Commnication between two projects

Hi,
I am creating two projects
1. Postpaid - This will contain BPEL.
2.Adapter - This will contain Database Adapter.
In project Postpaid i am having an invoke which will call the database adapter in Adapter project.
How will i expose the database adapter created in the Adapter project.
Thanks ,
Sachin

I assume that you have in below format.
1. Postpaid - BPEL
2. DBAdapter - Mediator or BPEL
Optiion 1: Before use the DBAdapter in your Postpaid project, you have to deploy the DBAdapter component and then use the explorer window or the end point of DBAdapter to invoke it from Postpaid bpel project.
Option 2 : If you have created both the components (Postpaid and DBAdapter) in a single composite then you can use it without deploying it to server and once completing both you can deploy and test it.
Thanks,
Vijay

Similar Messages

  • Transferring a sequence between two projects crashes FCP.

    I'm getting a bizarre problem.
    I made a mistake in my project and have to go back to an autosave version.
    I can open one project no problem (the older autosave).
    When I open a second project (the current project with the mistake), I get a notice saying that "the project is from a newer version of FCP" and cannot be opened. Newer version? I just worked on it!
    So, I can't transfer the sequence from the older autosave version to the current mistake project.
    In an attempt to work around this, I tried to open the autosave project, create a whole new project, and transfer the sequence to that empty project. However, when I drag it from the autosave into the new project, I get the spinning beachball and have to force quit the program (I even waited for the autosave feature to maybe pull it out of the loop, but it didn't kick in.)
    Any ideas on this?

    Thank you for your response, but there's a little confusion here.
    I am getting an impossible message when I try to open a second project. An autosave version that is maybe 20 minutes old will not open because it says it was created in "a NEWER version of FCP and cannot be opened by the current version." Yes, that's right. It's saying that the same FCP version that created it not 20 minutes ago is now an "old" version and cannot open this project. That is chronologically impossible.
    It's like Back to the Future! "Doc! I have to tell you something about the autosave!" "No, Marty!"
    And it's not just happening with autosave. ANY second project that I try to open gets the same message. So, no two projects can be opened. I'm waiting for the time-space continuum to collapse any moment now.

  • Parametre transfer between two project

    I write first project xx which call second project yy.
    1.Hyperlink_1 properties i used, onclick "window.open('http://localhost:29080/yy/?id=111111', 'mywindow','width=900,height=1200');"
    2.Hyperlink_2 properties i used, onclick "window.open('http://localhost:29080/yy/?id=222222', 'mywindow','width=900,height=1200');"
    Second project yy will display only "id" parametre.
    My problem is;
    When i run first project xx , i click hyperlink_1 , second project yy display "id=111111" it's true and then i close second project yy windows
    and i click hyperlink_2 in first project xx , second project yy displayed "id=111111" too.
    when i closed second and first projects , for first time hyperlink click always run true. Close second window and click another hyperlink , it didn't run true.
    Where do i make mistake?

    Properly speaking this is more a JSP/Javascript question than a Creator question, and for this reason there is no simple way to do this at the IDE level.
    Basically you will have to provide another action (component of your choice) that will call window.close() for each hyperlink. But more than that, you'll either have to restart the first projects' session before executing the second hyperlinks' action handler (that opens the second popup), or run 2 sessions concurrently (if that is possible) within the same application. You will also need to trun off browser caching from code.
    Here are some links with some hints as to the issues involved:
    http://forum.java.sun.com/thread.jspa?forumID=45&threadID=469326
    http://forum.java.sun.com/thread.jspa?forumID=427&threadID=702322
    http://java.sun.com/javaee/javaserverfaces/1.1_01/docs/tlddocs/index.html

