Configuration Steps: Message Determination Consignment Material

Dear friends,
I have been stuck for the past two trying to configure the message determination for consignment material. I am totally lost...! I am planning to start from scratch again. Can one of the gurus please provide me with a step by step proceedure for message determination of consignment material and what are the things I need to be aware of for the vendor setting etc.
I know I am asking a lot..but did not have an option.
Thanks,

Hi
You just need to maintain the Message Conditon record for Output type KONS - In Transaction MRM1, with one of the Key Combinations Vendor / Compnay code
All the Configuratioins are  standard only.
Run the Transaction MRKO for Consignment Settlement , the message for Output maintained will be determined here.
Thanks & Regards
Kishore

Similar Messages

  • Automotatic Message Determination:Consignment Settlement

    Friends,
    I need some help in after doing the consignment settlement process:
    After I run MRKO and settle the consignment once a month, I need to send a form to the vendor detailing the settlements done over the period of one month.
    My questions specifically are:
    1. What are the output methods for this form?
    2. I think there would be several, if so, how do I configure email,fax etc.
    3. Also, after I settle, I am trying to send the document to the local printer but I am getting the following error message
    "No messages for initial processing exist". Can someone please explain what are the places I need to check to make sure everything is configured properly.
    Thanks in advance ....
    Cheers.
    Chandu

    Pankaj-
    Thanks for your prompt reply. However this did not solve my problem. Please look at my comments below and respond:
    1. What are the output methods for this form?
    Ans: - SAP Standard output type is "KONS"
    I am using the KONS, but I am unable to see email as an option. I see simple mail, but do not see email.
    2. I think there would be several, if so, how do I configure email,fax etc.
    Ans: - Use the appropriate transmission medium in MRM1/MRM2 for KONS
    In MRM1/MRM2, I have configured my CoCode using the PI partner function with options 1(Transmission medium:Printer) and 4 (print immediately)
    3. Also, after I settle, I am trying to send the document to the local printer but I am getting the following error message
    "No messages for initial processing exist". Can someone please explain what are the places I need to check to make sure everything is configured properly.
    Ans: - Go to MR90 and here in selection screen, specify the "Processing mode" as "2" i.e. Repeat processing or "3" i.e. Error processing and then execute and print it again.
    *I tried mr90 and mr91 transactions with 1,2 and 3 options. But it still gives me the same error - No messages for first/repeat/error processing exist *

  • ERS Configuration Steps and Material

    Hello SAP Gurus,
    I am an SAP FI Consultant. In my present Project I am having an responsibility to implement ERS functionality. can any one provide me with the Configuration Steps or material related how to implement ERS.
    thanks
    vinay

    Hi
    ERS cannot be explained completely in a mail. You need to maintain ERS tick mark in Vendor master, info record.
    You need to mainatin output determination. See the below link. it will help you
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a8/b99804452b11d189430000e829fbbd/frameset.htm
    Regards
    Antony

  • SAP CIN configuration step - by- step material.

    Dear Experts,
    could you provide SAP CIN configuration step - by- step material.
    thanks & regards,
    vijay

    Hi,
    Please provide the same for me. I m also new in this.
    Thanks
    Kavita

  • Error in Message determination for GRN

    Hi Friends,
         I have tried to configure message determination for GRN. As per the steps in the thread i did. The steps i did are :
    GR print out settings
    1. Maintain the Printer Name in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    Enter the local printer where you want to print your Goods posting document
    2. Ensure that in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for Goods Receipt/GI/Transfer Posting Documents
    Here for Particular mvt type 101,201,121,311 etcu2026 Maintain the Print item as 1--Material document printout
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the following--
    Select the particular Output type then goto Details
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Printer Determination by Plant/Str Loc, Maintain the Output device for all your Plants
    7. Go to MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.
    Now the settings are ready for Printing Material doc
    8. While doing MIGO, ensure that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    9. Now depending on the setting in 5a, the Matl doc is printed. If it is 3, you have to print it using MB90. If it is 4, it is printed immediately.
    After doing this configuration, if i go and execute MB90 with output type WE03, it is telling " no messages for initial processing exist ".
    I want to see the GRN document before printing. what shall i do, kindly help me please.
    Regards,
    Prasath

    HI Manish,
       As u said, i have unchecked the tick mark in migo and i have posted it. Then i went to MB90 and tried with WE01. still it is showing the same message. Kindly resolve plz. Is there any change i have to do in above mentioned steps.
    Thanks&Regards,
    Prasath

  • Output Message Determination for Purchase Order

    Hi all !
    Can anybody please explain in brief, the procedure for Ouyput message determination for Purchase order. (including printer settings)
    I have tried it throgh the Standard Configuration guide. but i am not able to do.
    Please explain step by step including form attachment.
    Thanks in Advance !!!!

    Hi,
    Customization steps for Output of Purchase Order
    1. Condition Table
    SPRO > Material Management> Purchasing -> Message -> Output Control->Condition Tables->Define Condition Table for Purchase Order
    Select:
    Purchasing Doc. Type,
    Purch. Organization,
    Vendor
    2. Access Sequences
    SPRO -> Material Management-> Purchasing -> Message -> Output Control->Access Sequences->Define Condition Table for Purchase Order
    3. Message Type
    SPRO -> Material Management-> Purchasing -> Message -> Output Control->Message Types->Define Message Type for Purchase Order
    4. Message Determination Schemas
    4.1. Message Determination Schemas
    SPRO -> Material Management-> Purchasing -> Message -> Output Control->Message Schema->Define Message Schema for Purchase Order-> Maintain Message Determination Schema
    4.2. Assign Schema to Purchase Order
    SPRO -> Material Management-> Purchasing -> Message -> Output Control->Message Schema->Define Message Schema for Purchase Order-> Assign Schema to Purchase Order
    5. Partner Roles per Message Type
    SPRO -> Material Management-> Purchasing -> Message -> Output Control-> Partner Roles per Message Type ->Define Partner Role for Purchase Order
    6. Condition Record
    Navigation Path: SAP Menu-> Logistics -> Material Management -> Purchasing-> Master data->Messages-> Purchase Order-> MN04-> Create
    Now you create PO (ME21N) and save it. Go to ME22N and print the PO by giving output type.
    Note1
    Now Check in SPAD (Printer settings) settings & try to check the printer configuration. Check Device attributes, Access methods etc. are maintained in Spool Administration (SPAD) for the selected printer (your local Printer, may be ur using HP01or any but in SAP std is LP01) but consult with your basis consultant regarding above.
    Check the following also:
    Spool generated using SP01 or SP02.
    Output device.
    Local printer settings.
    Paper Tray, Print Mode, Printer
    Note2:
    Check MN04 and NACE t.codes
    Regards,
    Biju K

  • Is any  SD/MM Configuration step by step procedure available in the market?

