Change Who Receives Product Re-Order Notifications

Hi there,
I have a client site that is sending me all their product re-order notifications and it is rather annoying.
I am not sure where or how I change this, as I have already changed the roles and users so that I am not assigned to any workflows.
Sadly, I still get the annoying reorder notification email!
Any help on how to fix this one guys?
Thanks

Hi
At this stage it is not possible to control which accounts the re-order and other payment failed notification  emails is sent to - it is currently sent to all admin users of the particular site in question.
There is a feature request already open for this and i will add a vote to it on your behalf
Regards

Similar Messages

  • How to get change date in Production Order ?

    Dear Friends,
    I want to know it, how to get change date in Production Order "Administration-TAB".
    F1-Help, It is displayed with "Change date for Order Master". and Structure table "CAUFVD".
    But, CAUFVD is not Transp. Table.
    Which table should I read ?
    Thanks in advance
    Yamazaki-H

    Dear Friend
    Thank you for an answer.
    It was settled.
    Best regards.

  • Mass Cancel/ Mass change of a product across all orders

    Dear Friends,
    We have a typical requirement at our client:
    1.How to cancel a product across multiple orders (Mass Cancel) ?
    2.How to change a product acorss multiple orders (Mass change in all orders)
    They had a issue with one of the product and to be cancelled due to legal requirements..but we have had the orders ready, which include other materials also.
    We now want to change one Material across all orders..how to do this? Same is the case wtih Mass Cancellation requirement.
    I request you to help us on this.
    Thanks
    Ravi
    Edited by: Ravi Prasad on Nov 24, 2008 4:38 PM

    Dear Ravi
    1)  To cancel in mass, you have to create a recording in LSMW and upload the text file
    2)  To change a material in multiple sale orders, go to VA05, input the material code and execute.  There from top menu bar, click on "Edit -- Mass Change -- New Material"
    thanks
    G. Lakshmipathi

  • Table of list status changes of the production orders

    Dear.
    In which table the system store the list status changes of every production order ?
    Thanks.

    Hi,
    First go to CAUFV table input the production order get the object number
    Input this object number in JEST table and get the system status
    Input the system status in TJ02T table ,u will get the production order status

  • Change Component in Production Order

    Hi!
    I have to change materials in Production Order components before saving. Does anyone know a BADI or user-exit that i can use? I have tried so far BADI WORKORDER_UPDATE and user-exits PPCO0001 and PPCO0008 but none of them can be used for this.
    Regards,
    Zoltan

    Hi
    check the following exits related to production Order
                                                                                    CCOWB001            Customer exit for modifying menu entries                         
    COIB0001            Customer Exit for As-Built Assignment Tool                       
    COZF0001            Change purchase req. for externally processed operation          
    COZF0002            Change purchase req. for externally procured component           
    PPCO0001            Application development: PP orders                               
    PPCO0002            Check exit for setting delete mark / deletion indicator          
    PPCO0003            Check exit for order changes from sales order                    
    PPCO0004            Sort and processing exit: Mass processing orders                 
    PPCO0005            Storage location/backflushing when order is created              
    PPCO0006            Enhancement to specify defaults for fields in order header       
    PPCO0007            Exit when saving production order                                
    PPCO0008            Enhancement in the adding and changing of components             
    PPCO0009            Enhancement in goods movements for prod. process order           
    PPCO0010            Enhancement in make-to-order production - Unit of measure        
    PPCO0012            Production Order: Display/Change Order Header Data               
    PPCO0013            Change priorities of selection crit. for batch determination     
    PPCO0015            Additional check for document links from BOMs                    
    PPCO0016            Additional check for document links from master data             
    PPCO0017            Additional check for online processing of document links         
    PPCO0018            Check for changes to production order header                     
    PPCO0019            Checks for changes to order operations                           
    PPCO0021            Release Control for Automatic Batch Determination                
    PPCO0022            Determination of Production Memo                                 
    PPCO0023            Checks Changes to Order Components                               
    STATTEXT            Modification exit for formatting status text lines               
    Regards
    Anji

  • Changing material number when Process Order is released

    Hello,
    We have a scenario in which the material number of a process order may need to be changed after the process order is released.  We will have both in process and post production inspection types assigned to this order, and both inspection lots are created at process order release.  We also will have a batch number created at process order release. 
    When recording test results in the inspection lot before a process order has been confirmed, the users may identify that the material number should be different.  We would like a way to be able to either change the material number in the process order (and inspection lots).  We know this involves a lot of updates (master data changes to the existing process order and inspection lots).  Currently, there is no way to transfer information to a new material number without receiving product in and performing a usage decision in the post production inspection lot to transfer to a new material number. 
    The client has implemented all modules, except PP (which we are in the process of now).  We know that Variant Configuration would have been the right solution for this, but this is not an option since MM is already implemented. 
    If you have any suggestions, please reply. 
    Thanks in advance.

