Check run failing

A regular check run is failing at the formatting phase, even if its just one single invoice. Now, it works fine in the UAT instance, but fails on development or testing instances which are clones of each other.
Could this be a setup configuration issue? Please advice.
Exception error: ora-01403: no data found in package iby_disburse_ui_api_pub_pkg procedure iby_disburse_ui_api_pub_pkg.perform_check_print

981362 wrote:
A regular check run is failing at the formatting phase, even if its just one single invoice. Now, it works fine in the UAT instance, but fails on development or testing instances which are clones of each other.
Could this be a setup configuration issue? Please advice.
Exception error: ora-01403: no data found in package iby_disburse_ui_api_pub_pkg procedure iby_disburse_ui_api_pub_pkg.perform_check_printPlease do not post duplicates -- Check run failing

Similar Messages

  • I am geeting problem whem i run bulk insert query i got error Location:_ bcpimp.cpp:1797 Expression:_ cbOutTemp cbOutputStr SPID:__ 52 Process ID:_ 2364 Msg 3624, Level 20, State 1, Line 3 A system assertion check has failed. Check the SQL Server error

    Location: bcpimp.cpp:1797
    Expression: cbOutTemp < cbOutputStr
    SPID: 52
    Process ID: 2364
    Msg 3624, Level 20, State 1, Line 3
    A system assertion check has failed. Check the SQL Server error log for details. Typically, an assertion failure is caused by a software bug or data corruption. To check for database corruption, consider running DBCC CHECKDB. If you agreed to send dumps to
    Microsoft during setup, a mini dump will be sent to Microsoft. An update might be available from Microsoft in the latest Service Pack or in a QFE from Technical Support. 
    Msg 0, Level 20, State 0, Line 0
    A severe error occurred on the current command.  The results, if any, should be discarded.

    If you check your sql server error log folder you will see dump files created. You need to send those dump files to Microsoft for inspection because outside of microsoft product support the symbols for reading the dumps are not available without which it
    wont be easy to find the issue.
    http://support.microsoft.com/kb/2028589
    In the meantime check if you are on the latest version of Service Pack and if not apply the latest service pack. Majority of these kind of assertions are bugs which are solved in Service Packs/Cumulative Updates.
    Regards, Ashwin Menon My Blog - http:\\sqllearnings.com

  • ORA-3113 while running export (first run ok, second run fails)

    Hi,
    I'm running 10g (10.1.0.2.0) on gentoo Linux.
    After a restart of the database I can do an EXP for any user without errors. But when I repeat the same command after the export I get the following error:
    . . exporting table WEB_SESSION_DATA 0 rows exported
    . exporting synonyms
    EXP-00008: ORACLE error 3113 encountered
    ORA-03113: end-of-file on communication channel
    EXP-00000: Export terminated unsuccessfully
    It's always the same error on the same task (exporting synonyms) but always just for the second and any later export, while the first one is ok.
    I read through some forums and found, that ORA-3113 is a standard error which just hides the real error. So I look into the trace files and found:
    ksedmp: internal or fatal error
    ORA-07445: exception encountered: core dump [jox_lookup_known_object()+413] [SIGSEGV] [Address not mapped to object] [0x1AD14034] [] []
    Current SQL statement for this session:
    SELECT SYNNAM, DBMS_JAVA.LONGNAME(SYNNAM), DBMS_JAVA.LONGNAME(SYNTAB), TABOWN, TABNODE, PUBLIC$, SYNOWN, SYNOWNID, TABOWNID, SYNOBJNO FROM SYS.EXU9SYN WHERE SYNOWNID = :1 ORDER BY SYNTIME
    If I call this SQL from sqlplus I get the same ORA-3113, so this seems to be the cause for the export failure.
    When I remove the DBMS_JAVA.LONGNAME calls from the statement, it runs fine. It also runs fine, when I add a "and 1=0" to the EXU9SYN view. But this will not really solve the problem, because then all synonyms don't get exported.
    I also checked all the synonyms and they are valid, the referenced tables exist and can be queried.
    Because we use JavaStoredProcedures I cannot remove the Java Features in Oracle. But I reinstalled it (rmjvm.sql and initjvm.sql) but this did not help.
    Does anyone have an idea what's happening here?
    Especially the "first run ok, second run fails" seems to be very strange, because DB objects including DBMS_JAVA should be ok, if the first export can be done. So what changes in the database during or after the first run?