  • Sharing media between two project files

    If I have all the media in one project file, and the current sequence in another, shouldn't any changes I make to the media be reflected in both projects? Jpeg files in the media project were re-named and replaced with uprezed versions. The files in the sequence project did not change to match this - they still have their original file names, and were linked to the old files. They are still connected, as I made a copy of the media before I renamed the files. So now each project is referencing different media. Is there a way to resolve this? The only thing I can think of is to go through the timeline and replace the files one by one.
    Any advice would be much appreciated! Thanks in advance.
    (I know, I know . . . files shouldn't be renamed! I made a mistake last week - I'm already wearing the cone of shame.)
    Message was edited by: film_fish

    Oops ...
    The resolution is to "reconnect" the timeline instances with the new masterclip source media
    Select all the offline media in the timeline, then choose File menu > Reconnect Media...
    And in the Reconnect dialog press the "Locate" button, then navigate to and select the new file ... if you had/have kept the file names the same then leave "Matched Name and Reel Only" checked and let the app identify and reconnect all those offline files in the same relative path ... but if you have different names for the new source files uncheck the "Matched Name and Reel Only" option and sit yourself down for a long session of manually finding and attaching media
    Best
    Andy

  • Stock transfer between 2 projects of different plants.

    Hi All,
    We have two plants and each plant as multiple projects. Some time it is required to transfer stock between two project which are of different plants. Currently we are using MOVEMENT TYPE 415Q , where stock transfer is done using 4 steps. Our client is insisting to do it in SINGLE step.
    Please advice whether it is possible.
    Thanks,
    Vengal Rao.

    Thanks Venkat,
    For the quick reply, but here I think using 415Q in MB1B  it has more than one step, and our projects are in different plants, I mean both project are of different plants.
    Please clarify.
    Vengal Rao.

  • Merging two projects with Premiere elements 12.

    Hello,
    On my computer (windows 7) i have different directories with movie-fragments. From each directory i made a movieproject. It took a long time to trim everything. Now i have one project from 1,5 hours and another from 20 minutes. I would like to put the two projects together and then cut it into two projects. I was suprised that i could not do that. I could not copy the movie with titles in one project and copy it to the other project. Also i could not find any way to import one movie into the other. Very strange. I would think that this is a basic function the program should have.
    I found out that i can work of course with the Project Asset and import the moviefragments again, but then i have to trim everything again.
    I could also export one movie as for example AVI and then insert it with the Project Asset into the other project. But then i have no possibility to change the titles and transitions.
    Does anyone know a way to merge two projects?????
    Many thanks, Stephan

    Stephan
    You wrote
    I used it a lot when i worked with the program i used before Premiere Elements.
    Important: What version of Premiere Elements are you referring to in the above? Or, are you referring to another program that is not Premiere Elements?
    No version of Premiere Elements allows the user to open one project file (project.prel file) in another.
    You can copy/paste insert between two project files (project.prel) using ClipMate in conjunction with Premiere Elements. You cannot do a copy/paste insert between projects without ClipMate in use with Premiere Elements. The How To for this Windows Only feature is found
    http://www.atr935.blogspot.com/2013/05/pe-clipmate-copypaste-between-pe.html
    The alternative is to export your project 1 Timeline "trim" selectively to a file saved to the computer hard drive and then import that export into project 2.
    In this workflow considerations need to include project 1 export format consistent with project 2 import settings.
    So, we need details to explain the why not for
    Also i could not find any way to import one movie into the other. Very strange. I would think that this is a basic function the program should have.
    and
    I was suprised that i could not do that. I could not copy the movie with titles in one project and copy it to the other project.
    In the first part, what were your export settings from project 1 and your project preset for project 2.
    In the second part, did you use ClipMate with Premiere Elements or something else?
    What you want to do sounds very doable so we need to discover the whys to get to the solution.
    Thank you.
    ATR

  • How to join two projects?

    How do I join two 45 minute (.prel) projects?