    Hi Prasobh,
    The exact scenario is as follows:
    1. A semi finished good will be used as a component to produce the finished good.
    2. This semi finished good will have treatments added to it, and quality inspection will be performed as treatments are added. 
    3. Inspections will occur several times as treatments are added.  If during one of these inspections, material is out of spec, and the blend should be transferred to another material number, we need to be able to change to another material number.  To have a customization where material number is changed in all of the relevant PP and QM tables seems risky. 
    This is why we can't really use material classification.  We also do not have the option to use VC bc the MM module is already implemented. 
    Thanks.

  • IOS DEVICES receiving iCoud Possword failure Notifications

    I am submitting this issue for a relative who is unable to use her Apple ID because fails.  My cousin owns  two IOS DEVICES; IPad and iPhone    and is experiencing receiving "ICloud password failure" notifications on both devices.  I submitted her issue to the iCloud Forum and received no replies and I hope the iPad Forum can offer some type of recommendation to solve this issue.  Several weeks ago she changed her Apple ID password because of a possible Security breach and she believes the change was successful.  I recommended she attempt to to change her password again and re-input her information into her IOS devices. When attempting to make the password change, she received the Security Question she originally answered , but her answer this time failed.  Can the iPad Forum offer a resolution or a recommendation as my cousn's next step of action.

    You have to make sure that Port 5223  is open for your iOS devices
    If you support push notifications and want Apple mobile devices to receive push notifications over your Wi-Fi network, you also need to open port 5223 on your enterprise Wi-Fi network. Port 5223 is an outbound TCP port used by the Apple Push Notification
    Service (APNS). The mobile device initiates the connection. For details, see
    http://support.apple.com/kb/TS1629 .
    Technical Requirments for Lync Mobility
    http://technet.microsoft.com/en-us/library/hh690030.aspx
    - Belgian Unified Communications Community : http://www.pro-lync.be - MCM/MVP/MCT

  • Error Message V1810 - Make to Order No Change delivery plant in Sales Order

    Hello, for a client where I'm setting the flow intercompany , but i have  an error on the Sales Order when I must be change delivery plant.
    Scenario: Make to Order, Product configuration, Sales Order BOM created by  CS60
    Step:
    1 - I create sales order fo company X delivery plant 1000
    2 - Creates Order BOM on plant 2000 Company Y
    3 - creates MRP Planned Order
    4 - Convert Planned Order to Production Order
    For different issues can happen that you decide to ship the goods to a different plant than the X. Production Plant remains 2000.
    If I try to change the plant on the Order system stops me with the following error:
    Message V1810 - Plant can no longer be changed
    Diagnosis
    The plant can no longer be changed in the Following situations:
    The item has been assigned to a project.
    There is a production order for the order item but it is not a staticassembly order.
    Already have accrued costs.
    For the very complex structure of the product I can not delete the production order and sales order BOM.
    How do I handle these cases?
    Can anyone help me?
    Best regards
    Giuseppe

    Hi Guiseppe,
    can you please answer some questionsa to understand your requirement.
    if you want to transfer the goods from plant to plant you can do it through Stcok transfer MB1B t code.
    1.then why you want to change the plant? in which element you are trying to do in sales order or production order?
    2.you mention it as intercompany and MTO can you be clear for whoom you got the sales order(internal or External Customer?

  • How do I change the value of the Order By field in an MP3 file?

    good day Guys,
    I'm new here in the forum and I have a question that is "breaking" the order of my songs and my head too ...
    How do I change the value of the Order By field in an MP3 file?
    for example, in the photo below, the song "The Bad Touch" is coming BEFORE the song "A Little Respect", this happens because of the Name field to Order ...
    My "problem" is in the photo below, the "tab" Order, iTunes will not let me erase what is written in the "Sort As" ...
    I've been "collecting" several songs over SEVERAL years
    I'm currently with more than 1,500 songs on HD and several backups on DVDs and external hard drives and I think, download it again, will be a "little" laborious and boring
    I DON'T WANT to be filling the tags of songs (name, singer, CD, year, etc.)
    I have used the program Mp3tag to remove the music tags
    I've tried to download the song again and go through Mp3tag program as if it were a new song
    I've changed the music access permissions, folder and even entire hard drive (my Windows has only one user)
    I've tried to catch the song again, from a previous backup
    I've tried to create a copy of the file at iTunes own
    I've tried to create a new music file in a music recording program
    NOTHING of what I did above resolved
    -> I'm using Windows 7 64-bit Ultimate
    -> I'm using iTunes 12.1.1.4 for 64-bit Windows
    -> My iPad is the third generation (a little old, I know) with Wi-Fi and 3G, but it has served me VERY WELL
    -> The iPad is updated with iOS 8.1.3 and is not unlocked
    I'm sorry for the GIANT post, but well, I think I could explain as much as possible and for my English, too bad, by the way, I'm from Brazil and I'm using Google translator
    Hugs and await answers,
    Paulo Ricardo

