" from TM backup without harm. If there is personal info in "Library" (I have checked all the M

  • Automator 2-Add Spotlight Comments still dead?

    After the latest update, I was hoping that this Action would have been fixed. When creating a Workflow, adding Spotlight Comments works fine. However, save as a plugin or application and its dead. Is it me, or is this still a bug after the latest upd