    Dear fellow SDN's,
    Please give me a guide on
    1. Where to start SD learning?
    2. How to proceed to become a strong SD consultant.
    3. Is any SD/MM configuration procedure pdf / Document available in the market?
    I have an ECC 6.0 remote connectivity.
    Your valuable advice appreciated and allow to earn good credit.
    Thanks in advance.
    Regards.

    HI Stockton,
    1. Try to start with the Basic Concepts of SD which are given Below:
    SD FLOW/ OVERVIEW:
    Sales
    Inquiry - A customer’s request to a company that they provide a quotation or sales information without obligation. An inquiry can relate to materials or services, conditions and if necessary delivery dates. The sales area that accepts the inquiry becomes responsible for further processing.
    Quotation - A quotation presents the customer with a legally binding offer for delivering a product or providing a service within certain fixed conditions. This offer is legally binding for the company within a specified time period. A sales area can reply to a customer inquiry with a customer quotation or use it to refer to a business partner contact.
    Sales Order - Request from a customer to a company to deliver a defined quantity of products or provide a service at a certain time.
    The sales area that accepts the inquiry is responsible for completing the agreement.
    Create Delivery:a. Picking - The picking process involves taking goods from a storage location and staging the right quantity in a picking area where the goods will be prepared for shipping.
    b. Packing - Packing is part of delivery- and shipment processing. When you process a delivery, you can select delivery items for packing and assign them to handling units (HUs).
    c. Goods Issue - As soon as the goods leave the company, the shipping business activity is finished. This is illustrated using goods issue for outbound deliveries.
    Billing - Billing represents the final processing stage for a business transaction in Sales and Distribution. Information on billing is available at every stage of order processing and delivery processing.
    Sales Order Management Transactions
    SALES ORDER PROCESSING
    Creating Sales Order - VA01
    Maintaining a Sales Order - VA02
    Displaying a Sales Order - VA03
    Releasing an Order or Delivery from Credit Hold: Non-Flooring - VKM1
    Display List of RMAs by Customer - VA05
    Confirm RMA Goods Receipt - VL02
    Generate list of open return orders for deletion - VA05
    Display Customer returns eligibility - MCSI
    Removing a Billing Block (Approving Credit/Debit Requests) - V.23
    PRICING MASTER DATA
    Create Pricing - VK11
    Creating a Sales Deal - VB21
    Maintaining a Sales Deal - VB22
    Displaying a Sales Deal - VB23
    Maintaining Prices - VK12
    Displaying Prices - VK13
    MATERIAL MASTER DATA
    Creating Material Substitution Master Data - VB11
    Maintaining/Deleting Material Substitution Master Data - VB12
    Displaying Material Substitution Master Data - VB13
    Creating a Bundled Master - MM01
    Creating a Sales BOM - CS01
    Maintaining a Sales BOM - CS02
    Displaying a Sales BOM - CS03
    CUSTOMER MASTER DATA
    Creating Partner Records - XD01
    Maintaining Customer Master Data - XD02
    Displaying Customer Master Data - XD03
    Deactivating a Partner - VD06
    CUSTOMER CREDIT INFO
    Creating/Maintaining New Customer Credit Information - FD32
    Displaying Customer Credit Information - FD33
    Blocking or Unblocking a Customer - VD05
    SHIPPING
    Creating a Delivery - VL01N
    Displaying a Delivery - VL03N
    Changing a Delivery - VL02N
    Shipment Inquiry / Display - VT03
    Adjusting Transfer Order - Confirmation Quantity - LT12
    Collectively Confirm Transfer Order - LT25
    Batch Shipment Confirmation - VL19
    PGI Reversal Cancellation - VL09
    Creating Service Provider/Carrier Master Data - XK01
    Maintaining Serive Provider/Carrier Master Data - XK02
    Displaying Service Provider/Carrier Master Data - XK03
    Maintaining Product Master/Serial # Profile/Unit of Measure/Shipping Unit - MM02
    IDoc Inquiry - WE02 / WE05
    BILLING
    Invoicing a Customer Shipment - VF01
    Reprinting an Invoice - VF31
    Releasing a Sales Order for Billing - V.23
    Creating an Invoice by Using the Billing Due List - VF04
    Checking Open Billing Documents - VF05
    Create Credit/Debit Memo - FB01
    A/R
    Controlling Total Debit/Credit bkgs - F.03
    Generate FI Account balance - F.08
    Generate Month-to-date Inv. register - F.02
    Process payments - FBZ1
    Rqst Individual Customer Corresp. - FB12
    Generate Customer Correspondence - F.61
    Enter Batch totals under Control ttl - FB07
    Display G/L Acct. totals - FBL3N
    Reverse Posted Amounts - FB08
    Customer Refunds - FBL6
    Customer Refund to other than Payer - FB05
    Clearing Debit/Credit on Cust. acct. - FB1D
    Customer Balance in Local Currency - F.23
    G/L Account Balance Report - F.08
    Create Invoice - legal entity adjust - FB01
    Generate Cust. Acct. statements - F.27
    Generate Dunning Letters - F150
    Generate Billing Due List - VF04
    Generate Blocked Billing Doc list - VFX3
    Inq. via Credit Release Screen - VKM1
    List orders by partner - VA05
    Past Due invoices by customer - FD11
    Check number info by G/L account - FBL3N
    Display customer Line items - FBL5N
    SD Configuration:
    Enterprise Structure:
    1. Maintaining Sales Organization
    Sales Organization is an organizational unit responsible for the sale of certain products or services.
    IMG -> Enterprise Structure -> Definition -> Sales and Distribution -> Define, copy, delete, check Sales organization
    2. Assigning Sales Organization to Company Code
    This assignment ensures all the sales made through this Sales Organization are accounted for in the assigned Company Code (Company Code is created by FI Consultant).
    IMG -> Enterprise Structure -> Assignment -> Sales and Distribution -> Assign Sales Organziation to Company Code
    3. Maintaining Distribution Channel
    Distribution Channel is the way, in which Products or Services reach Customers.
    IMG -> Enterprise Structure -> Definition -> Sales and Distribution -> Define, copy, delete, check distribution channel
    4. Assigning Distribution Channel to Sales Organization
    This assignment ensures, a Sales Organization can supply Materials to Customers through this Distribution Channel.
    IMG -> Enterprise Structure -> Assignment -> Sales and Distribution > Assign distribution channel to sales organization
    5. Maintaining Division
    Division is a way of grouping materials, products, or services.
    IMG -> Enterprise Structure -> Definition -> Logistics - General -> Define, copy, delete, check division
    6. Assigning Division to Sales Organization
    IMG -> Enterprise Structure -> Assignment -> Sales and Distribution -> Assign division to sales organization
    7. Setting up Sales Area
    All the sales are made from a particular sales Area. For creating a Sales Order Sales Area is compulsory.
    IMG ->Enterprise Structure -> Assignment -> Sales and Distribution -> Set up sales area
    8. Assigning Sales Organization- Distribution Channel- Plant
    Plant is created ny MM Consultant.
    IMG -> Enterprise Structure -> Assignment -> Sales and Distribution -> Assign sales organization - distribution channel - plant
    9. Define Shipping Points
    Shipping Point is the Organizational element, which is responsible for shipping the Materials to the Customers.
    IMG -> Enterprise Structure -> Definition -> Logistics Execution -> Define, copy, delete, check shipping point
    10 Assigning Shipping Point to Plant
    This assignment ensures that goods from different Plant can be dispatched from different Shipping Points.
    IMG -> Enterprise Structure -> Assignment -> Logistics Execution -> Assign shipping point to plant
    Note: Ensure to do the undermentioned configuration also though it is not in Customizing node of Enterprise Structure.
    11. Defining Common Distribution Channels for Master Data
    Use
    The purpose of this activity is to define distribution channels which have common master data..
    Procedure
    Access the activity using one of the following navigation options:
    IMG Menu -> Sales and Distribution -> Master Data -> Define Common Distribution Channels
    Transaction Code: VOR1
    12. Defining Common Divisions for Master DataUse
    The purpose of this activity is to define distribution channels which have common master data..
    Procedure
    Access the activity using one of the following navigation options:
    IMG Menu -> Sales and Distribution -> Master Data -> Define Common Division
    Transaction Code: VOR2
    Pricing Procedure
