Changing check confrimation status

Hi
We have printed a check run and got off one number due to the checks sticking together.
Is there a way to change the print status to Unconfirmed on these checks so we can adjust these to reflect the correct numbers.
Thank You

On the Check number confirmation window if you have already confirmed the checks then the numbers get issued and alloted to the checks. To fix this the only way is to Void them and re-run
Suda

Similar Messages

  • CUA: One or more errors occurred while checking the status of Windows Firewall on the cluster nodes

    Cluster with 2 hosts 2012 R2
    Scheduled CAU fails with:
    CAU run {4EFE116C-AB49-456D-8EED-F7EDC764DA49} on cluster Cluster1 failed. Error Message:One or more errors occurred while checking the status of Windows Firewall on the cluster nodes. Review the errors for more information on how to resolve the problems.
    Error Code:-2146233088 Stack:   at MS.Internal.ClusterAwareUpdating.Util.<CheckFirewallsAsync>d__3a.MoveNext()
    --- End of stack trace from previous location where exception was thrown ---
       at System.Runtime.CompilerServices.TaskAwaiter.ThrowForNonSuccess(Task task)
       at System.Runtime.CompilerServices.TaskAwaiter.HandleNonSuccessAndDebuggerNotification(Task task)
       at Microsoft.ClusterAwareUpdating.Commands.InvokeCauRunCommand.<_ProcessCluster>d__78.MoveNext()
    If I run CAU "Analyze Readiness" ALL comes as PASS
    If I run CUA by hand on same hosts with NO change to the system (not even reboot) it finishes OK
    Anybody any ideas?
    Thanks
    Seb

    Hi,
    In some case if you disabled the connection in Windows firewall inbound of
     "Cluster aware updating" service it will can’t use the CAU.
    More information:
    Starting with Cluster-Aware Updating: Self-Updating
    http://blogs.technet.com/b/filecab/archive/2012/05/17/starting-with-cluster-aware-updating-self-updating.aspx
    What is Cluster Aware Updating in Windows Server 2012? (Part 1)
    http://blogs.technet.com/b/mspfe/archive/2013/02/06/what-is-cluster-aware-updating-in-windows-server-2012.aspx
    Cluster-Aware Updating Overview
    http://technet.microsoft.com/en-us/library/hh831694.aspx
    Hope this helps.
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • Exit or Badi for controlling the change of user status in notification

    Hi,
    I want to check the current user status of notification while saving the notificaton. If the current user status satisifies particular situation, then the notification should be save else not.
    Is there any user exit or Badi which can be used to control the change of user status in notification.
    Thanks
    SUMIT

    Hi Pushpa,
    Thanks for the reply.
    the problem over here is that the BADi IQS0_STATUS_MAINTAIN only allows to disable the user status.
    the other function module STATUS_READ only fetches the data from JEST.
    whereas my problem is that i want to check on the changed status on the screen(which is not saved also).
    Appreciate your reply on the same.
    Thanks
    SUMIT

  • User exit/BADI for tracing change of User Status in IW22

    Hello,
    I am looking for a user exit or BADI that triggers whenever ther's a change made to User status field.
    eg. changing user status to APTC(Approved to be executed)
    I then need the exit/badi to trigger my workflow to send mails to list of reviewers. I can handle that but I am not able to find the suitable exit.
    I have seen BADI IQS0_STATUS_MAINTAIN, but no use.
    Can anyone help?

    Hi..
    Transaction Code - IW22                     Change PM Notification
    Enhancement/ Business Add-in            Description
    Enhancement
    IWO10026                                User check on setting status 'Do not perform'
    IWO10027                                User exit: Generate user-defined settlement rule
    IWOC0001                                Create PM/SM notification: Determine reference object
    IWOC0002                                PM/SM notification: Check whether status change is allowed
    IWOC0003                                PM/SM authorization check of ref. object and planner group
    IWOC0004                                Change single-level list editing PM/QM/SM ALV settings
      Business Add-in
    WOC_FL_DETERMINE                        Determine Date for Determining Installation Loc. Equi.
    NOTIF_AUTHORITY_01                      Additional Authorization Checks for the Notification
    IWOC_OBJECTINFO_CHNG                    Changes to Data of Object Info Screen
    IWOC_LIST_TUNING                        Performance Tuning for Lists in PM/CS
    IWO1_SUBSCREEN_0170                     Display Additional Data on Object Screen 0170 PhysicalSample
    IQS_MASS_CHANGE                         BadI for Mass Changes to Notifications
    IQS0_STATUS_MAINTAIN                    Control of Changeability of User Status
    No.of Exits:          6
    No.of BADis:          7
    Arunima