    hello turingtest2,
    my language is Brazilian Portuguese (there are some little differences between Brazilian Portuguese and the Portuguese of Portugal, but nothing that interferes with the script)
    at this time, I'm managing songs manually, I don't know if this will interfere with the execution of a script or command
    as I picked up this iPad recently, I still don't understand how to set up the iTunes Music Library and the person who gave me, told me it was easier to put the songs manually
    as you said, in my iTunes, 95% of the songs are with ALL the blank fields, including the Name to Sort field, only songs that begin with a/an/the standing with the Name to Sort field filled with name of the song, without the a/the
    I do not know what to do...
    I want to learn to ride the iTunes Music Library, that my work is less
    you know any site that teaches create/manage my iTunes Music Library?
    this site/forum may be in English, no problem
    thanks for all your help and the help of others who responded to my request

  • How can I find out user id who has deleted payment order

    Issue : After payment run, the required information has been sent as Idoc to the bank. So, we know the payment order number.   We observed that another payment run also has picked up this vendor invoice and made payment.
    Usually Payment Sent will be marked X until the related information comes in the form of bank statement upload and this amount gets cleared.
    We noticed that bank has made two payments for this amount to this vendor on different dates :- a) when the payment order supposed to be paid as per the payment terms and b) when second paymnet run paid the amount [ this time it got paid directly as there is long due amount ].
    From SAP APP angle, both the payment run worked fine and also the calcaltion of payment terms as well.
    So, we come to conculsion that someone has deleted the payment order from the system. Thats the reason this invoice got picked up by 2nd APP and paid the amount.
    Where we could not find the related entry in REGUH/REGUP tables for this payment order and no document changes.
    Question: How can I find out user id who has deleted payment order. Appreciate any clue / answer for this issue please.
    Thank you
    Sri

    Hello,
    Not sure about deletion logs. =/
    Idea:
    What if an error occured during the first payment? Have you checked sm13 to check if any update termination occured in the payment program?
    Regards,
    Renan

  • Change item category in delivery order

    Hi everyone
    Issue: Can not change item category in delivery order.
    Phenomenon:
    1:Create purchase order and receive item based on it. complete invoice verification.
    2:Use MIGO to create return delivery based on material document that is created during above process.
    3:Based on system settings, (Sales org, ship-to party etc), outbound delivery is automatically created in background.
    4:Try to change item category which is already determined during delivery order creation, but it is grayed out.
    Can we change item category in this situation?
    I have checked thread "Number of attempts to change Item Category
    This looks same issue but I still do not know how to control item category in delivery order.
    In material type, is there any place I can configure to allow user to change item category
    in delivery order?
    Please advise.
    Satoru

    Hi,
    Check whether this link would help you,
    [Change item category in delivery|Change item category in delivery]
    It looks you need to use user exit: MV50AFZ1 to acheive your requirement.
    Regards,

  • Change of customer in sales order

    Hi,
    We are facing problem when our customer is changed for a particular sale order.
    Suppose we've manufactured a transformer under sale order 680700500 for a customer suppose X
    Now due to any payment issue or change in requirement of customer it is not being sold to X
    Suppose another customer let's say Y comes for the same rating of product which  is same as manufactured for X.
    Since the product is lying in our workshop we will be happy to give them.
    Can u please explain me the complete procedure of this change over on SAP right from generating new production order number to consumption of material.
    Strategy: Planning with final assembly
    How to change the customer in sales order

    Hi,
    You can transfer the stock from one customer to another customer by using tcode MB1B. Check with 411 or 413 with special indicator ( sale order to sale order)
    System will ask existing sale order no & new sale order no. You can transfer the stock in same str location.
    Regards,
    Dharma

  • How do you change the Print Products Store from USA to UK like you can do in IPhoto?

    How do you change the Print Products Store from USA to UK like you can do in IPhoto?