    In SD, Pricing Procedure is determined based on Sales Area (Sales Organization + Distribution Centre + Division) + Customer Pricing Procedure + Document Pricing Procedure. Sales Area is determined in Sales Order Header Level. Customer Pricing Procedure is determined from Customer Master. Document Pricing Procedure is determined from Sales Document Type / Billing Type (if configured). Once the pricing procedure is determined, Condition records are fetched. If appropriate condition records are found, the price is determined. If Mandatory pricing condition is missing, system will through an error message.
    In SD, the steps to configure Pricing procedure are as under:
    Step 1:
    Condition table: If existing condition table meets the requirement, we need not create a new condition table. Considering the requirement for new condition table, the configuration will be done in spro as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Condition Table (select the required fields combination, which will store condition record).
    Step 2:
    Access Sequence: If existing access sequence meets the requirement, we need not create a new access sequence. Considering the requirement for new sequence, the configuration will be done in spro as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Access Sequence (Access sequence is made up of Accesses (Tables) & the order of priority in which it is to be accessed. Here we assign the condition table to access sequence.
    Step 3:
    Condition Type: If existing condition type meets the requirement, we need not create a new condition type. Considering the requirement for new condition type, the configuration will be done in spro as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Condition Type. It is always recommended to copy an existing similar condition type & make the neccessary changes. Here we assign Access sequence to Condition type.
    Step 4:
    a. Pricing Procedure: It is recommended to copy a similar pricing procedure & make the neccesary changes in new pricing procedure. Pricing Procedure is a set of condition type & arranged in the sequence in which it has to perform the calculation. Considering the requirement for new Pricing Procedure, the configuration will be done in spro as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Pricing Procedure --> Maintain Pricing Procedure.
    b. Pricing Procedure: After maintaining the pricing procedure the next step will be determination of pricing procedure. Configuration for determining pricing procedure in SPRO is as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Pricing Procedure --> Determine Pricing Procedure.
    5. Condition record: Condition record is a master data, which is required to be maintained by Core team / person responsible from the client. During new implementation, the condition records can be uploaded using tools like SCAT, LSMW, etc.
    Normal Sales Order Cycle:-
    Step 1: Sales Document Type
    IMG > Sales and Distribution > Sales > Sales Documents >
    Sales Document Header:
    1. Sales Document Type:The sales document types represent the different business transactions, such as Inquiry, Quotation, Sales Order, etc. To create new sales order type, always copy as with reference to similar sales order. If possible use standard sales order.
    2. Define Number Ranges For Sales Documents: Maintain number range with discussion with core team.
    3. Assign Sales Area To Sales Document Types:
    A. Combine sales organizations / Combine distribution channels / Combine divisions: Ensure to maintain these, else Sales Order creation will give error.
    B. Assign sales order types permitted for sales areas: Assign only required Sales Order Types to required Sales Area. This will minimize selection of Sales Order Type as per sales area.
    Sales Document Item:
    1. Define Item Categories: If possible use Standard Item Category. Incase if required to create new, copy as from standard & maintain New.
    2. Assign Item Categories: If possible, use standard. Formula for deriving item category: Sales Document Type + Item Category Group + Usage + Higher Level Item Category = Item Category
    Schedule Line:
    1. Define Schedule Line Categories: If possible use Standard Schedule Lines. Incase if required to create new, copy as from standard & maintain New.
    2. Assign Schedule Line Categories: If possible, use standard. Formula for deriving Schedule Line: Item Category + MRP Type / No MRP Type.
    Step 2:
    IMG > Logistic Execution > Shipping > Deliveries >
    1. Define Delivery Types: If possible use Standard Delivery Type. Incase if required to create new, copy as from standard & maintain New.
    2. Define Item Categories for Deliveries: If possible use Standard Item Categories for Delivery Type. Incase if required to create new, copy as from standard & maintain New.
    3. Define Number Ranges for Deliveries: Ensure to maintain number range.
    Step 3:
    IMG > Sales and Distribution > Billing >
    1. Define Billing Types: If possible use Standard Billing Type. Incase if required to create new, copy as from standard & maintain New.
    2. Define Number Range For Billing Documents: Ensure to maintain number range.
    3. Maintain Copying Control For Billing Documents: Maintain relevant copy controls such as Sales Order to Billing, Deliver to Billing, etc.
    he configuration differs from scenario to scenario & requirement of the client.
    Interesting &important link to learn much more about configuration & business process is as under:
    Link: http://help.sap.com/
    Path: SAP Best Practices --> Baseline Packages --> Based on SAP ECC 5.00 --> Select Country: for eg, Localized for India --> Technical Information --> Building Blocks --> Select Country for eg, India --> List of Basic Configuration & scenarios will be listed.
    Select the required basic configuration / scenario. These will consist of overview, configuration guide, business process, master data &so on.
    SD FLOW
    SD Flow Cycle:
    INQUIRY ( VA11)
    |
    QUOTATION (VA21)
    |
    PURCHASE ORDER (ME21)
    |
    ORDER CONFIRMATION (VA01)
    |
    PICKING LIST – (VL36)
    |
    PACKING LIST - (VL02, VL01)
    |
    SHIPPING – (VT01)
    |
    INVOICE – (VF21, VF01)
    |
    AR
    2.Hope aware that SAP- SD itself the Big one.try to Explore the various Scenarios in SD and be Stong in Some Areas like Pricing, Intercompany Billing, Third Party Sales, LSWM, EDI Etc.,
    3.The link between SD and MM: -
    1. When you create sales order in SD, all the details of the items are copied from Material master of MM.
    2. MRP and availability check related data is also taken from MM although you control this data in SD also.
    3. While you create inbound/outbound delivery with reference to a sales order, the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.
    4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.
    There are many such links between SD and MM.
    SD INTEGRATON WITH MM
    1a. Looking at MM and SD interaction first, take the scenario of a third party order process. This process uses a purchase order (which is sent to your vendor). Also invoice verification is used further along the process to check that the invoice you send to your customer is the same material and quantity as that which the vendor sends to you (but obviously shipped
    directly to your customer).
    1b. Billing is an SD function. But SAP needs to know, when processing a customer's payment, to which GL account the payment has to be processed. For instance payment of a UK based material would be placed in a different GL account to that of a non-UK based material. Furthermore, a UK based customer may have a different GL account to that of an Export customer. This is configured in Account Determination.
    2. ABAPers are there to essential do some bespoke development. Your integration, or interaction, with them would be when specifying the tables, fields, input fields, a simple process explanation, data mapping (if doing an interface from one system to another) etc. *-- Shahee
    The link between SD and MM :-
    1. When you create sales order in SD, all the details of the items are copied from Material master of MM.
    2. MRP and availability check related data is also taken from MM although you control this data in SD also.
    3. While you create inbound/outbound delivery with reference to a sales order, the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.
    4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.
    There are many such links between SD and MM
    In Pricing we would want to determine the cost of the product
    thru VPRS Condition Type. This cost of the material is
    picked from the Material Master. How this happens is, if
    we would want to determine this cost VPRS in the Sales Order
    for Profitability purpose then , all those Item categories
    that can appear in a sales order must be activated for
    Determine Cost Check box in customizing. That’s one of the SD
    MM Integration.
    Please go through the below Link,
    http://sap-img.com/sap-sd/link-between-sap-sd-mm-and-fi.htm
    Hope Clarifies your doubts and Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Error in Message Determination of GRN