  • How to change the IO status to CLOSE after it has been settled through ko8g

    hi ,
    I have the following scenario : An internal order is assigned to a PO and after setllement of such an order i need to CLOSE the order .
    The PO has a GR done (no IR) . Currently Internal Order is in the status : TECO [technically complete] and setlement has ben doneusing Actual Settlemnet Run using KO8G.
    Now i need to change the IO status to  [ CLOSE ] : it is gving an error in KO02 : Balance is not zero .
    How  to change the Internal Order status to CLOSE or rather how to make teh balance in that Order toZero?
    Is it reqd to process some GR's for teh same PO ?
    Thansk
    Trina

    Hi,
    Check the order balance in Ko02
    Menu -->  Extras  -->  Order Balance if balance exist it means that the order has not completely settled.
    Regards,
    Raj

  • Changing Student Header status in Student file

    Hi,
    I want to change the header status of student in student file wrt to the reason of cancellations assigned during de-registration. I have created student status and cancellation reasons. Assigned these to RW01 activity. This activity is assigned to call up point 041( create de-registration) but no results. What shall i do to change system status?
    Regards
    Vinod Kumar

    Hi, i configured various status  but getting this error on execution.
    Which infotype and subtypes are used to store status?
    Entry 9008 does not exist for Subtype; check your input
    Message no. HRPIQ00ST_E108
    Diagnosis
    Entry 9008 does not exist for Subtype in table T777Z.
    System Response
    The program is terminated.
    Procedure
    Check your input value for Subtype. The value should exist in the value table.
    Regards
    Vinod

  • Not change the scheduled status after new planning explosion

    Dear  Expert
    We do detail schedule once a month, but MRP heuristic run in every day. We need new explosion every date for new master data, but after new exlopsion the allocated order come back to status 'deallocated'. Then we can not distinguish which are the plan order already scheduled which are new.  Is that any way to keep the order in allocated after new explosion.
    Thanks
    Hailiang

    In MMBE te stock should be showing in restricted batch status.
    Use MSC2n to change the batch status to released.
    Modify the "next inspection date" to the current date.  Set the SLED to the next day.
    Check MMBE and the stock should now show in unrestricted stock.
    Run QA07 using the material as an input and you should get a new recurring inspection lot for the material.  Do not enter in any value for the "window" of expired material in the bottom half of the screen.
    You should get an 09 lot generated now.  (As long as 09 inspection type is active).
    Craig

  • In HCM form & process Workflow event linkage changed to inactive status.

    Hi,
    In HCM  form & process event linkage is activated in HRASR_DT and workflow object .
    Now once we complete the process from EP portal ,reference number is generated and enteries are created in  table T5ASRPROCESSES .
    In SWEL,event is triggered and linked with the same workflow.
    Now the problem is,thesre is no workitem in SWIA with this workflow numbmer and the event linkage also changed to inactive status ( both in proces and  workflow )after we complete the process from EP.
    Thanks
    Manoj

    Hi
       When you are delaing workflows with HCM Process and form the behaviour is slightly different from the normal.. In order to check why the event linkage is inactive the possibilities are
    1. Either there are some chnages done in the workflow  and it is not activated from the transaction HRASR_DT.
    2. The other possibility is that you might have directly actovated the workflow from SWDD transaction and if you have done in this way then it is a wrong way of generating and activating the workflow
    Follow the below steps to find the error
    1. Execute HRASR_DT txn and try to activate the workflow from here. If you try to activate the workflow from this transaction the check function module which is linked to the workflow will be knowing that for which specific process which workflow has to be triggered..
    so in HCM process and forms frame workf it is always suggestable that try to create the workflow from HRASR_DT transaction using forward navigation and activate the respective event linkages.
    The other point you need to check is make sure that all the respective program exit classesare included in the basic data of the workflow other wise even if you miss the program exit classes in the basic data the workflow will not be able to start its process/execution.
    Regards
    Pavan

