Change Profit center in production order

Hi
In production order , profit center is taken from material master, we need a solution to fetch the profit center from cost center instead of material master, assigned in work center, in production order
selection  of production line from production version assigned to production order
Is there any std functionality or enhancements possible ?
now I am working with this SAP note
Note 150959 - Profit center is incorrect in production order
Regards
Devakumar
Edited by: Devakumar on Feb 22, 2010 11:27 AM

Then Go to OBA5 enter the KO  Application area
Add the 367 message and  your user iD enter warning in online and Batch,
After that You can able to Change the   profit center in Order with warning message in Order

Similar Messages

  • How to change Profit center in production order

    Hi guys,
    I have to change Profit center value in production order. Order has been created and released also. How to change, if i directly change system throwing error...Please suggest me in this case.
    RGDS
    Dos

    Then Go to OBA5 enter the KO  Application area
    Add the 367 message and  your user iD enter warning in online and Batch,
    After that You can able to Change the   profit center in Order with warning message in Order

  • User exit to populate profit center in production order change (CO02)

    Hello,
    The requirement is to populate the profit center in production order change (Tcode CO02). I know the user exit that can populate profitcenter in CO01 but it's not called in CO02. Ther other user exits that I found are for checking but not for changing
    Is there a user exit /BADI that can acheive this requirement?
    Thanks a lot for your advise.
    Joe

    Hi,
    Use the user exit PPCO0007 ,function module EXIT_SAPLCOZV_001
    HEADER_EXP-PRCTR
    Thanks,
    Shailaja Ainala.

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Change Profit Center in Internal Order

    Hi Experts,
    How can I change a profit centre in an internal order? I cannot change it I have an error message.
    What are the procedures/best practices?
    Thanks in advance for your help.
    Catherine.

    Hi,
    If you will change the status of message id KO367 from Error to Warning in Configuretion, you will be able to change the Profit centre.
    When you change the profit center, the last period should be settled and since then no more postings should have been made.
    For the new assignment, only the new order values on the profit center you are now assigning to are posted.
    Hope it will help.
    Regards,
    Manish

  • Changing Profit center in Sales Order after Shipment Document

    Hi All,
    We have situation here, The thing is at the time of creating Sales order I don't know the profit center which has to be assigned for example, I have created a sales order for goods transport, when I create the sales order I don't know which vehicle is going to transport this order and the goods can be transported by multiple vehicles.
    For my business each vehicle is a cost and profit center since I wanna know the profitability of each vehicle.
    So I will come to know the vehicle ( Profit center) after creating the shipment document, now I want to have the profit center of this vehicle to be updated back in the sales order so that the Billing (revenue) is recorded in this profit center.
    Please let me know how to do this. I know the PC field is greyed out after shipment and PGI is done. So how to handle this.
    Your suggestions will be highly appreciable
    Regards,
    Satan

    Hi,
    Thanks
    If I went with internal order every where I gotta enter the internal order since it doesn't get automatically derived like a profit center. I would have to define substitutions everywhere !
    I am trying to capture all the costs and revenue for each transport vehicle since this is transport business. It's not like my business is something else and vehicles are a part of it.
    Almost all transactions will have to be posted with Internal order which is very difficult to configure.
    Can you please elaborate on the work around you have mentioned since I am neither technical nor SD consultant.
    Thanks in advance

  • Mass change of work center in production order

    Dear All,
    Is it possible to mass change work center in production order, i.e. i have around 100 production order of which i have to change the work ceter assigned in particular operation .
    Thanks and regards
    Manish

    Hi Manish,
    If you have not posted any activity or goods to the production order, then in header click on Functions -> Read PP Master Data.
    The order will now read the routing with the new work centers, provided the same has been changed.
    If you have posted some activities or goods movement done, then its a manual process.
    Hope the above answers your query.
    Regards,
    Vivek
    Added
    If in case you have posted some goods or confirmed some activity, check if you can reverse the same, re-read the routing & then post back the goods.
    Edited by: Vivek on Feb 24, 2009 12:22 PM

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • How to change the Profit Center in Sales Order

    Hi Gurus,
    Previously they setted the profit center (YB999) in sales order, now i want to change the profit center and need to give the amount into this profit center 100500.
    So, could you guide me how to change the profit center in sales order.
    Thank you for your replies.....
    Thanks & Regards,
    Chandrababu.B
    Edited by: Chandrababu Naidu on May 25, 2011 12:44 PM

    Hi
    If this SO is processed partially - i.e. transactions happened - You cant change it
    You can use ABAP and change it in Debug mode, but not advisable... Better to short close the SO and open a new SO for Balance qty
    br, Ajay M
    Edited by: Ajay Maheshwari on May 25, 2011 5:10 PM

  • Change the Profit Center in Sales Order line item's Account assignment tab

    Hi Gurus,
    I need to change the Profit Center at Sales order Line item in Account Assignment Tab. Currently  The Profit center is coming from Material Master for the Line Item's Material as default but I have to change / overwrite  that.
    Can any body provide me how can i achive that means
    Any User exits, substitution or any thing ?
    I tried MV45AFZZ but i am not able to find out the right place where I can change COBL-PRCTR.
    Sony

    Hi
    There is perform which moves the values to VBAP field.
    This PRCTR field is stored in VBAP (i.e., SO line item table)
    USEREXIT_MOVE_FIELD_TO_VBAP
    Hope it works.
    VVR

  • Changing Profit Center in Partially Delevered Sales Order

    Dear Experts,
    Can anybody tell me how we can Change Profit Center in Partially Delivered Sales Order?. in Standard, System allows to change  PC in open sales Order without any subsequent documents.
    There is business requirement to change PC in all Open Sales Orders.
    br,
    vgl.