    Hello Seniors,
    I have done configuation of message determination for GRN by this
    1. Maintain the Printer Name in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    2. Ensured in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for GI/Transfer Posting Documents
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the foll:
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Pr Det by Pl/StoLoc, maintain the Output device for all your Plants
    7. In MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.(Condition records)
    8. While doing MIGO, ensured that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    Now go to MB90 enter the output type as WE01, Tr m as 1, Sort or. 01, Pro.mode as 01, and executed. System outputted all the material documents that has to be taken print out.
    BUt after this i did a grn and tried to take prinout in MB90, it is not showing. It is just telling " No messages exist for intial processing". I tried with 2 in processing mode, but still it is showing tha same. Kindly solve please.
    Regards,
    JanaMM

    Not this one the earlier one...
    Also did you check whether the GR is properly saved or not...and settigns are done properly or not..which you have given above...
    This is not smart form error...assign the smart form again...
    ADDED:
    Also in the above step ie:
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for GI/Transfer Posting Documents
    Here you shd provide print indicator for GR doc....
    Here add for Particular mvt type 101,201,121,311 etcu2026 Maintain the Print item as 1--Material document printout

  • ECC 600 - Cost Estimates for Consigned Material

    We are in ECC 600and planning to implement Consigned Inventory in short time. However I am stuck with Inventory revaluation for consigned material.
    Consingment Flow: Vendor ship these items against standard PO at zero price. At the consumption pricing is captured from Purchase info records.
    Material valuation: We are using valuation variant 001 Planned valuation - mat. with
    <b> Primary Strategy Sequence            </b>
    Planned Price 1             
    Valuation Price 1 Based On Co
    Price from Purchasing Info Re
    Sub-Strategy Sequence with Purchasing : Strategy Sequence                 
    Purchase Order Price via Condition
    Gross Purchase Order Price        
    Effective Price from Purchase Order
    However when I try create cost estimate I am getting following error,
    " No price could be determined for material/batch <......>/ plant <..> "
    Any suggestions.
    Thanks
    Uday