    Portland42
    What version of Premiere Elements are you using and on what computer operating system is it running?
    For now, I will assume Premiere Elements 12/12.1 on Windows 7, 8, or 8.1 64 bit.
    You cannot import one Premiere Elements (any version) project file (project.prel) into another.
    1. Windows Only. Use ClipMate in conjunction with Premiere Elements for a copy/paste insert between
    two project files.
    ATR Premiere Elements Troubleshooting: PE: ClipMate Copy/Paste Between Projects
    2. For Windows or Mac Premiere Elements users....export the Timeline content from project 1 to an
    appropriate file saved to the computer hard drive and then import that export into the second project with
    counterpart project settings.
    If you need help regarding the project settings for "2", please do not hesitate to ask. I am a hands on user of
    Premiere Elements versions.
    Thanks.
    ATR

  • Can't Copy/Paste betweet Two Projects

    I want to copy/paste a clip (which includes 2 video and 2 audio tracks) between two projects.  I open Project 1 and copy a clip.  I open Project 2 and paste.  But the paste does not work.  The last copy I did in Project 2 (of a clip that was already in Project 2) is the only thing that pastes, not the clip that I'm bring over from Project 1.  So then I went back to Project 1 and "exported" an xml sequence which contained the clip I wanted to paste into Project 2.  The import into project 2 worked but still I could not copy/paste from the imported sequence to the target sequence in Project 2.  I didn't want to drag he new sequence imported from Project 1 into the the  sequence into Project 2  because I needed to have access to all of the original tracks.  Why doesn't a regular Windows copy/paste not work and what can I do to get the clip from Project 1 to the targeted timeline in Project 2?

    If all else fails, couldn't you always just import the original sequence you're trying to copy from? Open it and copy/paste into the sequence you really want it in?

  • How to compare between two versions of template project???

    Dear All,
    We are doing some cleanup activity in our solution manager system. For this actually we have created the replica of this project from production system to a sandbox system. We can do the cleanup of this project and can transport this new project to our production system and can move on.
    But the pbm we are facing now is, how do we bring in the data captured or added to the production system after we have copied it to the sandbox system?
    Can anybody throw in some light into this issue?
    We tried the option of creating different version for the template and using the sa_project_upgrade transaction to compare between two versions of the template using "Current Version in Project" option. Not sure whether this will work out.
    {{We thought that if we try in this way, we can find the difference between the two versions of the template project, and from there, might be we can bring in the new changes into our new project manually. We do agree that this is not the right approach.}}
    But the end result we got was like we got the information regarding where all there is the difference between the current version in the template project to that of the original(in our case it checked against BPR as we selected the scenarios from BPR for this template). But what we expected was a difference between two versions of the template.
    Pls help. Pls make a try to help. Any thoughts in this direction will help us to move forward.
    Any info will be suitably rewarded.
    best regards,
    Krishna.

    Hi Andreas,
    Thanks a lot for your immediate reply.
    I too had that doubt that my appraoch will not work. But wanted to get confirmation that it will not work. Also wanted to know about any other approach. Thank you for providing me with some alternative approach.
    I tried the option suggested by you. But while running the comparison report for the newly copied project with the option "New Version of Original", I am getting the below error. I do agree that this approach should work. But for some reason I am getting the below error. Can you pls look into the same and help me out.
    Internal error
    Message no. AI_COMPARE006
    Diagnosis
    An unexpected error has occurred in:
               program CL_SA_PROJECT_UPGRADE_ONLINE==CP
               include CL_SA_PROJECT_UPGRADE_ONLINE==CM002
               line                                                  102
    Procedure
    Restart the transaction. If the problem persists, check if a SAP note is existing for this problem. If not please send a message to the SAP hotline.
    Thanks a lot in advance.
    best regards,
    Krishna.

  • What makes my default project location to bounce between two places in FCP X?