  • How to change the IDOC Status from 30 to 03

    Hi Friends,
    In the Partner Profiles Collect IDOCS option is Selected and the Output mode is 4.
    In my Custom Program i am Using the Function Module MASTER_IDOC_DISTRIBUTE to generate the IDOCs
    I am getting the IDOCs of Status 30.
    then in my Custom Program, I am Submitting the IDOCs to RSEOUT00 program.
    to change the IDOC status from 30 to 03.
      SUBMIT rseout00 USING SELECTION-SCREEN '1000'
                   WITH docnum  IN  gt_range_idocs
                   WITH p_compl EQ 'Y'
                   AND RETURN.
    but still i am not getting the IDOCs of changed status.
    I need to get the Changed IDOC status and if the IDOC status is not changed then I need to generate an Error file for the IDOCs data and send that data to customers as a mail.
    so my requirment is to call the RSEOUT00 in the Custom Program and Change the IDOCs Status to 03.
      When i am Executing the RSEOUT00 Indidually by giving the IDOCs numbers, then the IDOCs Status is going to change to 03 from 30.
    Kindly Guide me how to proceed furthur
    Thanks in Advance,
    Ganesh

    Thanks Shrishit,
    RC1_IDOC_SET_STATUS changing the Status from 30 to 03.
    Its fine, But my Question is will IDOC Data will be reached to XI Server or not.??
    means is the functionality of this Program is same as the RSEOUT00.
    MY job is to change Status from 30 to 03 only
    and then Check the Status of those IDOCs, and if the IDOC is not sended to XI  i.e.;03 status, then I need to send the Details of IDOC (i.e.; data in filed IDOC) to Customer Mail ID through an Attachement.
    I hope you Understood my AIM, why I need to change the Status in my Custom Program only, by submitting IDOCs to this report .
    Kindly waiting for your reply,
    Thanks in Advance,
    Ganesh

  • Package Log - Error checking work status

    Hi, Experts,
    We are using SAP BPC 10 NW.
    When we run a package manually it is ok. But when we include it at package link (with the same prompt) and run it, we received error message (Error checking work status). Look at the log below:
    ++++++++++++++++++++++++++++++++++++++++++++++
    /CPMB/MODIFY finished in 0 seconds
    /CPMB/ALLOCATION_LOGIC finished in 449 seconds
    /CPMB/CLEAR finished in 0 seconds
    [Selection]
    SELECTION = /CEREAL/EXPENSE/PRIVATEPUBLICATIONS/BPCADMINBIP/TempFiles/FROM.TMP@@@SAVE@@@@@@EXPAND@@@|DIMENSION:CATEGORY|PROJETADO,REVISAO|DIMENSION:ENTITY|CC_11
    [Message]
    RUN_LOGIC:
    Error checking work status
    +++++++++++++++++++++++++++++++++++++++++++++++
    There is no work status activity at REVISAO and PROJETADO category members at this model.
    Would anybody help us to understand what is happening?
    Best Regards,
    Ana Teresa

    Hi Ana
    I found a related note.
    1945016 - "Error checking work status" when executing package
    Symptom
    There is "Error checking work status" in the status log after executing clear package:/CPMB/CLEAR.
    Environment
    SAP BusinessObjects Planning and Consolidation, version 10 for SAP NetWeaver
    Reproducing the Issue
    Run clear package:/CPMB/CLEAR
    Set check work status when clearing as YES. ("CHECKLCK"=YES)
    Check detail status log
    CauseWork status is not set or not found for the "to be cleared" data.
    Resolution
    Try to change the work status of the data in EPM and check if system pops up with "work status not found".
    If yes, check in work status table (you can get the table name by running program UJ0_GET_GEN_TABNAME) if there is default work status assigned.
    If yes, check UJW_STATCODE table in SE16, incase the line which contain field ORDERN=0 is missing, run program: UJW_UP_INSERT_0_STATE to insert this line.
    See Also
    1862768 - EPMWorkStatus function displays wrong status
    Hope this helps.
    Regards
    Juan Pablo

  • Error message when changing compensation process status ?