    Thanks for the quick response. I did maintain Purchasing info record using ME12. We do see pricing information at the time Production order backflsh. However contract and PO has no pricing information. Therefore initial GR is created with zero price. However at the time consumption against prod order, consignment material gets price from the Purchase info record. Bur consumption documents are not linked back to PO.When I try to cost these material using CK11N, SAP gives following messages,
    Msg.typ Material Plnt Area MsgNo Message Text
    I 1000 CK 037 Lot size 1 EA taken from costing view
    I 1000 CK 776 No valid source of supply found for material plant 1000
    E 1000 CK 465 No price could be determined for material/batch / plant 1000
    I 1000 CK 361 Value of costing item 00001 in itemization is 0
    E 1000 CK 240 Cost component split costed with value of zero
    Any clue.
    Thanks,
    uday

  • IS Auto configuration Steps

    Do any one is having IS auto configuartion steps document/ BBPs convering below heads.
    Materials Management
    u2022     Purchasing and Inventory Management
         Procurement of direct input material ( Stock /Non-stock material)
         Procurement of indirect input material (Stock /Non-stock material)
         Procurement of services
         Text purchase requisition-POu2014GR-IV
         Service PR ( Item category=D)--PO-Service entry sheet----IV
         Procurement of assets
         Procurement of an asset from  imports vendor
         Procurement of an asset from domestic vendor
         Procurement of imports material
         Direct receipt of material ( Movement type 101)
         Receipt of material from customs warehouse
         Procurement of imports material from a first stage dealer/second stage dealer
         Procurement from a first stage/second stage dealer
         Request for Quotations
    u2022     Preparation of Quotations
    u2022     Comparisons of Quotations
         Creation of Purchase Requisitions
         Approval process for Purchasing Documents
         Workflow for Purchase Requisition Approval
         Scheduling Agreements
         Scheduling Agreement
         Scheduling Agreement with ERS, JIT & Retroactive Billing
         Scheduling Agreement processing with Spare parts and Warehouse Management
         Scheduling with Invoices and Tracing with Batches
         Scheduling with Invoices and Tracing with Serial Numbers
         Subcontracting
         Planned subcontracting ( from storage location to subcontractor)
         Unplanned subcontracting / Operation subcontracting ( from production order)
         Third party subcontracting
         Subcontracting with more than one BOM for different vendors
         Subcontracting via SD delivery
         Subsequent adjustments at subcontractor
         Stock transfer
         Interplant stock transfer
         Inter-company stock transfer (Cross company purchasing)
         Transfer of asset from one plant to other plant
         Stock transfer with pattern cost to be loaded on material
         Procurement of consignment material
         Handling Returnable Transport Packaging
         Procurement of Pipeline material
         Source Determination
         Stock Determination
         Third party purchasing (Non-deductible tax code processing in purchasing)
         Rejection handling
         Goods receipt stage rejection
         Line rejection
         Rejection of material due to the fault of original parts supplier
         Goods receipt of customer supplied material/ other non-valuated material
         Material  tracking at subcontractor
         Goods issue
         Goods issue to a production order
         Goods issue against a reservation
         Goods issue against movement type 351
         Physical inventory
         Transfer Posting from Material to Material
         Quota arrangement/ Share of business
         Over delivery/ Under delivery material processing with excise implications
    u2022     Invoice Verification
         Invoice verification for Goods/Service item
         Invoice verification for planned delivery cost
         Invoice verification for dealer
         Credit memo processing
         Subsequent Debit/Credit processing
         Evaluated Receipt Settlement
         GR/IR clearing account maintenance
         Consignment and pipeline settlements
         Invoicing plan settlement
    u2022     Vendor Evaluation
         Maintain vendor evaluation
         Compare evaluations and ranking lists
    u2022     Material Valuation
         Changing material prices
         Material valuation using MAP/Standard price
    u2022     Excise Transactions
         Capture and post excise invoice for raw material
         Capture and post excise invoice for capital material
         Capture and post excise for a dealer
         Capture and post excise for CVD, ECESS and additional customs duty
         Capture and post excise for stock transport excise invoice
         Creating challans for subcontracting
         Reconcile challans for subcontracting
         Print RG23 part II for raw material/ capital goods
         Cenvat utilization
    u2022     Purchasing Information System
         Purchasing values/frequencies for a period for a material/service/buyer/vendor/material group
         On time delivery and quantity reliability for a material
         Material valuation report for a period
         Stock in transit
         Plant / storage location level stock overview
         Inventory turnover
         List of slow moving/ non moving goods
         Order price history
         List of open purchasing documents
    Good rewards for helpful inputs

    First thanks For reply. But I ahve already downloaded the suggested BBPs. It is not covering some of the satting say
         Scheduling Agreements
         Scheduling Agreement
         Scheduling Agreement with ERS, JIT & Retroactive Billing
         Scheduling Agreement processing with Spare parts and Warehouse Management
         Scheduling with Invoices and Tracing with Batches
         Scheduling with Invoices and Tracing with Serial Numbers
         Subcontracting
         Planned subcontracting ( from storage location to subcontractor)
         Unplanned subcontracting / Operation subcontracting ( from production order)
         Third party subcontracting
         Subcontracting with more than one BOM for different vendors
         Subcontracting via SD delivery
         Subsequent adjustments at subcontractor
         Stock transfer
         Interplant stock transfer
         Inter-company stock transfer (Cross company purchasing)
         Transfer of asset from one plant to other plant
         Stock transfer with pattern cost to be loaded on material
         Procurement of consignment material
         Handling Returnable Transport Packaging
         Procurement of Pipeline material
         Source Determination
         Stock Determination
         Third party purchasing (Non-deductible tax code processing in purchasing)
         Rejection handling
         Goods receipt stage rejection
         Line rejection
         Rejection of material due to the fault of original parts supplier
    Can you help me on this