    Maybe description for bug 3953108 (ORA-7445 AND ORA-3113 DURING DIRECT FULL DATABASE EXPORT OF PUBLIC SYNONYMS) is helpful.
    Werner

  • Meaning of this error (ISE 1.2 on SNS-3415): HARDWARE RNG INTEGRITY CHECK HAS FAILED!

    Hi. We recently purchased an ISE 1.2 appliance (SNS-3415 hardware). It installed fine, but I am unable to access the GUI. When I login to the box and run the following command on the CLI
    ISE-12-NS-SD-2/admin# show application status ise
    I see the following output:
    ISE Database listener is running, PID: 7737
    ISE Database is running, number of processes: 38
    ISE Application Server process is not running.
    ISE Profiler DB is running, PID: 9090
    ISE M&T Session Database is running, PID: 8959
    ISE M&T Log Collector is running, PID: 9294
    ISE M&T Log Processor is running, PID: 9376
    % ERROR: ISE SERVICES HAVE BEEN DISABLED BECAUSE
    %        HARDWARE RNG INTEGRITY CHECK HAS FAILED!
    Can anyone help me? What can I do to ensure that the hardware RNG integrity check succeeds. Is it a license issue? Is it faulty hardware? Please advise. I would be very greatful.
    Thanks in advance.

    I worked with a TAC engineer on this and he said one other customer had this issue and the only recourse was reimaging the appliance with the ISE 1.2 ISO image.
    I did reboot, restarted services, reset to factory default and none of that worked. It is possible that the issue happened because during setup of the appliance I didn't have network connectivity and went ahead with the setup and configuration of the ISE application anyway. I later had network connectivity but by that time ISE manifested this fault.
    Reimaging and ensuring network connectivity during setup the next time around fixed the problem.

  • Updates and check DB failed in DB13

    Hi All,
    in one of our quality system, updates and check DB failed that scheduled in DB13. the error log shows there is permission issue, but i checked the BRTOOLS permissions it has rights, i attached the error log here, plz suggest to solve the issue.
    Job started
    Step 001 started (program RSDBAJOB, variant &0000000000816, user ID SAPADM)
    Execute logical command BRCONNECT On host sapqasr
    Parameters: -u / -jid CHECK20100724000000 -c -f check
    BR0801I BRCONNECT 7.20 (6)
    BR0252E Function stat() failed for '/oracle/QAS/112_64/bin/sqlplus' at location BrFileStatGet-1
    BR0253E errno 13: Permission denied
    BR0273E Determination of file status for /oracle/QAS/112_64/bin/sqlplus failed
    BR0280I BRCONNECT time stamp: 2010-10-26 07.00.43
    BR0301E SQL error -12546 at location db_connect-2, SQL statement:
    'CONNECT /'
    ORA-12546: TNS:permission denied
    BR0310E Connect to database instance QAS failed     
    BR0806I End of BRCONNECT processing: ceekqzgd.log2010-10-26 07.00.43
    BR0280I BRCONNECT time stamp: 2010-10-26 07.00.43
    BR0804I BRCONNECT terminated with errors
    External program terminated with exit code 3
    BRCONNECT returned error status E
    Job finished
    Thanks,
    Balaji