    I wonder what makes my default project location to bounce between two places in FCP X?The project I am working on is on my local disks which are backed up (daily) to external eSATA enclosure. If I run FCP X just by clicking its icon (not a project file) in most cases it opens FCP X with a project but in event library there is not files linked.Sometimes it expands the project’s library located on backup station.
    To make active the the local version (get it expanded and access all the files related to the project, I have to: close FCP X, launch FCP X by click on a project or a library file, close FCP X again and then I can get the project and its content displayed correctly just by clicking on a FCP X icon.
    After backup is made (I use Carbon Copy Cloner to backup this volume) if I relaunch my FCP X, I have to start the procedure mentioned above all over again. What I am doing wrong?

    Munas, what you describes sounds a lot like the problem I've been experiencing.
    I have two matching external drives mounted. Drive 1 is the primary, Drive 2 is an identical back-up. Both identically formatted.
    FCPX randomly opens drive 2 when I start the program, even when I click on a sidebar link to a project on Drive 1. The clips are often, nonsensically, shown as off-line.
    I really don’t care if FCPX recognizes drive 2, in fact I wish it wouldn’t. I don’t, obviously, want to unmount Drive 2 just to use FCPX.
    My workaround for this was to rename the Final Cut Events and Final Cut Project folders “FCE” and “FCP” respectively on Drive 2, and configure my back up utility accordingly.
    Now, although Drive 2 is listed in the Events and Project Libraries on start up, FCPX doesn’t recognize any events or projects on it, and it sits there as an icon that can’t be expanded.  I can live with this until a fix comes, in fact I rather like it.
    Cheers

  • Syncing a project between two computers

    I just got a new MacBook which I use when I travel every week. I have a project that I started at home on my 24" iMac. When I'm at home I would like to continue using the iMac because of the big screen. However I would still like to work on the project when I have time on the road.
    So the question is "Is is possible to copy / sync a whole project with clips between two computers and be able to go back and forth between the computers?" I realize I might have to copy the whole file.
    Better yet is there a way to keep the project on an external drive and use iMovie on each computer to open up and work on the project.
    Thanks,
    Alan

    Yes this is possible.
    First, make sure your external drive is formatted as MacOS (journalled) or HFS+ (journalled)
    Go into iMovie and from the Project list, drag your project to the External Drive by dragging the project name to the icon for the external drive in the project list in iMovie.
    Now select File/Consolidate Media and choose Move (not copy). Everything will be consolidated to the external drive where the project is. You can open it on another Mac.
    See the iMovie Help for further details.

  • Sharing a project between two Macs?

    Is it possible to share an un-finished iMovie project between two different Macs?
    And if yes, how?
    And is it possible to share an iMovie 08' project with an iMovie 09' project?
    Thank you for your help :'D

    Hi
    I think an intermediat external hard disk
    • FireWire
    • Mac OS Extended formatted (MUST BE)
    Storing material and project on this should make it "Share-ably" but not
    in same time of-course. One at a time.
    and
    • iMovie'09 on both Macs (I would go for exactly same version no. and same regarding
    QuickTime and it's version no.)
    (Heart of iLife and FinalCut it's the real motor doing the job. iMovie is just an interface to it.)
    Yours Bengt W

  • Communication between two MVC's

    Hi.
    I want a communication between two MVC's, offcourse in one project.
    What I have:
    MainWindowView (MVC)
      |
      +--> MenuView (MVC)In my Menu MVC there is a button Logout. When this one is pressed the model had to tell the MainWIndowView that he can close.
    How can I do this?
    Statix.

    I have a solution... but I don't know if this is a neat one..
    This is my MenuModel:
              case 3:
                   MainWindowController.closeMainWindow();
                   LoginModel loginModel = new LoginModel();
                   LoginController loginController = new LoginController(loginModel);
                   break;
              ...This one communicates directly with a public static void closeMainWindow () method which disposes the view (JFrame)
         public static void closeMainWindow (){
              mvcView.dispose();
         }     Is this a solution so I stick to the MVC pattern??? I hope so... I wouldn't know another way...
    Thanks in advance!