  • Give me the Configuration steps  for intercompany billing and third party s

    Hi Gurus,
    Give me  the Configuration steps  for intercompany billing and third party sales and give me a brief description with examples.
    Regards,
    YSR

    Dear YSR
    Check the links
    [Cross Company Configuration|http://help.sap.com/bp_bblibrary/500/Documentation/J62_BB_ConfigGuide_EN_DE.doc]
    [Third Party Without Shipping Notification|http://help.sap.com/bestpractices/BBLibrary/html/J55_ThirdPartyWOSN_EN_US.htm]
    Third party order processing is as follows:
    Assume three companies X, Y and Z
    X - The company,
    y - The customer
    Z - Vendor
    When ever X gets a PO from Y to supply some goods, X has an option of either manufacturing those goods or procuring those goods.
    If he is procuring the goods, there are two methods that are generally followed:
    Method 1)
    After receiving the PO from Y, X creates a sales order against Y.
    Now at the same time he also creates a PO to a vendor Z to produce the goods
    Z produces the goods and supplies to X
    X receives the goods from Z
    Then X delivers the same goods to Y.
    After that X invoices Y and Z invoices X.
    Note : Here there is no direct/ Indirect relation between Z and Y.
    This process is known as Trading Process. and the Material here is created  with Material type HAWA.
    The other method is a Third party order processing method:
    Here the glaring difference is that instead of Z supplying the material to X and X in turn supplying the same material to Y.
    X authorizes Z to supply the material to Y on his behalf and notify him once the delivery is complete.
    Now Z supplies the material to Y and acknowledges the same to X.
    Z  will send a copy of delivery acknowledgement and invoice to X.
    After receiving the delivery confirmation and invoice from Z, X has to verify the invoice and this process is known as invoice verification and is done in SAP through Tcode MIRO.
    The next step for X  is to create an invoice and submit to Y
    Only after the invoice verification document is posted  then only X can create an invoice for Y.
    This is the business flow that is followed for third party order configuration.
    There are few steps that have to be configured to enable the system to function as mentioned above.
    Step1)
    If you are always followwing a third party process for a material then you have to create the material using item category group BANS.
    The procument type should be marked as External procurement (F) in MRP 2 view of the material master record.
    if you are not always allowing third party order processing then u can create a material master record with item category group as NORM and the procurement type should be marked as ( X) meaning both types of procurment ( in house manufacturing and external procurement).
    Step 2)
    the item category in the order should be manually changed as TAS.
    For that you need to confugure the item category determination
    ord type + item cat grp + usge + Hiv level = Item cat + Manual item cat
    OR + NORM +      +       = TAN . + TAS
    OR + BANS +       +       = TAS
    Step 3)
    make sure that during the item category configuration for TAS  you need to mark relevnat for billing indicator as F
    Step 4)
    The schedule line cateogry for this type should be CS.
    make sure that you mark  subsequent type as NB - purchase requisition  in this schedule line category as this will trigger the purchase requision order immediately after the creation of the sales order and the PO to vendor is created against this purchase requiesion.
    thanks
    G. Lakshmipathi

  • Risk Mgmnt COnfiguration steps

    Hello Friends
    Can anyone please tell me the complete steps to configure "Risk Management " with LoC (Letter of Credit) & what is the necessary data to be collected from the business, for configuring the same.
    Regards
    Sumanth.Gururaj