    Try this.
    Go to MASS, Key in Object Type BUS2032, select Table MASSVBAP and click on "Fields".  There select the field "MASSVBAP-PRCTR" and execute.
    Next paste those open sale orders and again execute.  There maintain the required Profit Center on top cell and click Carry out mass change.
    thanks
    G. Lakshmipathi

  • Changing Profit Center in PartiallyDelevered Sales Order

    Dear Experts,
    Can anybody tell me how we can Change Profit Center in Partially Delivered Sales Order?. in Standard, System allows to change  PC in open sales Order without any subsequent documents.
    There is business requirement to change PC in all Open Sales Orders.
    br,
    vgl.

    Hi,
      I think note 580216 should solve your problem. Please read this note carefully
    regards
    Waman

  • Re:assign profit center to a order type

    hi gurus,
    good morning to everybody,
    i have a question i have 1000 materials in my organization using by 5 company codes in that few material i need to assign profit center so i went to mm change and assigned the profit center for sales:general/plant and plant data/stor.2, if i want to assign profit center to order type how can i assign, if i cannot assign in order type i need to assign profit center in mm change for 500 materials, so if i change manually in mm change for 500 materials is it going to effect for the other company code when they post the transactions please give me your opinions.
    thanks in advance and points will be assign for useful answers.
    kumar.

    Dear Kumar
    You cannot assign the Profit Center to Sale Order type.  Whatever you maintain in Material Master, that will flow automatically in sale order as and when you create. 
    If you want to change the profit center in material master in bulk, you can do so via MASS.  In fact for sale order also, you can achieve this via MASS but no partial delivery should have been made against that sale order.  In case, you have already made partial delivery, then the field would become grey and you cannot change the same.
    thanks
    G. Lakshmipathi

  • Change profit center for accounting document on item line

    HI
    I need to change profit center for accounting document on item line, for that purpose I have used user-exit EXIT_SAPLV60B_004, but my new profit center gets latly overwritten in FM CO_DOCUMENT_CHECK (which is called from FM AC_DOCUMENT_CREATE). It gets overwritten from COBL. Is there any way to solve this?

    HI,
    possible reasons are :
    In GR document profit center pulled from PO Material :
    If you have ordered with material code, must check profit center assigned into material by mm03/Plant Data2
    If you have ordered without material code, than check cost center assigned Profit center by 1KE4

  • Profit Center on Sales Order

    Hello Experts,
    We have a profit center substitution rule already that says if sales org = 'ABC' then substitute the profit center on sales order with '123'
    Now we have a new requirement and according to that we should use a different profit center if the Salesorg = 'ABC' and material master profit center = 'CDE' then profit center should be 'XYZ'. How can we achieve this?
    Even though the material master has the new profit center 'XYZ' , Sales order is using the substitution rule and not using the material master profit center.
    Your help if appreciated.
    Thanks

    Hi,
    the substitution rule works after the profit center derivation from material master.
    I suggest to change the substitution in a case that whenever the profitcenter derived from material master is ok, no substitution step takes place.
    At the moment substitution works at rvery line item even if the derivation from mat.master is ok.
    BR christian

Maybe you are looking for

  • How do I set a noise print for the entire track? (Back to Basics)

    Ok. I've only worked in STP with single audio clips. Now, I'm trying to adjust audio inside a Multi-Track project sent from FCP... and it's a little different. At least to a guy like me. I'm struggling with the most basic issue, and that's possibly w

  • Use Palm Desktop 4.1.4 to sync Palm Vx to Clie

    I apologize in advance if this is the wrong group/forum.  It seems to fit better than Software for the mobile PDA device.  If I am wrong, I am open to suggestions as to a more appropriate forum. I ran into the wonky digitizer problem that seems to af

  • Build from tow messages one message

    Hello, I have two inbound interface, which called from the client via SAP PI. The receiver systems are connected with SAP PI via RFC Adapters. The Servlet send a Request (Personal ID) to the PI Server, this forwards it to the Inbound 1 and Inbound2,

  • IS BIND() & COALESCE() supported in SEM_MATCH and if not what's alternative?

    I want to get rid of all these UNIONs and USE virtual model VISION instead of all these models: COMPASS, PROCESS, LIMS_ANALYTIC, CLOVER in SEM_MODEL() function... Jena:       VERSION: 2.11.1 ARQ:       VERSION: 2.11.1 RIOT:       VERSION: 2.11.1 I kn

  • Adobe Illustrator CS5 - Missing required plugins.BrS pencil tool/will not open program

    Hi! We hve downloaded a trial version of Adobe Illustrator CS5 and we are not able to open it. We followed Step 1 and Step 2 and then opened up the Zip version.I also have Windows Vista Home Premium Copyright 2007. Would anyone know how I can access