    Hi,
    When i change compensation process status from " Approved " to "Active" I got the err:
    "No infotype 0759 record with process status Approved selected" , So in my case what went wrong with my config or my system ?
    Thanks alot

    Hi,
    Did you try to change through FM "HR_INFOTYPE_OPERATION"?
    If so try calling the FM "HR_INFOTYPE_GETDETAIL" before the modification to get the infotype record details.
    Also check whether the infotype record in 759 has Status of  Process as '3' - Approved.
    Hope this helps you.
    Regards,
    Subbu.

  • R12: Is there a Public API to change the LifeCycle Status / Item Status ?

    Hi,
    R12.1.3 Advance Product Catalog :
    Is there any Public API to change the LifeCycle Status / Item Status from one phase to
    next phase specific to Product Information Management ?
    Thanks,

    Hi;
    All APIs are listed in Oracle Integration Repository
    http://irep.oracle.com/index.html
    http://download.oracle.com/docs/cd/E12839_01/apirefs.1111/e10652/toc.htm
    API User Notes - HTML Format [ID 236937.1]
    R12.0.[3-4] : Oracle Install Base Api / Open Interface Setup Test [ID 427566.1]
    Oracle Trading Community Architecture API User Notes, June 2003 [ID 241320.1]
    Technical Uses of Customer Interface and TCA-API [ID 269121.1]
    Pelase also check below:
    Api's in EBS
    Re: Api's in EBS
    http://sairamgoudmalla.blogspot.com/2009/05/script-to-find-oracle-apis-for-any.html
    API
    Fixed Asset API
    List of API
    Re: List of APIs
    Oracle Common Application Components API Reference Guide
    download.oracle.com/docs/cd/B25284_01/current/acrobat/jta115api.pdf
    List of APIs and open interface R12
    Re: List of APIs and open interface R12
    Regard
    Helios

  • How to Change Document Default Status

    Hi Everyone, How can i change Document default status for Goods Receipt PO. I want like this
    When user create new GR PO the default status for the document should be "Draft"
    but now it shows status as "Open"
    Thanx & Regards,
    Amar

    Hi
    For this simple create one user for Qualtiy department and when ever u r receving the GRPO make a approval for this document. so the appoaval has to go to qualtiy dep. user, after he auhtorises then Add the doc.
    Make Row level UDFin the name of "Qualtity Passed" and Make Drop down as "Passed & Failled or as ur wish" ..
    so the quality dep user has to check the qualtiy of each row item d he has to make passed or Failled and tell him to add, for passed qty make invoice, for failled failled make return .
    Giri

  • IW32 : User-Exit/BADI on Change of User Status

    Dear All,
                                     My requirement is to do some validations when a user changes the User Status of a Service Order to  'Cancel'.
    I am unable to find a user-exit/badi which will get trigerred when the above process occurs. I did find some user-exit at save but none of them will get me the new user status, so that I can check whether the Service Order going to be set as 'Cancel' .
    Regards,
    Antony

    Dear Wolfgang,
                         Thanks for your answer, it was indeed very helpful. I didnt find any luck with the FM you had mentioned but found some other FM:  QMEM_STATUS_OLD_NEW_READ , may be this will help me in solving my problem..There is one more Question which I hadnt mentioned in my post, If my validation over User Status  fails how can I get the old status back.. Because since the EXIT you had mentioned is at SAVE I dont think throwing an Error message will be the right option
    Regards,
    Antony

  • Change Document for Status Management

    Hi,
      I have a process order in which I have deleted a material component. If you click on the material button, then select a material which has been deleted and press the magnifying glass it will take you the details. Then beside the status field there is a Information button. Press it and it will take you to the change status field. Choose one of the status and in the menu click on extras -> change documents -> for status. I need the table fields for the change status which contains the object key, etc. I chekced the report behind it and have tried to pick up the status with regards to the material component. It does not display the material component status but the process order status which have been changed. I need the details for the changed material document and not the process order. ( Tried Table Jest but with no luck ).
    regards
    Aveek

    It is strange that you don't find any information for Change Documents in CDHDR or CDPOS. All change documents are stored in these two tables.
    You might want to check this as well :
    http://www.members.tripod.com/abap4/SAP_Functions.html and search for Change Document in that page
    Regards,
    Subramanian V.

Maybe you are looking for