    Hi,
    The configuration steps for risk management
    How To Do Configuration For Credit Management
    Credit and risk management takes place in the credit control area. According to your corporate requirements, you can implement credit management that is centralized, decentralized, or somewhere in between. 
    An organizational unit that represents the area where customer credit is awarded and monitored.   This organizational unit can either be a single or several company codes, if credit control is performed across several company codes. One credit control area contains credit control information for each customer.
    For example, if your credit management is centralized, you can define one credit control area for all of your company codes. 
    If, on the other hand, your credit policy requires decentralized credit management, you can define credit control areas for each company code or each group of company codes. 
    Credit limits and credit exposure are managed at both credit control area and customer level.  You set up credit control areas and other data related to credit management in Customizing for Financial Accounting. The implementation guide is under Enterprise Structure -> Definition or Assignment -> Financial Accounting and then Maintain credit control area. You assign customers to specific credit control areas and specify the appropriate credit limits in the customer master record.
    Settings for determining the credit control area of a document.  The settings of items 1 - 4 are taken into account according to their priority.  The credit control area found is stored in field VBAK-KKBER.
    1. Transaction OB38
       Check which credit control area is assigned to the company code.
       Company code:
       Credit control area:
    2. Transaction OVFL
       Check which credit control area is assigned to the sales area.
       Sales area:
       Credit control area:
    3. Transaction XD02 or VD02
       Check which credit control area is assigned to the payer.
       Payer:
       Credit control area:
    4. Transaction SE37
       Is user exit EXIT_SAPV45K_001 being used?
    5. Transaction OBZK
       For the settings under items 2 - 4, field "All company codes" must be marked in Transaction
    OB45, or the credit control area must be entered under the relevant company code in table T001CM of the credit control areas allowed.
    Company code:
    Credit control areas allowed:
    6. Settings for the credit checks
    7. Transaction OVAK
       Which settings do exist for the sales document type used?
       Sales document:
    Check credit:
    Credit group:
    8. Transaction OVAD
       Which settings do exist for the delivery type used?
    Delivery type:
    Credit group for delivery:
    Credit group for goods issue:
    9. Transaction OB01
       Credit management/Change risk category
       Definition of the risk category for each credit control area. This risk category can be assigned to a credit account by using Transaction FD32.
    10. Transaction OVA8
        Here, the individual credit checks for key fields
        o credit control area
        o risk category
        o credit group are set. Take these key fields from the above settings and go to the detail screen. In particular, check whether fields "Reaction" and "Status/block" are set correctly. To carry out follow-up actions in case of a credit block, the credit check status must be set (field "Status/block").
    11. Transaction FD32
        Credit master data for the payer of the relevant document.
        Credit account:
        Credit limit:
        Risk category:
        Currency:
    12. Settings for updating the credit values Update of the credit values is required for the limit check (static or dynamic credit limit check).
    13. Transaction OVA7
        Update of the credit value is active for the corresponding item type if the check box is marked. This field corresponds to 
        field "Active receivable" in Transaction VOV7.
    Item type: 
    Active receivable:
    14. Transaction V/08, Pricing
        In the pricing procedure used for pricing, subtotal "A" must be entered in a line for determining the credit value (mark the pricing procedure and doubleclick on "Control").
    Usually, the net value plus taxes is used. This way the system is determined to use this subtotal for credit pricing. The credit price is stored in field VBAP-CMPRE and used for update and credit check.
    You can find the used pricing procedure of the order under "Item -> Condition -> Analysis".
    Pricing procedure:
    Line with subtotal = 'A':
    15. Transaction OB45
        Which update group (field "Update") do you use in the relevant credit control area? The default setting is "12". If you use another update group, check whether this is fine with you. If you open an OSS message, please tell us the alternative update group.
    Credit control area:
    Update:
    16. Transaction OMO1
        Which kind of update did you choose for structure S066? 
         In any case, "Synchronous update (1)" has to be chosen as the kind of update.  All other settings will lead to errors.
    Credit Management Reports
    The following table provides an overview of all the reports that are available for credit management:
    Program     Function
    RFDKLI10     Customers with Missing Credit Data
    Checks whether the data regarding credit limits is complete and issues relevant error lists. These enable you to maintain the relevant definitions either manually or with batch input.
    RFDKLI20     Reset Credit Limit for Customers
    Resets the credit limit information in the control areas.
    RFDKLI30     Credit Limit Overview
    Lists the central and control area data for each customer.
    RFDKLI40     Credit Overview
    Provides a comprehensive overview of the customeru2019s credit situation.
    RFDKLI41     Credit Master Sheet
    Displays and prints the customer master data for an individual account that is needed for credit management.
    RFDKLI42     Early Warning List
    Displays and prints customers in Credit Management who have been listed by the credit check as critical.
    RFDKLI50     Credit Limit Data Mass Change
    Changes all the credit management master data together.
    RFDKLIAB     Display Changes to Credit Management
    Displays the changes to credit management master data for all accounts.
    RVKRED06     Check Blocked Credit Documents
    Checks all the documents blocked for credit reasons. The report is started in the background and should run after the incoming payments programs.
    RVKRED77     Reorganize SD Credit Data
    Reorganizes open credit, delivery and billing values. It can be used in the event of an update error, for example.
    RVKRED08     Checking sales documents which reach the credit horizon
    Rechecks all sales documents that fall within the credit limit horizon of the dynamic credit limit check. The report is run at regular intervals and should be run at the start of each period. The system uses the current date and the period split for the open order values to propose the u2018next credit check dateu2019.
    RVKRED09     Check Credit Documentation Background
    Checks released documents whose validity period of the release has been exceeded (number of days).
    RVKRED88     Simulating Reorganization of SD Credit Data
    To run a report:
    1.     Choose System ® Services ® Reporting.
    2.     Enter the name of the report.
    3.     Choose Program ® Execute.
    4.     Enter your selection criteria.
    5.     Choose Program ® Execute or Program ® Execute and print.
    SAP SD Credit Management Tcodes
    All business have their own credit management needs, SAP allows you to specify your own automatic credit checks based on a variety of criteria.  You can also specify at which critical points in the sales and distribution cycle the system carries out these checks.
    SM30 - Table/View
    u2022     V_TVTW - Define Distribution Channel
    u2022     V_TVTA_KKB - Assign sales area to credit control area
    u2022     V_T014 - FI - Define Credit Control Area
    u2022     T001CM - FI - Assign Permitted Credit Control Area to company code
    OVXG - Set up Sales Areas
    e.g.  Sales Organization
                      Distribution Channel
                                  Division
                      Distribution Channel
                                  Division
    FD32 - Customer Credit Management
    OVAK - Define credit limit check by sales document type
    u2022     Check Credit
    o     A - Credit limit check and warning message
    o     B - Credit limit check and error message (no sales order can    be created)
    o     C - Credit limit check and delivery block (block delivery if hit   credit limit)
         Options B and C -> used for checking open order values (when you create/change the sales order)
    o     D - Automatic credit control with open order values
         More control in transaction OVA8 - Automatic credit control
         You check for open orders and deliveries, or just open deliveries.
         or open order values with other options
    u2022     Credit group
    o     Allows you to combine different sales document types for the credit limit check
    VKM1 - Blocked SD Documents - Finance have to released the delivery block
    OVAD - Define credit limit check by delivery order
    u2022     whether the automatic credit check occurs at the time of delivery creation and/or goods issue
    OVA7 - Define credit limit check by item category
    u2022     Set whether to include/exclude item category for credit limit check
    OVA6 - Define credit group. You can groups together different business transactions which should be dealt with in the same manner with regard to the credit check.
    You enter the credit groups when you configure the sales document types for credit management and define the (D - automatic credit check).
    u2022     SAP default credit groups
    o     01 - credit group for sales order
    o     02 - credit group for delivery
    o     03 - credit group for goods issue
    OVA8 - Automatic credit control - Double click on the line items
    You can have the followings credit limit check :-
    u2022     Static
    Depends on the customer total value of open orders, deliveries, billing documents and open items.
    u2022     Open items
    No of days open
    Overdue open items checks is based on the ratio of open items that are overdue by a certain number of days.
    Max open items %
    The customer balance must not exceed a certain percentage.
    u2022     Oldest open items
    If you don't want to deliver to the customer at all when even only 1 invoice is overdue.
    Tick the Check for Oldest Open Item and Set the field Days oldest item = 1.
    Dayu2019s oldest item
    No of days allowed for overdue or payment terms.
    Use of the credit checks Oldest Open Item. If a user attempts to alter the order quantity of a released sales document
    that was previously blocked, it would be re-blocked again by the system.  The system only re-blocks the sales document if the new order quantity is above a certain % amount.
    u2022     Released documents are still unchecked
    The preset % is whatever you want to set it as when configuring your automatic credit processing. You enter a deviation % and number of days,eg, you can set it so that an order can be changed by up to 10% within 30 days of original order entry date without it going back on credit block.
    u2022     Next Review Date
    If a customer has a credit limit of 1000 USD, and you would like to restrict this credit limit only to be available in current month (say March). If the document date is in April then the credit limit is zero.
    You can use the "NextReview date" and "Number of days" fields and combined it with the "Last int.review" field in customer credit master "Status" view (FD32).
    VOKR - Display of work list for credit management (configure the display variant)
    SIMPLE CREDIT CHECK:
    Tr.Code - FD32
    It Considers the Doc.Value + Open Items.
    Doc.Value: Sales Order has been saved but not delivered
    Open Item: Sales Order has been saved, Delivered, Billed & Transferred to FI, but not received the payment from the customer.
    Eg: Customer Credit Limit is Rs.1, 00,000/-
    Suppose Doc.Value + Open Item Value is Rs.1,10,000/-
    Here credit limit exceeds then system reacts.
    Options: A) Warning Message
    B) Error Message (Sales Order won't be saved)
    C) Error Message with Delivery Block
    AUTOMATIC CREDIT CHECK: Give extra credit facilities to the particular customer.
    STATIC CREDIT LIMIT DETERMINATION: Checking Group + Risk Category + Credit Control Area.
    A) Credit Checking Groups: Types of Checking Groups.
    01) Sales
    02) Deliveries
    03) Goods Issue
    At all the above 3 levels orders can be blocked.
    B) Risk Category: Based on the risk Categories Company decides how much credit has to give to the customer.
    HIGH RISK (0001) :      LOW CREDIT
    LOW RISK (0002) :      MORE CREDIT
    MEDIUM RISK(0003): AVERAGE CREDIT
    Static Credit Check it checks all these doc value & check with the credit limit
    1) Open Doc.Value / Sales Order Value: Which is save but not delivered
    2) Open Delivery Doc.Value: Which is delivered but not billed
    3) Open Billing Doc.Value: Which is billed but not posted to FI
    4) Open Item: Which is transferred to FI but not received from the customer.
    DYNAMIC CREDIT CHECK:
    1) Open Doc
    2) Open Delivery
    3) Open Billing
    4) Open Items
    5) Horizon Period = Eg.3Months
    Here the System will not consider the above 1,2,3& 4 values for the last 3 months
    Then assign the Sales Doc & Del Documents.
    Sales Doc.Type(OR) + credit Check (0) + Credit Group (01)
    Credit Limit Check for Delivery Type : Del.Type (LF) + Del Credit
    Group (02) + Goods Issue Credit Group (03)
    User Exits For Credit Checks And Risk Management
    Credit Check
    I hope this will resolve your issue
    Thanks
    Anil Hooda