    Hi,
    BR0301E SQL error -12546 at location db_connect-2, SQL statement:
    'CONNECT /'
    ORA-12546: TNS:permission denied
    BR0310E Connect to database instance QAS failed
    From the above errors, I am guessing that you may be trying to run CheckDB / Update statistics jobs from DB13 for REMOTE DB Instance located on Remote Host (i.e. QAS instance).
    If my guess is right then,  please refer [SAP Note 1256322 - Establishing a remote database connection in DBACOCKPIT|https://service.sap.com/sap/support/notes/1256322] and do the required settings as listed in that SAP Note 1256322 and then retry.
    Also ensure that latest BR*tools is in use with the required permissions on local/remote hosts.
    Permissions 4775 should be there for brarchive, brbackup, brconnect, brtools with owner ora<sid> and group sapsys.
    Permissions 755 should be there for brrestore, brrecover, brspace with owner <sid>adm and group sapsys.
    Use the following commands to change the permissions & owners/groups for the same.
    chmod 4775 brarchive, brbackup, brconnect, brtools
    chown ora<sid>:sapsys brarchive, brbackup, brconnect, brtools
    chmod 755 brrestore, brrecover, brspace
    chown <sid>adm:sapsys brrestore, brrecover, brspace
    ORA-12546: TNS:permission denied
    If QAS is the remote DB host, then copy+paste the TNS entry in file tnsnames.ora of monitoring system (located at /oracle/<SID>/<Rel>_64/network/admin location). Its guided in the above suggested SAP Note 1256322. then check the connectivity using tnsping <Instance ID>. It should be completed with success and response time.
    Regards,
    Bhavik G. Shroff

  • Heuristic Run  - Fail

    Dear All,
                   Working on SCM 5.0
    Whenever i change/load  the T- Lanes , next Day the first Heuristic Run Fails.
    After Changing the T-Lane , i do the following,
    1. Consistency Check - Planning Areas.
    2. Consistency check - Live Cache
    3. Low level Code.
    Then also i am facing the same problem?
    Why ? and how can i resolve the same..
    Regards,
    Rajesh Patil

    Ya ..when u change T-lane/Load new T-Lane first Heuristic Run fails ...and in application log of Heuristic Run ... for some product- locations the source location isnot showing?
    But when i rerun(2nd time) the same Heuristic it is working fine?.
    As i am taking Daily Run..
    plz guide me when i Change the T-lane ...Except the above consistency check is there any thing to do?
    So the Heuristic will run smoothly.
    Regards,
    Rajesh Patil

  • SNP - Heuristic -First Run Fails

    Dear All,
    I am Working on SCM 5.0 SNP..
    Working on Following ..
    1. Heuristic Run
    2. Deployment
    3.Trasport Load Builder (TLB)
    We are running Heuristic on Daily Basis.
    If i run Heuristic after loading new Tranportation Lane(Master Data) the FIRST run fails?
    Why?
    After loading the New Trasportation Lane..i always Check Low Level Code/Live Cache Consistency Check the also i am facing the above problem.
    Plz help me to resolve the same.
    Regards,
    Rajesh patil

    Hi Rajesh patil,
    From your observations, it is clear that there is timelag required by system to update the master data (TL) newly maintained and the start of heuristic run.
    1)  Once the new TL is maintained, run consistency check (F9) to check for any errors
    2)  After maintaining the lane, ensure that the same is available in the active model
    3)  Once after maintaining the lane, clear all inbound and outbound queues before start of heuristic run.
    4)  Also run low level code/cons checks before start of the heuristic run.
    Please confirm with your findings.
    Regards
    R. Senthil Mareeswaran.

  • Attribute change run Failing in Process Chain

    Hi guys,
    Every day my process chains is failing due to Attribute change run and I am maually running attribute change run.
    And one more thing when the attr. change run is triggered automatically,then it is generating 2 change counters in RSATTR tcode instead of 1.
    One is successfully completes and one is still in schedule.After 2days days it is showing like completed change count id.
    Please help me.
    Regards,
    Tiragati.

    Hi,
    As you said Attribute change run step is failing every day.
    can you post the error message. is it failing because of Lock issue or some other issue.
    Mostly attribute change runs fails with lock issues. if its the same problem in your case. make sure that no master data objects runs at the time attribute change run runs.
    Try to put some delay in the process of the Attribute change run so that it will not get failed.
    Check if its the same ACR scheduled or diff objects?
    Regards
    KP

  • Satellite C855-1TD starts with message "Checking media [Fail]"

    Okay, My Toshiba laptop has suddenly refused to work and will not start up. When it loads past the initial toshiba loading screen, a black screen appears saying "Checking media [fail]" I've tried everything that I have seen online that does not include opening up my laptop. It does not let me acess the Bios and I have tried every combination available.
    My laptop is a Toshiba Satellite C855-1TD and runs on windows 8.1 software.
    Any ideas? Thanks!