  • Error while running code template mapping between two oracle tables

    Hello All
    Iam getting the following error while running code template mapping between two oracle tables. Using OWB 11gR2 and oracle 11gR2 DB.
    java.sql.SQLException: ORA-20001: The active workspace is not valid as a target for this mapping
    c: at "OWBSYS.WB_RT_MAPAUDIT_UTIL", line 1065
    ORA-06512: at "OWBSYS.WB_RT_MAPAUDIT_UTIL", line 1087
    ORA-06512: at "SOURCE.FILENET_EX_UNIT_3", line 555
    ORA-06512: at line 4                                        
    Job 51 error: java.sql.SQLException: ORA-20001: The active workspace is not valid as a target for this mapping
    ORA-06512: at "OWBSYS.WB_RT_MAPAUDIT_UTIL", line 1065
    ORA-06512: at "OWBSYS.WB_RT_MAPAUDIT_UTIL", line 1087
    ORA-06512: at "SOURCE.FILENET_EX_UNIT_3", line 555
    ORA-06512: at line 4
    Quick help is highly appreciated.

    Dera Dallan
    its only a target user for the workspace where you are deploying the mapping from.
    I have two repositories for two different projects. each repositary has its own workspace.
    ex:-
    Project 1
    Work space bpms_rep_owner
    Repositary owner bpms_rep_owner
    Repositary user bpms_rep_user
    Project 2
    Work space dem_rep_owner
    Repositary owner dem_rep_owner
    Repositary user dem_rep_user
    Reg
    S.Gyazuddin

  • Inserting a clip between two clips

    I'm trying to insert a clip between two clips yet still having everything from all V/A 1,2,3,4,etc. layers to move along with whatever clip is moved down the line. Everyone keep saying: Use the ctrl key! but all that does is indeed move some of it down but it cuts bits of the video in the process. I'm not sure how to solve this. I simply want to drag and drop an item between two clips and not cut or mess up any additional V layers.

    You can load a title into the Source Monitor by dragging it there from the Project Panel. But you can also use the insert command directly from the Project panel, via either the context menu or the same shortcut.
    Be aware that if the sequence has In/Out points set, then the Insert & Overwrite commands will insert the selected source into that range. This is known as 3-point or 4-point editing (depending on whether you have both in & out points set in both the source and the sequence). If In/Out points are not set in the sequence, then the source is inserted at the playhead's position in the Timeline.
    Also, source patching controls which tracks the clip is placed on. If you're not familiar with source patching, this tutorial video is worth watching.

Maybe you are looking for

  • I am having trouble with my skype and Microsoft ac...

    I signed in with MS account. I tried to change my registered mail in profile settings, it aked my password. I tried using MS account password and it said wrong password. I forgot my skype password and i tried to recover it in another browser but it t

  • How to secure firewire drive data for multi user mac ?

    I have a couple of external firewire hard drives attached to my mac which contain all my work files. My 6 yr son has started using my mac so I have set him up his own account and set up the parental controls etc. BUT - is there any way I can set thin

  • Connecting a thunderbolt to FW cable while my imac is on

    Hi everybody, I use a FW soundcard, and i know it's not really good for the FW port to connect the device while the computer is on. Now there's no FW port on Mac computers, i was wondering if it's also dangerous to plug the thunderbolt to FW adapter

  • Change Expense Report in FITV_POWL_TRIPS Application

    Hi, In my workflow, i would like to call the change expense report in FITV_POWL_TRIPS application. In FITV_POWL_TRIPS Application, it shows all the expense reports and if user wants to Change, then need to press the CHANGE button which shows in the A

  • How to get a coloured bar at the edge of a video

    Hi, I have a very funny few minutes of video of a family event that I am using for the closing moments of home movie. Unfortunately, my idiot cousin is in the background "flicking the bird to the camera" the entire time. Fortunately, she is near the