    Please keep in mind that Aperture is not an enhanced iPhoto, it is a different application with a different philosophy and a different intended audience. If you approach it with that in mind you will have a lot less frustration as you learn Aperture.
    Aperture adds a layer of complexity that is not needed by many.  iPhoto is a very powerful application and fits the needs of many amateur photographers.
    As for your original issue, as I said I am surprised that iPhoto allows you do switch countries like that and am not surprised that Aperture doesn't. If this is something you really need to do working in Aperture but using iPhoto to order the prints is a good work around and will not be all that difficult to do once you get the hang of it.
    As for your new question, the books in iPhoto and Aperture are different enough that the code that created the book in iPhoto wouldn't work in Aperture. What happens when you import an iPhoto library into Aperture is that the images in the book are combined into an album in Aperture with the same name as the iPhoto book. You will need to re-create the book in Aperture uaing the images in this album.
    Hope this helps, post back if you have anymore questions.
    regards

  • Still Receive Multiple E-Mail Notifications of New Posts When Subscribed

    In days past, a user would only receive one e-mail notification of new posts to a thread to which he/she was subscribed. You would have to visit said thread before you would receive new e-mails. Sometime during the last big change in the structure of the forums, this way of e-mailing notifications changed. Now I am bombarded with a new notification each time a new post is made to a subscribed thread. I may have ten or more new e-mails just notifying me of new posts to a single thread before I even get a chance to make a return visit. The old way was much, much neater. Any chance of a return to that?
    Regards,
    Steve M.

    I experience it even worse.
    I receive Notifications and Digests for threads that weren't changed.
    I mean to say that
    -I post an answer to some topic.
    -Automattically I am subscribed to that Thread (that's OK, I asked for that in my settings)
    -I receive lot's of Notifications and Digest ALTHOUGH NOBODY ADDED A NEW POST TO THE THREAD. It seems as if the Notification also reacts any time anybody is READING the thread.
    It seems obvious to me that I only want to receive Notifications (and Digests) of Threads that are altered in some way since the last time I read the thread OR received a Notification or Digest.
    That is:
    - new post added to the thread
    - a post has been altered by one of the posters
    - a Solved or Helpfull mark is given.
    Hope Apple can fix this.
    thanks
    Rienk

  • Inserting Object link as reference object in Maint Order/Notification

    Dear all,
    I've mapped pipe line using obejct link,now when i create Maint Order or Notification system displays below mentioned message,
    Select a link object as reference object
    Message no. IH101
    Diagnosis
    You are trying to create an order or a notification for a link object, but have not yet selected an object.
    Procedure
    Place the cursor on a link object. This object will be entered in the notification or order as the object referred to.
    In std Screen RefObject thers is no ref object for Link,
    Please guide me how we can create Maint.Order/Notification against Object Link,as it is required to track cost as well as history of repairs in pipe line.
    Thanks in advance
    Regards
    Parshil
    Edited by: PM_in_SAP on Jul 27, 2010 9:19 AM

    Hi,
    i refer page no 18 of SAP book Object Networking (CS-BD/PM-EQM-ON) SAP AG Release 4.6C,
    To select a particular link from the list, (IN18)select the object link and choose one of the following options:
    Goto --> Change/Display --> link, You reach the object link data screen.
    Goto -->Create notification  --> Notification type
    You reach the screen where you can create a maintenance notification for the link. If a link object is entered for the selected link, the system automatically uses it as a reference object for the notification.
    Goto --> Create order
    You reach the screen where you can create a maintenance order for the link. If a link the system automatically uses it as a
    reference object for the order.
    Regards
    Parshil
    Edited by: PM_in_SAP on Jul 27, 2010 11:22 AM

Maybe you are looking for

  • Solution Manager 4.0 Installation Error  AIX 5.3 / Oracle 10.2.0.1

    Hi All, I am facing an error in the installation step of Solution Manager 4.0 on AIX 5.3 / Oracle 10.2.0.1 Hostname : INXXXXSAPIDES The ABAP instance is not coming up  and the Installation failed.I tried to bring up the instance manually.But was not

  • DVD Drive broken - How do I unmount it on an iMac2007?

    As we entered 2 DVDs at a time the DVD drive broke. After an unprofessional repair service (iMac is vintage, no original parts available) the DVDs got out. BUT we get a "stomach like" grumbling from the DVD drive every 20 sec. How can I disconnect /

  • Print Preview of Purchasing Documents too small

    Some of my users are having difficulties with reading the content of Purchasing Document Previews as the font size selected for the documents is quite small. We want to increase the size of text on the screen without changing the document font size.

  • Access RDS

    Dear All, Our basis guys have been installed Finance accelerator RDS on HANA system. Could you please do let me know, how to access installed RDS from HANA Studio. I am very new to this. Regards, Jo

  • Upgrading from panther directly to leopard

    I have an eMac G4 with OS X 10.3.9 installed. Will I have any problems upgrading to leopard in Oct., or should I go to Tiger first?