  • How does message determination work?

    Hello,
    I should print an consignment settlement with MRKO. How can I define different output type for different company? I guess I should search the solution in SPRO Material management - Logistics Invoice Verification - Message determination but I did not find the right way. Could anybody help me? Thank you in advance.

    you can make the different ouput types for each company in nace.
    nace is transaction code.
    Regards
    Maqsood

  • Message Determination for GRN again

    Hello seniors,
       I had configured Output Determination for GRN, it was working fine for a GRN. When i try for next GRN, it is not working. Why is it so, do i need configure any more thing ?
    Regards,
    JanaMM

    Hello manish,
    I have done configuation of message determination for GRN by this
    1. Maintain the Printer Name in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    2. Ensured in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for GI/Transfer Posting Documents
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the foll:
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Pr Det by Pl/StoLoc, maintain the Output device for all your Plants
    7. In MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.(Condition records)
    8. While doing MIGO, ensured that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    Now go to MB90 enter the output type as WE01, Tr m as 1, Sort or. 01, Pro.mode as 01, and executed. System outputted all the material documents that has to be taken print out.
    BUt after this i did a grn and tried to take prinout in MB90, it is not showing. It is just telling " No messages exist for intial processing". I tried with 2 in processing mode, but still it is showing tha same.  But it was workng fine for first time. Even now if i check for that grn it is showing the print preview. but for new grn it is not showing. what could be the reason.
    Regards,
    JanaMM

  • Message Determination & Output Control

    Hi all,
    What Message Determination & Output Control?
    Why we use them , also what are the configuration steps in same?
    Please guide me alon with transaction codes involved in it?
    Thanks in Advance.
    Komal

    Hi Komal,
    The message determination Process is the process in which you select how you want your output.
    You go to T code "NACE" and can see which Application area is activated for which type. Eg. for PO gernally it is NEU. So you can select from here that which procedure and further which sap script or smart form as well as print driver or program is attached to that and can do amendements if desired.
    Also you can maintain what are the out put detrmination method attached to that like print, email, EDI , fax etc.
    Cheers!!
    Biren Agnihotri

Maybe you are looking for

  • Maxdb parameter file corrupt

    Hello Experts, The file system /sapdb/data was 100% full some time ago, and since then we cannot start one of the database instances anymore. When trying to start the instance it returns: dbmcli -U c_J2EE db_start ERR -11608 COMMUNIC sql03_request: w

  • System requirement for Business Object XI 3.1

    Hi, I am wondering if someone can gives us some basic information regarding the system requirement to setup the Business Object 3.1 enterprise.  We have tried 2CPU & 2GB memory in a VM environment, it ran very very slow and CPU went up 100% very easi

  • Newbie simple question

    Hi everyone, What is the difference between active and passive monitor ? Moreover, is it necessary to add an external HD to the new version of mac book pro (7200rpm HD)? I prefer mac book pro rather than mac pro because of it's mobility. Thanks in ad

  • How can I run netflix on PowerMac G5?

    Netflix is telling it requires a Mac to be Intel based. Say it's not so?

  • Can't print June 2010 Calendar from Palm Desktop

    When I try to print the month of June 2010 the page numbers start spinning rapidly as it spools to the printer.  I press cancel as the page number never seem to end.  I also notice the the Windows print spooler shows the spooled file is huge.  Usuall