    Hi
    Usually you should be able to access the BIOS pressing the F2 button while booting up the unit.
    I cannot say for sure but it looks to me like serious hardware malfunction if you are not able to access the BIOS.
    Such serious hardware problem might be related to motherboard problems as well as RAM modules.
    In case you are able to access the BIOS, check if the HDD is still visible on the first BIOS page.
    If HDD isnt visible, then the notebook cannot find a proper bootable device and therefore the error Checking media fail appears.

  • Optimizer Run Failed

    Dear,
    We are using TM 8.0. In transportation Cockpit after I choose the freight units ,when I click on the button "Transportation Proposals", I get "Optimizer Run Failed" error message. Do you have any idea to correct this issue.
    Thank you very much
    Mehmet

    Dear Vikas,
    When I have a look at the RFC log, I see the below message. It seems " /SAPAPO/CSOPT_INPUT_DATA" function module is not available in TM 8.0 System. However, when we look at the other APO systems this function is available. Is there any add on needs to be installed on the TM server?
    <i> 16:20:12 caruso_script.cpp(307) 'MsgMgr' ***** Start optimization run *****
    <i> 16:20:12 core_msgmgr.cpp(440) 'MsgMgr' * Sending progress number 801 to OutputInterface from [CarUsOMainScript]
    <i> 16:20:12 caruso_script.cpp(310) 'MsgMgr' ***** Load parameters *****
    <i> 16:20:12 core_msgmgr.cpp(440) 'MsgMgr' * Sending progress number 802 to OutputInterface from [CarUsOMainScript]
    <i> 16:20:12 caruso_script.cpp(321) 'SuperVisor' Setting optimization time to 60 sec.
    <i> 16:20:12 core_msgmgr.cpp(440) 'MsgMgr' * Sending progress number 803 to OutputInterface from [CarUsOMainScript]
    <i> 16:20:12 caruso_script.cpp(339) 'MsgMgr' ***** load planning data *****
    <i> 16:20:12 rfc_connection.cpp(599) 'MsgMgr' <rfc> calling function module /SAPAPO/CSOPT_INPUT_DATA
    <e> 16:20:12 caruso_script.cpp(360) 'SuperVisor' <!> CORE EXCEPTION : 14 =
    #RFC_RC (RFC_EXCEPTION) Exception raised
    #RFC_ERROR_GROUP (RFC_ERROR_APPLICATION_EXCEPTION) The called function module raised an exception
    #RFC_ERROR_INFO Function module not found
    #exception=FU_NOT_FOUND
    <i> 16:20:12 optsvr_main.cpp(1169) 'MsgMgr' Current check values:
    Regards,
    Mehmet YILMAZ

  • Availability check run requirement in the Sales order Save user Exit.

    Hi Gurus,
    As per the requirment we are using a user exit SAVE SALE ORDER PREPARE for BOM purpose to reconfirm the confirmation qty.
    Now we need to add one more logic in the same user exit, which will run the availabilty check run for each of the line items of the BOM and consider latest confirmation qty from it. So my concern is it possible that we can call the availabilty check run event with in the user exit SAVE SALE ORDER PREPARE or this not advisable?
    Please let me know..
      Regards,
      Babs

    HI Venkat,
    Thanks for your reply.Yes you are right availability check runs automatically at sub item level.
    But please note the customer requirment iteself is is little different from std BOM configuration.
    Currently the availabilty check is activated both at header and sub item level. They are maintaining the stock for header and sub item level.Also the these sub items are some time being sold as invidual materials. hence there exist a mismatch in the stock value between header and sub items.
    when a sales order is created both header and sub items will have confirmation with different value between each and the same mismatched values are being passed in to delivery. But the deliveries can not be processed for PGI because of the mismatched confirmation qty between header and item level.
    I guess now you the rrequirment.
    So we are using the SAVE SALE ORDER exit which will re check the confirmed qty between header and item and takes lowest confirmed qty and change the confirmed quantities from all the line items to lowest one, so that confirmation qty among all the line items are same. This is the first logic we are planning.
    Further there is one more additional process BOP need to be run for this header and sub items, which will change the confirmed qty based on the latest stock for individual line item. even in this case also the user exit SAVE Sale order is being called but we need to run the availability check run additionally because of which our requirment will be taken care.
    Regards,
    Babs

  • Vendor's check run clearind date

    hi all,
    this question is regarding clearing date of vendor's check run.
    They found out that one vendor from today's check run had a clearing date of 10/23/07 instead of 10/16/07. I checked and all the other payments from today's run had a 10/16/07 clearing date. My understanding is that becoz there was one invoice that was inadvetently posted with a 10/18 date, somehow it caused the payment run to pick up that date. Please advise.
    thanks.

    When clearing, the <b>last posting date of all the documents involved</b> in clearing is set as the clearing date.
    A rental invoice for December is entered on 11/28/1997 and the posting date is set to 12/01/1997. The rent is paid on 11/30/1997 and is also posted under this date. 12/01/1997 is then set as the clearing date, in other words the posting date of the invoice.

  • In workflow need to check in passed validaitons and check out failed once?

    Hi All,
    Can any one let me know is the following requirement possible?
    In workflow can I able to split records based on validation result? I need to check in passed validations and check out failed validations..
    Regards
    Rajeev

    Hi Rajeev,
    You can try out both branch step and validation step and see which serves your purpose better.
    In branch step you can give multiple validation/validation groups,if result is TRUE take the first branch and check in at STOP.
    If FALSE,take dont checkin at STOP,either cascade or Rollback as the case be.Also here you can call the same or other Workflow.The split branches can later be combined using MERGE or Group.
    Other way can be by using Validation step,setup iteration threshold.here failed jobs will be sent to previous step and passed ones will move ahead in WF.Later you can checkin at STOP and failed jobs would still be in WF in checkout state.
    For your reference :
    http://213.41.80.15/SAP_ELearning/OKEC/nav/content/011000358700000601512007E.PDF
    http://help.sap.com/saphelp_mdm550/helpdata/en/43/e0615a82b40a2ee10000000a11466f/frameset.htm
    Thanks,
    Ravi

  • F110:  What is best method in voiding an EFT payment after check run?

    What is the best method in voiding or reversing an EFT payment after a check run (F110)?
    Thanks!

    have you figureed it out?
    if I didn't remember wrong, we first find the clearing document number in proposal log, and used FBRA to reset the clearing items, then reverse the document
    I am also interested in setting a dummy check number for EFT, anyone can throw some ideas here?
    thanks
    Keqin

  • What do I do if my laptop keeps saying checking media fail and it keeps saying no bootable device

    I need help because my laptop keeps saying checking media failed and then it says no bootable device please restart system I don't get it

    checking media failed and then it says no bootable device
    This is possible HDD failure. Could be that the Hard Drive is no longer working.
    *********Click on Kudos if it helped you. Thanks! ***********

Maybe you are looking for

  • Can't get monitors to work on 10.6.4

    I'm helping a client out who has 3 Planar monitors model PL2010M (standard 4:3 20" LCD) that he used on these systems: 10.5.8 Machine Model: PowerMac G5 Processor: PowerPC 970 2.2 GHz #processors: 2 Memory: 2GB Graphics Card #1: ATI Radeon 9200 Type:

  • No longer able to build ejb using appc (WLS 8.1)

    I'm in the process of re-writing some build files to make use of the new appc compiler, but I started to get a rather confusing error. Although the EJB builds (using ejbc) and deploys fine on WLS 7, when I try to build using appc I get a slew of mess

  • Left shift key doesn't work on some characters

    In some applications, such as Excel and AOL, my left shift key doesn't work on some letters. Consequently, when I'm typing I get lower case letters when I've typed shift plus the letter to get a cap. Right shift works OK, but I'm not used to using it

  • Acrobat PDF Toolbar in Internet Explorer 7 Disappears

    I have the Adobe Acrobat Web PDF Converter addin on IE7 under WinXP Pro. The toolbar for the function appears normally when I am browsing in the first tab. If I open another tab for browsing, the PDF toolbar disappears. It is listed in View/Toolbars,

  • Popup window error must set parameter windowInfo

    Hi Friends, I am getting error as :- must set parameter windowInfo,when I am clicking on the link to view the Modal window. I am providing the correct window name, btu still teh error coming. any clue please.      IWDWindowInfo windowInfo = (IWDWindo